CN217912123U - Civil engineering construction waste material shredding device - Google Patents

Civil engineering construction waste material shredding device Download PDF

Info

Publication number
CN217912123U
CN217912123U CN202221958110.5U CN202221958110U CN217912123U CN 217912123 U CN217912123 U CN 217912123U CN 202221958110 U CN202221958110 U CN 202221958110U CN 217912123 U CN217912123 U CN 217912123U
Authority
CN
China
Prior art keywords
cabin
rod
waste material
civil engineering
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221958110.5U
Other languages
Chinese (zh)
Inventor
王昌建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221958110.5U priority Critical patent/CN217912123U/en
Application granted granted Critical
Publication of CN217912123U publication Critical patent/CN217912123U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The utility model discloses a civil engineering construction waste material shredding device relates to waste material processing technology field, smash the cabin including the waste material, the bottom fixed mounting that cabin one side was smashed to the waste material has the material to collect the cabin, the inner wall fixed mounting of material collection cabin one side has the slip buckle rail, the slip buckle groove has been seted up on the surface of slip buckle rail, the inside demountable installation in slip buckle groove has scrap collecting box, the positive top fixed mounting of scrap collecting box has first mounting disc. Through the material collection cabin, the slip buckle rail, slip buckle groove and garbage collection box cooperate, have played the inside that utilizes garbage collection box to put into the material collection cabin and have carried out the collection of waste material disintegrating slag, have collected directly after full and dismantle, utilize garbage collection box directly to carry out the transport of material as the small handcart can, the staff need not contact with kibbling material, avoid the staff health by the potential safety hazard of fish tail.

Description

Civil engineering construction waste material shredding device
Technical Field
The utility model relates to a waste material processing technology field especially relates to a civil engineering construction waste material shredding device.
Background
The construction waste is solid waste generated in the process of building construction, reconstruction, extension or demolition of a building, and can be divided into construction waste and demolition construction waste according to different generation sources of the construction waste.
The traditional civil engineering construction waste material crushing treatment device still has the following problem when using:
after the materials are crushed, workers are required to load the crushed materials onto the carrier, and the hands or body parts of the workers can contact with metal fragments in the process, so that great potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a civil engineering construction waste material shredding device has solved the material and after smashing, needs the worker personnel to install these kibbling materials additional to the carrier, can contact metal fragment at the position of its in-process staff hand or health, has the problem of very big potential safety hazard.
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides a civil engineering construction waste material shredding device, smashes the cabin including the waste material, the bottom fixed mounting of waste material shredding cabin one side has the material collection cabin, the inner wall fixed mounting of material collection cabin one side has the slip buckle rail, slip buckle groove has been seted up on the surface of slip buckle rail, the inside demountable installation in slip buckle groove has scrap collecting box, the positive top fixed mounting of scrap collecting box has first mounting disc, one side fixed mounting of first mounting disc has the head rod, one side demountable installation of head rod has the movable rod, the fixed welding in top of movable rod one side has the shrink pole, one side demountable installation of shrink pole has flexible regulation pole, the fixed welding in top of flexible regulation pole one side has the transport handle.
Preferably, the diameter of the cross section of the telescopic adjusting rod is smaller than that of the cross section of the telescopic rod, the telescopic adjusting rod is movably sleeved with the telescopic rod, and the movable rod is movably sleeved with the first connecting rod.
Preferably, one side of the waste collecting box close to the first mounting plate is fixedly provided with a buckle block, a buckle groove is formed in the buckle block, and a communicating groove is formed in the bottom end of the waste crushing cabin.
Preferably, the connection relationship between the contraction rod and the clamping block is movable clamping.
Preferably, a second mounting disc is fixedly mounted at the top end of one side of the waste collection box, a second connecting rod is fixedly mounted at one side of the second mounting disc, a movable connecting column is movably sleeved at one side of the second connecting rod, a support steering shaft is fixedly welded at one side of the movable connecting column, and a movable wheel is detachably mounted at one side of the support steering shaft.
Preferably, the outer wall fixed mounting of cabin one side is smashed to the waste material has the motor, one side demountable installation of motor has the power shaft, one side driven connection of power shaft has the driven shaft, one side fixedly connected with of driven shaft smashes the squeeze roll.
Compared with the prior art, the utility model provides a civil engineering construction waste material shredding device has following beneficial effect:
1. the utility model provides a civil engineering construction waste material shredding device, through the material collection cabin, the slip buckle rail, slip buckle groove and garbage collection box cooperate, played the inside that utilizes garbage collection box to put into the material collection cabin and carried out the collection of waste material disintegrating slag, collected directly after full and dismantled, utilize garbage collection box directly as the small handcart carry out the transport of material can, the staff need not contact with kibbling material, avoid the staff health by the potential safety hazard of fish tail.
2. The utility model provides a civil engineering construction waste material shredding device, adopt the second mounting disc, the second connecting rod, the movable connection post, support the steering spindle and remove the wheel and cooperate, played and to have supported the steering spindle adjust to with the ground level direction, utilize to remove the wheel and install the inside in slip buckle groove, improve garbage collection box's installation effectiveness and dismantlement efficiency, after follow-up garbage collection box is full, will support the steering spindle again and adjust to with the perpendicular to the ground direction, the utilization is removed wheel contact ground and is carried out garbage collection box's transport work, improve the use variety that removes the wheel, the practicality of improving the device.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a side view of the waste collection box of the present invention;
fig. 3 is an enlarged schematic view of a portion a of fig. 2 according to the present invention;
fig. 4 is the schematic view of the internal structure of the waste material crushing cabin of the present invention.
Reference numbers in the figures: 1. a waste crushing bin; 2. a material collection chamber; 3. a sliding snap rail; 4. a sliding snap groove; 5. a waste collection tank; 6. a first mounting plate; 7. a first connecting rod; 8. a movable rod; 9. a retraction lever; 10. a telescopic adjusting rod; 11. carrying a handle; 12. a buckling block; 13. a fastening groove; 14. a communicating groove; 15. a second mounting plate; 16. a second connecting rod; 17. a movable connecting column; 18. supporting a steering shaft; 19. a moving wheel; 20. an electric motor; 21. a power shaft; 22. a driven shaft; 23. crushing the squeeze roll.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a civil engineering construction waste material shredding device, smash cabin 1 including the waste material, the bottom fixed mounting in 1 one side in the waste material crushing cabin has material collection cabin 2, the inner wall fixed mounting in 2 one sides in material collection cabin has slide buckle rail 3, slide buckle groove 4 has been seted up on the surface of slide buckle rail 3, the inside demountable installation of slide buckle groove 4 has scrap collecting box 5, the positive top fixed mounting of scrap collecting box 5 has first mounting disc 6, one side fixed mounting of first mounting disc 6 has head rod 7, one side demountable installation of head rod 7 has movable rod 8, the top fixed welding of movable rod 8 one side has shrink rod 9, one side demountable installation of shrink rod 9 has telescopic adjusting rod 10, the top fixed welding of telescopic adjusting rod 10 one side has transport handle 11, telescopic adjusting rod 10's cross section diameter is less than telescopic rod 9's cross section diameter, telescopic adjusting rod 10 and telescopic rod 9's connection are the activity and cup joint, movable rod 8 and head rod's connection are the activity and cup joint 7.
In the embodiment, through material collection cabin 2, slide buckle rail 3, slide buckle groove 4 and garbage collection box 5 cooperate, the collection that utilizes garbage collection box 5 to put into the inside of material collection cabin 2 and carry out the waste material disintegrating slag has been played, collect after full direct dismantlement, utilize garbage collection box 5 direct as the small handcart carry on the transport of material can, the staff need not contact with kibbling material, avoid the staff health by the potential safety hazard of fish tail.
Example two:
referring to fig. 1-4, based on the first embodiment, the present invention provides a technical solution: one side fixed mounting that waste collecting box 5 is close to first mounting disc 6 has buckle piece 12, buckle groove 13 has been seted up to buckle piece 12's inside, communicating groove 14 has been seted up to the bottom of the inside of waste material crushing cabin 1, the connection relation of shrink pole 9 and buckle piece 12 is the activity joint, the top fixed mounting of waste collecting box 5 one side has second mounting disc 15, one side fixed mounting of second mounting disc 15 has second connecting rod 16, movable connection post 17 has been cup jointed in one side activity of second connecting rod 16, one side fixed welding of movable connection post 17 has support steering spindle 18, one side demountable installation that supports steering spindle 18 has removal wheel 19, the outer wall fixed mounting of waste material crushing cabin 1 one side has motor 20, one side demountable installation of motor 20 has power shaft 21, one side driven connection of power shaft 21 has driven shaft 22, one side fixedly connected with of driven shaft 22 smashes squeeze roll 23.
In the embodiment, adopt second mounting disc 15, second connecting rod 16, the movable connecting column 17, support steering spindle 18 and removal wheel 19 and cooperate, played and will support steering spindle 18 and adjust to the direction with ground level, utilize the inside of removing wheel 19 installation slip buckle groove 4, improve the installation effectiveness and the dismantlement efficiency of garbage collection box 5, after follow-up garbage collection box 5 is full, will support steering spindle 18 again and adjust to the direction with ground vertically, utilize and remove wheel 19 contact ground and carry out the transport work of garbage collection box 5, improve the use variety of removing wheel 19, the practicality of improvement device.
The working principle is as follows:
through adjusting the direction to the ground level with supporting steering shaft 18, utilize and remove the inside that wheel 19 installed the slip buckle groove 4, improve the installation effectiveness and the dismantlement efficiency of garbage collection box 5, utilize motor 20 drive crushing squeeze roll 23 on garbage crushing cabin 1 both sides to rotate, smash the operation to the waste material, kibbling material gets into the inside of garbage collection box 5 through second mounting disc 15, after garbage collection box 5 is full, dismantle garbage collection box 5 from the inside of material collection cabin 2, put into another garbage collection box 5, will support steering shaft 18 again and adjust to the direction with ground vertically, utilize and remove wheel 19 contact ground to carry out the transport work of garbage collection box 5, shrink rod 9 can be taken out from the inside of buckle groove 13, through the adjustable angle of movable rod 8, simultaneously telescopic adjusting rod 10 can adjust length, it can to carry out the transport of dragging of garbage collection box 5 with carrying handle 11.

Claims (6)

1. The utility model provides a civil engineering construction waste material shredding device, includes waste material crushing cabin (1), the bottom fixed mounting of waste material crushing cabin (1) one side has material collection cabin (2), its characterized in that: the inner wall fixed mounting of material collection cabin (2) one side has slide buckle rail (3), slide buckle groove (4) have been seted up on the surface of slide buckle rail (3), the inside demountable installation of slide buckle groove (4) has garbage collection box (5), the positive top fixed mounting of garbage collection box (5) has first mounting disc (6), one side fixed mounting of first mounting disc (6) has head rod (7), one side demountable installation of head rod (7) has movable rod (8), the fixed welding in top of movable rod (8) one side has shrink pole (9), one side demountable installation of shrink pole (9) has telescopic adjusting pole (10), the fixed welding in top of telescopic adjusting pole (10) one side has transport handle (11).
2. The civil engineering construction waste crushing treatment device as claimed in claim 1, characterized in that the diameter of the cross section of the telescopic adjusting rod (10) is smaller than that of the telescopic rod (9), the connection relationship between the telescopic adjusting rod (10) and the telescopic rod (9) is a movable sleeve joint, and the connection relationship between the movable rod (8) and the first connecting rod (7) is a movable sleeve joint.
3. The civil engineering construction waste crushing treatment device as claimed in claim 1, wherein the waste collection box (5) is fixedly provided with a buckle block (12) at one side close to the first mounting plate (6), a buckle groove (13) is formed in the buckle block (12), and a communication groove (14) is formed in the bottom end of the interior of the waste crushing cabin (1).
4. The civil engineering construction waste comminution treatment device of claim 3, characterized in that the connection of shrink rod (9) and snap-in block (12) is a movable snap-in.
5. The civil engineering construction waste crushing treatment device as claimed in claim 1, wherein a second mounting disc (15) is fixedly mounted at the top end of one side of the waste collection box (5), a second connecting rod (16) is fixedly mounted at one side of the second mounting disc (15), a movable connecting column (17) is movably sleeved at one side of the second connecting rod (16), a support steering shaft (18) is fixedly welded at one side of the movable connecting column (17), and a moving wheel (19) is detachably mounted at one side of the support steering shaft (18).
6. The civil engineering construction waste crushing treatment device as claimed in claim 1, wherein the outer wall of one side of the waste crushing cabin (1) is fixedly provided with an electric motor (20), one side of the electric motor (20) is detachably provided with a power shaft (21), one side of the power shaft (21) is in driven connection with a driven shaft (22), and one side of the driven shaft (22) is fixedly connected with a crushing squeezing roller (23).
CN202221958110.5U 2022-07-27 2022-07-27 Civil engineering construction waste material shredding device Active CN217912123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221958110.5U CN217912123U (en) 2022-07-27 2022-07-27 Civil engineering construction waste material shredding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221958110.5U CN217912123U (en) 2022-07-27 2022-07-27 Civil engineering construction waste material shredding device

Publications (1)

Publication Number Publication Date
CN217912123U true CN217912123U (en) 2022-11-29

Family

ID=84149694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221958110.5U Active CN217912123U (en) 2022-07-27 2022-07-27 Civil engineering construction waste material shredding device

Country Status (1)

Country Link
CN (1) CN217912123U (en)

Similar Documents

Publication Publication Date Title
CN206796246U (en) A kind of dust-proof cutter device of stone material
CN114345455A (en) Waste recovery device for building engineering
CN217912123U (en) Civil engineering construction waste material shredding device
CN213142738U (en) Safe and environment-friendly concrete pavement grinding machine
CN212820156U (en) Environment-friendly discarded object reducing mechanism for construction
CN211887084U (en) Building rubbish breaker for building engineering
CN213886523U (en) Crushing device with anti-splashing structure for treating environment-friendly material solid waste
CN213321009U (en) Novel scabbling device
CN214086037U (en) Garbage pool for building
CN211801187U (en) Civil engineering construction waste treatment device
CN212284133U (en) Waste battery handles selection by winnowing crushing apparatus
CN212000807U (en) Waste residue recovery unit for highway construction
CN212882761U (en) Recovery unit is smashed to carton
CN211436506U (en) Novel electron science and technology is breakage for product device
CN109723235B (en) Automatic breaker that multi-angle was adjusted for building site
CN215758775U (en) Hand propelled scum collection device
CN206986694U (en) Pavement breaking device is used in a kind of novel road construction
CN220388778U (en) Hydraulic shear waste collection device
CN213415300U (en) Traffic engineering is garbage collection processing apparatus for highway construction
CN215087986U (en) Building industry solid waste processingequipment
CN214288442U (en) Waste steel class rubbish recovery breaker
CN213762268U (en) Steel structural plate crushed aggregates collection device
CN216706136U (en) Cutting equipment for plate processing
CN213050966U (en) Traditional Chinese medicine processing and grinding device
CN217288724U (en) Environment-friendly building material shredding equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant