CN217897482U - Building construction rail guard - Google Patents

Building construction rail guard Download PDF

Info

Publication number
CN217897482U
CN217897482U CN202222371237.3U CN202222371237U CN217897482U CN 217897482 U CN217897482 U CN 217897482U CN 202222371237 U CN202222371237 U CN 202222371237U CN 217897482 U CN217897482 U CN 217897482U
Authority
CN
China
Prior art keywords
groove
plate
splicing
moving
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222371237.3U
Other languages
Chinese (zh)
Inventor
林金华
林士青
杨永杰
吴晓文
胡建革
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xintai Engineering Construction Co ltd
Original Assignee
Zhejiang Xintai Engineering Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xintai Engineering Construction Co ltd filed Critical Zhejiang Xintai Engineering Construction Co ltd
Priority to CN202222371237.3U priority Critical patent/CN217897482U/en
Application granted granted Critical
Publication of CN217897482U publication Critical patent/CN217897482U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a construction rail guard is built in room, include rail guard main part and the concatenation part that is used for carrying out a plurality of rail guard main parts and connects, concatenation part is including the concatenation piece of locating rail guard main part one side, set up the splice groove at concatenation piece top, locate the splice plate of rail guard main part opposite side, set up the chamber that holds in the splice plate, locate the movable block that holds the intracavity, locate the rake of movable block one side, set up the shifting chute on the rake, locate the movable plate in the shifting chute, locate the kelly of movable plate one side, set up the opening that holds chamber one side, set up the draw-in groove of one side in the splice groove, the utility model discloses a set up rail guard main part, concatenation piece, splice groove, solved current rail guard and can blockked the construction place to the room, can prevent that personnel from getting into at will, but when using, be not convenient for the concatenation, lead to the connectivity general, the practicality is not enough, can not satisfy the problem of user's demand.

Description

Building construction protective fence
Technical Field
The utility model belongs to the technical field of the construction protection is built in the room, especially, relate to a construction rail guard is built in room.
Background
The house building construction refers to house building engineering, and refers to various house buildings and auxiliary facilities thereof, and lines, pipelines, equipment installation engineering and indoor and outdoor decoration engineering matched with the house buildings, and a guard rail is required to surround a construction site before construction so as to prevent construction articles from being lost.
Present patent CN210768127U discloses a novel construction rail guard is built in room, its structure includes the base, the guard plate, reflection of light strip, show board and dust strike off the mechanism, this novel construction rail guard is built in room has set up the dust through inside the guard plate and has struck off the mechanism, when show board front end dust is too much, pull rod downward pulling makes the steady downstream of scraping the strip scrape off the dust on show board surface, make the dust fall into and collect the dirt groove, and the slide bar drives the push pedal and releases the processing with the dust at the inslot horizontal slip that gathers dust simultaneously, it often flies upward to have solved loess dust in the building site, the adhesion can make the visibility reduce in show board department, and be difficult to clear up, can't watch the building information can make whole attention degree gliding, and the problem of harm enterprise's image, reach the effect of being convenient for the clearance.
Based on the retrieval of above-mentioned patent to and combine the rail guard discovery among the prior art, above-mentioned rail guard can be built the construction site to the room when using and stops, can prevent that personnel from getting into at will, but its concatenation not convenient to when using leads to connecting the steadiness general, and the practicality is not enough, can not satisfy user's demand.
SUMMERY OF THE UTILITY MODEL
Problem to prior art exists, the utility model provides a construction rail guard is built in room possesses can be convenient splices a plurality of rail guard main parts, can fix the rail guard main part after the concatenation, can improve the advantage of connecting the steadiness, solved current rail guard and can build the construction place to the room and block, can prevent that personnel from getting into at will, but its when using, the concatenation of being not convenient for leads to connecting the steadiness general, the practicality is not enough, can not satisfy the problem of user's demand.
The utility model discloses a realize like this, a construction rail guard is built in room, include the rail guard main part and be used for carrying out the concatenation part connected a plurality of rail guard main parts, concatenation part including the concatenation piece of locating rail guard main part one side, set up the concatenation groove at concatenation piece top, locate the splice plate of rail guard main part opposite side, set up the chamber that holds in the splice plate, locate the movable block that holds the intracavity, locate the rake of movable block one side, set up the shifting chute on the rake, locate the movable plate in the shifting chute, locate the kelly of movable plate one side, set up the opening that holds chamber one side, set up the draw-in groove of one side in the concatenation groove and be used for the driver part that the movable block removed, movable plate and shifting chute sliding connection, the kelly respectively with opening and draw-in groove sliding connection, the splice plate is the L type.
As the utility model discloses preferred, the first spring in the push rod outside is located including the push rod of locating the movable block top, the push pedal of locating the push rod top and cover to the drive part, the push rod run through hold the chamber and with splice plate sliding connection.
As the utility model discloses preferred, it has seted up the stabilisation groove to hold intracavity one side, movable block one side is equipped with the steady piece, steady piece and stabilisation groove sliding connection.
As the utility model discloses it is preferred, the rail guard main part back is equipped with the mounting panel, set up threaded hole on the mounting panel, the mounting panel slope sets up.
As the utility model discloses it is preferred, it is equipped with the second spring to stabilize the piece bottom, second spring both ends respectively with stabilize piece bottom and stabilize inslot bottom fixed connection.
As the utility model discloses it is preferred, rail guard main part one side just is located splice piece below and is equipped with a plurality of first guardrails of align to grid, rail guard main part opposite side just is located splice plate top and is equipped with a plurality of second guardrails of align to grid.
As the utility model discloses preferred, the splice plate is the L type.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the rail guard main part, the splice block, the splice groove, the splice plate, hold the chamber, the movable block, the rake, the shifting chute, the movable plate, the kelly, the opening, draw-in groove and driver part's cooperation is used, movable plate and shifting chute sliding connection, the kelly respectively with opening and draw-in groove sliding connection, the splice plate is the L type, can be convenient splice a plurality of rail guard main parts, can fix the rail guard main part after the concatenation, can improve the connection steadiness, it can block the building construction place to the room to have solved current rail guard, can prevent that personnel from getting into at will, but it is when using, be not convenient for splice, it is general to lead to connecting the steadiness, the practicality is not enough, can not satisfy the problem of user's demand.
2. The utility model discloses a set up push rod, push pedal and first spring, the push rod run through hold the chamber and with splice plate sliding connection, promote the push pedal and can drive the push rod and move down, the push rod moves down and can make first spring deformation, can promote the movable block simultaneously and move down, the movable block moves down and drives the movable plate and slide in the shifting chute, the movable plate removes and drives the kelly and remove, the kelly of being convenient for breaks away from the draw-in groove, is convenient for dismantle the rail guard main part after the concatenation.
3. The utility model discloses a set up stable groove and stable piece, stable piece and stable groove sliding connection can lead reciprocating of movable block, can improve the stability that the movable block removed, prevent that the movable block from removing the skew appears.
4. The utility model discloses a set up mounting panel and screw hole, the mounting panel slope sets up, can install the rail guard main part through bolt and screw hole fixedly, improves the stability that the rail guard main part used.
5. The utility model discloses a set up the second spring, second spring both ends respectively with stabilize piece bottom and the bottom fixed connection in the stable trough, can improve the effect that resets to the movable block, and then can guarantee the effect that resets of kelly.
6. The utility model discloses a set up first guardrail and second guardrail, can improve the protecting effect, prevent that personnel from entering into the job site.
7. The utility model discloses a set up the splice plate and be the L type, can be convenient for the splice plate card go into the splice groove in, be convenient for fix the rail guard main part after the concatenation.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a left side sectional view provided by an embodiment of the present invention;
fig. 3 is an enlarged view of a point a in fig. 2 according to an embodiment of the present invention.
In the figure: 1. a guard rail main body; 21. splicing blocks; 22. splicing grooves; 23. splicing plates; 24. an accommodating chamber; 25. a moving block; 26. an inclined portion; 27. a moving groove; 28. moving the plate; 29. a clamping rod; 30. a port; 31. a card slot; 32. a push rod; 33. pushing the plate; 34. a first spring; 35. a stabilizing slot; 36. a stabilization block; 37. mounting a plate; 38. a threaded hole; 39. a second spring; 40. a first guardrail; 41. a second guardrail.
Detailed Description
For further understanding the contents, features and effects of the present invention, the following embodiments will be illustrated in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 3, an embodiment of the present invention provides a building construction protective guard, including a protective guard main body 1 and a splicing component for connecting a plurality of protective guard main bodies 1, where the splicing component includes a splicing block 21 disposed on one side of the protective guard main body 1, a splicing groove 22 disposed on the top of the splicing block 21, a splicing plate 23 disposed on the other side of the protective guard main body 1, a containing cavity 24 disposed in the splicing plate 23, a moving block 25 disposed in the containing cavity 24, an inclined portion 26 disposed on one side of the moving block 25, a moving groove 27 disposed on the inclined portion 26, a moving plate 28 disposed in the moving groove 27, a clamping rod 29 disposed on one side of the moving plate 28, an opening 30 disposed on one side of the containing cavity 24, a clamping groove 31 disposed on one side of the splicing groove 22, and a driving component for moving the moving block 25 to move, where the moving plate 28 and the moving groove 27 are slidably connected, and the clamping rod 29 is slidably connected with the clamping groove 30 and the clamping groove 31, respectively.
Referring to fig. 3, the driving part includes a push rod 32 disposed at the top of the moving block 25, a push plate 33 disposed at the top of the push rod 32, and a first spring 34 sleeved outside the push rod 32, and the push rod 32 penetrates through the accommodating cavity 24 and is slidably connected to the splice plate 23.
The scheme is adopted: through setting up push rod 32, push pedal 33 and first spring 34, push rod 32 runs through and holds chamber 24 and with splice plate 23 sliding connection, and it can drive push rod 32 to promote push pedal 33 and move down, and push rod 32 moves down and can make first spring 34 deform, can promote the movable block 25 to move down simultaneously, and movable block 25 moves down and drives movable plate 28 and slide in shifting chute 27, and movable plate 28 removes and drives kelly 29 and remove, is convenient for kelly 29 to break away from draw-in groove 31, is convenient for dismantle the rail guard main part 1 after the concatenation.
Referring to fig. 3, a stabilizing groove 35 is formed in one side of the accommodating cavity 24, a stabilizing block 36 is arranged on one side of the moving block 25, and the stabilizing block 36 is slidably connected with the stabilizing groove 35.
Adopt above-mentioned scheme: by providing the stabilizing groove 35 and the stabilizing block 36, the stabilizing block 36 is slidably connected to the stabilizing groove 35, so that the up-and-down movement of the moving block 25 can be guided, the stability of the movement of the moving block 25 can be improved, and the moving block 25 can be prevented from moving and deviating.
Referring to fig. 1, a mounting plate 37 is disposed on a back surface of the guard rail main body 1, a threaded hole 38 is formed in the mounting plate 37, and the mounting plate 37 is disposed in an inclined manner.
Adopt above-mentioned scheme: by providing the mounting plate 37 and the screw hole 38 and inclining the mounting plate 37, the guard rail main body 1 can be mounted and fixed by the bolt and the screw hole 38, and the stability of the use of the guard rail main body 1 is improved.
Referring to fig. 3, a second spring 39 is arranged at the bottom of the stabilizing block 36, and two ends of the second spring 39 are fixedly connected with the bottom of the stabilizing block 36 and the bottom of the stabilizing groove 35, respectively.
Adopt above-mentioned scheme: through the second spring 39, the two ends of the second spring 39 are respectively fixedly connected with the bottom of the stabilizing block 36 and the bottom of the stabilizing groove 35, so that the reset effect of the moving block 25 can be improved, and the reset effect of the clamping rod 29 can be further ensured.
Referring to fig. 2, a plurality of first guard rails 40 are uniformly arranged on one side of the guard rail main body 1 below the splicing block 21, and a plurality of second guard rails 41 are uniformly arranged on the other side of the guard rail main body 1 above the splicing block 23.
Adopt above-mentioned scheme: through setting up first guardrail 40 and second guardrail 41, can improve the safeguard effect, prevent that personnel from entering into the job site.
Referring to fig. 3, the splice plate 23 is L-shaped.
Adopt above-mentioned scheme: the splicing plates 23 are arranged to be L-shaped, so that the splicing plates 23 can be conveniently clamped into the splicing grooves 22, and the spliced protective guard main body 1 can be conveniently fixed.
The utility model discloses a theory of operation:
when the combined type guardrail is used, the splicing plate 23 on one side of one guardrail main body 1 is aligned with the splicing groove 22 on one side of the other guardrail main body 1, then the pushing plate 33 is pushed, the pushing plate 33 can drive the pushing rod 32 to move downwards, the pushing rod 32 can move downwards to enable the first spring 34 to deform, meanwhile, the moving block 25 can be pushed to move downwards, the moving block 25 moves downwards to drive the moving plate 28 to slide in the moving groove 27, meanwhile, the stabilizing block 36 moves downwards to enable the second spring 39 to deform, the moving plate 28 moves to drive the clamping rod 29 to move, then, the splicing plate 23 is placed in the splicing groove 22, then, the pushing plate 33 is loosened, the first spring 34 and the second spring 39 reset to drive the moving block 25 to reset, further, the clamping rod 29 is driven to be clamped into the moving plate 31, the spliced guardrail main body 1 is fixed, connection stability is improved, and then, the guardrail main body 1 can be stably fixed through the bolts and the threaded holes 38 to prevent toppling.
In summary, the following steps: this construction rail guard is built in room, through setting up rail guard main part 1, splice 21, splice 22, splice 23, hold chamber 24, movable block 25, slope 26, shift 27, movable plate 28, kelly 29, opening 30, draw-in groove 31, push rod 32, push pedal 33, first spring 34, stabilizing slot 35, stabilizing block 36, mounting panel 37, screw hole 38, second spring 39, first guardrail 40 and second guardrail 41, it can block the room construction place to have solved current rail guard, can prevent that personnel from getting into at will, but it is when using, the concatenation of being not convenient for, lead to connecting the steadiness generally, the practicality is not enough, can not satisfy the problem of user's demand.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a building construction rail guard, includes rail guard main part (1) and is used for carrying out the piecing together part that connects a plurality of rail guard main parts (1), its characterized in that: the splicing component comprises a splicing block (21) arranged on one side of the guard rail main body (1), a splicing groove (22) formed in the top of the splicing block (21), a splicing plate (23) arranged on the other side of the guard rail main body (1), a containing cavity (24) formed in the splicing plate (23), a moving block (25) formed in the containing cavity (24), an inclined portion (26) formed on one side of the moving block (25), a moving groove (27) formed in the inclined portion (26), a moving plate (28) formed in the moving groove (27), a clamping rod (29) formed on one side of the moving plate (28), an opening (30) formed in one side of the containing cavity (24), a clamping groove (31) formed in one side of the splicing groove (22) and a driving component used for moving the moving block (25), the moving plate (28) is in sliding connection with the moving groove (27), and the clamping rod (29) is in sliding connection with the opening (30) and the clamping groove (31) respectively.
2. The building construction protective guard of claim 1, characterized in that: the driving part comprises a push rod (32) arranged at the top of the moving block (25), a push plate (33) arranged at the top of the push rod (32) and a first spring (34) sleeved on the outer side of the push rod (32), and the push rod (32) penetrates through the accommodating cavity (24) and is in sliding connection with the splicing plate (23).
3. The building construction protective guard of claim 1, characterized in that: a stabilizing groove (35) is formed in one side in the accommodating cavity (24), a stabilizing block (36) is arranged on one side of the moving block (25), and the stabilizing block (36) is connected with the stabilizing groove (35) in a sliding mode.
4. The building construction protective guard of claim 1, characterized in that: the protective guard is characterized in that a mounting plate (37) is arranged on the back of the protective guard main body (1), a threaded hole (38) is formed in the mounting plate (37), and the mounting plate (37) is obliquely arranged.
5. The building construction protective guard of claim 3, wherein: the bottom of the stabilizing block (36) is provided with a second spring (39), and two ends of the second spring (39) are fixedly connected with the bottom of the stabilizing block (36) and the bottom of the stabilizing groove (35) respectively.
6. The building construction protective guard of claim 1, wherein: a plurality of first guardrails (40) which are uniformly arranged are arranged on one side of the protective guard main body (1) and below the splicing blocks (21), and a plurality of second guardrails (41) which are uniformly arranged are arranged on the other side of the protective guard main body (1) and above the splicing plates (23).
7. The building construction protective guard of claim 1, characterized in that: the splice plate (23) is L-shaped.
CN202222371237.3U 2022-09-07 2022-09-07 Building construction rail guard Active CN217897482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222371237.3U CN217897482U (en) 2022-09-07 2022-09-07 Building construction rail guard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222371237.3U CN217897482U (en) 2022-09-07 2022-09-07 Building construction rail guard

Publications (1)

Publication Number Publication Date
CN217897482U true CN217897482U (en) 2022-11-25

Family

ID=84107485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222371237.3U Active CN217897482U (en) 2022-09-07 2022-09-07 Building construction rail guard

Country Status (1)

Country Link
CN (1) CN217897482U (en)

Similar Documents

Publication Publication Date Title
CN217897482U (en) Building construction rail guard
CN210195452U (en) Construction enclosure
CN109377899B (en) LED display screen with maintenance mechanism around module
CN110933524B (en) Installation device of repeater
CN213654440U (en) Fixed rail guard for construction
CN218324261U (en) Fender is enclosed with engineering that has altitude mixture control structure to house municipal administration
CN217441490U (en) Combined curtain wall vertical face floodlighting structure
CN212748643U (en) Raise dust detection device for construction
CN219753771U (en) Building decoration decorative board structure
CN212273281U (en) Dust device for construction
CN216892972U (en) Combined member of assembled building wallboard and frame
CN215210466U (en) Full-hydraulic cantilever type mobile trestle with good stability
CN216355299U (en) Lightning receptor installed on support rod
CN211629960U (en) Safety device for construction
CN217353084U (en) Large glass mounting structure
CN215368839U (en) Novel quick installation mechanism of ground protection shield for fitment
CN218509880U (en) Combined liquid crystal display screen auxiliary positioning assembly
CN220749508U (en) Screen body installation protection structure for information advertisement machine
CN215406121U (en) Be used for domatic soil erosion and water loss protective structure of soil property side slope
CN215291836U (en) Fence is kept apart with quick concatenation type to municipal works
CN220021902U (en) Fixing mechanism of lightning receiving base
CN219688375U (en) Lifting mechanism for assembling fiber cement composite wallboard
CN214621160U (en) Auxiliary tool for aerial photogrammetry of homeland resources
CN220705705U (en) Shield constructs quick-witted scraper protection seat
CN221105428U (en) Assembly type building curtain wall exhibition and sales frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant