CN217897166U - Energy-saving efficient construction plastering device for green building engineering - Google Patents

Energy-saving efficient construction plastering device for green building engineering Download PDF

Info

Publication number
CN217897166U
CN217897166U CN202220833517.9U CN202220833517U CN217897166U CN 217897166 U CN217897166 U CN 217897166U CN 202220833517 U CN202220833517 U CN 202220833517U CN 217897166 U CN217897166 U CN 217897166U
Authority
CN
China
Prior art keywords
mud
plastering
energy
base
efficient construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220833517.9U
Other languages
Chinese (zh)
Inventor
陈诚
肖龙
彭创
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Format Coating Engineering Co ltd
Original Assignee
Wuhan Format Coating Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Format Coating Engineering Co ltd filed Critical Wuhan Format Coating Engineering Co ltd
Priority to CN202220833517.9U priority Critical patent/CN217897166U/en
Application granted granted Critical
Publication of CN217897166U publication Critical patent/CN217897166U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mixers Of The Rotary Stirring Type (AREA)

Abstract

The utility model relates to a building engineering field especially relates to a green building engineering is with energy-saving high-efficient construction plastering unit. Green for building engineering energy-saving high-efficient construction plastering unit includes the base, deposits mud box and backup pad, the upper surface of base is connected with through elevating system and deposits the mud box to the rear end face of depositing the mud box is connected with the mechanism of plastering, the mechanism of plastering is including taking out dredge pump, roller brush, axis of rotation and spouting the mud pipe, the rear end face of depositing the mud box has seted up the plastering groove. The utility model discloses a thereby the mechanism of plastering can carry out the operation of plastering fast to the wall, the efficiency of plastering has not only been promoted, and make the mud on wall surface more even, when using, the mud pump carries out work, thereby will deposit the mud of mud incasement and spout through spouting the mud pipe, thereby fall into the surface of roller brush, under elevating system's work, thereby paint the wall with the mud on the roller brush, the waste to manpower resources has been reduced, and make mud paint more even.

Description

Energy-saving efficient construction plastering device for green building engineering
Technical Field
The utility model relates to a building engineering field especially relates to a green building engineering is with energy-saving high-efficient construction plastering unit.
Background
The building engineering, which is a part of the construction engineering, refers to the engineering formed by the construction of various building-related auxiliary facilities and the installation activities of matched lines, pipelines and equipment, and meets the requirements of production, residence, study, public activities and the like of citizens.
When carrying out the building decoration, need plaster the operation to the wall to reach protection basic unit and increase pleasing to the eye effect, nevertheless when plastering, generally plaster by the manual work, not only efficiency is lower, and leads to very easily that the thickness that plasters is inhomogeneous, causes the waste.
Therefore, there is a need to provide a new energy-saving efficient construction plastering apparatus for green construction engineering to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a green building engineering is with energy-saving high-efficient construction plastering unit.
The utility model provides a green building engineering is with energy-saving high-efficient construction plastering unit includes: base, deposit mud case and backup pad, the upper surface of base is connected with through elevating system and deposits the mud case to the rear end face of depositing the mud case is connected with the mechanism of plastering, the mechanism of plastering includes mud pump, roller brush, axis of rotation and spouts the mud pipe, the rear end face of depositing the mud case has seted up the mud groove to rotate between the both sides inner wall in mud groove and be connected with two evenly distributed's axis of rotation, and the outer fixed surface cover of axis of rotation is equipped with the roller brush, the last fixed surface who deposits the mud case installs the mud pump, and the feed end of mud pump extends to the inside bottom of depositing the mud case, and the discharge end of mud pump passes through the hose and spouts the fixed intercommunication of mud pipe, and spouts mud pipe fixed connection at the rear end face of depositing the mud case, and deposit the incasement and be equipped with rabbling mechanism, elevating system's top is connected with the backup pad.
Preferably, elevating system includes threaded rod and slide bar, the both ends of threaded rod rotate with backup pad and base respectively and are connected, and the bottom of threaded rod runs through the inner wall of base and passes through shaft coupling fixed connection with the output of the rotation motor in it, the both ends of slide bar respectively with backup pad and base fixed connection, and deposit mud case and slide bar sliding connection, deposit mud case and threaded rod threaded connection.
Preferably, the outer end face of the sludge storage box is provided with an observation port, and the observation port is fixedly and hermetically connected with an observation window.
Preferably, locking universal wheels are installed at four corners of the lower surface of the base.
Preferably, a rubber pad is fixedly adhered to the upper surface of the supporting plate.
Preferably, the rabbling mechanism includes driving motor, (mixing) shaft and stirring leaf, it is connected with the (mixing) shaft to rotate between the both sides inner wall of mud case to deposit, the outside fixedly connected with stirring leaf of (mixing) shaft to deposit mud case one side fixed mounting have driving motor, driving motor's output runs through the inner wall of depositing the mud case and through shaft coupling and (mixing) shaft fixed connection.
Preferably, a leakage receiving box is placed on the upper surface of the base.
Preferably, the lower surface of the leakage receiving box is fixedly connected with a plurality of inserting rods, the upper surface of the base is provided with a plurality of inserting grooves matched with the inserting rods, and the inserting rods are inserted into the inserting grooves.
Compared with the prior art, the utility model provides a green building engineering is with energy-saving high-efficient construction plastering apparatus has following beneficial effect:
1. the utility model discloses a thereby the mechanism of plastering can carry out the operation of plastering fast to the wall, the efficiency of plastering has not only been promoted, and make the mud on wall surface more even, when using, the mud pump carries out work, thereby will deposit the mud of mud incasement and spout through spouting the mud pipe, thereby fall into the surface of roller brush, under elevating system's work, thereby paint the wall with the mud on the roller brush, the waste to manpower resources has been reduced, and make mud paint more even.
2. The utility model discloses a thereby connect the hourglass box can catch the mud that drops, avoid it directly to fall into on the ground, not only reduced the pollution to the surrounding environment, and can carry out recycle, more energy-concerving and environment-protective to mud.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of the energy-saving efficient construction plastering device for green construction engineering provided by the present invention;
FIG. 2 is a schematic structural view of a stirring shaft and stirring blades in the present invention;
fig. 3 is a schematic structural view of the rear end face of the mud storage box of the present invention.
Reference numbers in the figures: 1. a base; 2. a leakage receiving box; 3. a slide bar; 4. a sludge storage box; 5. a mud pump; 6. a rubber pad; 7. a support plate; 8. an observation window; 9. a threaded rod; 10. locking the universal wheel; 11. a mud spraying pipe; 12. a mud smearing groove; 13. roller brushing; 14. a rotating shaft; 15. a drive motor; 16. a stirring shaft; 17. stirring the leaves.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The following detailed description is provided for the specific embodiments of the present invention.
Referring to fig. 1 to 3, an embodiment of the present invention provides an energy-saving efficient construction plastering apparatus for green building engineering, including: base 1, deposit mud case 4 and backup pad 7.
Referring to fig. 1 and 3, the upper surface of the base 1 is connected with a mud storage tank 4 through a lifting mechanism, and the rear end surface of the mud storage tank 4 is connected with a plastering mechanism, the plastering mechanism includes a mud pump 5, a roller brush 13, a rotating shaft 14 and a mud spraying pipe 11, the rear end surface of the mud storage tank 4 is provided with a mud smearing groove 12, two rotating shafts 14 which are uniformly distributed are rotatably connected between the inner walls of the two sides of the mud smearing groove 12, the outer end surface of the rotating shaft 14 is fixedly sleeved with the roller brush 13, the upper surface of the mud storage tank 4 is fixedly provided with the mud pump 5, the feeding end of the mud pump 5 extends to the inner bottom end of the mud storage tank 4, the discharging end of the mud pump 5 is fixedly communicated with the mud spraying pipe 11 through a hose, and the mud spraying pipe 11 is fixedly connected to the rear end surface of the mud storage tank 4.
It should be noted that thereby can carry out the operation of plastering fast to the wall through the mechanism of plastering, the efficiency of plastering has not only been promoted, and make the mud on wall surface more even, when using, the mud pump 5 carries out work, thereby will deposit the mud in the mud case 4 and spout through mud spray pipe 11, thereby fall into the surface of roller brush 13, under elevating system's work, thereby paint the wall with the mud on the roller brush 13, the waste to manpower resources has been reduced, and make the mud of paining more even.
Referring to fig. 1, the lifting mechanism includes a threaded rod 9 and a sliding rod 3, two ends of the threaded rod 9 are rotatably connected with the supporting plate 7 and the base 1 respectively, a bottom end of the threaded rod 9 penetrates through an inner wall of the base 1 and is fixedly connected with an output end of a rotating motor (not specifically shown in the figure) inside the base through a coupler, two ends of the sliding rod 3 are fixedly connected with the supporting plate 7 and the base 1 respectively, the sludge storage tank 4 is slidably connected with the sliding rod 3, and the sludge storage tank 4 is in threaded connection with the threaded rod 9.
It should be noted that thereby utilize elevating system can be so that deposit mud box 4 round trip movement in vertical direction, and then make the mud of wall more even, at the during operation, the rotation motor drives threaded rod 9 and takes place to rotate, and owing to deposit mud box 4 and 9 threaded connection of threaded rod, and then can make deposit mud box 4 and remove in vertical direction, reach the effect of plastering.
Please refer to fig. 1 and fig. 2, a stirring mechanism is arranged in the sludge storage tank 4, the stirring mechanism includes a driving motor 15, a stirring shaft 16 and a stirring blade 17, the stirring shaft 16 is rotatably connected between the inner walls of the two sides of the sludge storage tank 4, the stirring blade 17 is fixedly connected to the outer side of the stirring shaft 16, the driving motor 15 is fixedly mounted on one side of the sludge storage tank 4, the output end of the driving motor 15 penetrates through the inner wall of the sludge storage tank 4 and is fixedly connected with the stirring shaft 16 through a shaft coupling, an observation window is opened on the outer end face of the sludge storage tank 4, and the observation window 8 is fixedly and hermetically connected to the observation window.
It should be noted that thereby can make the continuous rolling of mud in depositing mud box 4 through rabbling mechanism, reduce its possibility of solidifying, and make between the mud mix more evenly, promote the effect of plastering, when carrying out work, driving motor 15 carries out work to drive stirring leaf 17 through (mixing) shaft 16 and take place to rotate, and then reached the effect of stirring mud.
Referring to fig. 1, a supporting plate 7 is connected to the top end of the lifting mechanism, a rubber pad 6 is fixedly adhered to the upper surface of the supporting plate 7, when the supporting plate 7 contacts with a wall top, the rubber pad 6 is used for increasing the friction force of the device, so that the stability of the device is improved, and the four corners of the lower surface of the base 1 are provided with the locking universal wheels 10, so that the device is convenient to move, and the flexibility of the device is improved.
Referring to fig. 1, a leakage receiving box 2 is placed on the upper surface of a base 1, a plurality of insertion rods are fixedly connected to the lower surface of the leakage receiving box 2, a plurality of insertion slots matched with the insertion rods are formed in the upper surface of the base 1, and the insertion rods are inserted into the insertion slots.
It should be noted that the dropped slurry can be received through the receiving box 2, so that the slurry is prevented from directly falling onto the ground, the pollution to the surrounding environment is reduced, the slurry can be recycled, and the energy conservation and the environmental protection are realized.
The utility model provides a green building engineering is with energy-saving high-efficient construction plastering unit's theory of operation as follows:
this device utilizes elevating system thereby can make deposit mud case 4 round trip movement in vertical direction, and then make the mud of wall more even, at the during operation, it drives threaded rod 9 and takes place to rotate the motor, and because deposit mud case 4 and threaded rod 9 threaded connection, and then can make deposit mud case 4 remove in the vertical direction, thereby can carry out the operation of plastering fast to the wall through plastering the mechanism, not only promote the efficiency of plastering, and make the mud on wall surface more even, when using, mud pump 5 works, thereby will deposit the mud in mud case 4 and spout through spouting mud pipe 11, thereby fall into the surface of roller brush 13, under elevating system's work, thereby scribble the mud on roller brush 13 to the wall, the waste to manpower resources has been reduced, and make mud scribble more even, and through the rabbling mechanism thereby can make and deposit the continuous rolling of mud in mud case 4, reduce its possibility that solidifies, and make the more even that mixes between the mud, the effect of plastering has been promoted, when carrying out work, thereby driving motor 15 works, thereby it takes place to rotate and then drive 17, and the stirring blade can take place to rotate and the effect of stirring and the energy-saving through the stirring effect of not only the direct use of its energy-saving to the environment to avoid the mud to the environment pollution of dropping, thereby it is carried out on the ground.
The utility model discloses circuit and control that relate to are prior art, do not carry out too much repetition here. The above-mentioned only be the embodiment of the present invention, not consequently the restriction of the patent scope of the present invention, all utilize the equivalent structure or equivalent flow transform made of the content of the specification and the attached drawings, or directly or indirectly use in other relevant technical fields, all including in the same way the patent protection scope of the present invention.

Claims (8)

1. The utility model provides a green building engineering is with energy-saving high-efficient construction plastering unit which characterized in that includes:
a base (1);
the mud storage box (4), the upper surface of the base (1) is connected with the mud storage box (4) through a lifting mechanism, the rear end face of the mud storage box (4) is connected with a plastering mechanism, the plastering mechanism comprises a mud pumping pump (5), a roller brush (13), a rotating shaft (14) and a mud spraying pipe (11), a mud smearing groove (12) is formed in the rear end face of the mud storage box (4), two rotating shafts (14) which are uniformly distributed are connected between the inner walls of the two sides of the mud smearing groove (12) in a rotating mode, the outer end face of each rotating shaft (14) is fixedly sleeved with the roller brush (13), the mud pumping pump (5) is fixedly installed on the upper surface of the mud storage box (4), the feeding end of the mud pumping pump (5) extends to the inner bottom end of the mud storage box (4), the discharging end of the mud pumping pump (5) is fixedly communicated with the mud spraying pipe (11) through a hose, the mud spraying pipe (11) is fixedly connected to the rear end face of the mud storage box (4), and a stirring mechanism is arranged in the mud storage box (4);
the top end of the lifting mechanism is connected with the supporting plate (7).
2. The energy-saving efficient construction plastering device for green building engineering as claimed in claim 1, wherein the lifting mechanism comprises a threaded rod (9) and a sliding rod (3), both ends of the threaded rod (9) are respectively and rotatably connected with the supporting plate (7) and the base (1), the bottom end of the threaded rod (9) penetrates through the inner wall of the base (1) and is fixedly connected with the output end of a rotating motor therein through a coupler, both ends of the sliding rod (3) are respectively and fixedly connected with the supporting plate (7) and the base (1), the sludge storage tank (4) is slidably connected with the sliding rod (3), and the sludge storage tank (4) is in threaded connection with the threaded rod (9).
3. The energy-saving efficient construction plastering device for green construction engineering according to claim 2, wherein an observation port is opened on the outer end surface of the sludge storage box (4), and an observation window (8) is fixedly and hermetically connected on the observation port.
4. The energy-saving efficient construction plastering device for green construction engineering according to claim 1, wherein four corners of the lower surface of the base (1) are provided with locking universal wheels (10).
5. The energy-saving high-efficiency construction plastering device for green construction engineering as claimed in claim 1, wherein a rubber pad (6) is fixedly adhered to the upper surface of the supporting plate (7).
6. The energy-saving efficient construction plastering device for green building engineering according to claim 1, wherein the stirring mechanism comprises a driving motor (15), a stirring shaft (16) and stirring blades (17), the stirring shaft (16) is rotatably connected between the inner walls of the two sides of the sludge storage tank (4), the stirring blades (17) are fixedly connected to the outer side of the stirring shaft (16), the driving motor (15) is fixedly installed on one side of the sludge storage tank (4), and the output end of the driving motor (15) penetrates through the inner wall of the sludge storage tank (4) and is fixedly connected with the stirring shaft (16) through a coupler.
7. The energy-saving efficient construction plastering device for green construction engineering according to claim 1, wherein a leakage receiving box (2) is placed on the upper surface of the base (1).
8. The energy-saving efficient construction plastering device for green construction engineering as claimed in claim 7, wherein a plurality of insertion rods are fixedly connected to the lower surface of the leakage receiving box (2), and a plurality of slots matched with the insertion rods are formed in the upper surface of the base (1), and the insertion rods are inserted into the slots.
CN202220833517.9U 2022-04-11 2022-04-11 Energy-saving efficient construction plastering device for green building engineering Active CN217897166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220833517.9U CN217897166U (en) 2022-04-11 2022-04-11 Energy-saving efficient construction plastering device for green building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220833517.9U CN217897166U (en) 2022-04-11 2022-04-11 Energy-saving efficient construction plastering device for green building engineering

Publications (1)

Publication Number Publication Date
CN217897166U true CN217897166U (en) 2022-11-25

Family

ID=84111012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220833517.9U Active CN217897166U (en) 2022-04-11 2022-04-11 Energy-saving efficient construction plastering device for green building engineering

Country Status (1)

Country Link
CN (1) CN217897166U (en)

Similar Documents

Publication Publication Date Title
CN211691327U (en) Indoor coating smearing device
CN110666965A (en) Cement mortar mixer for building
CN217897166U (en) Energy-saving efficient construction plastering device for green building engineering
CN215978298U (en) Plastering device for wall decoration construction
CN216470514U (en) Prevent concrete conveying device of jam
CN114856129A (en) Device is paintd to construction mortar
CN216609517U (en) Construction cement evenly scribbles paper-back edition and puts
CN213683283U (en) Stirring is carried and is paintd integral type mortar joint grouting machine
CN212925680U (en) Asphalt laying equipment for municipal engineering building
CN208451923U (en) A kind of concrete batch plant convenient for cleaning
CN217812177U (en) Outer wall decoration spraying machine with lifting function
CN216704137U (en) Integrated device arranged at waterproof construction node
CN217614233U (en) Be used for gap filler mixer feed mechanism
CN218700175U (en) Improved mortar barrel
CN210999417U (en) Hydraulic engineering maintenance fastening processing apparatus
CN219072780U (en) Coating stirring and uniformly mixing processing equipment for constructional engineering
CN217834136U (en) Cement mortar stirring barrel
CN214819631U (en) Energy-concerving and environment-protective building mortar mixer
CN218029059U (en) Concrete pouring device
CN214245879U (en) Hydraulic engineering is with high-efficient desilting device
CN217494702U (en) Hydraulic concrete stirrer for skid steer loader
CN212442430U (en) Cleaning system applied to concrete spreader
CN220496101U (en) Anti-sticking anti-doodling paint stirring device
CN216606244U (en) Cable throws grey instrument in oil pipe
CN216616733U (en) House building engineering is with wall painting device with a brush

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant