CN217890081U - Wind-powered electricity generation gear box planet carrier frock - Google Patents

Wind-powered electricity generation gear box planet carrier frock Download PDF

Info

Publication number
CN217890081U
CN217890081U CN202222159283.7U CN202222159283U CN217890081U CN 217890081 U CN217890081 U CN 217890081U CN 202222159283 U CN202222159283 U CN 202222159283U CN 217890081 U CN217890081 U CN 217890081U
Authority
CN
China
Prior art keywords
planet carrier
centre gripping
wind
base
gear box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222159283.7U
Other languages
Chinese (zh)
Inventor
李立志
周欢
沈健
廖明轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Delijia Transmission Technology Jiangsu Co ltd
Original Assignee
Delijia Transmission Technology Jiangsu Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Delijia Transmission Technology Jiangsu Co ltd filed Critical Delijia Transmission Technology Jiangsu Co ltd
Priority to CN202222159283.7U priority Critical patent/CN217890081U/en
Application granted granted Critical
Publication of CN217890081U publication Critical patent/CN217890081U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model relates to a planet carrier frock technical field especially relates to a wind-powered electricity generation gear box planet carrier frock, and it is fixed to have solved to impel the centre gripping through both sides mounting fixture when installing the planet carrier among the prior art, wherein need use the bolt to fix anchor clamps, is not convenient for carry on spacingly to the planet carrier of different specifications simultaneously to when heating planet carrier installation work piece position, still need carry out the problem that heating device removed. The utility model provides a wind-powered electricity generation gear box planet carrier frock, includes the base, and the top of base is rotated and is connected with the carrier bar, and the loading board has been cup jointed to the lower part of carrier bar. The utility model discloses in the mode that proposes, through the regulation to the centre gripping frame, can carry out the centre gripping to the planet carrier of different specifications and fix, utilize arc splint to further strengthen fixedly to the planet carrier simultaneously, need heat the position of planet carrier installation, only need through the carrier bar with the planet carrier that is held with adding on the loading board rotate and can adjust.

Description

Wind-powered electricity generation gear box planet carrier frock
Technical Field
The utility model relates to a planet carrier frock technical field especially relates to a wind-powered electricity generation gear box planet carrier frock.
Background
The gearbox in the wind generating set is an important mechanical component, and the main function of the gearbox is to transmit the power generated by the wind wheel under the action of wind power to the generator and enable the generator to obtain a corresponding rotating speed, usually, the rotating speed of the wind wheel is very low and far cannot reach the rotating speed required by the power generation of the generator, and the rotating speed is realized by the speed increasing action of a gear pair of the gearbox, so the gearbox is also called as a speed increasing box.
The wind power gear box comprises a planet carrier, when a planet wheel is used as a basic component, the planet carrier is a part which bears the maximum external moment in a mechanism, the planet carrier is one of main components of the planetary gear transmission and is a part with a complex structure, and the reasonable structure of the planet carrier is light in weight, good in rigidity and convenient to process and assemble. The common structural forms of the composite plate include a double-side-plate integral type, a double-side-plate split type and a single-side-plate type.
When carrying out the work piece assembly of planet carrier, on the one hand need be fixed the planet carrier, on the other hand needs heat the position of the required installation of planet carrier, generally adopt electromagnetic heating board to heat, but advance the centre gripping through both sides mounting fixture when installing the planet carrier in the tradition and fix, wherein need use the bolt fixed with anchor clamps, it is not convenient for carry on spacingly to the planet carrier of different specifications simultaneously, and when heating planet carrier installation work piece position, still need remove heating device, and then greatly reduced the efficiency to the planet carrier installation, seem very inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a wind-powered electricity generation gear box planet carrier frock has solved and has impeld the centre gripping through both sides mounting fixture when installing the planet carrier among the prior art fixed, wherein need use the bolt fixed with anchor clamps, is not convenient for carry on spacingly to the planet carrier of different specifications simultaneously to when heating planet carrier installation work piece position, still need carry out the problem that removes with heating device.
In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a wind-powered electricity generation gear box planet carrier frock, the on-line screen storage device comprises a base, the top of base is rotated and is connected with the carrier bar, and the loading board has been cup jointed to the lower part of carrier bar, a plurality of bears the weight of the groove has been seted up on the loading board, and the inboard of all bearing the weight of the groove all is rotated through the torsional spring pivot and is connected with the connecting axle, the equal fixedly connected with centre gripping frame in top of all connecting axles, and the inboard of all centre gripping frames all is equipped with arc splint, and the top of all centre gripping frames all is equipped with the threaded rod, the bottom of threaded rod runs through the top of centre gripping frame through the thread groove, and the extension end of threaded rod is connected through the pivot rotation with the top of arc splint.
Preferably, a plurality of side grooves are formed in the bearing plate, the cylinder is fixedly connected to one side of the top of the base through the bolt, the electromagnetic heating plate is arranged on one side of the top of the base, and the bottom of the electromagnetic heating plate is fixedly connected with the output end of the cylinder.
Preferably, the tops of all the connecting shafts are fixedly connected with connecting rods, and the top ends of all the connecting rods are fixedly connected with the bottoms of all the clamping frames respectively.
Preferably, the bottom end of the bearing rod is rotatably connected with the top of the base through a rotating shaft, and all the bearing grooves are distributed in an annular array along the center of the bearing plate.
Preferably, all the side grooves are symmetrically distributed along the center of the bearing plate, and the electromagnetic heating plate is positioned at the bottom of any one of the side grooves.
Preferably, the threaded rod is connected with the threaded groove in a screwing mode through threads.
The utility model discloses possess following beneficial effect at least:
when the wind power gear box planet carrier tool is used, firstly, a planet carrier required to be processed and installed is fixed, as the connecting shaft is connected with the bearing groove through the torsional spring rotating shaft, all clamping frames move backwards before the planet carrier is installed, then, the planet carrier is placed on the top of the bearing plate, then, all clamping frames are loosened one by one, so that the planet carrier is positioned in the clamping frames, all clamping frames are utilized to bear planet carriers with different specifications and diameters, finally, the threaded rod is rotated to enable the arc-shaped clamping plate to move downwards, the planet carrier is further clamped and fixed, when a workpiece is required to be installed on the planet carrier, such as a gear, at the moment, the part required to be installed of the planet carrier is required to be heated, at the moment, the clamped planet carrier on the bearing plate is only required to be rotated through the bearing rod, can make the top of the required installation position firing equipment of planet carrier heat, it is fixed to impel the centre gripping through both sides mounting fixture when installing the planet carrier among the prior art, wherein need use the bolt to fix anchor clamps, be not convenient for simultaneously carry on spacingly to the planet carrier of different specifications, and when heating planet carrier installation work piece position, still need carry out the problem that heating device removed, the utility model discloses in the mode that proposes, through the regulation to the centre gripping frame, can carry out the centre gripping to the planet carrier of different specifications and fix, utilize arc splint to further strengthen fixedly to the planet carrier simultaneously, need heat the position of planet carrier installation, only need to rotate the planet carrier of being held on with the loading board through the carrier bar and can adjust.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without any creative effort.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front view of the clamping frame of the present invention;
FIG. 3 is a schematic view of the structure of the loading plate and its components of the present invention;
fig. 4 is a schematic view of the top view structure of the loading plate of the present invention.
In the figure: 1. a base; 2. carrying a plate; 3. a side groove; 4. a cylinder; 5. an electromagnetic heating plate; 6. a bearing groove; 7. a connecting shaft; 8. a clamping frame; 9. a threaded rod; 10. a carrier bar; 11. an arc-shaped splint; 12. a connecting rod; 13. a thread groove.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-4, a wind-powered electricity generation gear box planet carrier frock, including base 1, base 1's top is rotated and is connected with carrier bar 10, and carrier bar 10's lower part has cup jointed loading board 2, a plurality of bears groove 6 has been seted up on loading board 2, and all inboard that bear groove 6 all is rotated through the torsional spring pivot and is connected with connecting axle 7, the equal fixedly connected with centre gripping frame 8 in top of all connecting axle 7, and all inboard of centre gripping frame 8 all is equipped with arc splint 11, and all top of centre gripping frame 8 all are equipped with threaded rod 9, threaded rod 9's bottom runs through the top of centre gripping frame 8 through threaded groove 13, and threaded rod 9's extension end is connected through the pivot rotation with arc splint 11's top, specifically, through the regulation to centre gripping frame 8, can carry out the centre gripping to the planet carrier of different specifications fixed, utilize arc splint 11 can further strengthen fixedly to the planet carrier simultaneously, the position that needs to install the planet carrier to heat, only need to rotate the planet carrier that is held on loading board 2 through carrier bar 10 and can adjust.
The scheme has the following working processes:
the utility model discloses in a when wind-powered electricity generation gear box planet carrier frock is put into operation, at first fix the planet carrier of required processing installation, because connecting axle 7 is connected with bearing groove 6 through the torsional spring pivot, so move all centre gripping frame 8 backward before planet carrier installation, place the top of loading board 2 with the planet carrier again afterwards, then loosen all centre gripping frame 8 one by one, make the planet carrier be located centre gripping frame 8, utilize all centre gripping frame 8 to bear the planet carrier of different specification diameters, at last again through rotating threaded rod 9, make arc splint 11 move down, it is fixed to further centre gripping of planet carrier, for example the gear when needing to install the work piece to the planet carrier, at this moment, need heat the position of the required installation of planet carrier, at this moment, only need rotate the planet carrier by the centre gripping on loading board 2 through carrier pole 10, can make the top of the required installation position firing equipment of planet carrier heat.
According to the working process, the following steps are known:
through the regulation to centre gripping frame 8, can carry out the centre gripping to the planet carrier of different specifications fixed, utilize arc splint 11 to further strengthen fixedly to the planet carrier simultaneously, need heat the position of planet carrier installation, only need through carrier bar 10 with the planet carrier that is held on the loading board 2 rotate and can adjust.
Further, a plurality of side channel 3 has been seted up on the loading board 2, and bolt fixedly connected with cylinder 4 is passed through to top one side of base 1, and top one side of base 1 is equipped with electromagnetic heating board 5 to electromagnetic heating board 5's bottom and cylinder 4's output fixed connection, it is specific, when needs heat planet carrier installation position, start cylinder 4 and drive electromagnetic heating board 5 and reciprocate, can carry out heating work to the planet carrier.
Furthermore, the tops of all the connecting shafts 7 are fixedly connected with connecting rods 12, and the top ends of all the connecting rods 12 are fixedly connected with the bottoms of all the clamping frames 8 respectively.
Further, the bottom of carrier bar 10 is connected with the top of base 1 through rotating between the pivot, and all bearing grooves 6 all are distributed along the center of loading board 2 in annular array, and is concrete, rotates carrier bar 10 through manual mode.
Further, all the side grooves 3 are symmetrically distributed along the center of the bearing plate 2, and the electromagnetic heating plate 5 is located at the bottom of any one of the side grooves 3.
Furthermore, the threaded rod 9 is connected with the thread groove 13 in a screwing manner through threads, and particularly, the arc-shaped clamping plate 11 can be more stable by the aid of the threaded rod 9 connected with the thread groove 13 in the screwing manner.
In conclusion: when needs heat planet carrier installation position, start cylinder 4 and drive electromagnetic heating board 5 and reciprocate, can carry out the heating work to the planet carrier, rotate carrier bar 10 through manual mode, utilize threaded rod 9 and 13 screw threads of thread groove to close soon and be connected with and can make arc splint 11 more stable.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the principles of the present invention may be applied to any other embodiment without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a wind-powered electricity generation gear box planet carrier frock, includes base (1), its characterized in that, the top of base (1) is rotated and is connected with carrier bar (10), and the lower part of carrier bar (10) has cup jointed loading board (2), a plurality of bearing groove (6) have been seted up on loading board (2), and the inboard of all bearing groove (6) all rotates through the torsional spring pivot and is connected with connecting axle (7), all the equal fixedly connected with centre gripping frame (8) in top of connecting axle (7), and the inboard of all centre gripping frame (8) all is equipped with arc splint (11) to the top of all centre gripping frame (8) all is equipped with threaded rod (9), the top of centre gripping frame (8) is run through thread groove (13) in the bottom of threaded rod (9), and the top of the extension end of threaded rod (9) and arc splint (11) is rotated through the pivot and is connected.
2. The wind power gear box planet carrier tool according to claim 1, wherein a plurality of side grooves (3) are formed in the bearing plate (2), a cylinder (4) is fixedly connected to one side of the top of the base (1) through a bolt, an electromagnetic heating plate (5) is arranged on one side of the top of the base (1), and the bottom of the electromagnetic heating plate (5) is fixedly connected with the output end of the cylinder (4).
3. The wind power gearbox planet carrier tool according to claim 1, wherein the tops of all the connecting shafts (7) are fixedly connected with connecting rods (12), and the top ends of all the connecting rods (12) are fixedly connected with the bottoms of all the clamping frames (8) respectively.
4. The wind power gearbox planet carrier tool according to claim 1, wherein the bottom end of the bearing rod (10) is rotatably connected with the top of the base (1) through a rotating shaft, and all the bearing grooves (6) are distributed in an annular array along the center of the bearing plate (2).
5. The wind power gearbox planet carrier tool according to claim 2, wherein all the side grooves (3) are symmetrically distributed along the center of the bearing plate (2), and the electromagnetic heating plate (5) is located at the bottom of any one of the side grooves (3).
6. The wind power gearbox planet carrier tool according to claim 1, wherein the threaded rod (9) is connected with the threaded groove (13) in a threaded manner.
CN202222159283.7U 2022-08-17 2022-08-17 Wind-powered electricity generation gear box planet carrier frock Active CN217890081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222159283.7U CN217890081U (en) 2022-08-17 2022-08-17 Wind-powered electricity generation gear box planet carrier frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222159283.7U CN217890081U (en) 2022-08-17 2022-08-17 Wind-powered electricity generation gear box planet carrier frock

Publications (1)

Publication Number Publication Date
CN217890081U true CN217890081U (en) 2022-11-25

Family

ID=84142548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222159283.7U Active CN217890081U (en) 2022-08-17 2022-08-17 Wind-powered electricity generation gear box planet carrier frock

Country Status (1)

Country Link
CN (1) CN217890081U (en)

Similar Documents

Publication Publication Date Title
CN214685674U (en) Aerogenerator transmission flange grinding device
CN217890081U (en) Wind-powered electricity generation gear box planet carrier frock
CN212012561U (en) Photovoltaic support convenient to it is folding
CN216904759U (en) Solar panel mounting rack
CN220016041U (en) Planetary rotating device of wind power gear box
CN210024331U (en) Rapid fixing mechanism for welding transmission shaft
CN214092126U (en) Universal fixture for mounting blades of small wind driven generator
CN210033545U (en) Overhauling jigger of steam turbine generator unit
CN213521745U (en) Novel solar photovoltaic power generation device
CN202388481U (en) Electric torque multiplier
CN213574472U (en) Wind power generation blade clamping device
CN219235119U (en) Clamp for processing generator fuel tank cap
CN216326150U (en) Automobile welding fixture with adjustable size
CN217254269U (en) Auxiliary assembly mechanism for oil pump chain wheel
CN217633063U (en) Novel fan installation shaft without following rotation
CN110159367B (en) Maintenance jigger for steam turbine generator unit
CN219627595U (en) Photovoltaic power equipment with function of following spot
CN221669786U (en) Auxiliary support for solar bracket
CN218162085U (en) Inertia flywheel generator
CN220809700U (en) Electric friction power transmission device
CN214228179U (en) But automatically regulated angle's photovoltaic power generation device
CN220267867U (en) Organism forging on wind-powered electricity generation
CN219881723U (en) Support frame for hydroelectric installation
CN218269630U (en) Mounting bracket of concentrating solar heat collector
CN218904118U (en) Metal processing clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 67, Antai 1st Road, Xishan District, Wuxi, Jiangsu 214105

Patentee after: Delijia Transmission Technology (Jiangsu) Co.,Ltd.

Address before: No. 67, Antai 1st Road, Xishan District, Wuxi, Jiangsu 214105

Patentee before: DELIJIA TRANSMISSION TECHNOLOGY (JIANGSU) Co.,Ltd.

CP01 Change in the name or title of a patent holder