CN217874543U - Heating and ventilation engineering installation structure device - Google Patents

Heating and ventilation engineering installation structure device Download PDF

Info

Publication number
CN217874543U
CN217874543U CN202221757020.XU CN202221757020U CN217874543U CN 217874543 U CN217874543 U CN 217874543U CN 202221757020 U CN202221757020 U CN 202221757020U CN 217874543 U CN217874543 U CN 217874543U
Authority
CN
China
Prior art keywords
frame
mounting
structure device
sliding sleeve
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221757020.XU
Other languages
Chinese (zh)
Inventor
范伟华
蒋磊亚
郑广兵
徐君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yushijie Construction Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221757020.XU priority Critical patent/CN217874543U/en
Application granted granted Critical
Publication of CN217874543U publication Critical patent/CN217874543U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Central Heating Systems (AREA)

Abstract

The utility model is suitable for a processing of warm engineering pipeline that leads to is with supplementary technical field, discloses a warm engineering mounting structure device that leads to, including the installing frame, installing frame top fixed surface installs fixed frame, and fixed frame inboard top middle-end fixed mounting has electric push rod, and the inboard top slidable mounting of installing frame has the slurcam. The utility model discloses technical scheme will support through the pivot and move the pole about both ends be connected with catch plate bottom and sliding sleeve top respectively, and then can drive the catch plate in the operation of electric push rod and descend thereupon, can provide the corresponding driving force of sliding sleeve, make two sets of sliding sleeve can be in step in opposite directions remove inside the installing frame, and then make the horizontal both ends of installing frame and the tight friction plate synchronous motion of supporting at top, can support tight spacing processing to the pipeline outside, and then reduce the operator and to warm required operating procedure of logical pipe-line erection location, thereby improve the efficiency of whole warm logical pipe-line erection.

Description

Warm engineering mounting structure device that leads to
Technical Field
The utility model is suitable for a warm engineering pipeline processing that leads to uses supplementary technical field, in particular to warm engineering mounting structure device that leads to.
Background
At present, the application range of the heating and ventilation pipeline is very wide, a purifying system air return pipe, a central air conditioning ventilation pipe, an industrial air supply and exhaust ventilation pipe, an environmental protection system air suction and exhaust pipe, a mine gas drainage pipe, a mine rubberized cloth air duct and the like are required, and two identical pipelines are required to be connected and aligned in the installation process of the heating and ventilation pipeline so as to be convenient for installation and fixation of the pipelines.
At present when installing the location processing to warm logical pipeline, need support tight spacing processing to four group sides in the pipeline outside, and when adjusting the use to it, need the manual positioning mechanism to four sides of operator to adjust the processing, and then waste time and energy when leading to whole warm logical pipeline location processing, influence subsequent piping erection efficiency. Therefore, a heating and ventilation engineering installation structure device is provided.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide a heating and ventilation engineering installation structure device, which can effectively solve the problems in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a warm engineering mounting structure device that leads to, includes the installing frame, installing frame top fixed surface installs fixed frame, fixed frame inboard top middle-end fixed mounting has electric push rod, the inboard top slidable mounting of installing frame has the slurcam, slurcam bottom both sides all articulate through the pivot and have the pole of keeping to, the inboard bottom both ends surface of installing frame equal fixed mounting has the dead lever, every the equal slip sleeve that has cup jointed in dead lever outside surface, and keep to move the pole bottom and articulate in slip sleeve outside top surface, every through the pivot the equal vertical fixed mounting in slip sleeve outside both ends surface has a connecting plate, every the inboard middle-end surface of connecting plate all horizontal fixed mounting has the installation pole.
As an alternative of this application technical scheme, the fixed surface of end has the cavity frame in the slurcam bottom, the vertical movable mounting that runs through in cavity frame bottom middle part has the movable rod.
As an alternative scheme of the technical scheme, fixing plates are fixedly arranged between the inner sides of the two groups of mounting rods and on the bottom surface of the movable rod.
As an alternative scheme of the technical scheme, the side surface of each fixing plate is fixedly provided with a tight friction plate.
As an alternative scheme of this application technical scheme, the inboard activity of cavity frame is cup jointed and is promoted the spring, and promotes the activity of spring bottom and laminate in movable rod top surface.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model provides a warm engineering mounting structure device that leads to, both ends are connected with catch plate bottom and sliding sleeve top respectively about will propping the pole through the pivot, and then can drive the catch plate in the operation of electric push rod and descend thereupon, can provide the corresponding driving force of sliding sleeve, make two sets of sliding sleeve can move in the installing frame is inside in synchronous opposite directions, and then make the horizontal both ends of installing frame and the tight friction plate synchronous motion that supports at top, can support tight spacing processing to the pipeline outside, and then reduce the operator and lead to the required operating procedure of pipeline installation location to warm, thereby improve the efficiency of whole warm piping erection that leads to.
2. The utility model provides a warm engineering mounting structure device that leads to, through having cup jointed the promotion spring in well hollow frame inside, and then can set up in the catch plate bottom support the friction plate laminating behind warm logical pipeline, still can remove and avoid the unable continued removal of movable sleeve to influence subsequent use.
Drawings
Fig. 1 is an overall front sectional structural view of the heating and ventilation engineering installation structure device of the present invention;
fig. 2 is the utility model relates to a warm engineering mounting structure device's dead lever looks sideways at section structure sketch map.
Reference numerals: 1. installing a frame; 2. a fixing frame; 3. an electric push rod; 4. a transmission frame; 5. a push plate; 6. fixing the rod; 7. pushing the rod; 8. a sliding sleeve; 9. a connecting plate; 10. mounting a rod; 11. a movable rod; 12. a fixing plate; 13. abutting against the friction plate; 14. a push spring; 15. a hollow frame.
Detailed Description
As shown in fig. 1-2, the utility model provides a technical solution: the utility model provides a warm engineering mounting structure device that leads to, includes installing frame 1, 1 top fixed surface of installing frame installs fixed frame 2, and 2 inboard top middle-end fixed mounting of fixed frame have electric push rod 3.
In this technical scheme (shown through fig. 1 and fig. 2), 1 inboard top slidable mounting of installing frame has slurcam 5, and 5 bottom both sides of slurcam are all articulated through the pivot to have to push away pole 7, and 1 inboard bottom both ends surface of installing frame all fixed mounting has dead lever 6, and the equal sliding sleeve 8 that has cup jointed in the outside surface of every dead lever 6, and pushes away pole 7 bottoms and articulate in 8 outside top surfaces of sliding sleeve through the pivot.
In the technical scheme, the upper end and the lower end of the pushing rod 7 are respectively connected with the bottom of the pushing plate 5 and the top of the sliding sleeve 8 through the rotating shaft, and the electric pushing rod 3 operates to drive the pushing plate 5 to descend along with the pushing rod, so that the horizontal two ends of the mounting frame 1 and the abutting friction plates 13 at the tops of the horizontal two ends of the mounting frame move synchronously, and abutting limiting treatment can be performed on the outer side of the pipeline.
In the technical scheme (shown by fig. 1 and 2), the two end surfaces of the outer side of each sliding sleeve 8 are vertically and fixedly provided with connecting plates 9, and the middle end surface of the inner side of each connecting plate 9 is transversely and fixedly provided with a mounting rod 10.
In this solution, the transmission of the mounting rod 10 ensures that the sliding sleeve 8, when moving, can provide a horizontal movement to the abutting friction plate 13.
In this technical scheme (shown through fig. 1 and fig. 2), the fixed surface of the middle end of the bottom of the pushing plate 5 is provided with a hollow frame 15, the middle of the bottom end of the hollow frame 15 vertically penetrates through the movable rod 11, the pushing spring 14 is movably sleeved on the inner side of the hollow frame 15, and the bottom of the pushing spring 14 is movably attached to the top surface of the movable rod 11.
In the technical scheme, the pushing spring 14 is sleeved inside the hollow frame 15, so that the abutting friction plate 13 arranged at the bottom of the pushing plate 5 can still move after being attached to the heating and ventilation pipeline, and the movable sleeve 10 cannot continuously move to influence subsequent use.
In some technical solutions (as shown in fig. 1 and 2), fixing plates 12 are fixedly installed between the inner sides of the group installation rods 10 and on the bottom surface of the movable rod 11, and a abutting friction plate 13 is fixedly installed on the side surface of each fixing plate 12.
In this kind of technical scheme, can laminate in the warm outside of leading to the pipeline through propping tight friction plate 13 and support tight spacing processing.
The during operation, place warm logical pipeline in the inside back of installing frame 1, open electric push rod 3 through external control switch thereupon, make its operation combine the driving frame 4 to make it remove, provide the corresponding motive force of slurcam 5, combine the transmission effect of pushing rod 7, when making slurcam 5 descend thereupon, can provide the corresponding motive force of sliding sleeve 8, make two sets of sliding sleeve 8 can move in installing frame 1 inside in step in opposite directions, and then make the horizontal both ends of installing frame 1 and the tight friction plate 13 synchronous motion of supporting at top thereof, support tight spacing processing to the warm logical pipeline outside, guarantee the stability of pipeline when connecting.

Claims (5)

1. The utility model provides a warm engineering mounting structure device that leads to, includes installing frame (1), its characterized in that: the surface of the top of the mounting frame (1) is fixedly provided with a fixed frame (2), and the middle end of the top of the inner side of the fixed frame (2) is fixedly provided with an electric push rod (3);
the top of the inner side of the mounting frame (1) is slidably provided with a pushing plate (5), two sides of the bottom of the pushing plate (5) are respectively hinged with a pushing rod (7) through a rotating shaft, the surfaces of two ends of the inner side bottom of the mounting frame (1) are respectively fixedly provided with a fixing rod (6), the surface of the outer side of each fixing rod (6) is slidably sleeved with a sliding sleeve (8), and the bottom of each pushing rod (7) is hinged to the surface of the top of the outer side of the sliding sleeve (8) through the rotating shaft;
every sliding sleeve (8) outside both ends surface all vertical fixed mounting have connecting plate (9), every connecting plate (9) inboard middle-end surface all horizontal fixed mounting have installation pole (10).
2. The heating and ventilation engineering installation structure device according to claim 1, wherein: the improved push plate is characterized in that a hollow frame (15) is fixedly mounted at the middle end surface of the bottom of the push plate (5), and a movable rod (11) is vertically arranged in the middle of the bottom end of the hollow frame (15) in a penetrating and movable mode.
3. The heating and ventilation engineering installation structure device according to claim 1, wherein: and a fixed plate (12) is fixedly arranged between the inner sides of the two groups of mounting rods (10) and on the surface of the bottom of the movable rod (11).
4. A heating and ventilation engineering installation structure device according to claim 3, characterized in that: and a pressing friction plate (13) is fixedly arranged on the side surface of each fixing plate (12).
5. A heating and ventilation engineering installation structure device according to claim 2, characterized in that: the pushing spring (14) is movably sleeved on the inner side of the hollow frame (15), and the bottom of the pushing spring (14) is movably attached to the top end surface of the movable rod (11).
CN202221757020.XU 2022-07-07 2022-07-07 Heating and ventilation engineering installation structure device Active CN217874543U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221757020.XU CN217874543U (en) 2022-07-07 2022-07-07 Heating and ventilation engineering installation structure device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221757020.XU CN217874543U (en) 2022-07-07 2022-07-07 Heating and ventilation engineering installation structure device

Publications (1)

Publication Number Publication Date
CN217874543U true CN217874543U (en) 2022-11-22

Family

ID=84050036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221757020.XU Active CN217874543U (en) 2022-07-07 2022-07-07 Heating and ventilation engineering installation structure device

Country Status (1)

Country Link
CN (1) CN217874543U (en)

Similar Documents

Publication Publication Date Title
CN217874543U (en) Heating and ventilation engineering installation structure device
CN202245806U (en) Double-station superposition type cover mold removing and pile lifting combined mechanism
CN203947027U (en) Full-automatic large sheet glass hollow upper slice equipment
CN205070896U (en) Photovoltaic board support with adjustable
CN110762338A (en) Pneumatic passing device of pipeline robot and using method
CN102635375A (en) Lifting device for shield segments
CN202057192U (en) Furnace door device for large horizontal heat treatment vacuum furnace
CN215371409U (en) Automatic butt-joint device for pipelines
CN206174497U (en) Glass curtain wall ash handling equipment
CN216427142U (en) Glass sheet combining machine for producing hollow glass
CN208538886U (en) A kind of solar battery glass plate pastes reflective strip equipment offline
CN110080553B (en) Consolidate carbon fiber cloth wall continuity compaction processing system for building
CN204145205U (en) A kind of electric vehicle motor mounting tool
CN109794936B (en) Automatic film feeding mechanical arm
CN203103326U (en) A folding device of a solar-energy battery board
CN208308286U (en) Tube coupling assembly guiding device and Lift-on/Lift-off System
CN111483528A (en) Climbing robot with pneumatic control device
CN219120751U (en) Air port baffle plate of building central air conditioner
CN220915240U (en) Solar photovoltaic power generation dust collector
CN220994567U (en) Rubber cutting device
CN218876828U (en) Multidirectional regulation automobile air outlet
CN218749291U (en) A high-efficient flaring device for plastic conduit
CN220067362U (en) Photovoltaic panel mounting frame and photovoltaic system
CN115158695A (en) Method and system for improving airplane wing assembly efficiency
CN216501412U (en) Novel airtight waste gas is collected device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231215

Address after: Room 104, Building 64, Zone 1, Yangshan Huayuan, Huqiu District, Suzhou City, Jiangsu Province, 215000

Patentee after: Peng Fei

Patentee after: Wang Wenxue

Address before: 050091 No.3, No. 9, Yuhua West Road, Qiaoxi District, Shijiazhuang, Hebei

Patentee before: Fan Weihua

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240105

Address after: 215000, Room 3012, Building A, Suzhou Intelligent Manufacturing Service Industrial Park, Wangsheng Road, Huangqiao Street, Xiangcheng District, Suzhou City, Jiangsu Province

Patentee after: Jiangsu Yushijie Construction Engineering Co.,Ltd.

Address before: Room 104, Building 64, Zone 1, Yangshan Huayuan, Huqiu District, Suzhou City, Jiangsu Province, 215000

Patentee before: Peng Fei

Patentee before: Wang Wenxue