CN217871819U - Building construction template anchor clamps - Google Patents

Building construction template anchor clamps Download PDF

Info

Publication number
CN217871819U
CN217871819U CN202222056557.XU CN202222056557U CN217871819U CN 217871819 U CN217871819 U CN 217871819U CN 202222056557 U CN202222056557 U CN 202222056557U CN 217871819 U CN217871819 U CN 217871819U
Authority
CN
China
Prior art keywords
clamp
connecting rod
hole
anchor clamps
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222056557.XU
Other languages
Chinese (zh)
Inventor
卜飞飞
吉鹏
王张祥
许瑞栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Daxin Engineering Co Ltd
Original Assignee
Nantong Daxin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Daxin Engineering Co Ltd filed Critical Nantong Daxin Engineering Co Ltd
Priority to CN202222056557.XU priority Critical patent/CN217871819U/en
Application granted granted Critical
Publication of CN217871819U publication Critical patent/CN217871819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building construction template clamp, including first anchor clamps and coupling mechanism, the right side of first anchor clamps is equipped with the second anchor clamps, the front side of second anchor clamps is provided with the third anchor clamps, the left side of third anchor clamps is provided with the fourth anchor clamps, and the fourth anchor clamps are located the front side of first anchor clamps, the interval between first anchor clamps, second anchor clamps, third anchor clamps and the fourth anchor clamps is equal, the top surface of first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps all is provided with the standing groove; through connecing protruding and card hole cooperation standing groove and snap ring, utilize first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps to connect protruding grafting card hole to fix, put into standing groove and snap ring with head rod, second connecting rod, third connecting rod, fourth connecting rod, fifth connecting rod, sixth connecting rod, seventh connecting rod, eighth connecting rod, fix, realize reducing the device and accomodate the transportation of being convenient for.

Description

Building construction template anchor clamps
Technical Field
The utility model relates to a construction field, in particular to construction form anchor clamps.
Background
The building formwork is a temporary supporting structure, which is made according to the design requirement, makes the concrete structure and the member shaped according to the specified position and geometric dimension, keeps the correct position, and bears the self weight of the building formwork and the external load acting on the building formwork, and carries out the formwork engineering, which is the building formwork structure for ensuring the quality and the construction safety of the concrete engineering, accelerating the construction progress and reducing the engineering cost.
However, in the construction process of the existing square concrete column beam, a building template is required to be used for shaping, and the existing building construction template clamp suitable for the square concrete column beam is generally complex in structure and difficult to adapt to templates of square concrete column beams with different sizes; accomodate simultaneously and remove comparatively difficultly, reduced the efficiency of construction.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's defect, provide a construction template anchor clamps.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a construction formwork anchor clamps, including first anchor clamps and coupling mechanism, the right side of first anchor clamps is equipped with the second anchor clamps, the front side of second anchor clamps is provided with the third anchor clamps, the left side of third anchor clamps is provided with the fourth anchor clamps, and the fourth anchor clamps are located the front side of first anchor clamps, interval between first anchor clamps, second anchor clamps, third anchor clamps and the fourth anchor clamps equals, the top surface of first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps all is provided with the standing groove, the outside four corners department of first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps all is provided with the fixed plate, the gim peg has all been run through to the inside of fixed plate, connect through coupling mechanism between first anchor clamps, second anchor clamps, third anchor clamps and the fourth anchor clamps, a side surface of first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps all is provided with connects protrudingly, it all is provided with the card hole to connect bellied one side, it is provided with the snap ring to connect bellied opposite side.
As a preferred technical scheme of the utility model, first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps are the cross, the height of first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps equals, connect bellied size and the big or small phase-match in card hole.
As an optimal technical scheme of the utility model, coupling mechanism is including perforating and connecting the hole, first anchor clamps, second anchor clamps, third anchor clamps and the inside perforation of fourth anchor clamps all are provided with perforate and connect the hole, the inside perforation of first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps is two with the quantity that connects the hole, and perforate and connect the hole and be the longitudinal symmetry setting, first anchor clamps top and below connect the hole and the perforation inside of second anchor clamps top and below are run through respectively have head rod and fifth connecting rod, second anchor clamps top and below connect the hole and the perforation inside of third anchor clamps top and below are run through respectively have second connecting rod and sixth connecting rod, third anchor clamps top and below connect the hole and the perforation inside of fourth anchor clamps top and below are run through respectively have third connecting rod and seventh connecting rod, fourth anchor clamps top and below connect the hole and the perforation inside of first anchor clamps top and below are run through respectively have fourth connecting rod and eighth connecting rod.
As a preferred technical scheme of the utility model, the front and back side surface of first anchor clamps and third anchor clamps runs through there is the perforation, the side surface runs through there is the perforation about second anchor clamps and fourth anchor clamps, the right side surface of first anchor clamps is provided with and connects the hole, the front side surface of second anchor clamps is provided with and connects the hole, the left side surface of third anchor clamps is provided with and connects the hole, the back side surface of fourth anchor clamps is provided with and connects the hole.
As a preferred technical scheme of the utility model, perforate, connect the inside screw thread that all is provided with of hole and snap ring, the same length of structure of head rod, second connecting rod, third connecting rod, fourth connecting rod, fifth connecting rod, sixth connecting rod, seventh connecting rod and eighth connecting rod equals, the outside of head rod is provided with the screw thread.
As a preferred technical scheme of the utility model, the size of standing groove and the size of head rod are matchd each other, the size of snap ring and the size of head rod are matchd each other.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses a connect protruding and block hole cooperation standing groove and snap ring, utilize to connect protruding grafting block hole with first anchor clamps, second anchor clamps, third anchor clamps and fourth anchor clamps and fix, put into standing groove and snap ring with first connecting rod, second connecting rod, third connecting rod, fourth connecting rod, fifth connecting rod, sixth connecting rod, seventh connecting rod, eighth connecting rod, fix, realize reducing the device and accomodate the transportation of being convenient for; through the hole is put in the perforation cooperation, let the interval between first connecting rod, second connecting rod, third connecting rod, fourth connecting rod, fifth connecting rod, sixth connecting rod, seventh connecting rod, the first anchor clamps of eighth connecting rod rotation regulation, second anchor clamps, third anchor clamps and the fourth anchor clamps, let the device can adapt to the square concrete column roof beam of equidimension not, and more firm.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a top view of the overall structure of the present invention;
fig. 3 is a schematic view of the overall structure of the present invention;
fig. 4 is a top view of the internal structure of the first clamp of the present invention;
fig. 5 is a top view of the first, second, third and fourth clamps of the present invention;
in the figure: 1. a first clamp; 2. a second clamp; 3. a third clamp; 4. a fourth clamp; 5. a fixing plate; 6. a fixing bolt; 7. a connecting mechanism; 8. a placement groove; 9. a connecting projection; 10. a clamping hole; 11. a snap ring; 71. perforating; 72. connecting holes; 73. a first connecting rod; 74. a fifth connecting rod; 75. a second connecting rod; 76. a sixth connecting rod; 77. a third connecting rod; 78. a seventh connecting rod; 79. a fourth connecting rod; 710. and an eighth connecting rod.
Detailed Description
The preferred embodiments of the present invention will be described hereinafter with reference to the accompanying drawings, and it should be understood that the preferred embodiments described herein are merely for purposes of illustration and explanation, and are not intended to limit the present invention.
Wherein like reference numerals refer to like parts throughout.
Example 1
As shown in fig. 1-5, the utility model provides a construction formwork clamp, including first anchor clamps 1 and coupling mechanism 7, the right side of first anchor clamps 1 is equipped with second anchor clamps 2, the front side of second anchor clamps 2 is provided with third anchor clamps 3, the left side of third anchor clamps 3 is provided with fourth anchor clamps 4, and fourth anchor clamps 4 are located the front side of first anchor clamps 1, second anchor clamps 2, interval between third anchor clamps 3 and the fourth anchor clamps 4 equals, first anchor clamps 1, second anchor clamps 2, the top surface of third anchor clamps 3 and fourth anchor clamps 4 all is provided with standing groove 8, first anchor clamps 1, second anchor clamps 2, the outside four corners department of third anchor clamps 3 and fourth anchor clamps 4 all is provided with fixed plate 5, the inside of fixed plate 5 has all penetrated gim peg 6, first anchor clamps 1, second anchor clamps 2, connect through coupling mechanism 7 between third anchor clamps 3 and the fourth anchor clamps 4, first anchor clamps 1, second anchor clamps 2, one side surface of third anchor clamps 3 and fourth anchor clamps 4 all is provided with protruding connection 9, one side connection hole 9 all is provided with protruding connection 9, the opposite side of connecting hole 11.
Furthermore, the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4 are all cross-shaped, the heights of the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4 are equal, and the size of the connecting protrusion 9 is matched with the size of the clamping hole 10.
The connecting mechanism 7 comprises a through hole 71 and a connecting hole 72, the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4 are internally provided with two through holes 71 and two connecting holes 72, the through holes 71 and the connecting holes 72 inside the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4 are symmetrically arranged up and down, the connecting holes 72 above and below the first clamp 1 and the through holes 71 above and below the second clamp 2 are respectively penetrated with a first connecting rod 73 and a fifth connecting rod 74, the connecting holes 72 above and below the second clamp 2 and the through holes 71 above and below the third clamp 2 are respectively penetrated with a second connecting rod 75 and a sixth connecting rod 76, the connecting holes 72 above and below the third clamp 3 and the through holes 71 above and below the fourth clamp 4 are respectively penetrated with a third connecting rod 77 and a seventh connecting rod 78, and the connecting rods 79 and an eighth connecting rod 710 are respectively penetrated by the connecting holes 72 above and below the fourth clamp 1 and the inside of the first clamp 2 and the through holes 71 below the fourth clamp 2.
The front and rear side surfaces of the first and third clamps 1 and 3 are penetrated with a through hole 71, the left and right side surfaces of the second and fourth clamps 2 and 3 are penetrated with the through hole 71, the right side surface of the first clamp 1 is provided with a connection hole 72, the front side surface of the second clamp 2 is provided with a connection hole 72, the left side surface of the third clamp 3 is provided with a connection hole 72, and the rear side surface of the fourth clamp 4 is provided with a connection hole 72.
The through hole 71, the connecting hole 72 and the snap ring 11 are internally provided with threads, the first connecting rod 73, the second connecting rod 75, the third connecting rod 77, the fourth connecting rod 79, the fifth connecting rod 74, the sixth connecting rod 76, the seventh connecting rod 72 and the eighth connecting rod 710 have the same structure and the same length, and the first connecting rod 73 is externally provided with threads.
The size of the placing groove 8 is matched with the size of the first connecting rod 73, and the size of the snap ring 11 is matched with the size of the first connecting rod 73.
Specifically, when in use, the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4 are respectively placed at the four corners of the square concrete column beam, then, the fixing bolts 6 in the fixing plates 5 of the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4 are rotated to fix the positions of the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4, then the first connecting rod 73, the second connecting rod 75, the third connecting rod 77, the fourth connecting rod 79, the fifth connecting rod 74, the sixth connecting rod 76, the seventh connecting rod 72 and the eighth connecting rod 710 are taken out from the inner part of the placing groove 8 and the snap ring 11, then a first connecting rod 73 and a fifth connecting rod 74 are respectively penetrated through the inside of the connecting hole 72 above and below the first clamp 1 and the through hole 71 above and below the second clamp 2, while a second connecting bar 75 and a sixth connecting bar 76 are respectively penetrated through the inside of the connection holes 72 above and below the second jig 2 and the penetration holes 71 above and below the third jig 2, a third connecting rod 77 and a seventh connecting rod 78 are respectively penetrated inside the upper and lower connection holes 72 of the third jig 3 and the upper and lower through holes 71 of the fourth jig 4, a fourth connecting rod 79 and an eighth connecting rod 710 are respectively penetrated inside the connection holes 72 above and below the fourth clamp 1 and the through holes 71 above and below the first clamp 2, the threads in the through hole 71 and the connecting hole 72 are matched with the threads on the outer sides of the first connecting rod 73, the second connecting rod 75, the third connecting rod 77, the fourth connecting rod 79, the fifth connecting rod 74, the sixth connecting rod 76, the seventh connecting rod 72 and the eighth connecting rod 710 so as to realize fixation, so that the device can adapt to square concrete columns and beams with different sizes and is firmer; during storage, the first connecting rod 73, the second connecting rod 75, the third connecting rod 77 and the fourth connecting rod 79 are respectively inserted into the placing grooves 8 of the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4, the fifth connecting rod 74, the sixth connecting rod 76, the seventh connecting rod 72 and the eighth connecting rod 710 are respectively placed inside the snap rings 11 of the first clamp 1, the second clamp 2, the third clamp 3 and the fourth clamp 4, the snap holes 10 of the first clamp 1 are aligned with the connecting protrusions 9 of the second clamp 2, the snap holes 10 of the second clamp 2 are aligned with the connecting protrusions 9 of the third clamp 3, the snap holes 10 of the third clamp 3 are aligned with the connecting protrusions 9 of the fourth clamp 4, and the snap holes 10 of the fourth clamp 4 are aligned with the connecting protrusions 9 of the first clamp 1, so that the connecting protrusions 9 and the snap holes 10 are mutually clamped and fixed, thereby facilitating carrying and transportation of the device.
In summary, the utility model fixes the first clamp, the second clamp, the third clamp and the fourth clamp by utilizing the insertion clamping holes of the connecting bulges through matching the connecting bulges and the clamping holes with the placing grooves and the clamping rings, and places the first connecting rod, the second connecting rod, the third connecting rod, the fourth connecting rod, the fifth connecting rod, the sixth connecting rod, the seventh connecting rod and the eighth connecting rod into the placing grooves and the clamping rings for fixation, so as to reduce the size of the device for storage and transportation; through the hole is put in the perforation cooperation, let the interval between first connecting rod, second connecting rod, third connecting rod, fourth connecting rod, fifth connecting rod, sixth connecting rod, seventh connecting rod, the first anchor clamps of eighth connecting rod rotation regulation, second anchor clamps, third anchor clamps and the fourth anchor clamps, let the device can adapt to the square concrete column roof beam of equidimension not, and more firm.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The building construction template clamp comprises a first clamp (1) and a connecting mechanism (7), and is characterized in that a second clamp (2) is arranged on the right side of the first clamp (1), a third clamp (3) is arranged on the front side of the second clamp (2), a fourth clamp (4) is arranged on the left side of the third clamp (3), the fourth clamp (4) is positioned on the front side of the first clamp (1), the distances among the first clamp (1), the second clamp (2), the third clamp (3) and the fourth clamp (4) are equal, placing grooves (8) are formed in the top end surfaces of the first clamp (1), the second clamp (2), the third clamp (3) and the fourth clamp (4), fixing plates (5) are arranged at the four corners of the outer sides of the first clamp (1), the second clamp (2), the third clamp (3) and the fourth clamp (4), fixing bolts (6) penetrate through the inside of the fixing plates (5), and a connecting mechanism is arranged among the first clamp (1), the second clamp (2), the third clamp (3) and the fourth clamp (4), one side of the connecting protrusion (9) is provided with a clamping hole (10), and the other side of the connecting protrusion (9) is provided with a clamping ring (11).
2. The building construction formwork clamp according to claim 1, wherein the first clamp (1), the second clamp (2), the third clamp (3) and the fourth clamp (4) are all cross-shaped, the heights of the first clamp (1), the second clamp (2), the third clamp (3) and the fourth clamp (4) are equal, and the size of the connecting protrusion (9) is matched with the size of the clamping hole (10).
3. The formwork clamp for building construction according to claim 1, wherein the connecting mechanism (7) comprises a through hole (71) and a connecting hole (72), the first clamp (1), the second clamp (2), the third clamp (3) and the fourth clamp (4) are provided with two through holes (71) and two connecting holes (72) inside, the through holes (71) and the connecting holes (72) inside the first clamp (1), the second clamp (2), the third clamp (3) and the fourth clamp (4) are symmetrically arranged up and down, the first connecting rod (73) and the fifth connecting rod (74) penetrate through the inside of the through hole (72) above and below the first clamp (1) and the through hole (71) above and below the second clamp (2), the second connecting rod (75) and the sixth connecting rod (74) penetrate through the inside of the through hole (72) above and below the second clamp (2) and the through hole (71) above and below the third clamp (3), the through hole (76) and the through hole (78) above and the through hole (71) below the through hole (72) above and the fourth clamp (4), the through hole (77) and the through hole (78) above and the fourth clamp (4), respectively, and the through hole (72) penetrate through the through hole (72) below the through hole (72) and the through hole (71) below the fourth connecting rod (78), and the through hole (72) below the through hole (4), and the through hole (72) respectively 1) A fourth connecting rod (79) and an eighth connecting rod (710) respectively penetrate through the upper through hole (71) and the lower through hole (71).
4. The formwork fixture for construction work according to claim 3, wherein the front and rear side surfaces of the first fixture (1) and the third fixture (3) are penetrated with a through hole (71), the left and right side surfaces of the second fixture (2) and the fourth fixture (4) are penetrated with a through hole (71), the right side surface of the first fixture (1) is provided with a connection hole (72), the front side surface of the second fixture (2) is provided with a connection hole (72), the left side surface of the third fixture (3) is provided with a connection hole (72), and the rear side surface of the fourth fixture (4) is provided with a connection hole (72).
5. The building construction formwork clamp according to claim 3, wherein the through hole (71), the connecting hole (72) and the snap ring (11) are internally provided with threads, the first connecting rod (73), the second connecting rod (75), the third connecting rod (77), the fourth connecting rod (79), the fifth connecting rod (74), the sixth connecting rod (76), the seventh connecting rod (78) and the eighth connecting rod (710) are structurally identical and equally long, and the first connecting rod (73) is externally provided with threads.
6. A construction form clamp according to claim 5, wherein the size of the placement groove (8) and the size of the first connecting rod (73) are matched to each other, and the size of the snap ring (11) and the size of the first connecting rod (73) are matched to each other.
CN202222056557.XU 2022-08-05 2022-08-05 Building construction template anchor clamps Active CN217871819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222056557.XU CN217871819U (en) 2022-08-05 2022-08-05 Building construction template anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222056557.XU CN217871819U (en) 2022-08-05 2022-08-05 Building construction template anchor clamps

Publications (1)

Publication Number Publication Date
CN217871819U true CN217871819U (en) 2022-11-22

Family

ID=84076389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222056557.XU Active CN217871819U (en) 2022-08-05 2022-08-05 Building construction template anchor clamps

Country Status (1)

Country Link
CN (1) CN217871819U (en)

Similar Documents

Publication Publication Date Title
CN108393641A (en) Oil tank of transformer skeleton jig
CN217871819U (en) Building construction template anchor clamps
CN212385315U (en) Positioning device for assembling cross steel pull rod
CN112900837A (en) Detachable assembly type building mould
CN215168022U (en) Adjustable building template fixing frame
CN215168009U (en) Novel combined building curtain wall template for building
CN212716033U (en) Building structure design roof beam reinforced structure
CN212405466U (en) Assembled concrete frame beam column connection structure
CN214995926U (en) Building template with self-locking function
CN219219339U (en) Assembled concrete beam column connector
CN112392150A (en) Method for jacking construction reinforced concrete frame beam
CN216276901U (en) Column mould bottom leveling device
CN220686453U (en) Steel structure floor support plate capable of being fixed rapidly
CN214531877U (en) Building template for shear wall concrete construction
CN210888076U (en) Prefabricated assembled aluminum alloy template installation device
CN219411285U (en) Pre-buried equipment of civil engineering construction
CN220035696U (en) Steel construction beam column node connecting device
CN220666930U (en) Reinforcing apparatus for column template
CN213359385U (en) Building construction template anchor clamps
CN218840386U (en) Anti-collision aluminum alloy template loading and transporting equipment
CN221001446U (en) Connection structure of steel column and beam reinforcement cage
CN211029083U (en) Pneumatic clamping jig for mold machining
CN212836254U (en) High-bearing lattice column
CN216616287U (en) Wood structure building beam column connecting piece
CN219138281U (en) Scaffold with anti-drop footboard structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant