CN217867709U - Steel construction hoist device - Google Patents

Steel construction hoist device Download PDF

Info

Publication number
CN217867709U
CN217867709U CN202221686718.7U CN202221686718U CN217867709U CN 217867709 U CN217867709 U CN 217867709U CN 202221686718 U CN202221686718 U CN 202221686718U CN 217867709 U CN217867709 U CN 217867709U
Authority
CN
China
Prior art keywords
plate
fixedly connected
support
couple
arc surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221686718.7U
Other languages
Chinese (zh)
Inventor
潘尚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yinong Steel Structure Co ltd
Original Assignee
Shanghai Yinong Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yinong Steel Structure Co ltd filed Critical Shanghai Yinong Steel Structure Co ltd
Priority to CN202221686718.7U priority Critical patent/CN217867709U/en
Application granted granted Critical
Publication of CN217867709U publication Critical patent/CN217867709U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a steel construction technical field specifically is a steel construction hoist device, and this application includes the support frame, the support is installed to the upper end of support frame, the top of support is provided with automatic serving machine, one side of automatic serving machine is rotated and is connected with the stay cord, the arc surface and the support sliding connection of stay cord, the one end fixedly connected with connecting plate of stay cord, the lower fixed surface of connecting plate is connected with the couple, the both sides of couple are equipped with limit structure, limit structure includes two fixed plates, two one side that the fixed plate is close to each other all with couple fixed connection, the surface slip of fixed plate runs through there is the stock, the arc surface sliding connection of stock has the rectangular plate, one side and the couple fixed connection of rectangular plate, the one end fixedly connected with plectane of stock. This application has been solved and has been hung the rope and drive the couple because the removal of stay cord drives easily at the inner wall of couple and rock, leads to the problem that the rope that hangs in the couple drops.

Description

Steel construction hoist device
Technical Field
The application relates to the technical field of steel structures, in particular to a steel structure hoisting device.
Background
The steel construction is the structure of constituteing by steel material, be one of main building structure type, when hoist the steel construction, generally need use a gallows, the inner wall of couple is hung into to the rope of hanging after will connecting the steel construction usually, in practical application, hang the rope and can shake because the removal of stay cord drives the couple easily to a certain extent at the inner wall of couple, lead to hanging in the couple the problem that the rope drops, thereby cause the unnecessary loss, and then reduce the efficiency of construction of gallows.
SUMMERY OF THE UTILITY MODEL
The purpose of this application is in order to solve to have among the prior art to hang the rope and drive the couple because the removal of stay cord drives easily and rock at the inner wall of couple, leads to the shortcoming that the rope that hangs in the couple drops, and a steel construction hoist device who provides.
In order to achieve the purpose, the following technical scheme is adopted in the application: the utility model provides a steel construction hoist device, includes the support frame, the support is installed to the upper end of support frame, the top of support is provided with automatic serving machine, one side of automatic serving machine is rotated and is connected with the stay cord, the arc surface and the support sliding connection of stay cord, the one end fixedly connected with connecting plate of stay cord, the lower fixed surface of connecting plate is connected with the couple, the both sides of couple are equipped with limit structure, limit structure includes two fixed plates, two one side that the fixed plate is close to each other all with couple fixed connection, the surface slip of fixed plate has run through the stock, the arc surface sliding connection of stock has the rectangular plate, one side and the couple fixed connection of rectangular plate, the one end fixedly connected with plectane of stock.
The effect that above-mentioned part reaches is: when having reached the use couple, carry out spacing effect to the string rope of couple inside to take place to rock when avoiding the stay cord to remove as far as possible, lead to hanging the problem that the rope drops from couple inside.
Preferably, the arc surface of the long rod is sleeved with a spring, and two ends of the spring are respectively fixedly connected with the circular plate and the fixing plate.
The effect that above-mentioned part reaches is: the movable circular plate drives the spring to stretch out and draw back from the arc surface of the long rod, and the spring plays a role in assisting in fixing the long rod by virtue of the elasticity of the spring.
Preferably, one side of each circular plate far away from the long rod is fixedly connected with a U-shaped rod, and the arc surface of each U-shaped rod is provided with an anti-skid bump.
The effect that above-mentioned part reaches does: the pulling U-shaped rod drives the two circular plates to move, so that the effect of conveniently pulling the circular plates by an operator is achieved.
Preferably, the upper surface of the connecting plate is fixedly connected with a rectangular plate, one side of the rectangular plate, which is far away from the pull rope, is fixedly connected with a supporting rod, the arc surface of the supporting rod is fixedly connected with a limiting rod, and the arc surface of the supporting rod is provided with a limiting groove.
The effect that above-mentioned part reaches is: the U-shaped rod is moved to be attached to the limiting rod, and then the U-shaped rod is clamped into the limiting groove of the arc surface of the supporting rod, so that the effect of temporarily limiting the U-shaped rod is achieved.
Preferably, the both sides of support are equipped with bearing structure, bearing structure includes two long boards, two one side that the long board is close to each other all with support fixed connection, two the surface of long board is rotated and is connected with the round bar, the arc surface fixedly connected with backup pad of round bar.
The effect that above-mentioned part reaches does: the effect of auxiliary stay support has been reached to improve the support efficiency of support frame.
Preferably, one side of the supporting plate, which is far away from the round rod, is rotatably connected with a rotating frame, one side of the rotating frame, which is far away from the supporting plate, is fixedly connected with an expansion plate, and the lower surface of the expansion plate is provided with a plurality of anti-skidding grooves.
The effect that above-mentioned part reaches does: the rotating frame drives the expansion plate to move through the movement of the supporting plate, and the effect of increasing the contact area between the supporting plate and the ground is achieved.
Preferably, one side fixedly connected with U-shaped plate of support is kept away from to the long slab, the both sides threaded connection of U-shaped plate has the threaded rod, the round hole has all been seted up for the position of two threaded rods to the round bar arc surface, the inner wall size and the threaded rod circular arc size looks adaptation of round bar arc surface round hole.
The effect that above-mentioned part reaches does: the threaded rod is rotated to insert into the round hole of the circular arc surface of the round rod through one side of the U-shaped plate, and the effect of fixing the round rod is achieved.
Preferably, one side fixedly connected with ring of backup pad, the below fixed connection of support has spacing rope, and the one end fixedly connected with spacing hook that the support was kept away from to spacing rope.
The effect that above-mentioned part reaches is: the movable circular ring drives the supporting plate to be sleeved on the arc surface of the limiting hook, and the effect of folding the steel structure when the steel structure is not hoisted is achieved.
In summary, the following steps:
in this application, when needs hoist the steel construction, at first will hang the rope and be connected with the steel construction, then with the U-shaped pole to the one side pulling of keeping away from the fixed plate, the U-shaped pole reaches the effect of making things convenient for operating personnel pulling plectane, the plectane drives the stock through the removal of U-shaped pole and removes from the fixed plate surface, then break away from the rectangular plate surface, the spring is in the state of opening this moment, play the effect of supplementary fixed stock with the help of the elasticity of spring, block into the spacing inslot of rectangular plate one side bracing piece arc surface with the U-shaped pole again, the gag lever post is spacing again with the U-shaped pole, the bracing piece plays the effect of interim spacing U-shaped pole, then put the inner wall at the couple with hanging the rope, break away from the spacing inslot of bracing piece arc surface again with the U-shaped pole, the spring is in the contraction state this moment, the plectane drives the stock through the removal of spring and inserts the rectangular plate from the surface of fixed plate, start automatic serving rope winder at last, the support frame supports the connecting plate, the stay cord drives the connecting plate from the surface of support and removes, the stay cord from the connecting plate, the removal drive connecting plate of support, it removes to drive hanging rope through the couple.
After the completion of hoisting the steel construction, at first with the pulling of U-shaped pole to the one side of keeping away from the fixed plate, the plectane drives the stock and removes from the fixed plate surface through the removal of U-shaped pole, then break away from the rectangular plate surface, the spring is in the state of opening this moment, block into the spacing inslot of rectangular plate one side bracing piece arc surface with the U-shaped pole again, the gag lever post is spacing with the U-shaped pole again, then will hang the rope and break away from the inner wall of couple, break away from the spacing inslot of U-shaped pole from the bracing piece arc surface again, the spring is in the shrink state this moment, the plectane drives the stock and inserts the rectangular plate from the surface of fixed plate through the removal of spring, through setting up limit structure, reached and carried out spacing effect to hanging the rope in the couple, thereby improve the security of couple during operation, and then improve the work efficiency of gallows.
Drawings
FIG. 1 is a schematic perspective view of the present application;
FIG. 2 is a schematic view of another embodiment of the present application;
FIG. 3 is an enlarged view taken at A of FIG. 2 of the present application;
FIG. 4 is a side view partially in schematic form of the present application;
fig. 5 is an enlarged view of fig. 4 at B.
Illustration of the drawings: 1. a support frame; 2. a support; 3. an automatic rope winder; 4. pulling a rope; 5. a connecting plate; 6. hooking; 7. a limiting structure; 701. a fixing plate; 702. a long rod; 703. a rectangular plate; 704. a circular plate; 705. a spring; 706. a U-shaped rod; 707. a rectangular plate; 708. a support bar; 709. a limiting rod; 710. a limiting groove; 8. a support structure; 81. a long plate; 82. a round bar; 83. a support plate; 84. a rotating frame; 85. an expansion plate; 86. a U-shaped plate; 87. a threaded rod; 88. a circular ring; 89. and a limiting hook.
Detailed Description
Referring to fig. 1, 2 and 3, the present application provides a technical solution: the utility model provides a steel construction hoist device, which comprises a supporting rack 1, support 2 is installed to the upper end of support frame 1, the top of support 2 is provided with automatic serving machine 3, one side of automatic serving machine 3 is rotated and is connected with stay cord 4, the arc surface and the support 2 sliding connection of stay cord 4, the one end fixedly connected with connecting plate 5 of stay cord 4, the lower fixed surface of connecting plate 5 is connected with couple 6, the both sides of couple 6 are equipped with limit structure 7, when having reached and using couple 6, carry out spacing effect to the inside string rope of couple 6, thereby take place to rock when avoiding stay cord 4 to remove as far as possible, lead to hanging the problem that the rope drops from couple 6 inside, the both sides of support 2 are equipped with bearing structure 8, the effect of auxiliary stay support 2 has been reached, thereby improve the support efficiency of support frame 1.
Referring to fig. 2 and 3, in the present embodiment: the lower part of the bracket 2 is fixedly connected with a limiting rope, and one end of the limiting rope, far away from the bracket 2, is fixedly connected with a limiting hook 89. Limiting structure 7 includes two fixed plates 701, one side that two fixed plates 701 are close to each other all with 6 fixed connection of couple, the surface slip of fixed plate 701 runs through stock 702, the arc surface sliding connection of stock 702 has rectangular plate 703, one side and 6 fixed connection of couple of rectangular plate 703, the one end fixedly connected with plectane 704 of stock 702, the arc surface cover of stock 702 has spring 705, spring 705's both ends respectively with plectane 704 and fixed plate 701 fixed connection, it is flexible from stock 702 arc surface to remove plectane 704 and drive spring 705, the effect of supplementary fixed stock 702 is played with the help of spring 705's elasticity.
Referring to fig. 2 and 3, specifically, one side of each of the two circular plates 704, which is far away from the long rod 702, is fixedly connected with a U-shaped rod 706, an arc surface of the U-shaped rod 706 is provided with an anti-skid protrusion, the pulling U-shaped rod 706 drives the two circular plates 704 to move, so that an effect of conveniently pulling the circular plates 704 by an operator is achieved, the upper surface of the connecting plate 5 is fixedly connected with a rectangular plate 707, one side of the rectangular plate 707, which is far away from the pull rope 4, is fixedly connected with a support rod 708, the arc surface of the support rod 708 is fixedly connected with a limit rod 709, the arc surface of the support rod 708 is provided with a limit groove 710, the moving U-shaped rod 706 is attached to the limit rod 709, and then the arc surface of the support rod 708 is clamped into the limit groove 710, so that the effect of temporarily limiting the U-shaped rod 706 is achieved.
Referring to fig. 4 and 5, in the present embodiment: bearing structure 8 includes two long boards 81, one side that two long boards 81 are close to each other all with support 2 fixed connection, the surface of two long boards 81 is rotated and is connected with round bar 82, the arc fixedly connected with backup pad 83 of round bar 82, one side that round bar 82 was kept away from to backup pad 83 is rotated and is connected with rotating turret 84, one side fixedly connected with expansion plate 85 of backup pad 83 is kept away from to rotating turret 84, a plurality of antiskid ribbed tile has been seted up to expansion plate 85's lower surface, rotating turret 84 drives expansion plate 85 through the removal of backup pad 83 and removes, play backup pad 83 and the effect that ground increases area of contact, one side fixedly connected with ring 88 of backup pad 83. One side fixedly connected with U-shaped plate 86 that long plate 81 kept away from support 2, the both sides threaded connection of U-shaped plate 86 has threaded rod 87, the round hole has all been seted up for two threaded rod 87 positions to round bar 82 arc, the inner wall size and the threaded rod 87 arc size looks adaptation of round bar 82 arc round hole, it drives the arc of backup pad 83 cover at stop hook 89 to remove ring 88, play and do not carry out the effect of rolling up when hoist to the steel construction, it inserts in the round hole of round bar 82 arc to rotate threaded rod 87 through U-shaped plate 86 one side, the effect of fixing round bar 82 has been reached.
The working principle is that when a steel structure needs to be hoisted, firstly, a hanging rope is connected with the steel structure, then a U-shaped rod 706 is pulled to one side far away from a fixing plate 701, the U-shaped rod 706 achieves the effect of conveniently pulling a circular plate 704 by an operator, the circular plate 704 drives a long rod 702 to move from the surface of the fixing plate 701 through the movement of the U-shaped rod 706, then the long rod 702 is separated from the surface of the rectangular plate 703, at the moment, a spring 705 is in an opening state, the effect of assisting in fixing the long rod 702 is achieved through the elastic force of the spring 705, then the U-shaped rod 706 is clamped into a limiting groove 710 of a circular arc surface of a support rod 708 on one side of a rectangular plate 707, a limiting rod 709 limits the U-shaped rod 706, the support rod 708 plays the effect of temporarily limiting the U-shaped rod 706, then the hanging rope is placed on the inner wall of a hook 6, then the U-shaped rod 706 is separated from the limiting groove 710 of the circular arc surface of the support rod 707, at the moment, the spring 705 is in a contracting state, the circular plate 704 drives the long rod 702 to be inserted into the surface of the fixing plate 701 through the movement of the rectangular rod 703, finally, an automatic rope winder 3 is started, a support frame 1 supports a pull rope 4, and drives a connecting plate 5 to move through the hook 5 to move.
When the steel structure needs to be hoisted, the ring 88 is firstly separated from the inner wall of the limiting hook 89 at one end of the limiting rope, then the supporting plate 83 is moved to one side close to the supporting frame 1, the rotating frame 84 drives the expansion plate 85 to be attached to the ground through the movement of the supporting plate 83 for supporting, the round rod 82 slides from the surface of the long plate 81 through the movement of the supporting plate 83, finally the threaded rod 87 rotates to one side close to the round rod 82, and the threaded rod 87 penetrates through the circular hole of the circular arc surface of the round rod 82 through the U-shaped plate 86.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.

Claims (8)

1. The utility model provides a steel construction hoist device, includes support frame (1), its characterized in that: support (2) are installed to the upper end of support frame (1), the top of support (2) is provided with automatic serving machine (3), one side of automatic serving machine (3) is rotated and is connected with stay cord (4), the arc surface and support (2) sliding connection of stay cord (4), the one end fixedly connected with connecting plate (5) of stay cord (4), the lower fixed surface of connecting plate (5) is connected with couple (6), the both sides of couple (6) are equipped with limit structure (7), limit structure (7) include two fixed plate (701), two one side that fixed plate (701) are close to each other all with couple (6) fixed connection, the surface slip of fixed plate (701) runs through stock (702), the arc surface sliding connection of stock (702) has rectangular plate (703), one side and couple (6) fixed connection of rectangular plate (703), the one end fixedly connected with plectane (704) of stock (702).
2. The steel structure hoisting device of claim 1, wherein: the arc surface of the long rod (702) is sleeved with a spring (705), and two ends of the spring (705) are respectively fixedly connected with the circular plate (704) and the fixing plate (701).
3. The steel structure hoisting device of claim 1, wherein: two one side fixedly connected with U-shaped pole (706) that stock (702) was kept away from in plectane (704), the arc surface of U-shaped pole (706) is equipped with the non-skid stud.
4. The steel structure hoisting device of claim 1, wherein: the upper surface fixedly connected with rectangular plate (707) of connecting plate (5), one side fixedly connected with bracing piece (708) of stay cord (4) is kept away from rectangular plate (707), the arc surface fixedly connected with gag lever post (709) of bracing piece (708), spacing groove (710) have been seted up to the arc surface of bracing piece (708).
5. The steel structure hoisting device of claim 1, wherein: the both sides of support (2) are equipped with bearing structure (8), bearing structure (8) are including two long boards (81), two one side that long board (81) are close to each other all with support (2) fixed connection, two the surface of long board (81) is rotated and is connected with round bar (82), arc surface fixedly connected with backup pad (83) of round bar (82).
6. The steel structure hoisting device of claim 5, wherein: one side of the supporting plate (83) far away from the round rod (82) is rotatably connected with a rotating frame (84), one side of the rotating frame (84) far away from the supporting plate (83) is fixedly connected with an expansion plate (85), and the lower surface of the expansion plate (85) is provided with a plurality of anti-skidding grooves.
7. The steel structure hoisting device of claim 5, wherein: one side fixedly connected with U-shaped plate (86) of support (2) are kept away from in long board (81), the both sides threaded connection of U-shaped plate (86) has threaded rod (87), round rod (82) arc surface has all seted up the round hole for the position of two threaded rod (87), the inner wall size and threaded rod (87) circular arc size looks adaptation of round rod (82) arc surface round hole.
8. The steel structure hoisting device of claim 5, wherein: one side fixedly connected with ring (88) of backup pad (83), the below fixed connection of support (2) has spacing rope, and the one end fixedly connected with limit hook (89) of support (2) are kept away from to spacing rope.
CN202221686718.7U 2022-07-01 2022-07-01 Steel construction hoist device Active CN217867709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221686718.7U CN217867709U (en) 2022-07-01 2022-07-01 Steel construction hoist device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221686718.7U CN217867709U (en) 2022-07-01 2022-07-01 Steel construction hoist device

Publications (1)

Publication Number Publication Date
CN217867709U true CN217867709U (en) 2022-11-22

Family

ID=84100406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221686718.7U Active CN217867709U (en) 2022-07-01 2022-07-01 Steel construction hoist device

Country Status (1)

Country Link
CN (1) CN217867709U (en)

Similar Documents

Publication Publication Date Title
CN217867709U (en) Steel construction hoist device
CN113213330B (en) Electric pole hoisting device for electric power construction
CN210598374U (en) Pole pole setting device
CN217281825U (en) Support frame for automatic maintenance of power dispatching
CN213416212U (en) Combined pneumatic triangular rescue frame
JPH04125297A (en) Gib swinging and housing device for crane
CN212953990U (en) Municipal administration building construction is with hanging material haulage equipment
CN114084807A (en) Tubular pile vacuum chuck crane and using method thereof
CN213037251U (en) Pipeline construction lifting device
CN218290088U (en) A hoist device for various steel sheet installation
CN218345020U (en) Liftable support for building construction
CN221051370U (en) Fan hoist device
CN217627325U (en) Special jib machine of anticreep rope stage
CN219389930U (en) Auxiliary structure for hanging air conditioner outdoor unit
CN218642306U (en) Hook bridge crane
CN116788978B (en) Electric pole hoisting device for electric power construction
CN109110667A (en) A kind of mobile auxiliary board wall splicing apparatus
CN219009686U (en) Lifting device for transportation of gate station electromechanical equipment
CN108979174B (en) Cement paste transfer equipment during bricklaying
CN117303120B (en) Cable construction exhibition puts device
CN219469475U (en) Hanging rack structure for decoration
CN218058157U (en) Municipal administration sewer is hoisting apparatus for fence
CN218102904U (en) Rotor winding wire drawing device
CN216006624U (en) Hanging basket device for bridge maintenance
CN215287799U (en) Dewatering well water pump hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant