CN217859642U - Fire engine pipeline welding frock - Google Patents

Fire engine pipeline welding frock Download PDF

Info

Publication number
CN217859642U
CN217859642U CN202221668334.2U CN202221668334U CN217859642U CN 217859642 U CN217859642 U CN 217859642U CN 202221668334 U CN202221668334 U CN 202221668334U CN 217859642 U CN217859642 U CN 217859642U
Authority
CN
China
Prior art keywords
pipeline
positioning
fixing
water tank
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221668334.2U
Other languages
Chinese (zh)
Inventor
戚中勇
赵久玉
彭沛
杨芝勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Sanliu11 Emergency Equipment Co ltd
Original Assignee
Hubei Sanliu11 Emergency Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Sanliu11 Emergency Equipment Co ltd filed Critical Hubei Sanliu11 Emergency Equipment Co ltd
Priority to CN202221668334.2U priority Critical patent/CN217859642U/en
Application granted granted Critical
Publication of CN217859642U publication Critical patent/CN217859642U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model relates to a fire engine pipeline welding tool, which comprises a frame, a base and a positioning component; the frame is provided with a pump body platform and a positioning platform which are arranged adjacently; the base is movably arranged on the frame along the front-back direction and is positioned on the pump body platform, the base is provided with an analog pump bracket and pipe support frames respectively arranged on two sides of the analog pump bracket in the width direction, the analog pump bracket is used for fixing a water pump pipeline, and the pipe support frames are used for fixing branch pipelines; the positioning assembly comprises a positioning frame, a water tank pipeline positioning plate and a fire monitor pipeline positioning plate, the water tank pipeline positioning plate and the fire monitor pipeline positioning plate are arranged on the positioning frame, the positioning frame is arranged on the machine frame and located on the positioning platform, the water tank pipeline positioning plate is used for fixing a water tank pipeline and can be movably arranged along the vertical direction, and the fire monitor pipeline positioning plate is located above the water tank pipeline positioning plate and used for fixing a fire monitor pipeline. The scheme can shorten the delay time, reduce the influence of delayed delivery and has better universality.

Description

Fire engine pipeline welding frock
Technical Field
The utility model relates to an emergency rescue equipment technical field especially relates to a fire engine pipeline welding frock.
Background
The fire truck, also called fire truck, is designed and manufactured to be suitable for firefighters to take and equip various fire-fighting equipment or fire extinguishing agents according to requirements, and is used for fire extinguishing, auxiliary fire extinguishing or fire rescue for fire-fighting troops, and most of national fire departments including China can also be used for other emergency rescue purposes.
At present, fire engines, foam cars, remote water supply systems, etc. can be classified into various forms such as low pressure, medium pressure and high pressure, import and home-made, etc. according to the kind of pumps. When a fire engine plant organizes production, pipeline accessories of the fire engine are delayed to the plant due to a plurality of adverse factors such as production plan sequencing, insufficient funds and the like, so that the plant cannot assemble the pipeline accessories according to a normal assembly sequence, the production progress of the product and the assembly period of the assembly are delayed, and the delivery time of the product is seriously influenced.
SUMMERY OF THE UTILITY MODEL
In view of the above, a need exists for a welding tool for a pipeline of a fire fighting truck, which is used to solve the technical problem in the prior art that the delivery time of a product is seriously affected when the pipeline fitting of the fire fighting truck is postponed to a factory.
The utility model provides a fire engine pipeline welding frock, this fire engine pipeline welding frock includes:
the pump body platform and the positioning platform are arranged adjacently;
the base is movably arranged on the rack along the front-back direction and is positioned on the pump body platform, the base is provided with an analog pump bracket and pipe support frames respectively arranged on two sides of the analog pump bracket in the width direction, the analog pump bracket is used for fixing a water pump pipeline, and the pipe support frames are used for fixing branch pipelines; and the number of the first and second groups,
positioning assembly, include the locating rack, and locate the water pitcher pipeline locating plate and the fire gun pipeline locating plate of locating rack, the locating rack is located the frame, and be located positioning platform, water pitcher pipeline locating plate is used for fixed water pitcher pipeline, and can follow vertical direction activity setting, fire gun pipeline locating plate is located the top of water pitcher pipeline locating plate is used for fixed fire gun pipeline.
Optionally, the positioning frame is provided with a plurality of positioning holes, the positioning holes are arranged at intervals along the vertical direction, and the water tank pipeline positioning plate is provided with a connecting hole capable of communicating with the positioning holes;
the positioning assembly further comprises positioning pins, and the positioning pins sequentially penetrate through the connecting holes and the positioning holes, so that the water tank pipeline positioning plate can be fixed at the position, corresponding to any positioning hole, of the positioning frame.
Optionally, the positioning frame is movably arranged on the frame in the front-back direction so as to have a moving stroke close to and far away from the simulated pump bracket.
Optionally, one of the positioning frame and the rack is provided with a sliding rail, the other is provided with a sliding groove, and the sliding rail and the sliding groove extend in the front-back direction.
Optionally, the water tank pipeline positioning plate is provided with a fixing hole along the thickness direction;
the positioning assembly further comprises a fixing bolt, and the fixing bolt is used for sequentially penetrating through the flange plate threaded hole of the water tank pipeline and the fixing hole, so that the water tank pipeline is fixed on the water tank pipeline positioning plate.
Optionally, the fire fighting truck pipeline welding tool further comprises a water tank pipeline supporting rod arranged on the base, the water tank pipeline supporting rod comprises a first fixing rod and a first telescopic rod which is arranged at the upper end of the first fixing rod in a telescopic and movable mode along the vertical direction, and the first telescopic rod is used for supporting the water tank pipeline; and/or the presence of a gas in the gas,
fire engine pipeline welding frock is still including locating the branch road pipeline bracing piece of base, branch road pipeline bracing piece includes the second dead lever, reaches to locate along vertical direction activity the second telescopic link of second dead lever upper end, the second telescopic link is used for supporting the branch road pipeline.
Optionally, a threaded hole is concavely formed in the upper end of the first fixing rod, and an external thread is formed at one end, close to the first fixing rod, of the first telescopic rod; and/or the presence of a gas in the gas,
the upper end of the second fixing rod is concavely provided with a threaded hole, and one end, close to the second fixing rod, of the second telescopic rod is provided with an external thread.
Optionally, the simulation pump support includes water pump pipeline fixed plate and backup pad, water pump pipeline fixed plate is used for fixing the water pump pipeline, and the lower extreme connect in the base, the backup pad is located the upper end of water pump pipeline fixed plate, and be the level setting, be used for supporting the pipeline junction.
Optionally, the lower end of the frame is provided with a roller.
Optionally, the base and the lower extreme of frame are the interval along vertical direction and set up to be formed with and dodge the space.
Compared with the prior art, the utility model provides a fire engine pipeline welding frock through simulation pump bracket, pipe-support rack, water pitcher pipeline locating plate and fire gun pipeline locating plate when the equipment, can carry out alone fixed with water pump pipeline, branch road pipeline, water pitcher pipeline and fire gun pipeline. Therefore, when the accessories are delayed to arrive at the factory, the existing accessories of the factory can be fixed according to the preset position, and corresponding final assembly is carried out after the delayed accessories arrive at the factory, so that the purpose of shortening the delay time is achieved, and the phenomenon that the product construction period is delayed to be overlong due to the fact that the accessories can be assembled after all parts are completely gathered is avoided. In addition, the base in this scheme can be followed the fore-and-aft direction activity, and water pitcher pipeline locating plate also can be in vertical direction activity to can be applicable to the accessory of not unidimensional type, improve the commonality.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood, and to implement the technical means in accordance with the content of the description, the preferred embodiments of the present invention are described in detail below with reference to the accompanying drawings. The detailed description of the present invention is given by the following examples and the accompanying drawings.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without undue limitation to the invention. In the drawings:
fig. 1 is a schematic structural view of an embodiment of the fire fighting truck pipeline welding tool provided by the present invention when assembling a fire fighting truck pipeline;
fig. 2 is a schematic structural view of the pipeline welding tool of the defense vehicle in fig. 1;
FIG. 3 is a schematic view of the pipeline of the fire fighting truck in FIG. 1;
FIG. 4 is a schematic structural view of the base of FIG. 2 mounted on the frame;
FIG. 5 is an enlarged schematic view of the structure at A in FIG. 2;
FIG. 6 is a schematic cross-sectional view of a support rod for the plumbing of the tank of FIG. 1;
FIG. 7 is a schematic cross-sectional view of the branch duct support bar of FIG. 1;
fig. 8 is a schematic structural diagram of a second embodiment of the fire fighting truck pipeline welding tool provided by the present invention.
Description of the reference numerals:
100-fire engine pipeline welding tool, 1-frame, 11-pump body platform, 12-positioning platform, 2-base, 21-simulation pump bracket, 211-water pump pipeline fixing plate, 212-supporting plate, 22-supporting pipe frame, 3-positioning component, 31-positioning frame, 31 a-positioning hole, 32-water tank pipeline positioning plate, 32 a-fixing hole, 33-fire monitor pipeline positioning plate, 34-positioning pin, 4-water tank pipeline supporting rod, 41-first fixing rod, 42-first telescopic rod, 43-first supporting seat, 5-branch pipeline supporting rod, 51-second fixing rod, 52-second telescopic rod, 53-second supporting seat, 6-roller, 200-fire engine pipeline, 210-water pump pipeline, 220-branch pipeline, 230-water tank pipeline and 240-fire monitor pipeline.
Detailed Description
The following detailed description of the preferred embodiments of the invention, which is to be read in connection with the accompanying drawings, forms a part of this application, and together with the embodiments of the invention, serve to explain the principles of the invention and not to limit its scope.
Referring to fig. 1 to 4, the fire engine pipeline welding tool 100 includes a frame 1, a base 2 and a positioning assembly 3; the frame 1 is provided with a pump body platform 11 and a positioning platform 12 which are adjacently arranged; the base 2 is movably arranged on the rack 1 along the front-back direction and is positioned on the pump body platform 11, the base 2 is provided with a simulation pump bracket 21 and branch pipe brackets 22 respectively arranged on two sides of the simulation pump bracket 21 in the width direction, the simulation pump bracket 21 is used for fixing a water pump pipeline 210, and the branch pipe brackets 22 are used for fixing a branch pipeline 220; locating component 3 includes locating rack 31, and locates the water pitcher pipeline locating plate 32 and the fire monitor pipeline locating plate 33 of locating rack 31, locating rack 31 is located frame 1, and be located positioning platform 12, water pitcher pipeline locating plate 32 is used for fixing water pitcher pipeline 230, and can follow vertical direction activity and set up, fire monitor pipeline locating plate 33 is located the top of water pitcher pipeline locating plate 32 is used for fixed fire monitor pipeline 240.
The utility model provides a fire engine pipeline welding frock 100 through simulation pump support 21, pipe-strut support 22, water pitcher pipeline locating plate 32 and fire monitor pipeline locating plate 33 when the equipment, can fix water pump pipeline 210, branch road pipeline 220, water pitcher pipeline 230 and fire monitor pipeline 240 alone. Therefore, when the accessories are delayed to the factory, the existing accessories in the factory are fixedly welded according to the preset position, and the corresponding final assembly welding is carried out after the delayed accessories arrive at the factory, so that the aim of shortening the delay time is fulfilled, and the phenomenon that the product construction period is delayed to be overlong due to the fact that the accessories can be assembled after all the components are completely gathered is avoided. In addition, base 2 in this scheme can be followed the fore-and-aft direction activity, and water pitcher pipeline locating plate 32 also can be in vertical direction activity to can be applicable to the accessory of not unidimensional type, improve the commonality.
Further, referring to fig. 5, the positioning frame 31 is provided with a plurality of positioning holes 31a, the plurality of positioning holes 31a are arranged at intervals along the vertical direction, and the water tank pipeline positioning plate 32 is provided with a connecting hole capable of communicating with the positioning holes 31 a; the positioning assembly 3 further comprises a positioning pin 34, wherein the positioning pin 34 sequentially penetrates through the connecting hole and the positioning hole 31a, so that the water tank pipeline positioning plate 32 can be fixed at any position of the positioning frame 31 corresponding to the positioning hole 31 a. This scheme is through the cooperation of locating pin 34, connecting hole and locating hole 31a for water pitcher pipeline 230 can be fixed on the locating hole 31a of co-altitude not, realizes that water pitcher pipeline 230 moves along vertical direction, and simple structure is reliable, and the dismouting of being convenient for.
In order to further improve the versatility and convenience of the fire engine pipeline welding tool 100, in an embodiment, the positioning frame 31 is movably disposed on the frame 1 along the front-back direction so as to have a moving stroke approaching to and moving away from the simulated pump bracket 21. Specifically, one of the positioning frame 31 and the rack 1 is provided with a slide rail, and the other is provided with a slide groove, and the slide rail and the slide groove extend in the front-back direction. In this embodiment, a sliding plate is connected to the lower end of the positioning frame 31, the sliding plate spans over the rack 1, a sliding rail is disposed on the lower side of the sliding plate, and the rack 1 is provided with a sliding groove corresponding to the sliding rail, so as to realize stable movement of the positioning frame 31 in the front-back direction.
Further, the water tank pipeline positioning plate 32 is provided with a fixing hole 32a along the thickness direction; the positioning assembly 3 further includes a fixing bolt, which is used to sequentially penetrate through the flange plate threaded hole of the water tank pipeline 230 and the fixing hole 32a, so that the water tank pipeline 230 is fixed to the water tank pipeline positioning plate 32. In this embodiment, the water tank pipeline 230 is fixed by the cooperation of the fixing bolt and the fixing hole 32 a. Similarly, it can be understood that the water pump pipeline 210 and the fire monitor pipeline 240 can be fixed to the corresponding tool parts through bolts, and the structure is simple and reliable. In addition, the bypass pipe 220 is fixed in the form of a fastening ring.
Further, in this embodiment, the positioning frame 31 includes a main body frame and an extension frame bent from the upper end of the main body frame, the extension frame is located on one side of the main body frame close to the pump body platform 11, the water tank pipeline positioning plate 32 is located on the main body frame, and the fire monitor pipeline positioning plate 33 is located on the extension frame. Specifically, the fire monitor pipeline positioning plate 33 is fixed with the extension frame through a pin. And a reinforcing rib is arranged between the extension frame and the main body frame.
Further, referring to fig. 6 and 7, the fire fighting truck pipeline welding tool 100 further includes a water tank pipeline support rod 4 disposed on the base 2, the water tank pipeline support rod 4 includes a first fixing rod 41 and a first telescopic rod 42 extending and retracting in a vertical direction at an upper end of the first fixing rod 41, and the first telescopic rod 42 is used for supporting the water tank pipeline 230; and/or, fire engine pipeline welding frock 100 is still including locating the branch road pipeline bracing piece 5 of base 2, branch road pipeline bracing piece 5 includes second dead lever 51, and locates along the activity of vertical direction the second telescopic link 52 of second dead lever 51 upper end, second telescopic link 52 is used for supporting branch road pipeline 220. In this embodiment, the water tank pipeline supporting rod 4 and the branch pipeline supporting rod 5 are used to support and fix the water tank pipeline 230 and the branch pipeline 220, so that the water tank pipeline and the branch pipeline are independently fixed more firmly. And because first telescopic link 42 and second telescopic link 52 can be followed the activity setting of vertical direction to can carry out height control, be applicable to the pipeline accessory of different model sizes.
Specifically, a threaded hole is concavely formed in the upper end of the first fixing rod 41, and an external thread is formed at one end of the first telescopic rod 42 close to the first fixing rod 41; the upper end of the second fixing rod 51 is concavely provided with a threaded hole, and one end of the second telescopic rod 52 close to the second fixing rod 51 is provided with an external thread. The first telescopic rod 42 and the second telescopic rod 52 can be extended and retracted up and down through threaded matching, the structure is simple, and the cost is saved. In addition, in the embodiment, the first support seat 43 and the second support seat 53 are correspondingly disposed at the upper ends of the first telescopic rod 42 and the second telescopic rod 52, and the upper ends of the first support seat 43 and the second support seat 53 are disposed in an arc concave surface to match the pipeline shape correspondingly supported.
Further, the simulation pump bracket 21 includes a water pump pipeline fixing plate 211 and a supporting plate 212, the water pump pipeline fixing plate 211 is used for fixing the water pump pipeline 210, and the lower end of the water pump pipeline fixing plate is connected to the base 2, and the supporting plate 212 is arranged at the upper end of the water pump pipeline fixing plate 211 and is horizontally arranged to support the pipeline joint. This scheme can wholly apply certain holding power through simulation pump support 21 by fire engine pipeline 200 for each part of fire engine pipeline 200 is more stable at fixed in-process.
Further, referring to fig. 8, in one embodiment, in order to facilitate the transportation of the fire engine pipeline 200, the lower end of the frame 1 is provided with rollers 6. In this way, the frame 1 and the fire engine pipeline 200 are directly transported by driving the rollers 6 to rotate. In another embodiment, the base 2 and the lower end of the frame 1 are arranged at intervals along the vertical direction to form an avoidance space. Thereby be convenient for fork truck stretch into the fork truck arm and transport in the space to transport.
The above description is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention should be covered by the present invention.

Claims (10)

1. The utility model provides a fire engine pipeline welding frock which characterized in that, it includes:
the pump body platform and the positioning platform are arranged adjacently;
the base is movably arranged on the rack along the front-back direction and is positioned on the pump body platform, the base is provided with an analog pump bracket and branch pipe frames respectively arranged on two sides of the analog pump bracket in the width direction, the analog pump bracket is used for fixing a water pump pipeline, and the branch pipe frames are used for fixing branch pipelines; and the number of the first and second groups,
locating component, including the locating rack, and locate the water pitcher pipeline locating plate and the fire gun pipeline locating plate of locating rack, the locating rack is located the frame, and be located the location platform, water pitcher pipeline locating plate is used for fixing the water pitcher pipeline, and can follow vertical direction activity setting, fire gun pipeline locating plate is located the top of water pitcher pipeline locating plate is used for fixed fire gun pipeline.
2. The fire fighting truck pipeline welding tool according to claim 1, wherein the positioning frame is provided with a plurality of positioning holes which are arranged at intervals in the vertical direction, and the water tank pipeline positioning plate is provided with a connecting hole which can be communicated with the positioning holes;
the positioning assembly further comprises positioning pins, and the positioning pins sequentially penetrate through the connecting holes and the positioning holes, so that the water tank pipeline positioning plate can be fixed at the position, corresponding to any positioning hole, of the positioning frame.
3. The fire fighting truck pipeline welding tool according to claim 1, wherein the positioning frame is movably arranged on the rack in the front-back direction so as to have a movable stroke close to and far away from the simulation pump bracket.
4. The fire engine pipeline welding tool according to claim 3, wherein one of the positioning frame and the rack is provided with a slide rail, the other is provided with a slide groove, and the slide rail and the slide groove extend in the front-rear direction.
5. The fire fighting truck pipeline welding tool according to claim 1, wherein a fixing hole penetrates through the water tank pipeline positioning plate in the thickness direction;
the positioning assembly further comprises a fixing bolt, and the fixing bolt is used for sequentially penetrating through the flange plate threaded hole of the water tank pipeline and the fixing hole, so that the water tank pipeline is fixed on the water tank pipeline positioning plate.
6. The fire fighting truck pipeline welding tool according to claim 1, further comprising a water tank pipeline support rod arranged on the base, wherein the water tank pipeline support rod comprises a first fixed rod and a first telescopic rod which is vertically and flexibly movable on the upper end of the first fixed rod, and the first telescopic rod is used for supporting the water tank pipeline; and/or the presence of a gas in the gas,
fire engine pipeline welding frock is still including locating the branch road pipeline bracing piece of base, branch road pipeline bracing piece includes the second dead lever, reaches to locate along vertical direction activity the second telescopic link of second dead lever upper end, the second telescopic link is used for supporting the branch road pipeline.
7. The fire engine pipeline welding tool as claimed in claim 6, wherein a threaded hole is concavely formed in the upper end of the first fixing rod, and an external thread is formed in one end, close to the first fixing rod, of the first telescopic rod; and/or the presence of a gas in the gas,
the upper end of the second fixing rod is concavely provided with a threaded hole, and one end, close to the second fixing rod, of the second telescopic rod is provided with an external thread.
8. The fire engine pipeline welding tool according to claim 1, wherein the simulation pump bracket comprises a water pump pipeline fixing plate and a supporting plate, the water pump pipeline fixing plate is used for fixing the water pump pipeline, the lower end of the water pump pipeline fixing plate is connected to the base, and the supporting plate is arranged at the upper end of the water pump pipeline fixing plate and is horizontally arranged to support the pipeline joint.
9. The fire engine pipeline welding tool according to claim 1, wherein a roller is arranged at the lower end of the rack.
10. The fire fighting truck pipeline welding tool according to claim 1, wherein the base is arranged at an interval with the lower end of the frame in the vertical direction to form an avoidance space.
CN202221668334.2U 2022-06-28 2022-06-28 Fire engine pipeline welding frock Active CN217859642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221668334.2U CN217859642U (en) 2022-06-28 2022-06-28 Fire engine pipeline welding frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221668334.2U CN217859642U (en) 2022-06-28 2022-06-28 Fire engine pipeline welding frock

Publications (1)

Publication Number Publication Date
CN217859642U true CN217859642U (en) 2022-11-22

Family

ID=84099269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221668334.2U Active CN217859642U (en) 2022-06-28 2022-06-28 Fire engine pipeline welding frock

Country Status (1)

Country Link
CN (1) CN217859642U (en)

Similar Documents

Publication Publication Date Title
CN217859642U (en) Fire engine pipeline welding frock
CN109746614B (en) Self-adaptive prefabricating method for camber of main girder of crane and special matching device thereof
CN203247533U (en) Watering cart
CN219131347U (en) Building steel structure welding set
CN212289804U (en) Passenger car brake pipe mounting structure
CN210908731U (en) Simple tool positioning platform based on vehicle body welding
CN209780910U (en) tunnel maintenance trolley with variable section
CN109515521B (en) Detachable rear lifting support leg assembly
CN110949608A (en) Double-bottom bracket-free type cargo oil hose crane base of oil tanker
CN212201219U (en) High support photovoltaic overhauls platform
CN220806094U (en) Novel flange group leveling device
CN219836061U (en) Fire engine driver's cabin top big gun pipeline structure
CN210343884U (en) Energy accumulator group for power station water inlet butterfly valve
CN216665632U (en) Arch spraying trolley arm frame system and arch spraying trolley
CN216483733U (en) Vehicle rain test system
CN219549017U (en) Hydraulic turbine main shaft buttress
CN208552921U (en) A kind of fire fighting truck foam water tank
CN218176397U (en) Steel structure stair for power plant building
CN211058820U (en) Trusteeship device of tunnel pipe gallery fortune frame machine
CN219673959U (en) Unloading device for liquefied natural gas tank car
CN216587421U (en) Assemble stand railing fixed knot and construct
CN115042619B (en) Work machine
CN218345108U (en) Pipeline system of small-tonnage two-stage full-freedom forklift gantry attachment
CN203654706U (en) Movable operation platform for pot top
CN221069742U (en) General frock of steel tower internals installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant