CN217840017U - Garden engineering construction foundation ditch compaction fill structure - Google Patents

Garden engineering construction foundation ditch compaction fill structure Download PDF

Info

Publication number
CN217840017U
CN217840017U CN202221507233.7U CN202221507233U CN217840017U CN 217840017 U CN217840017 U CN 217840017U CN 202221507233 U CN202221507233 U CN 202221507233U CN 217840017 U CN217840017 U CN 217840017U
Authority
CN
China
Prior art keywords
plate
installation
engineering construction
compaction
garden engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221507233.7U
Other languages
Chinese (zh)
Inventor
叶鹏
白东坡
王艳淑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Jimu Construction Engineering Co ltd
Original Assignee
Henan Jimu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Jimu Construction Engineering Co ltd filed Critical Henan Jimu Construction Engineering Co ltd
Priority to CN202221507233.7U priority Critical patent/CN217840017U/en
Application granted granted Critical
Publication of CN217840017U publication Critical patent/CN217840017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a garden engineering construction foundation pit compaction fill structure, which relates to the technical field of garden construction, and comprises two installation vehicles, wherein one side of each installation vehicle is provided with a pressing plate which slides along the vertical direction, a fixed component is installed on the pressing plate, a lifting device for driving the pressing plate to lift is installed on each installation vehicle, a telescopic plate is installed between the installation vehicles, and two movable ends of the telescopic plate are respectively and fixedly arranged on the two installation vehicles; drive the clamp plate downstream on the installation car through elevating gear, after compressing tightly the bottom of foundation ditch up to the bottom of clamp plate, thrust unit drives the installation car and moves towards the both sides of foundation ditch, drives the clamp plate through the installation car and moves towards the foundation ditch inner wall and then compresses tightly the inner wall of foundation ditch in order to prevent the phenomenon of collapsing to appear, through setting up fixed subassembly, extends the area of clamp plate, and then adapts to not unidimensional foundation ditch.

Description

Garden engineering construction foundation ditch compaction fill structure
Technical Field
The utility model relates to a gardens construction technical field specifically is a garden engineering construction foundation ditch compaction fill structure.
Background
Garden engineering generally can excavate some interim foundation pits in advance in the work progress, some foundation pits are located near comparatively complicated topography in garden engineering, for example at view lakeshore, foundation pit near artifical river bank is higher because of soil water content, when carrying out compaction fill to the foundation pit, constructor need lay the backfill material of different materials in the foundation pit, constructor can be in the operation of foundation pit, and the lateral wall of the higher foundation pit of water content takes place to collapse easily, there is great threat to constructor's personal safety
When garden engineering construction foundation ditch compaction fill structure among the prior art carries out garden construction, it is stable inadequately to the support of wall body, causes the wall body landslide easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a garden engineering construction foundation ditch compaction fill structure aims at solving among the prior art to the support of wall body stable inadequately, causes the problem of wall body landslide easily.
In order to achieve the above purpose, the utility model adopts the following technical scheme: garden engineering construction foundation ditch compaction fill structure, including the installation car, the installation car is provided with two, every one side of installation car all is provided with along the gliding clamp plate of vertical direction, install fixed subassembly on the clamp plate, install the elevating gear who is used for driving the clamp plate to go up and down on the installation car, install the expansion plate between the installation car, two expansion ends of expansion plate are fixed respectively and are set up on two installation cars, install the thrust unit who is used for promoting two installation cars to remove on the expansion plate.
In order to make the utility model discloses have the function that drives the clamp plate and go up and down, the utility model discloses a further technical scheme does, elevating gear is including the fixed plate of fixed setting on the installation car, install electric telescopic handle on the fixed plate, electric telescopic handle's the fixed setting of activity end is on the clamp plate.
In order to make the utility model discloses have the effect of keeping rotating motor position, the utility model discloses a further technical scheme does, the expansion plate is including the fixed sleeve that sets up on two installation cars respectively, it is provided with the bottom plate to slide in the sleeve.
In order to make the utility model discloses have the effect that promotes the installation car and remove, the utility model discloses a further technical scheme does, thrust unit is including the fixed rotation motor that sets up on the bottom plate, the gear is installed to the expansion end that rotates the motor, the last meshing of gear has two racks that are parallel to each other, the fixed push rod that is provided with of one end of rack, push rod and installation car fixed connection.
In order to make the utility model discloses have the vertical function of holding clamp plate, the utility model discloses a further technical scheme does, the fixed dovetail that is provided with on the installation car, set up the forked tail slider that slides and set up in the dovetail on the clamp plate.
In order to make the utility model discloses have the drive and carry out the effect that extends the clamp plate, the utility model discloses a further technical scheme does, fixed subassembly is including seting up screw hole and the screw of threaded connection in the screw hole on the clamp plate.
In order to make the utility model discloses have the effect of the service property of assurance clamp plate, the utility model discloses a further technical scheme does, the material of clamp plate is stainless steel material.
In order to make the utility model discloses have the effect that conveniently will install the car and hang, the utility model discloses a further technical scheme does, the fixed rings that are provided with on the clamp plate.
The utility model has the advantages that:
the utility model discloses during the use, place the installation car in the foundation ditch, drive the clamp plate downstream on the installation car through elevating gear, after the bottom of clamp plate compresses tightly the bottom of foundation ditch, drive the installation car through thrust unit and move towards the both sides of foundation ditch, drive the clamp plate through the installation car and move towards the foundation ditch inner wall and then compress tightly the inner wall of foundation ditch in order to prevent the collapse phenomenon appearance, through setting up fixed subassembly, extend the area of clamp plate, and then adapt to not unidimensional foundation ditch.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is an enlarged schematic view of a structure at a in fig. 1.
Fig. 3 is a schematic structural diagram of an expansion plate according to an embodiment of the present invention.
In the figure: 1. installing a vehicle; 2. pressing a plate; 3. a fixing assembly; 4. a lifting device; 41. a fixing plate; 42. an electric telescopic rod; 5. a retractable plate; 51. a sleeve; 52. a base plate; 6. a pushing device; 61. rotating the motor; 62. a gear; 63. a rack; 64. a push rod; 7. a dovetail groove; 8. a dovetail slide block; 9. a lifting ring.
Detailed Description
The following description will further describe embodiments of the present invention with reference to the accompanying drawings.
As shown in fig. 1-3, a garden engineering construction foundation ditch compaction fill structure, including installation car 1, installation car 1 is provided with two, every one side of installation car 1 all is provided with along the gliding clamp plate 2 of vertical direction, install fixed subassembly 3 on the clamp plate 2, install the elevating gear 4 that is used for driving clamp plate 2 to go up and down on the installation car 1, install expansion plate 5 between the installation car 1, two expansion ends of expansion plate 5 are fixed the setting respectively on two installation cars 1, install the thrust unit 6 that is used for promoting two installation cars 1 to remove on the expansion plate 5.
In this embodiment, when carrying out the gardens construction, place installation vehicle 1 in the foundation ditch, drive 2 downstream of clamp plate on the installation vehicle 1 through elevating gear 4, after the bottom of clamp plate 2 compresses tightly the bottom of foundation ditch, drive installation vehicle 1 through thrust unit 6 and move towards the both sides of foundation ditch, drive clamp plate 2 through installation vehicle 1 and move towards the foundation ditch inner wall and then compress tightly the inner wall of foundation ditch in order to prevent the collapse phenomenon and appear, through setting up fixed subassembly 2, extend the area of clamp plate 2, and then adapt to not unidimensional foundation ditch.
Specifically, the lifting device 4 comprises a fixing plate 41 fixedly arranged on the mounting vehicle 1, an electric telescopic rod 42 is arranged on the fixing plate 41, and the movable end of the electric telescopic rod 42 is fixedly arranged on the pressure plate 2; the electric telescopic rod 42 drives the pressing plate 2 to lift, so that the bottom of the pressing plate 2 is driven to be in contact with the bottom of the foundation pit, and the bottom of the foundation pit is compacted.
Preferably, the expansion plate 5 comprises sleeves 51 respectively fixedly arranged on the two mounting vehicles 1, and a bottom plate 52 is slidably arranged in the sleeves 51; when the vehicle 1 is moved towards both sides, the base plate 52 slides within the sleeve 51 and the rotary motor 61 is fixed to the base plate without moving.
Preferably, the pushing device 6 comprises a rotating motor 61 fixedly arranged on the bottom plate 52, a gear 62 is mounted at the movable end of the rotating motor 61, two parallel racks 63 are engaged on the gear 62, a push rod 64 is fixedly arranged at one end of each rack 63, and the push rod 64 is fixedly connected with the installation vehicle 1; the gear 62 is driven to rotate by the rotating motor 61, the gear 62 rotates to drive the rack 63 to move, and the rack 63 drives the push rod 64 to drive the installation vehicle 1 to move towards two sides.
Preferably, a dovetail groove 7 is fixedly arranged on the installation vehicle 1, and a dovetail slide block 8 which is arranged in the dovetail groove 7 in a sliding manner is arranged on the pressure plate 2; the platen 2 is held in a vertical state by the provision of the dovetail groove 7 and the dovetail slider 8.
Preferably, the fixing component 3 comprises a threaded hole formed on the pressure plate 2 and a screw in threaded connection with the threaded hole; through setting up fixed subassembly 7, can expand the area of clamp plate 2 to adapt to not unidimensional foundation ditch.
Preferably, the pressing plate 2 is made of stainless steel; through the pressure plate 2 that sets up stainless steel, after the operation is accomplished, can keep the life of pressure plate 2.
Preferably, a lifting ring 9 is fixedly arranged on the pressing plate 2; the installation vehicle 1 is convenient to be hoisted.
In the description of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.

Claims (8)

1. The utility model provides a garden engineering construction foundation ditch compaction fill structure, a serial communication port, including installation car (1), installation car (1) is provided with two, every one side of installation car (1) all is provided with along the gliding clamp plate of vertical direction (2), install fixed subassembly (3) on clamp plate (2), install elevating gear (4) that are used for driving clamp plate (2) to go up and down on installation car (1), install expansion plate (5) between installation car (1), two expansion ends of expansion plate (5) are fixed the setting respectively on two installation cars (1), install thrust unit (6) that are used for promoting two installation cars (1) to remove on expansion plate (5).
2. The compaction and filling structure for the garden engineering construction foundation pit according to claim 1, wherein the lifting device (4) comprises a fixing plate (41) fixedly arranged on the mounting vehicle (1), an electric telescopic rod (42) is mounted on the fixing plate (41), and the movable end of the electric telescopic rod (42) is fixedly arranged on the pressing plate (2).
3. The compaction and filling structure for the garden engineering construction foundation pit as claimed in claim 1, wherein the expansion plate (5) comprises sleeves (51) fixedly arranged on the two mounting vehicles (1), and a bottom plate (52) is slidably arranged in the sleeves (51).
4. The compaction and filling structure for the foundation pit in garden engineering construction according to claim 1, wherein the pushing device (6) comprises a rotating motor (61) fixedly arranged on the bottom plate (52), a gear (62) is installed at the movable end of the rotating motor (61), two parallel racks (63) are engaged on the gear (62), a push rod (64) is fixedly arranged at one end of each rack (63), and the push rod (64) is fixedly connected with the mounting vehicle (1).
5. The compaction and filling structure for the garden engineering construction foundation pit according to claim 1, wherein a dovetail groove (7) is fixedly arranged on the mounting vehicle (1), and a dovetail sliding block (8) which is arranged in the dovetail groove (7) in a sliding manner is arranged on the pressing plate (2).
6. The compaction and filling structure for the garden engineering construction foundation pit as claimed in claim 1, wherein the fixing assembly (3) comprises a threaded hole formed on the pressure plate (2) and a screw screwed in the threaded hole.
7. The compaction and filling structure for the garden engineering construction foundation pit according to claim 1, wherein the pressing plate (2) is made of stainless steel.
8. The garden engineering construction foundation pit compaction fill structure according to any one of claims 1-7, characterized in that a lifting ring (9) is fixedly arranged on the pressure plate (2).
CN202221507233.7U 2022-06-16 2022-06-16 Garden engineering construction foundation ditch compaction fill structure Active CN217840017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221507233.7U CN217840017U (en) 2022-06-16 2022-06-16 Garden engineering construction foundation ditch compaction fill structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221507233.7U CN217840017U (en) 2022-06-16 2022-06-16 Garden engineering construction foundation ditch compaction fill structure

Publications (1)

Publication Number Publication Date
CN217840017U true CN217840017U (en) 2022-11-18

Family

ID=84023326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221507233.7U Active CN217840017U (en) 2022-06-16 2022-06-16 Garden engineering construction foundation ditch compaction fill structure

Country Status (1)

Country Link
CN (1) CN217840017U (en)

Similar Documents

Publication Publication Date Title
CN217840017U (en) Garden engineering construction foundation ditch compaction fill structure
CN215562915U (en) Efficient water conservancy construction sediment removal device
CN216275727U (en) Pit wall supporting device for deep foundation pit construction
CN108206580A (en) A kind of solar energy charging pile
CN212025792U (en) Track sleeper-changing digging machine
CN210177490U (en) Highway subgrade leveling device
CN208201963U (en) A kind of road construction bull-dozer
CN219973324U (en) Civil engineering foundation pit excavating device
CN107962967A (en) A kind of clean energy resource charging pile
CN220100011U (en) Pushing device for building civil engineering construction
CN219491017U (en) Foundation pit supporting structure
CN108242710A (en) A kind of clean energy resource electric automobile charging pile
CN212104258U (en) Municipal works slot excavating gear
CN216948494U (en) Coal mine dredging equipment
CN220117177U (en) Ramming device is backfilled to earthwork
CN219412617U (en) Coal mine tunneling supporting device
CN217974444U (en) Narrow deep basal pit drainage structures
CN218711860U (en) Roadbed filling construction device
CN218175947U (en) Land leveler with adjustable width
CN214247347U (en) Grouting is with filling head fixing device
CN218322651U (en) Hydroelectric power generation equipment for ditch
CN218322700U (en) A backfill rammer compactor for building corner
CN213142923U (en) Environment-friendly foundation ditch excavation dust-proof device
CN213448505U (en) Deep foundation pit supporting structure
CN215630242U (en) Underground scraper