CN217838317U - Ascending device for building electric power engineering - Google Patents

Ascending device for building electric power engineering Download PDF

Info

Publication number
CN217838317U
CN217838317U CN202221786977.7U CN202221786977U CN217838317U CN 217838317 U CN217838317 U CN 217838317U CN 202221786977 U CN202221786977 U CN 202221786977U CN 217838317 U CN217838317 U CN 217838317U
Authority
CN
China
Prior art keywords
platform
ascending
height
device main
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221786977.7U
Other languages
Chinese (zh)
Inventor
卢庆磊
高伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221786977.7U priority Critical patent/CN217838317U/en
Application granted granted Critical
Publication of CN217838317U publication Critical patent/CN217838317U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a building electric power engineering is with device of ascending a height relates to building electric power engineering technical field, including ascending a height device main part, connection platform, moving mechanism, stabilizing mean, elevating system, work platform, platform handrail and dead lever, the bottom of ascending a height device main part is provided with connection platform, connection platform's the left and right sides is provided with moving mechanism, the top of ascending a height device main part is provided with elevating system, just the top of ascending a height device main part and the left and right sides that is located elevating system are provided with stabilizing mean. The utility model discloses an possess stabilizing mean, work platform, connecting plate, damping spring, solve current device of ascending a height and at the removal in-process, the shake takes place easily for the device platform, leads to the device unstable inadequately, makes the workman take place the problem of falling easily, combines to make the device of ascending a height when using through above structure, can offset the shake to stabilize the platform, effectively avoid the workman to fall down from the platform.

Description

Ascending device for building electric power engineering
Technical Field
The utility model relates to a device of ascending a height relates to building electric power engineering technical field, concretely relates to building electric power engineering is with device of ascending a height.
Background
Along with the acceleration of urbanization, industrialization process, the device of ascending a height is indispensable instrument in the aspect of the building, can help the staff to maintain in the aspect of the electric power of higher department of contrast, has improved staff's work efficiency, simultaneously, also makes certain help to staff's maintenance work. The following problems exist in the prior art:
1. in the moving process of the conventional climbing device, a platform of the device is easy to shake, so that the device is not stable enough and workers are easy to fall;
2. when the existing climbing device is used, the platform handrail cannot be easily conducted, and the problem that the practicability of the device is not high enough due to insufficient firmness is caused.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a building electric power engineering is with device of ascending a height, is including ascending a height device main part, connection platform, moving mechanism, stabilizing mean, elevating system, work platform, platform handrail and dead lever, the bottom of ascending a height device main part is provided with connection platform, connection platform's the left and right sides is provided with moving mechanism, the top of ascending a height device main part is provided with elevating system, just the top of ascending a height device main part and the left and right sides that is located elevating system are provided with stabilizing mean, elevating system's top is provided with work platform, work platform's top both sides are provided with the platform handrail, the inboard of platform handrail is provided with the dead lever, work platform's inside is provided with damping spring, damping spring is used for offsetting the shake.
And an insulating outer layer is arranged on the inner wall of the platform handrail and is used for preventing the platform from conducting electricity.
The utility model discloses technical scheme's further improvement lies in: the top fixed mounting of connecting platform is in the bottom of the device main part of ascending a height, moving mechanism's inboard movable mounting is in the left and right sides of connecting platform, stabilizing mean's bottom movable mounting is in the top both sides of the device main part of ascending a height, elevating system's bottom fixed mounting is at the top of the device main part of ascending a height.
By adopting the technical scheme, one side of the ascending device main body in the scheme is provided with the controller, so that the device mechanism can be controlled.
The utility model discloses technical scheme's further improvement lies in: the bottom fixed mounting of work platform is in elevating system's bottom, stabilizing mean's top movable mounting is in the bottom both sides of work platform, the bottom fixed mounting of platform handrail is in the top both sides of work platform, the left and right sides fixed mounting of dead lever is in the inboard of platform handrail, just the bottom fixed mounting of dead lever is at the top of work platform.
By adopting the technical scheme, the stabilizing mechanism in the scheme stabilizes the left and right balance of the work platform, the driving element controls the lifting mechanism to lift, and the height of the work platform is lifted when the height is lifted.
The utility model discloses technical scheme's further improvement lies in: the climbing device comprises a climbing device body and is characterized in that a driving element is arranged on the inner wall of the climbing device body, the bottom of the driving element is fixedly installed on the inner wall of the climbing device body, a connecting cable is fixedly connected to the periphery of the surface of the driving element, a second driver is arranged at the other end of the connecting cable, the inner side of the second driver is fixedly connected to the other end of the connecting cable, and the bottom of the second driver is fixedly installed on the inner wall of the climbing device body.
By adopting the technical scheme, the controller on one side of the ascending device main body can control the driving element in the ascending device main body.
The utility model discloses technical scheme's further improvement lies in: the damping device is characterized in that a connecting plate is arranged on the inner wall of the work platform, the outer side of the connecting plate is fixedly installed on the inner wall of the work platform, and the upper end and the lower end of the damping spring are fixedly installed on the inner side of the connecting plate.
By adopting the technical scheme, the damping spring in the working platform in the scheme utilizes the elasticity of the damping spring to offset the generated shake.
The utility model discloses technical scheme's further improvement lies in: the utility model discloses a platform handrail, including platform handrail, reinforcing inner panel, outer insulating layer, reinforcing inner panel, upper and lower both ends fixed mounting that just are located insulating outer layer are provided with the reinforcing inner panel on the inner wall of platform handrail, the surface of reinforcing inner panel is fixed mounting all around in insulating outer layer's inside, just the upper and lower both ends fixed mounting who reinforces the inner panel is on the inner wall of platform handrail.
Adopt above-mentioned technical scheme, the inside insulating skin of platform handrail in this scheme can prevent that the platform handrail is electrically conductive, consolidates the interior plate and can improve the toughness of handrail, improves the practicality of device.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a building electric power engineering is with device of ascending a height, in order to possess stabilizing mean, work platform, connecting plate, damping spring, solve current device of ascending a height and at the removal in-process, the shake takes place easily for the device platform, leads to the device unstable enough, makes the workman take place the problem of falling easily, combines to make the device of ascending a height when using through above structure, can offset the shake to stabilize the platform, effectively avoid the workman to fall from the platform.
2. The utility model provides a building electric power engineering is with device of ascending a height, in order to possess platform handrail, insulating outer layer, consolidate the inner panel, solve current device of ascending a height when using, unable platform handrail is electrically conductive easily to durable inadequately leads to the not enough efficient problem of device practicality, combines to make the device of ascending a height when using through above structure, can prevent that the platform handrail from electrically conducting, and improve the toughness of handrail, improve the practicality of device.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic sectional structural view of the main body of the ascending device of the present invention;
FIG. 3 is a schematic cross-sectional view of the working platform of the present invention;
fig. 4 is a schematic view of the platform handrail of the present invention.
In the figure: 1. a main body of the ascending device; 2. connecting the platform; 3. a moving mechanism; 4. a stabilizing mechanism; 5. a lifting mechanism; 6. a work station; 7. a platform handrail; 8. fixing the rod; 9. a drive element; 10. a connecting cable; 11. a second driver; 12. a connecting plate; 13. a damping spring; 14. an insulating outer layer; 15. and reinforcing the inner plate.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the utility model provides a climbing device for building electric power engineering, which comprises a climbing device main body 1, a connecting platform 2, a moving mechanism 3, a stabilizing mechanism 4, a lifting mechanism 5, a work platform 6, a platform handrail 7 and a fixing rod 8, wherein the bottom of the climbing device main body 1 is provided with the connecting platform 2, the left and right sides of the connecting platform 2 are provided with the moving mechanism 3, the top of the climbing device main body 1 is provided with the lifting mechanism 5, one side of the climbing device main body 1 is provided with a controller which can control the device mechanism, the top of the climbing device main body 1 and the left and right sides of the lifting mechanism 5 are provided with the stabilizing mechanism 4, the top of the lifting mechanism 5 is provided with the work platform 6, the two sides of the top of the work platform 6 are provided with the platform handrail 7, the inner side of the platform handrail 7 is provided with the fixing rod 8, the inside of the work platform 6 is provided with a damping spring 13, the damping spring 13 is used for offsetting shaking, the inner wall of the platform handrail 7 is provided with an insulating outer layer 14, the insulating outer layer 14 is used for preventing the platform from conducting electricity, the top of the connecting platform 2 is fixedly arranged at the bottom of the ascending device main body 1, the inner sides of the moving mechanisms 3 are movably arranged at the left side and the right side of the connecting platform 2, the bottom of the stabilizing mechanism 4 is movably arranged at the two sides of the top of the ascending device main body 1, the bottom of the lifting mechanism 5 is fixedly arranged at the top of the ascending device main body 1, the bottom of the working platform 6 is fixedly arranged at the bottom of the lifting mechanism 5, the top of the stabilizing mechanism 4 is movably arranged at the two sides of the bottom of the working platform 6, the stabilizing mechanism 4 is used for stabilizing the left-right balance of the working platform 6, the bottom of the platform handrail 7 is fixedly arranged at the two sides of the top of the working platform 6, and the left side and right side of the fixing rod 8 are fixedly arranged at the inner side of the platform handrail 7, and the bottom of the fixing rod 8 is fixedly installed at the top of the work platform 6.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: the inner wall of the ascending device main body 1 is provided with a driving element 9, the controller on one side of the ascending device main body 1 can control the driving element 9 inside the ascending device main body 1, the driving element 9 can control the ascending and descending mechanism 5 to ascend and descend, the height of the working platform 6 is lifted, when the height is lifted, the bottom of the driving element 9 is fixedly installed on the inner wall of the ascending device main body 1, the surface of the driving element 9 is fixedly connected with a connecting cable 10 all around, the other end of the connecting cable 10 is provided with a second driver 11, the inner side of the second driver 11 is fixedly connected to the other end of the connecting cable 10, the bottom of the second driver 11 is fixedly installed on the inner wall of the ascending device main body 1, the inner wall of the working platform 6 is provided with a connecting plate 12, the outer side of the connecting plate 12 is fixedly installed on the inner wall of the working platform 6, the upper end and the lower end of a damping spring 13 are fixedly installed on the inner wall of the connecting plate 12, the damping spring 13 inside of the working platform utilizes the elasticity of the inner plate to offset the vibration generated by the inner plate, the surface of the insulating outer layer 14 is fixedly installed on the inner wall of the handrail 7, the inner plate 15, the inner plate of the handrail is provided with an outer layer 14, the reinforcing device, the inner plate 15, the inner wall of the handrail is installed on the handrail, the handrail inner plate, the handrail device can improve the inner wall of the handrail, and the handrail, the inner plate 15, the handrail device, and the handrail inner wall of the handrail can improve the inner plate, and the handrail.
The working principle of the ascending device for electric power engineering in construction will be described in detail below.
As shown in fig. 1 to 4, when in use, a user stands on the work platform 6, and then another person operates the controller on one side of the ascending device main body 1 to control the driving element 9 inside the ascending device main body 1, so that the driving element 9 controls the lifting mechanism 5 to lift and lift, and the height of the work platform 6 is raised, when the height is raised, the left and right balance of the work platform 6 is stabilized through the stabilizing mechanism 4, the generated shake is offset by the damping spring 13 in the work platform 6 through the elasticity of the damping spring, and then the moving mechanisms 3 on the two sides of the connecting platform 2 are controlled to move through the second driver 11 to move to the specified position.
The present invention has been described in general terms, but it will be apparent to those skilled in the art that modifications and improvements can be made based on the present invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (6)

1. The utility model provides a building electric power engineering is with device of ascending a height, is including ascending a height device main part (1), coupling platform (2), moving mechanism (3), stabilizing mean (4), elevating system (5), work platform (6), platform handrail (7) and dead lever (8), the bottom of ascending a height device main part (1) is provided with coupling platform (2), the left and right sides of coupling platform (2) is provided with moving mechanism (3), the top of ascending a height device main part (1) is provided with elevating system (5), just the top of ascending a height device main part (1) and the left and right sides that is located elevating system (5) are provided with stabilizing mean (4), the top of elevating system (5) is provided with work platform (6), the top both sides of platform work (6) are provided with platform handrail (7), the inboard of platform handrail (7) is provided with dead lever (8), its characterized in that: a damping spring (13) is arranged inside the work platform (6), and the damping spring (13) is used for offsetting shaking;
an insulating outer layer (14) is arranged on the inner wall of the platform handrail (7), and the insulating outer layer (14) is used for preventing the platform from conducting electricity.
2. The ascending device for construction electric power engineering according to claim 1, wherein: the top fixed mounting of connecting platform (2) is in the bottom of device main part (1) of ascending a height, the inboard movable mounting of moving mechanism (3) is in the left and right sides of connecting platform (2), the bottom movable mounting of stabilizing mean (4) is in the top both sides of device main part (1) of ascending a height, the bottom fixed mounting of elevating system (5) is at the top of device main part (1) of ascending a height.
3. The ascending device for construction electric power engineering according to claim 1, wherein: the bottom fixed mounting of workstation (6) is in the bottom of elevating system (5), the top movable mounting of stabilizing mean (4) is in the bottom both sides of workstation (6), the bottom fixed mounting of platform handrail (7) is in the top both sides of workstation (6), the left and right sides fixed mounting of dead lever (8) is in the inboard of platform handrail (7), just the bottom fixed mounting of dead lever (8) is at the top of workstation (6).
4. The ascending device for construction electric power engineering according to claim 1, wherein: be provided with drive element (9) on the inner wall of device main part of ascending a height (1), the bottom fixed mounting of drive element (9) is on the inner wall of device main part of ascending a height (1), just the surperficial fixedly connected with connecting cable (10) all around of drive element (9), the other end of connecting cable (10) is provided with second driver (11), the inboard fixed connection of second driver (11) is at the other end of connecting cable (10), just the bottom fixed mounting of second driver (11) is on the inner wall of device main part of ascending a height (1).
5. The ascending device for construction electric power engineering according to claim 1, wherein: the damping device is characterized in that a connecting plate (12) is arranged on the inner wall of the working platform (6), the outer side of the connecting plate (12) is fixedly installed on the inner wall of the working platform (6), and the upper end and the lower end of the damping spring (13) are fixedly installed on the inner side of the connecting plate (12).
6. The ascending device for construction electric power engineering according to claim 1, wherein: the surface of the outer insulating layer (14) is fixedly arranged on the inner wall of the platform handrail (7), a reinforced inner plate (15) is arranged on the inner wall of the platform handrail (7) and inside the outer insulating layer (14), the surface of the reinforced inner plate (15) is fixedly arranged on the inner wall of the outer insulating layer (14), and the upper end and the lower end of the reinforced inner plate (15) are fixedly arranged on the inner wall of the platform handrail (7).
CN202221786977.7U 2022-07-12 2022-07-12 Ascending device for building electric power engineering Active CN217838317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221786977.7U CN217838317U (en) 2022-07-12 2022-07-12 Ascending device for building electric power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221786977.7U CN217838317U (en) 2022-07-12 2022-07-12 Ascending device for building electric power engineering

Publications (1)

Publication Number Publication Date
CN217838317U true CN217838317U (en) 2022-11-18

Family

ID=84036263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221786977.7U Active CN217838317U (en) 2022-07-12 2022-07-12 Ascending device for building electric power engineering

Country Status (1)

Country Link
CN (1) CN217838317U (en)

Similar Documents

Publication Publication Date Title
CN204497630U (en) A kind of highly compatible for circuit breaker and porcelain vase overturns car
CN217838317U (en) Ascending device for building electric power engineering
CN213641656U (en) Obstacle-crossing wheelchair
CN212416128U (en) Wheelchair with automatic seat lifting structure
CN218367443U (en) Intelligent charging stake based on thing networking management and control platform
CN218261583U (en) Auxiliary tool for hoisting steel structure construction
CN213449398U (en) Automatic lifting building climbing frame for building
CN210366899U (en) Lifting platform
CN215593717U (en) Personnel up-and-down system of bridge construction creeping formwork mechanism
CN213651735U (en) A dismouting device for reactor in converter
CN221256872U (en) Tunnel side wall roughening device
CN218438117U (en) Lifting construction operation platform
CN219669092U (en) Ground rail fixing structure for stacker
CN210885123U (en) Vertical lift transport mechanism that construction was used
CN220226154U (en) A building hanging flower basket for facing limit operation
CN217420433U (en) Three-way movable operation platform
CN216272580U (en) Windproof and rainproof lifter for disabled people
CN215710876U (en) Portable elevator button board and elevator
CN208200072U (en) A kind of towed elevator structure of double underbeam y-type structure forms
CN213738143U (en) Elevator construction platform easy to assemble, disassemble and transport
CN219279426U (en) Lifter for building
CN211873767U (en) Civil engineering construction jacking equipment with stability is high
CN216069814U (en) Vehicle-mounted telescopic pedal for mobile vaccination vehicle
CN218508990U (en) Building climbing frame with large storage space and low possibility of inclining
CN215711607U (en) Crank arm lifter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant