CN2178257Y - Partition for building - Google Patents

Partition for building Download PDF

Info

Publication number
CN2178257Y
CN2178257Y CN 93244410 CN93244410U CN2178257Y CN 2178257 Y CN2178257 Y CN 2178257Y CN 93244410 CN93244410 CN 93244410 CN 93244410 U CN93244410 U CN 93244410U CN 2178257 Y CN2178257 Y CN 2178257Y
Authority
CN
China
Prior art keywords
framework
partition wall
building
frame
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93244410
Other languages
Chinese (zh)
Inventor
张昆地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 93244410 priority Critical patent/CN2178257Y/en
Application granted granted Critical
Publication of CN2178257Y publication Critical patent/CN2178257Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a partition wall for a building. The utility model comprises a frame, steel bars, two moulding board nets, concrete and other members. The frame can be fixedly arranged under the structural beam column of the building. The steel bars can be arranged in the frame. The two moulding board nets can be respectively and fixedly connected with the both end surfaces of the frame. The concrete is limited by the two moulding board nets, and the concrete is stuffed in the frame. The frame is a hollow frame body which is formed by the assembly of a plurality of channel irons, the inner part of the frame is connected with supporting bars, and a plurality of positioning holes for penetrating with steel bars are arranged on the channel irons and the supporting bars. The utility model makes use of the positioning function that the frame can be fixedly connected with the structural beam column, and the moulding board nets can be fixed to the frame; so the quick and easy construction of the utility model is realized, and the working cost of the utility model is decreased.

Description

Partition for building
The utility model relates to a kind of partition wall of building, is meant especially a kind ofly to construct fast and exempt from multi-use architecture thing partition wall with interim bracing frame.
Builing industry is after finishing the bearing structure (or claiming main structure) of building at present, general all is to utilize the combination of setting up of wooden form to be in the milk with the concreting of finishing its partition wall, but the construction operation of this type of wooden form must have the loaded down with trivial details step of shut die and form removal etc., quite trouble is with inconvenient, also increase its building costs virtually, so is not a perfect construction method by gang form to finish the partition wall construction operation, thereby building trade is for improving this partition wall construction forming operation, so develop and a kind of avoid dismantle template net, in order to replace traditional wooden form, the loaded down with trivial details operation of template can be avoided installing and removing, and the manual work expense can be greatly reduced.
This kind avoid dismantle template net be used on the building partition wall schematic diagram promptly as shown in Figure 1, it is to be installed with hanging stick 11 in beam column 1 bottom surface of building earlier, then several bars 12 is tied on these hanging sticks 11, and then be to be tied on the aforementioned reinforcing bar 12 with other reinforcement reinforcing bar 13, to reach the effect of these reinforcement reinforcing bars 13 of location, and then template net 2 is arranged in the periphery of these reinforcing bars 13, and utilize iron wire to be tied on template net 2 and reinforcing bar 12 and the reinforcement reinforcing bar 13, make template net 2 can be fixed in the periphery of reinforcing bar 12 and reinforcement reinforcing bar 13, the last outside that is supported by template net 2 again with many interim bracing frames 3, to improve the resistance intensity of template net 2, so promptly finish the operation of setting up of this partition wall 4, thereafter, again concrete is in the milk between the template net 2 by the inlet near beam column 1 place, till filling whole template net 2 inner spaces, treat after the concrete setting again with its external surface of the cement band, get final product a smooth partition wall 4; Though yet this kind partition wall 4 construction operations do not have the step of dismounting template, but still having is the operation of taking a lot of work of tying up reinforcing bar 12 and 13, it must be consolidated with a plurality of interim bracing frames 3 in the lateral surface of template net 2 again simultaneously, the operation of this fixed interim bracing frame 3 is inconvenience quite, it is special when the outer rim of high-rise building is implemented the operation of the fixed bracing frame 3 of this kind, very big danger is arranged in fact, sincere non-safe construction operation, so building step that the construction operation of this kind curtain wall structure real non-is good, and then cause its operating cost to improve relatively, and time-consuming shortcoming of taking a lot of work is also arranged.
That is main purpose of the present utility model is: a kind of partition wall of building is provided, and it is a kind of partition wall convenient and building that reduces the operating cost characteristic of constructing that has.
Another purpose of the present utility model is: a kind of partition wall of building is provided, and wherein can arrange in pairs or groups is provided with Sound-proof material, and can obtain good soundproof effect.
A purpose more of the present utility model is: a kind of partition wall of building is provided, wherein can heat insulation, the firm light gypsum of filling, and can be beneficial to the supporting capacity of building skeleton.
Another purpose of the present utility model is: a kind of partition wall of building is provided, and the hole of being reserved on its middle frame can be made for the utilization of water power pipe arrangement, and can reach better practicality effect.
The utility model provides a kind of partition wall of building, wherein: this partition wall includes the framework that can be fixedly arranged under the fabric structure beam column, reach the two template nets that are fixedly arranged on the framework two sides respectively with retaining element, and can and fill filling of framework inside and add material by two template net boundaries, wherein, framework is to be assembled into the support body of a hollow by most root channels, and is provided with the support bar of proper number in this framework.
The partition wall of aforesaid building, wherein: on the channel of framework and support bar, offer a plurality of locating holes respectively, and can in this locating hole, wear the assembling reinforcing bar, reach the effect of reinforcement placing in framework.
The partition wall of aforesaid building, wherein: in framework inside every one suitably highly the place be connected with a horizontal reinforcement channel again, and on this reinforcement channel, also offer most individual locating holes, place the location for reinforcing bar longitudinally.
The partition wall of aforesaid building, wherein: by two template nets limitations and fill and add material filling of framework inside and can be and mix earth or Sound-proof material or heat insulation, firm light gypsum.
The partition wall of aforesaid building, wherein: the retaining element that the template net is fixedly arranged on the framework is a screw.
The partition wall of aforesaid building, wherein: but be equipped with the connecting hole that the water supply piping line wears on the framework.
The partition wall of building of the present utility model has rational in infrastructure, and easy construction, rapidly operating cost is low and also can improve the building aunt and carry and soundproof effect.
Further specify architectural feature of the present utility model below in conjunction with accompanying drawing.
Fig. 1 is that existing template net is used in the schematic diagram on the curtain wall structure.
Fig. 2 is the part exploded perspective schematic diagram of the utility model one preferred embodiment.
Fig. 3 is the sectional view after the internals of the utility model one preferred embodiment is installed.
Fig. 4 is the three-dimensional partly cross-sectional schematic after the utility model one preferred embodiment assembling.
At first, see also Fig. 2, shown in the part exploded perspective schematic diagram of the utility model one preferred embodiment, as seen from the figure, the member of the partition wall inside of present embodiment includes a framework 5, and is provided with two template nets 6 in framework 5 two sides; Framework 5 is the support bodys that are assembled into a hollow by many U type channels 51, and in this framework 5, be provided with the support bar 52 of proper number, and these channels 51 equidistantly offer most locating holes 53 all thereon with support bar 52, so can set up assembling reinforcing bar 7 in these framework 5 inside, and this majority root reinforcing bar 7 can be placed through in the relative locating hole 53 one by one respectively, reach the effect of reinforcement placing 7, and can exempt the operation of binding reinforcing bar 7 in framework 5.
After framework 5 and support bar 52 assemblings are finished, earlier with retaining element 61(as shown in Figure 2 the screw of a template net 6 by proper number, also can adopt other fixed structure), it is fixed on a side of framework 5, then it can be passed to desiring moulding partition wall place, utilize swell fixture 55 channel 51 of framework 5 to be fixed between the beam column 8 and its round floor 9 of building (shown in the sectional view after the internals of Fig. 3 the utility model one preferred embodiment is installed) then respectively, then can be according to need again the reinforcing bar 7 of proper number be placed through in the framework 5 one by one, to increase whole structural strength, it is to utilize the locating hole of being offered on framework 5 and the support bar 52 53, the reinforcing bar of being put 7 all can be positioned in the framework 5 according to predetermined locus, economize except being the manual work of tying up reinforcing bar 7; In addition, if when being provided with of pipeline etc. need be arranged in this partition wall, can be in the installation exercise of the laggard line pipe line of these reinforcing bar 7 placement steps, and the appropriate location in framework 5 can offer connecting hole 56(as shown in Figure 2) so that the water, the electric line that supply to be installed are passed by this connecting hole 56 and are connected to other appropriate location; Add thing if need in addition in partition wall of the present utility model assembling Sound-proof material etc. to fill, also can assemble at this moment; Again another template net 6 is locked on the another side of framework 5 with retaining element 61 equally at last, only in keeping somewhere an inlet 80 near place, beam column 8 bottom surfaces, promptly the template net 6 in these inlet 80 places does not still lock, then again with concrete by inlet 80 places grouting (shown in the arrow of Fig. 3), treat its solidify after again with the whitewashing or the filling concrete in the space at inlet 80 places, and then the template net 6 at inlet 80 places is locked on the framework 5, so promptly finish the inside forming operation of this partition wall, shown in the three-dimensional part cross-sectional schematic after Fig. 4 the utility model one preferred embodiment assembling, the last surface of modifying this partition wall again with cement 60, promptly finish the construction operation of whole partition wall, quite fast facility.
For this reason, by previous embodiment as can be known, it is when the partition wall construction operation, can be in advance at the template net of safe place assembling frame and one side, and then with its dislocation in partition wall shaping place, so not only can exempt in the building outer rim is to tie up reinforcing bar and template net or settle outside the danger of work such as interim bracing frame, the reinforcing bar of being put simultaneously can utilize the locating hole on framework and the support bar again and reach the effect of location easily, so can remove the loaded down with trivial details operation that reinforcing bar is tied up by existing system, and to utilize framework be to connect the beam column that is fixed in building and the fixation of its bottom in advance, make the two template nets that are locked on framework and the support bar can obtain sufficient resistance to deformation intensity, really can exempt existing avoid dismantle template net and need add the trouble of interim bracing frame with inconvenient, so partition wall of the present utility model really is better than existing curtain wall structure, and has higher utility.
In addition, for improving the ability of framework cross binding, can be when the partition wall of be shaped big or broad, suitably highly locate to be connected with again a horizontal reinforcement channel in framework inside every one, and on this reinforcement channel, also offer most locating holes, place the usefulness of location for reinforcing bar longitudinally, even so the support bar of the framework inside after the assembling is to be mutual vertical configuration with mending wall chase iron, make the reinforcing bar that is placed in the framework all can distinguish supported and benefit wall chase location that iron supports, reach the structural strength of strengthening this partition wall.
With partition wall design of the present utility model; it can wear assembling reinforcing bar 7 according to need in framework 5; it is when cooperating different demand again; also can be at framework 5 and 6 assemblings of template net Sound-proof material or heat insulation; materials such as firm light gypsum or concrete; and can obtain different effects; the connecting hole of on framework 5, offering the again 56 electric pipe arrangement utilization of can supplying water; its true tool convenience; in addition partition surface of the present utility model can be adopted various surfacing (such as powder light; paste ceramic tile or other modes); template net 6 of the present utility model can be selected its direction (as shown in Fig. 3 and Fig. 5) according to need in addition; and can its position of protruding most as the mould basic point line of leveling; and its template net 6 is on being assembled to framework 5 time; but the periwinkle collecting silk is fixed or other are grabbed and close; the retaining element that fastens, more convenient and practical when allowing integral construction.

Claims (6)

1, a kind of partition wall of building, it is characterized in that: this partition wall includes the framework that can be fixedly arranged under the fabric structure beam column, reach the two template nets that are fixedly arranged on the framework two sides respectively with retaining element, and can and fill filling of framework inside and add material by two template net boundaries, wherein, framework is to be assembled into the support body of a hollow by most root channels, and is provided with the support bar of proper number in this framework.
2, the partition wall of building according to claim 1 is characterized in that: offer most locating holes respectively on the channel of framework and support bar, and can wear the assembling reinforcing bar in this locating hole, reach the effect of reinforcement placing in framework.
3, the partition wall of building according to claim 1 is characterized in that: suitably highly locate to be connected with a horizontal reinforcement channel again every one in framework inside, and also offer a plurality of locating holes on this reinforcement channel, place the location for reinforcing bar longitudinally.
4, the partition wall of building according to claim 1 is characterized in that: by two template nets limitations and fill and add material filling of framework inside and can be and mix earth or Sound-proof material or heat insulation, firm light gypsum.
5, the partition wall of building according to claim 1 is characterized in that: the retaining element that the template net is fixedly arranged on the framework is a screw.
6, the partition wall of building according to claim 1 is characterized in that: but be equipped with the connecting hole that the water supply piping line wears on the framework.
CN 93244410 1993-11-12 1993-11-12 Partition for building Expired - Fee Related CN2178257Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93244410 CN2178257Y (en) 1993-11-12 1993-11-12 Partition for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93244410 CN2178257Y (en) 1993-11-12 1993-11-12 Partition for building

Publications (1)

Publication Number Publication Date
CN2178257Y true CN2178257Y (en) 1994-09-28

Family

ID=33817620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93244410 Expired - Fee Related CN2178257Y (en) 1993-11-12 1993-11-12 Partition for building

Country Status (1)

Country Link
CN (1) CN2178257Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1948653B (en) * 2005-10-12 2010-05-26 汪右城 Precombined composite supporting frame construction method and its structure
CN102359206A (en) * 2011-10-12 2012-02-22 华浚塑料建材有限公司 Combined PVC (Polyvinyl Chloride) building template wall and manufacturing method thereof
CN102877572A (en) * 2012-09-19 2013-01-16 广州市科帮洁净工程技术有限公司 Safe and reliable main wall structure of color steel sandwich panel
CN103255913A (en) * 2013-04-28 2013-08-21 世技机械江苏有限公司 Template net
CN104131651A (en) * 2014-06-12 2014-11-05 高国忠 Foamed ceramic steel structure wall
CN110080435A (en) * 2019-05-28 2019-08-02 重庆工程职业技术学院 Assembled architecture internal partition wall system
CN110439151A (en) * 2019-07-31 2019-11-12 上海市建筑装饰工程集团有限公司 A kind of construction method of Modularized partition plate
CN110748045A (en) * 2019-11-06 2020-02-04 江苏千禧杭萧装配式建筑科技有限公司 Assembled splicing partition wall light and thin template
CN114293766A (en) * 2021-12-20 2022-04-08 中建四局土木工程有限公司 Self-adaptive mold sealing method for combining steel and aluminum templates

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1948653B (en) * 2005-10-12 2010-05-26 汪右城 Precombined composite supporting frame construction method and its structure
CN102359206A (en) * 2011-10-12 2012-02-22 华浚塑料建材有限公司 Combined PVC (Polyvinyl Chloride) building template wall and manufacturing method thereof
CN102877572A (en) * 2012-09-19 2013-01-16 广州市科帮洁净工程技术有限公司 Safe and reliable main wall structure of color steel sandwich panel
CN102877572B (en) * 2012-09-19 2015-12-16 广州市科帮洁净工程技术有限公司 A kind of safe and reliable main wall structure of color steel sandwich panel
CN103255913A (en) * 2013-04-28 2013-08-21 世技机械江苏有限公司 Template net
CN104131651A (en) * 2014-06-12 2014-11-05 高国忠 Foamed ceramic steel structure wall
CN110080435A (en) * 2019-05-28 2019-08-02 重庆工程职业技术学院 Assembled architecture internal partition wall system
CN110439151A (en) * 2019-07-31 2019-11-12 上海市建筑装饰工程集团有限公司 A kind of construction method of Modularized partition plate
CN110439151B (en) * 2019-07-31 2021-04-06 上海市建筑装饰工程集团有限公司 Construction method of modular partition board
CN110748045A (en) * 2019-11-06 2020-02-04 江苏千禧杭萧装配式建筑科技有限公司 Assembled splicing partition wall light and thin template
CN114293766A (en) * 2021-12-20 2022-04-08 中建四局土木工程有限公司 Self-adaptive mold sealing method for combining steel and aluminum templates
CN114293766B (en) * 2021-12-20 2023-02-28 中建四局土木工程有限公司 Self-adaptive mold sealing method for combining steel and aluminum templates

Similar Documents

Publication Publication Date Title
CN105888108B (en) Built-in positioning prefabricated component reinforced concrete shear wall and construction method
US20050284088A1 (en) Structural panel and method of fabrication
CN105133755B (en) A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall
CN2178257Y (en) Partition for building
CN108708481B (en) Construction method for constructional column without formwork support
US11293179B2 (en) Structural panels for buildings integrating 3D printed shells and method of fabrication
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
CN114658219B (en) Construction method for single-side assembled formwork support
CN206052964U (en) Prefabricated composite steel reinforcement cage component and structure
CN110130534A (en) A kind of novel energy-consumption precast shear wall and its processing installation method
KR200366493Y1 (en) Insulated concrete structure using reinforced pressed cement and metal stud
CN107366353B (en) A kind of assembled steel reinforced concrete frame column with variable cross-sections and its construction method
CN217353122U (en) Assembled exempts from to prop up mould building carrier plate
CN208777746U (en) A kind of jointing finished tool
CN213359377U (en) Building templates support frame
CN210032269U (en) Prefabricated laminated slab capable of reducing noise
CN215483756U (en) Precast concrete wallboard that stability is high
CN214942329U (en) Steel mesh inner die for assembly type building
CN212715911U (en) Archaize building semicircle half square column template prop up and establish structure
CN211114844U (en) Compound heat preservation wall body beam net stagnant water locating lever
CN215671015U (en) Hang mould reinforced structure
CN113250360B (en) Assembled precast concrete floor slab and production method thereof
CN218970075U (en) Foundation plate subsides post-cast strip structure
CN218787033U (en) Reusable assembled enclosure wall
CN218117209U (en) Integral casting one-step forming structure for house building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee