CN217811645U - Steel house assembling connecting component - Google Patents

Steel house assembling connecting component Download PDF

Info

Publication number
CN217811645U
CN217811645U CN202222005586.3U CN202222005586U CN217811645U CN 217811645 U CN217811645 U CN 217811645U CN 202222005586 U CN202222005586 U CN 202222005586U CN 217811645 U CN217811645 U CN 217811645U
Authority
CN
China
Prior art keywords
steel
connecting seat
lateral wall
installation cavity
splicing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222005586.3U
Other languages
Chinese (zh)
Inventor
张国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222005586.3U priority Critical patent/CN217811645U/en
Application granted granted Critical
Publication of CN217811645U publication Critical patent/CN217811645U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a connecting component for assembling steel structure houses, which belongs to the technical field of building construction and aims at the problems that the efficiency is lower when steel is constructed and assembled and the overall firmness after assembly is relatively poor; the utility model discloses a connecting seat is overlapped the tip of two girder steels and is established the connection, makes the connecting seat can form better support to the link of girder steel, improves the holistic fastness of girder steel after the concatenation, and the spacing hole that control assembly control gag lever post and girder steel both sides were seted up is pegged graft spacingly, can guarantee the fastness of girder steel when splicing with the connecting seat, has better concatenation effect, and assembles comparatively convenient and fast.

Description

Steel house assembling connecting part
Technical Field
The utility model belongs to the technical field of the house is built, concretely relates to adapting unit is assembled to steel house room.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and has the characteristics of high strength, light dead weight, good integral rigidity and strong deformability, so the steel structure is particularly suitable for building large-span, ultrahigh and extra-heavy buildings.
The H-shaped steel is widely applied to actual construction due to the firm structure, but the following inconvenience is caused when the steel structure is spliced and fixed in the actual construction process;
(1) often need splice steel according to actual conditions in the house construction process, the welding is the concatenation means commonly used, but the operation is comparatively consuming time, consuming power and consumptive material, and inconvenient dismantlement after the concatenation is fixed, leads to its suitability relatively poor.
(2) Common welding is assembled or is punched and carry out the concatenation operation through the bolt and all comparatively inconvenient, and needs many people to assist the cooperation to assemble, and the efficiency of construction is lower, and intensity of labour is great, and the H shape steel structural stability after assembling also can not add better ground and consolidate.
Therefore, a connecting component for assembling steel structure buildings is needed, and the problems that steel products are low in efficiency when being constructed and assembled and the overall firmness after assembly is relatively poor are solved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an adapting unit is assembled to steel house to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a adapting unit is assembled to steel house room, includes the connecting seat, the connecting groove has been seted up to the inside of connecting seat, it has the girder steel that two symmetries set up to peg graft in the inside of connecting groove, a plurality of spacing holes that are the equidistance and distribute are seted up respectively to the both sides lateral wall of girder steel, two installation cavities that are the upper and lower distribution are seted up to the inside of connecting seat, sliding connection has the movable plate that two symmetries set up between the both sides lateral wall of installation cavity, the one end of movable plate is fixed with a plurality of gag lever posts that are the symmetric distribution, the gag lever post slides and runs through one side lateral wall of installation cavity, the gag lever post with correspond spacing hole pegs graft mutually, the inside of installation cavity is provided with control assembly.
What need explain in the scheme is, the control assembly is connected including rotating two-way lead screw between the lateral wall of installation cavity both sides, the lateral wall threaded connection of two-way lead screw has the thread bush that two symmetries set up, the top and the bottom of thread bush with the top and the bottom sliding connection of installation cavity, the both sides lateral wall of thread bush respectively with two one side lateral wall that the movable plate is close to each other articulates there is the connecting rod, the lateral wall fastening cup joints of two-way lead screw has the worm wheel, the top lateral wall of installation cavity rotates and is connected with the pivot, the lateral wall fastening cup joint of pivot has the worm, the worm with worm wheel intermeshing, the one end of pivot runs through the connecting seat is fixed with the knob.
It is worth further saying that a plurality of through holes which are symmetrically distributed are respectively formed in the outer walls of the two sides of the connecting seat, a plurality of limiting rods respectively penetrate through the through holes, and one end of each limiting rod, which is located on the outer side of the connecting seat, is in threaded connection with a fixing nut.
It should be further noted that the top end outer wall and the bottom end outer wall of the connecting seat are both provided with circular grooves which are symmetrically arranged, and the two knobs are respectively located inside the two circular grooves.
As a preferred embodiment, the vertical section of the steel beam is H-shaped, the vertical section of the connecting through groove is H-shaped, and the ends of the two steel beams close to each other are in contact with each other.
As a preferred embodiment, sliding grooves are respectively formed in side walls of two sides of the mounting cavity, and two ends of the moving plate are respectively connected with the two sliding grooves in a sliding manner.
As a preferred embodiment, the connecting rod and the moving plate are obliquely arranged, and the moving plate and the limiting rod are vertically arranged.
Compared with the prior art, the utility model provides a pair of adapting unit is assembled to steel house room includes following beneficial effect at least:
(1) The connection is established to the tip of two girder steels through the connecting seat cover, makes the connecting seat can form better support to the link of girder steel, improves the holistic fastness of girder steel after the concatenation, and the spacing hole that control assembly control gag lever post and girder steel both sides were seted up is pegged graft spacingly, can guarantee the fastness of girder steel when splicing with the connecting seat, has better concatenation effect, and assembles comparatively convenient and fast.
(2) Through inserting the girder steel inside the connecting groove of connecting seat to it is spacing to rotate the knob simultaneously and can control the gag lever post and peg graft with the girder steel, whole operation is comparatively convenient, and the efficiency of construction is improved, manpower and materials have been saved, and the later stage can be dismantled the girder steel again, but has better recoverability, it is equally comparatively convenient to retrieve, carry out spacing reinforcement to the tip of gag lever post through the nut, can further improve the device and assemble the fastness when fixing to the girder steel.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the connecting seat structure of the present invention;
FIG. 3 is a schematic view of the steel beam structure of the present invention;
fig. 4 is the schematic view of the connecting seat structure of the present invention.
In the figure: 1. a connecting seat; 2. connecting the through grooves; 3. a steel beam; 4. a limiting hole; 5. a mounting cavity; 6. moving the plate; 7. a limiting rod; 8. a control component; 81. a bidirectional screw rod; 82. a threaded sleeve; 83. a connecting rod; 84. a worm gear; 85. a rotating shaft; 86. a worm; 87. a knob; 9. a through hole; 10. fixing a nut; 11. a circular groove; 12. a chute.
Detailed Description
The present invention will be further described with reference to the following examples.
In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the following will combine the drawings of the embodiments of the present invention to clearly and completely describe the technical solution of the embodiments of the present invention, and obviously, the described embodiments are a part of the embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative labor are within the scope of the protection of the present invention based on the described embodiments of the present invention.
The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention. The condition in the embodiment can be according to concrete condition do further adjustment the utility model discloses a it is right under the design prerequisite the utility model discloses a simple improvement of method all belongs to the utility model discloses the scope of requiring protection.
Please refer to fig. 1-4, the utility model provides a connecting part for assembling steel structure house, including connecting seat 1, connecting through groove 2 is provided in connecting seat 1, two symmetrical steel beams 3 are inserted in connecting through groove 2, a plurality of spacing holes 4 are provided on two side walls of steel beam 3, the spacing holes are distributed at equal intervals, two mounting cavities 5 are provided in connecting seat 1, two symmetrical moving plates 6 are connected between two side walls of mounting cavity 5, a plurality of spacing rods 7 are fixed on one end of moving plate 6, spacing rods 7 slide to penetrate through one side wall of mounting cavity 5, spacing rods 7 are inserted in corresponding spacing holes 4, and control assembly 8 is provided in mounting cavity 5; the connection is established to the tip of two girder steels 3 through connecting seat 1 cover, makes connecting seat 1 can form better support to the link of girder steel 3, improves the holistic fastness behind the concatenation of girder steel 3, and control assembly 8 control gag lever post 7 is pegged graft spacingly with spacing hole 4 that 3 both sides of girder steel were seted up, can guarantee the fastness of girder steel 3 when splicing with connecting seat 1, has better concatenation effect.
Further as shown in fig. 4, it is worth specifically explaining that the control assembly 8 includes a bidirectional screw rod 81 rotatably connected between the side walls of the two sides of the installation cavity 5, the outer side wall of the bidirectional screw rod 81 is in threaded connection with two symmetrically arranged threaded sleeves 82, the top and bottom ends of the threaded sleeves 82 are in sliding connection with the top and bottom ends of the installation cavity 5, the side walls of the two sides of the threaded sleeves 82 are respectively hinged with a connecting rod 83 with the side walls of the two moving plates 6 close to each other, the outer side wall of the bidirectional screw rod 81 is fixedly sleeved with a worm wheel 84, the side wall of the top end of the installation cavity 5 is rotatably connected with a rotating shaft 85, the outer side wall of the rotating shaft 85 is fixedly sleeved with a worm 86, the worm 86 is mutually engaged with the worm wheel 84, and one end of the rotating shaft 85 penetrates through the connection seat 1 and is fixed with a knob 87; through inserting girder steel 3 in the connecting groove 2 of connecting seat 1 inside to it is spacing to rotate knob 87 simultaneously and can control gag lever post 7 and girder steel 3 and peg graft, and the whole operation is comparatively convenient, has improved the efficiency of construction, has saved manpower and materials, and the later stage can be dismantled girder steel 3 again, has better recoverability, retrieves equally comparatively conveniently.
Further, as shown in fig. 1 and fig. 2, it is worth specifically explaining that the outer walls of the two sides of the connecting seat 1 are respectively provided with a plurality of through holes 9 which are symmetrically distributed, a plurality of limiting rods 7 respectively penetrate through the plurality of through holes 9, and one end of each limiting rod 7, which is located at the outer side of the connecting seat 1, is in threaded connection with a fixing nut 10; carry out spacing reinforcement through the nut to the tip of gag lever post 7, can further improve the device and assemble the fastness when fixing to girder steel 3.
The scheme has the following working processes: when the steel beams 3 need to be assembled, the two steel beams 3 are respectively inserted into the connecting through grooves 2 at the two ends of the connecting seat 1, then the two ends of the two steel beams 3 are centered to be assembled, the two knobs 87 are sequentially rotated after the steel beams 3 are spliced, the rotating shafts 85 are driven to rotate when the knobs 87 rotate, the worm 86 and the worm wheel 84 are driven to be meshed for transmission when the rotating shafts 85 rotate, then the bidirectional screw rods 81 are driven to rotate, the bidirectional screw rods 81 are in threaded transmission with the threaded sleeves 82 when the bidirectional screw rods 81 rotate, then the two threaded sleeves 82 are driven to be close to each other, the connecting rods 83 are squeezed to push the two adjacent movable plates 6 to move when the two threaded sleeves 82 are close to each other, the movable plates 6 drive the limiting rods 7 to be spliced with the limiting holes 4 formed in the side walls of the steel beams 3 when the movable plates 6 move, meanwhile, the limiting rods 7 penetrate through the through holes 9 formed in the outer side walls of the connecting seat 1 and extend to the outer side of the connecting seat 1, at the limiting rods 7 are fixed, finally, the nuts and the exposed end portions of the limiting rods 7 are in threaded connection with the limiting rods 7, and the connecting seat can be removed conveniently and the connecting rods 7, and the connecting seat can be removed from the connecting seat 3, and the connecting rods.
According to the working process, the following steps are carried out: overlap through connecting seat 1 to the tip of two girder steels 3 and establish the connection, make connecting seat 1 can form better support to the link of girder steel 3, improve girder steel 3 holistic fastness after the concatenation, it is spacing to peg graft with spacing hole 4 that 3 both sides of girder steel were seted up to control assembly 8 control gag lever post 7, can guarantee the fastness of girder steel 3 when splicing with connecting seat 1, has better concatenation effect.
As further shown in fig. 1 and fig. 2, it is worth specifically explaining that the top end outer wall and the bottom end outer wall of the connecting seat 1 are both provided with symmetrically arranged circular grooves 11, and the two knobs 87 are respectively located inside the two circular grooves 11; by arranging the knob 87 to be embedded, the occupied space of the connecting seat 1 can be reduced, and the installation and construction are facilitated.
As further shown in fig. 1, 2 and 3, it is worth concretely explaining that the vertical section of the steel beam 3 is H-shaped, the vertical section of the connecting through groove 2 is H-shaped, and the ends of the two steel beams 3 close to each other are in contact with each other.
Further, as shown in fig. 4, it is worth specifically describing that the side walls of the two sides of the installation cavity 5 are respectively provided with a sliding groove 12, the two ends of the moving plate 6 are respectively connected with the two sliding grooves 12 in a sliding manner, it is worth specifically describing that the connecting rod 83 and the moving plate 6 are arranged in an inclined manner, and the moving plate 6 and the limiting rod 7 are arranged in a vertical manner.
To sum up: through inserting girder steel 3 in the logical groove 2 of connecting of 1 inside of connecting seat, and rotate knob 87 simultaneously and can control gag lever post 7 and girder steel 3 and peg graft spacingly, the whole operation is comparatively convenient, the efficiency of construction is improved, manpower and materials have been saved, and the later stage can be dismantled girder steel 3 again, has better recoverability, it is equally comparatively convenient to retrieve, carry out spacing reinforcement through the nut to the tip of gag lever post 7, can further improve the device and assemble the fastness when fixing to girder steel 3.
Unless defined otherwise, technical or scientific terms used herein should be understood as commonly understood by one of ordinary skill in the art, and the use of the terms "comprising" or "including" and the like in the present invention is intended to mean that elements or items listed before the term encompass elements or items listed after the term and their equivalents, without excluding other elements or items, that "connected" or "connected" and the like are not limited to physical or mechanical connections, but may also include electrical connections, whether direct or indirect, that "up", "down", "left", "right", and the like are used merely to indicate relative positional relationships, which may also change accordingly when the absolute position of the object being described changes.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a adapting unit is assembled to steel house room, includes connecting seat (1), its characterized in that, connecting groove (2) have been seted up to the inside of connecting seat (1), the inside of connecting groove (2) is pegged graft and is had girder steel (3) that two symmetries set up, a plurality of spacing holes (4) that are the equidistance and distribute are seted up respectively to the both sides lateral wall of girder steel (3), two installation cavity (5) that are about distributing are seted up to the inside of connecting seat (1), sliding connection has movable plate (6) that two symmetries set up between the both sides lateral wall of installation cavity (5), the one end of movable plate (6) is fixed with a plurality of gag lever post (7) that are the symmetric distribution, gag lever post (7) slide to run through one side lateral wall of installation cavity (5), gag lever post (7) and corresponding spacing hole (4) are pegged graft mutually, the inside of installation cavity (5) is provided with control assembly (8).
2. The splicing and connecting component for the steel structure house according to claim 1, which is characterized in that: control assembly (8) are connected including rotating two-way lead screw (81) between installation cavity (5) both sides lateral wall, the lateral wall threaded connection of two-way lead screw (81) has thread bush (82) that two symmetries set up, the top and the bottom of thread bush (82) with the top and the bottom sliding connection of installation cavity (5), the both sides lateral wall of thread bush (82) respectively with two one side lateral wall that moving plate (6) are close to each other articulates there is connecting rod (83), worm wheel (84) have been cup jointed in the lateral wall fastening of two-way lead screw (81), the top lateral wall of installation cavity (5) rotates and is connected with pivot (85), worm (86) have been cup jointed in the lateral wall fastening of pivot (85), worm (86) with worm wheel (84) intermeshing, the one end of pivot (85) runs through connecting seat (1) is fixed with knob (87).
3. The splicing connecting component for the steel structure houses as claimed in claim 2, which is characterized in that: a plurality of through holes (9) that are the symmetric distribution are seted up respectively to the both sides outer wall of connecting seat (1), and is a plurality of gag lever post (7) run through a plurality of through hole (9) respectively, the one end threaded connection that gag lever post (7) are located the connecting seat (1) outside has fixation nut (10).
4. The splicing and connecting component for the steel structure house according to claim 3, wherein: circular slots (11) which are symmetrically arranged are formed in the outer wall of the top end and the outer wall of the bottom end of the connecting seat (1), and the two knobs (87) are located in the two circular slots (11) respectively.
5. The splicing connecting component for the steel structure houses as claimed in claim 4, which is characterized in that: the vertical section of the steel beam (3) is H-shaped, the vertical section of the connecting through groove (2) is H-shaped, and two ends, close to each other, of the steel beam (3) are in contact with each other.
6. The splicing connecting component for the steel structure houses as claimed in claim 5, which is characterized in that: the side walls of the two sides of the mounting cavity (5) are respectively provided with a sliding groove (12), and the two ends of the moving plate (6) are respectively connected with the two sliding grooves (12) in a sliding manner.
7. The splicing and connecting component for the steel structure house according to claim 6, wherein: the connecting rod (83) and the moving plate (6) are obliquely arranged, and the moving plate (6) and the limiting rod (7) are vertically arranged.
CN202222005586.3U 2022-08-01 2022-08-01 Steel house assembling connecting component Active CN217811645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222005586.3U CN217811645U (en) 2022-08-01 2022-08-01 Steel house assembling connecting component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222005586.3U CN217811645U (en) 2022-08-01 2022-08-01 Steel house assembling connecting component

Publications (1)

Publication Number Publication Date
CN217811645U true CN217811645U (en) 2022-11-15

Family

ID=83970327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222005586.3U Active CN217811645U (en) 2022-08-01 2022-08-01 Steel house assembling connecting component

Country Status (1)

Country Link
CN (1) CN217811645U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118407515A (en) * 2024-07-03 2024-07-30 山西建筑工程集团有限公司 Connection structure for connecting reinforced concrete beam and steel column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118407515A (en) * 2024-07-03 2024-07-30 山西建筑工程集团有限公司 Connection structure for connecting reinforced concrete beam and steel column

Similar Documents

Publication Publication Date Title
CN217811645U (en) Steel house assembling connecting component
CN110439276B (en) Column formwork installation method
CN108894315B (en) Modular building structure building system
CN113982119B (en) Steel structure prefabricated house and assembly process thereof
CN112227540B (en) Assembled building beam column node
CN112538901A (en) Assembly type integrated connecting device for construction equipment
CN113882446B (en) Assembled building construction device
CN113152675B (en) Light steel assembled house structure
CN115012526B (en) Light steel structure beam column node assembled connection structure
CN215368037U (en) Assembled factory building wallboard and stand connection structure
CN214144114U (en) Combined light steel truss with strong wind resistance
CN211816937U (en) Assembled building frame
CN113463933A (en) House building wall structure and construction method
CN215648446U (en) Combined steel structure greenhouse frame
CN220100155U (en) House frame steel construction
CN219863397U (en) V-shaped special-shaped column connecting structure
CN112814149B (en) Precast concrete member
CN219175457U (en) Structure is built in quick detachable interim room
CN211421474U (en) Assembled wallboard connected node
CN219060548U (en) Assembled roof node structure
CN215442421U (en) Rapid Assembly formula gate-type steel frame construction
CN221001975U (en) Installation mechanism convenient to disassemble and assemble
CN214302249U (en) Middle joint connecting structure for assembling integral frame column beam
CN218406051U (en) Split type steel construction building crossbeam of dismantling
CN219508827U (en) Easy-to-disassemble movable house