CN217802516U - Building water and electricity overall arrangement construction is with high-efficient type fluting device - Google Patents

Building water and electricity overall arrangement construction is with high-efficient type fluting device Download PDF

Info

Publication number
CN217802516U
CN217802516U CN202221688081.5U CN202221688081U CN217802516U CN 217802516 U CN217802516 U CN 217802516U CN 202221688081 U CN202221688081 U CN 202221688081U CN 217802516 U CN217802516 U CN 217802516U
Authority
CN
China
Prior art keywords
saw
connecting rod
wheel disc
round
bracing piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221688081.5U
Other languages
Chinese (zh)
Inventor
张丽华
井泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huaxin Decoration Engineering Co ltd
Original Assignee
Shandong Huaxin Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huaxin Decoration Engineering Co ltd filed Critical Shandong Huaxin Decoration Engineering Co ltd
Priority to CN202221688081.5U priority Critical patent/CN217802516U/en
Application granted granted Critical
Publication of CN217802516U publication Critical patent/CN217802516U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model discloses a high-efficiency slotting device for building hydropower layout construction, in particular to the technical field of hydropower layout slotting, which comprises a first wheel disc saw, wherein one side of the first wheel disc saw is provided with a second wheel disc saw, a connecting rod is arranged between the first wheel disc saw and the second wheel disc saw, two ends of the connecting rod respectively extend out of the outer sides of the first wheel disc saw and the second wheel disc saw, the outer side of the connecting rod is provided with a positioning mechanism and a driving mechanism, and the driving mechanism is arranged above the positioning mechanism; the driving mechanism comprises a motor, the motor is arranged on the front side of the connecting rod, a second straight gear is fixedly arranged at the output end of the motor, a first straight gear is meshed with the rear side of the second straight gear, and the first straight gear is fixedly arranged at the outer end of the connecting rod. The utility model discloses a first rim plate saw and second rim plate saw simultaneous working fluting for the work efficiency of water and electricity overall arrangement, make the progress of engineering promote.

Description

Building water and electricity overall arrangement construction is with high-efficient type fluting device
Technical Field
The utility model relates to a water and electricity overall arrangement fluting technical field, concretely relates to building water and electricity overall arrangement construction is with high-efficient type fluting device.
Background
The hydropower project is a concealed project in home decoration, and the quality of the hydropower project usually determines the quality of the whole home decoration. Therefore, in the decoration process, the slotting and the construction of the hydropower are very critical links. The water and electricity wiring, slotting, connection and the like have certain construction specifications and criteria, the slotting must be very regular, the pipeline slotting must be parallel lines and vertical lines according to requirements, the depth of the slot needs to be controlled at 4 cm, and the size and the position of the slotted pipeline need to be recorded after the slot is slotted.
The prior art has the following defects: the structure to building rubbish collection is not set up to water and electricity overall arrangement fluting device, and the overall arrangement of building water and electricity is usually slotted through a roulette saw work, and its work efficiency is lower, leads to the progress of engineering slow.
SUMMERY OF THE UTILITY MODEL
Therefore, the utility model provides a building water and electricity overall arrangement construction is with high-efficient type fluting device to solve prior art normal water and electricity distribution fluting device and not set up the structure to building garbage collection, and the building water and electricity overall arrangement is slotted through a roulette saw work usually, its work efficiency is lower, leads to the slow problem of progress of engineering.
In order to achieve the above object, the embodiment of the present invention provides the following technical solutions: a high-efficiency slotting device for building hydropower layout construction comprises a first wheel disc saw, wherein a second wheel disc saw is arranged on one side of the first wheel disc saw, a connecting rod is arranged between the first wheel disc saw and the second wheel disc saw, the two ends of the connecting rod respectively extend out of the outer sides of the first wheel disc saw and the second wheel disc saw, a positioning mechanism and a driving mechanism are arranged on the outer side of the connecting rod, and the driving mechanism is arranged above the positioning mechanism;
the driving mechanism comprises a motor, the motor is arranged on the front side of the connecting rod, a second straight gear is fixedly arranged at the output end of the motor, a first straight gear is meshed with the rear side of the second straight gear, and the first straight gear is fixedly arranged at the outer end of the connecting rod;
positioning mechanism includes the U-shaped pole, the below at the connecting rod is established to the U-shaped pole, the rear side of U-shaped pole is equipped with the backup pad, the front side of backup pad is equipped with two springs that distribute about, the spring is established in the rear side of U-shaped pole, and positioning mechanism is convenient for the staff to operate this device.
Further, the outside of first spur gear and second spur gear is equipped with the protective housing, connecting rod and protective housing fixed connection, the setting of protective housing prevents that the staff is unexpected injured.
Furthermore, a first supporting rod is fixedly arranged on one side of the motor, one end of the first supporting rod is fixedly connected with one side of the protective shell, and the first supporting rod supports the motor.
Furthermore, the two ends of the U-shaped rod are respectively connected with the two ends of the connecting rod through bearings, two anti-skidding sleeves distributed in the left and right directions are sleeved at the outer end of the U-shaped rod, and the anti-skidding sleeves are arranged to prevent hands of workers from skidding.
Furthermore, the outer end of the U-shaped rod is fixedly provided with two first fixed sleeves which are distributed left and right, the first fixed sleeves are arranged below the anti-skidding sleeves, the front sides of the springs are sleeved with the first fixed sleeves, and the front ends of the springs are fixedly connected with the rear sides of the first fixed sleeves to position and support the device and the surface of the wall body.
Further, the below of protective housing is equipped with the receiver, the receiver is established in the inboard of U-shaped pole and is established in the front side of backup pad, the ring cover that distributes about two is passed through to the bottom of receiver and the bottom of U-shaped pole rotates to be connected, and the receiver is collected the building rubbish that the fluting produced.
Further, the fixed cover of second that distributes about two is equipped with in the outer end of U-shaped pole, the fixed cover of second is established in the below of first fixed cover, the inboard of the fixed cover of second is fixed and is equipped with the second bracing piece, the inside slip of second bracing piece is equipped with the third bracing piece, the one end of second bracing piece is extended to the one end of third bracing piece, the one end of third bracing piece extends into the inside of receiver and the two is pegged graft, the front side of second bracing piece is equipped with the bolt, the rear end of bolt extends into the inside of second bracing piece and contacts with the front side of third bracing piece, conveniently emptys the inside building rubbish of receiver.
Further, first rim plate saw is fixed to be established in the outer end of connecting rod, second rim plate saw and connecting rod fixed connection, be equipped with the threaded rod between first rim plate saw and the second rim plate saw, the front side at the connecting rod is established to the threaded rod, the inboard fixed connection of the one end of threaded rod and first rim plate saw, the outer end and the second rim plate saw threaded connection of threaded rod, the other end of threaded rod runs through the second rim plate saw, the outer end of threaded rod is equipped with about two distribution nut, two the nut contacts with the both sides of second rim plate saw respectively, carries out fixed position to the receiver.
The embodiment of the utility model provides an have following advantage:
1. the two nuts on the threaded rod are unscrewed, the distance between the first wheel disc saw and the second wheel disc saw is adjusted according to the width of a wire slot required to be formed, the two nuts are screwed on the threaded rod, the two sides of the second wheel disc saw are clamped by the two nuts, the two anti-slip sleeves are held by hands, the rear sides of the first wheel disc saw and the second wheel disc saw are abutted to the surface of a wall body required to be grooved, at the moment, the rear side of the supporting plate is in contact with the surface of the wall body, at the moment, the spring contracts, the motor rotates to enable the second straight gear to rotate, the second straight gear rotates to drive the first straight gear meshed with the second straight gear to rotate, at the moment, the connecting rod rotates, the first wheel disc saw and the second wheel disc saw which rotate on the connecting rod rotate take the connecting rod as a shaft to rotate, the first wheel disc saw and the second wheel disc saw rotate simultaneously to groove the surface of the wall body, compared with the prior art, the working efficiency of water and electricity layout is accelerated, and the progress of the engineering is improved;
2. the utility model discloses an in-process that first rim plate saw and second rim plate saw carried out the fluting, inside a large amount of wall body fragments dropped into the receiver, the back is accomplished in the fluting, unscrews the bolt on two second bracing pieces, and inside two third bracing pieces left the receiver respectively this moment, the receiver rotated 90 this moment, can pour the inside wall body fragment of receiver, compare with prior art, the building rubbish that this device produced the fluting is collected, reduce to sweep the required time of rubbish, improve work efficiency.
Drawings
Fig. 1 is a schematic view of an overall front view structure provided by the present invention;
FIG. 2 is a schematic view of the overall side view structure provided by the present invention;
fig. 3 is a schematic view of the overall rear view structure provided by the present invention;
fig. 4 is a schematic side sectional structural view of the protective casing provided by the present invention;
fig. 5 is a schematic view of a storage box according to the present invention;
in the figure: 1. a first roulette saw; 2. a second roulette saw; 3. a connecting rod; 4. a first straight gear; 5. a second spur gear; 6. a motor; 7. a protective shell; 8. a first support bar; 9. a threaded rod; 10. a nut; 11. a U-shaped rod; 12. an anti-slip sleeve; 13. a first fixing sleeve; 14. a second fixing sleeve; 15. a spring; 16. a support plate; 17. a second support bar; 18. a third support bar; 19. a storage box; 20. a ring sleeve is provided.
Detailed Description
The present invention is described in detail with reference to the specific embodiments, and other advantages and effects of the present invention will be apparent to those skilled in the art from the disclosure herein. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to the attached drawings 1-5 in the specification, the efficient slotting device for building hydropower layout construction of the embodiment comprises a first wheel disc saw 1, a second wheel disc saw 2 is arranged on one side of the first wheel disc saw 1, a connecting rod 3 is arranged between the first wheel disc saw 1 and the second wheel disc saw 2, two ends of the connecting rod 3 respectively extend out of the outer sides of the first wheel disc saw 1 and the second wheel disc saw 2, a positioning mechanism and a driving mechanism are arranged on the outer side of the connecting rod 3, and the driving mechanism is arranged above the positioning mechanism;
the driving mechanism comprises a motor 6, the motor 6 is arranged on the front side of the connecting rod 3, a second straight gear 5 is fixedly arranged at the output end of the motor 6, a first straight gear 4 is meshed with the rear side of the second straight gear 5, and the first straight gear 4 is fixedly arranged at the outer end of the connecting rod 3;
positioning mechanism includes U-shaped pole 11, U-shaped pole 11 is established in the below of connecting rod 3, the rear side of U-shaped pole 11 is equipped with backup pad 16, the front side of backup pad 16 is equipped with two and controls the spring 15 that distributes, spring 15 is established in the rear side of U-shaped pole 11, and positioning mechanism is convenient for the staff to operate this device.
The outside of first spur gear 4 and second spur gear 5 is equipped with protective housing 7, connecting rod 3 and protective housing 7 fixed connection, the setting of protective housing 7 prevents that the staff is unexpected injured.
One side of motor 6 is fixed and is equipped with first bracing piece 8, one end of first bracing piece 8 and one side fixed connection of protective housing 7, first bracing piece 8 supports motor 6.
The both ends of U-shaped pole 11 pass through the bearing with the both ends of connecting rod 3 respectively and are connected, the outer pot head of U-shaped pole 11 is equipped with two and controls the antiskid cover 12 that distributes, and the setting of antiskid cover 12 prevents that the staff hand from skidding.
The fixed first fixed cover 13 that distributes about two that is equipped with of U-shaped pole 11's outer end, first fixed cover 13 is established in the below of antiskid cover 12, first fixed cover 13 is established in the front side of spring 15, the front end of spring 15 and the rear side fixed connection of first fixed cover 13 carry out the location support between this device and the wall body surface.
The implementation scenario is specifically as follows: unscrew two nuts 10 on the threaded rod 9, the width of the wire casing seted up as required, adjust the distance between first round of dish saw 1 and the second round of dish saw 2, again screw up two nuts 10 on threaded rod 9, make the both sides of second round of dish saw 2 pressed from both sides tightly by two nuts 10, handheld two antiskid cover 12, support the rear side of first round of dish saw 1 and second round of dish saw 2 at the wall body surface that needs the fluting, the rear side and the wall body surface contact of backup pad 16 this moment, spring 15 shrink this moment, starter motor 6, motor 6 rotates and makes second straight-tooth gear 5 rotate, second straight-tooth gear 5 rotates and drives the first straight-tooth gear 4 rotation of meshing with it, connecting rod 3 rotates this moment, connecting rod 3 rotates first round of dish saw 1 and second round of dish saw 2 on it uses connecting rod 3 to rotate for the axle, first round of dish saw 1 and second round of dish saw 2 rotate simultaneously and carry out the fluting to the wall body surface, the first round of dish saw 1 and second round of dish saw 2 simultaneous working of this device carries out the grooving, the overall arrangement efficiency of working of overall arrangement has been accelerated, make the work efficiency of this implementation of the current water and electricity work to obtain the problem of the slow grooving work efficiency of its work of carrying out the grooving work of a slow construction, the current engineering mode, the construction progress is solved the problem of the construction progress.
Referring to the attached drawings 1-5 in the specification, the efficient slotting device for building hydropower layout construction of the embodiment is characterized in that a storage box 19 is arranged below the protective shell 7, the storage box 19 is arranged on the inner side of the U-shaped rod 11 and on the front side of the supporting plate 16, the bottom end of the storage box 19 is rotatably connected with the bottom end of the U-shaped rod 11 through two ring sleeves 20 which are distributed left and right, and building garbage generated by slotting in the storage box 19 is collected.
The fixed cover 14 of second that distributes about two of being equipped with in the outer end of U-shaped pole 11, the fixed cover 14 of second is established in the below of first fixed cover 13, the fixed second bracing piece 17 that is equipped with in inboard of the fixed cover 14 of second, the inside of second bracing piece 17 slides and is equipped with third bracing piece 18, the one end of second bracing piece 17 is extended to the one end of third bracing piece 18, the one end of third bracing piece 18 extends into 19 inside and the two grafting of receiver, the front side of second bracing piece 17 is equipped with the bolt, the rear end of bolt extends into the inside of second bracing piece 17 and contacts with the front side of third bracing piece 18, conveniently emptys the inside building rubbish of receiver 19.
First round of dish saw 1 fixed establishment in the outer end of connecting rod 3, second round of dish saw 2 and connecting rod 3 fixed connection, be equipped with threaded rod 9 between first round of dish saw 1 and the second round of dish saw 2, threaded rod 9 is established in the front side of connecting rod 3, the inboard fixed connection of the one end of threaded rod 9 and first round of dish saw 1, 2 threaded connection are sawed to the outer end and the second round of dish of threaded rod 9, the other end of threaded rod 9 runs through second round of dish saw 2, the outer end of threaded rod 9 is equipped with two and controls distribution nut 10, two nut 10 contacts with the both sides of second round of dish saw 2 respectively, carries out fixed position to receiver 19.
The implementation scene is specifically as follows: first rim plate saw 1 and second rim plate saw 2 carry out the grooved in-process, a large amount of wall body fragments fall into inside 19 receivers, the back finishes in the fluting, unscrew the bolt on two second bracing pieces 17, two third bracing pieces 18 leave inside 19 receivers respectively this moment, 19 receivers rotate 90 this moment, can pour the inside wall body fragments of 19 receivers, the building rubbish that this device produced the fluting is collected, reduce and clean the required time of rubbish, the work efficiency is improved, this embodiment has specifically solved the problem that water and electricity overall arrangement fluting device did not set up the structure of collecting building rubbish among the prior art.
Although the invention has been described in detail with respect to the general description and the specific embodiments, it will be apparent to those skilled in the art that modifications and improvements can be made based on the invention. Therefore, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (8)

1. The utility model provides a building water and electricity overall arrangement construction is with high-efficient type fluting device, includes first round of dish saw (1), its characterized in that: a second wheel disc saw (2) is arranged on one side of the first wheel disc saw (1), a connecting rod (3) is arranged between the first wheel disc saw (1) and the second wheel disc saw (2), two ends of the connecting rod (3) respectively extend out of the outer sides of the first wheel disc saw (1) and the second wheel disc saw (2), a positioning mechanism and a driving mechanism are arranged on the outer side of the connecting rod (3), and the driving mechanism is arranged above the positioning mechanism;
the driving mechanism comprises a motor (6), the motor (6) is arranged on the front side of the connecting rod (3), a second straight gear (5) is fixedly arranged at the output end of the motor (6), a first straight gear (4) is meshed with the rear side of the second straight gear (5), and the first straight gear (4) is fixedly arranged at the outer end of the connecting rod (3);
positioning mechanism includes U-shaped pole (11), the below at connecting rod (3) is established in U-shaped pole (11), the rear side of U-shaped pole (11) is equipped with backup pad (16), the front side of backup pad (16) is equipped with two and controls spring (15) that distribute, the rear side in U-shaped pole (11) is established in spring (15).
2. The efficient slotting device for building hydropower layout construction according to claim 1, which is characterized in that: the outer sides of the first straight gear (4) and the second straight gear (5) are provided with a protective shell (7), and the connecting rod (3) is fixedly connected with the protective shell (7).
3. The efficient slotting device for building hydropower layout construction according to claim 2, and is characterized in that: one side of the motor (6) is fixedly provided with a first supporting rod (8), and one end of the first supporting rod (8) is fixedly connected with one side of the protective shell (7).
4. The efficient slotting device for building hydropower layout construction according to claim 1, which is characterized in that: the two ends of the U-shaped rod (11) are respectively connected with the two ends of the connecting rod (3) through bearings, and the outer end of the U-shaped rod (11) is sleeved with two anti-skidding sleeves (12) which are distributed leftwards and rightwards.
5. The efficient slotting device for building hydropower layout construction according to claim 4, which is characterized in that: the fixed first fixed cover (13) that distribute about two that are equipped with in the outer end of U-shaped pole (11), establish the below at antiskid cover (12) in first fixed cover (13), establish the front side at spring (15) in first fixed cover (13), the front end of spring (15) and the rear side fixed connection of first fixed cover (13).
6. The efficient slotting device for building hydropower layout construction according to claim 2, and is characterized in that: the below of protective housing (7) is equipped with receiver (19), the inboard of U-shaped pole (11) and establish the front side in backup pad (16) are established in receiver (19), ring cover (20) rotation connection that the bottom of receiver (19) and the bottom of U-shaped pole (11) distribute about through two.
7. The efficient slotting device for building hydropower layout construction according to claim 5, which is characterized in that: the fixed cover of second (14) that distributes about two is equipped with in the outer end of U-shaped pole (11), the below at first fixed cover (13) is established in the fixed cover of second (14), the inboard of the fixed cover of second (14) is fixed and is equipped with second bracing piece (17), the inside slip of second bracing piece (17) is equipped with third bracing piece (18), the one end of third bracing piece (18) is extended the one end of second bracing piece (17), the one end of third bracing piece (18) is extended into the inside and the two grafting of receiver (19), the front side of second bracing piece (17) is equipped with the bolt, the rear end of bolt extends into the inside of second bracing piece (17) and contacts with the front side of third bracing piece (18).
8. The efficient slotting device for building hydropower layout construction according to claim 1, which is characterized in that: first round of dish saw (1) fixed establishment in the outer end of connecting rod (3), second round of dish saw (2) and connecting rod (3) fixed connection, be equipped with threaded rod (9) between first round of dish saw (1) and second round of dish saw (2), the front side at connecting rod (3) is established in threaded rod (9), the one end of threaded rod (9) and the inboard fixed connection of first round of dish saw (1), the outer end and second round of dish saw (2) threaded connection of threaded rod (9), the other end of threaded rod (9) runs through second round of dish saw (2), distribution nut (10), two about the outer end of threaded rod (9) is equipped with two nut (10) that contact with the both sides of second round of dish saw (2) respectively.
CN202221688081.5U 2022-07-03 2022-07-03 Building water and electricity overall arrangement construction is with high-efficient type fluting device Active CN217802516U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221688081.5U CN217802516U (en) 2022-07-03 2022-07-03 Building water and electricity overall arrangement construction is with high-efficient type fluting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221688081.5U CN217802516U (en) 2022-07-03 2022-07-03 Building water and electricity overall arrangement construction is with high-efficient type fluting device

Publications (1)

Publication Number Publication Date
CN217802516U true CN217802516U (en) 2022-11-15

Family

ID=83960507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221688081.5U Active CN217802516U (en) 2022-07-03 2022-07-03 Building water and electricity overall arrangement construction is with high-efficient type fluting device

Country Status (1)

Country Link
CN (1) CN217802516U (en)

Similar Documents

Publication Publication Date Title
CN210172715U (en) Deburring device of gear hobbing machine
CN210616111U (en) Angle-adjustable point-removing angle grinder
CN217802516U (en) Building water and electricity overall arrangement construction is with high-efficient type fluting device
CN213661157U (en) Deicing device for electric power cable maintenance
CN210550501U (en) Environment-friendly sandblast grinding device is used in processing of wind power tower section of thick bamboo
CN217942826U (en) Surface grinding device is used in processing of axle type accessory
CN218016213U (en) Grinding device for machining kitchen integrated small household appliance gear
CN203124305U (en) Portable small ad cleaning machine
CN115157106A (en) Generator carbon brush grinding machine convenient for carbon powder water machine
CN210121710U (en) On-line thread tapping machine
CN213730969U (en) Socket clevis ball head grinding device
CN212706055U (en) A rust cleaning device for machining
CN211029259U (en) Cutter clamping moving mechanism for efficient numerical control cutter grinding machine
CN218856513U (en) Polishing and grinding equipment for electric bicycle frame
CN216129942U (en) Concrete road surface deckle edge treatment facility
CN213135276U (en) Machine parts production processingequipment convenient to adjust
CN211680369U (en) Grinding machine convenient to operate for gear machining
CN216633744U (en) Hardware mould convenient to hardware fitting deckle edge is polished
CN209095260U (en) A kind of double abrasive wheel composite sand turbine
CN218745144U (en) H-shaped steel cutting device for operation of ocean platform
CN215432910U (en) Burr removing device for metal product processing
CN216577177U (en) Polishing lathe for machining motorcycle accessories
CN211540707U (en) Angle grinder with small resistance
CN218856891U (en) Disassembly workbench convenient for personnel to operate positive and negative electrode plates of battery
CN221088489U (en) Wooden door sander

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant