CN217789205U - Pre-buried mechanism that erects of pipeline for electrical installation - Google Patents

Pre-buried mechanism that erects of pipeline for electrical installation Download PDF

Info

Publication number
CN217789205U
CN217789205U CN202220838868.9U CN202220838868U CN217789205U CN 217789205 U CN217789205 U CN 217789205U CN 202220838868 U CN202220838868 U CN 202220838868U CN 217789205 U CN217789205 U CN 217789205U
Authority
CN
China
Prior art keywords
pipeline
fixed mounting
buried
riser
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220838868.9U
Other languages
Chinese (zh)
Inventor
杨向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220838868.9U priority Critical patent/CN217789205U/en
Application granted granted Critical
Publication of CN217789205U publication Critical patent/CN217789205U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline pre-buried erection mechanism for electrical installation, which relates to the technical field of electrical installation and solves the technical problems that the pipeline is limited when pre-buried erection is carried out due to different sizes of slots, the pipeline cannot be pre-buried and erected, the pre-buried erection mechanism cannot be used, and the pipeline is only clamped with a reserved placing groove when being erected, the pipeline cannot be clamped at the placing groove due to the difference of the sizes of the pipeline, and the pipeline cannot be clamped and fixed by the placing groove; the device comprises an operation block, wherein a screw rod is rotatably connected inside the operation block, the thread turning directions of two ends of the screw rod are opposite, two ends of the screw rod are respectively provided with an adjusting assembly, and a U-shaped plate is fixedly arranged at the top end of the operation block; the utility model discloses have and to install pre-buried the erectting to it in not unidimensional fluting department, it is more convenient to use, can press from both sides tight fixedly to not unidimensional pipeline, and it is more convenient to use.

Description

Pre-buried mechanism that erects of pipeline for electrical installation
Technical Field
The utility model relates to an electrical installation technical field especially relates to an electric installation is with pre-buried mechanism of erectting of pipeline.
Background
Electrical equipment is a generic term for equipment such as generators, transformers, power lines, circuit breakers, etc. in an electrical power system; when the electrical equipment is installed, pipelines need to be pre-buried and erected and are pre-buried to the clamping grooves, so that the pipeline pre-buried erecting mechanism can be used, the existing pipeline pre-buried erecting mechanism is limited in pre-buried and erected due to different sizes of the grooves, the pipelines cannot be pre-buried and erected, the pre-buried erecting mechanism cannot be used, the pipelines are only clamped with the reserved placing grooves during erecting, the pipelines cannot be clamped at the placing grooves due to different sizes of the pipelines, and the pipelines cannot be clamped and fixed;
therefore, the pipeline pre-buried erection mechanism for electrical installation is designed to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pre-buried mechanism of erectting of pipeline for electrical installation has solved because fluting size variation in size, therefore receives the restriction when carrying out pre-buried erection to the pipeline, leads to the pipeline can't carry out pre-buried erection, and pre-buried mechanism of erectting can't use, and only makes the pipeline carry out the joint with reserving the standing groove when erectting, and there is the difference in the pipeline size, leads to standing groove department can't carry out the joint to the pipeline, can not press from both sides tight fixed technical problem to the pipeline.
For solving the technical problem, the utility model provides a pair of pre-buried mechanism of erectting of pipeline for electrical installation, including the operation piece, the inside of operation piece is rotated and is connected with the lead screw, the screw thread at lead screw both ends is revolved to opposite, the both ends of lead screw all are equipped with adjusting part, the top fixed mounting of operation piece has the U template, the bottom fixed mounting of U template inner wall has the supporting shoe, the inside fixed mounting of supporting shoe has the bracing piece, the both sides of bracing piece are equipped with clamping component, the equal fixed mounting of inner wall of U template both sides has first arc, the equal fixed mounting in both ends of bracing piece has spacing cap.
Preferably, the two adjusting assemblies respectively comprise a moving plate, a transverse plate and pushing plates, the moving plates are respectively connected to the surface of the screw rod through screw nuts and threads, the transverse plate is fixedly mounted at the top of one side of each moving plate, the pushing plates are fixedly mounted at one ends of the transverse plates, and the pushing plates are respectively located on two sides of the operation block.
Preferably, two clamping component all includes riser, second arc, catch bar and supporting spring, two the riser is sliding connection respectively at the both ends of bracing piece, two the equal fixed mounting in top of riser has the second arc, two the equal fixed mounting in surface of riser has the catch bar, two the spring activity respectively cup joints at the both ends of bracing piece, two the one end of spring all is connected two with the fixed surface of supporting shoe the other end of spring all is connected with the fixed surface of riser.
Preferably, two the bottom of movable plate all fixed mounting has the slider, the bottom of operation piece inner wall all seted up with slider assorted spout.
Preferably, two the equal fixed mounting in bottom of riser has the slide, the shifting chute that corresponds with the slide is all seted up to the bottom of U template inner wall.
Preferably, one end of the screw rod penetrates through the operation block and is fixedly connected with an adjusting rotating handle arranged outside the operation block, and support frames are fixedly mounted on two sides of the bottom end of the operation block.
Compared with the prior art, the utility model provides a pair of pre-buried erect mechanism of pipeline for electrical installation has following beneficial effect:
the utility model provides a pre-buried mechanism of erectting of pipeline for electrical installation, the lead screw that drives the setting through the regulation commentaries on classics of setting carries out the rotation of positive and negative rotation, because the screw thread handedness at lead screw both ends is opposite, the adjustment assembly that sets up at the lead screw surface is cooperated, and then make the corresponding movable plate move at the both ends of lead screw, and then make two thrust plates do opposite motion in the horizontal direction simultaneously, make two thrust plates and fluting department carry out butt fixed mounting, then can install pre-buried the erectting to the fluting department of different sizes, it is more convenient to use; through the clamping component who sets up for corresponding lapse pole removes at the horizontal direction, makes riser and the second arc that corresponds remove on the surface of bracing piece, cooperates first arc and spring, makes first arc and the second arc that corresponds carry out lock each other, then can press from both sides tight fixedly to not unidimensional pipeline, and it is more convenient to use.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic cross-sectional view of the operation block of the present invention;
fig. 3 is an enlarged schematic structural view of the utility model at a;
fig. 4 is an enlarged schematic structural view of the utility model B.
Reference numbers in the figures: 1. an operation block; 2. a screw rod; 3. an adjustment assembly; 31. moving the plate; 32. a transverse plate; 33. a pushing plate; 4. a U-shaped plate; 5. a support bar; 6. a support block; 7. a clamping assembly; 71. a vertical plate; 72. a second arc-shaped plate; 73. a push rod; 74. a spring; 8. a slide plate; 9. a limiting cap; 10. a first arc-shaped plate; 11. adjusting the rotating handle; 12. a slider; 13. a support frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the first embodiment, as shown in fig. 1-4, the utility model discloses an operation block 1, the inside of operation block 1 is rotated and is connected with lead screw 2, the screw thread direction of both ends of lead screw 2 is opposite, both ends of lead screw 2 all are equipped with adjusting part 3, the top fixed mounting of operation block 1 has U template 4, the bottom fixed mounting of U template 4 inner wall has supporting shoe 6, the inside fixed mounting of supporting shoe 6 has bracing piece 5, the both sides of bracing piece 5 are equipped with clamping component 7, the inner wall of U template 4 both sides all is fixed mounting has first arc 10, the both ends of bracing piece 5 all are fixed mounting has stop cap 9.
In the second embodiment, on the basis of the first embodiment, the two adjusting assemblies 3 respectively comprise a moving plate 31, a transverse plate 32 and a pushing plate 33, the two moving plates 31 are respectively connected to the surface of the screw rod 2 through screw nuts and threads, the transverse plate 32 is fixedly mounted at the top of one side of each of the two moving plates 31, the pushing plate 33 is fixedly mounted at one end of each of the two transverse plates 32, and the two pushing plates 33 are respectively located at two sides of the operating block 1, so that the installation of different slot sizes is facilitated, and the application range of the erecting mechanism is enlarged.
Third embodiment, on the basis of first embodiment, two clamping components 7 all include riser 71, second arc 72, catch bar 73 and supporting spring 74, two riser 71 are sliding connection respectively at the both ends of bracing piece 5, the equal fixed mounting in top of two riser 71 has second arc 72, the equal fixed mounting in surface of two riser 71 has catch bar 73, two springs 74 are the activity cup jointed at the both ends of bracing piece 5 respectively, the one end of two springs 74 all is connected with the fixed surface of supporting shoe 6, the other end of two springs 74 all is connected with the fixed surface of riser 71, the first arc 10 that the cooperation of being convenient for set up, press from both sides the pipeline and press from both sides fixedly, it is convenient to press from both sides the fastening of not unidimensional pipeline fixedly.
Fourth, on the basis of the first embodiment, the bottom ends of the two moving plates 31 are fixedly provided with the sliding blocks 12, and the bottom ends of the inner walls of the operating block 1 are provided with sliding grooves matched with the sliding blocks 12, so that the limiting effect is facilitated, and the moving plates 31 can move in the horizontal direction.
Fifth, on the basis of the first embodiment, the bottom ends of the two vertical plates 71 are fixedly provided with the sliding plates 8, and the bottom ends of the inner walls of the u-shaped plates 4 are provided with the moving grooves corresponding to the sliding plates 8, so that the limiting effect is facilitated.
Sixth embodiment, on the basis of first embodiment, the one end of lead screw 2 passes operation block 1 and changes 11 fixed connection with the regulation that operation block 1 outside set up, and the equal fixed mounting in both sides of operation block 1 bottom has support frame 13, is convenient for drive the setting and obtains lead screw 2 to adjust, plays the effect of support.
The working principle is as follows:
the first step is as follows: firstly, placing the pre-buried erection mechanism at a working place, then installing the pre-buried erection mechanism and a slot, driving the screw rod 2 to rotate in the forward direction through the arranged adjusting rotating handle 11, and matching with the screw rod nut and the slide block 12 thereof, so that the corresponding moving plate 31, the transverse plate 32 and the pushing plate 33 move in the horizontal direction;
the second step is that: one side of each of the two pushing plates 33 is in mutual extrusion contact with the inner wall of the corresponding notch, so that the embedded erection mechanism is convenient to install, the notches of different sizes can be further assembled, and the application range is greatly enlarged;
the third step: then clamping and fixing the pipeline, pushing the set vertical plate 71 to move on the surface of the support rod 5 through the set pushing rod 73, so that the corresponding second arc-shaped plate 72 moves oppositely in the horizontal direction, and the pipeline is placed between the first arc-shaped plate 10 and the second arc-shaped plate 72;
the fourth step: at this time, the push rod 73 arranged loosely makes the two second arc-shaped plates 72 close to each other in the direction of the first arc-shaped plate 10 under the action of the spring 74, so that different pipelines can be clamped and fixed conveniently; and finally, carrying out the next implementation step.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an electric installation is with pre-buried mechanism of erectting of pipeline, includes operation piece (1), its characterized in that: the utility model discloses a quick-witted, including operation piece (1), lead screw (2), screw rod (2) both ends, the both ends of lead screw (2) all are equipped with adjusting part (3), the top fixed mounting of operation piece (1) has U template (4), the bottom fixed mounting of U template (4) inner wall has supporting shoe (6), the inside fixed mounting of supporting shoe (6) has bracing piece (5), the both sides of bracing piece (5) are equipped with clamping component (7), the equal fixed mounting in inner wall of U template (4) both sides has first arc (10), the equal fixed mounting in both ends of bracing piece (5) has stop cap (9).
2. The electric installation pipeline pre-buried erection mechanism of claim 1, characterized in that, two said adjusting component (3) are respectively including moving plate (31), diaphragm (32) and push plate (33), two said moving plate (31) are respectively through the surface of screw-nut threaded connection at lead screw (2), the top of one side of two said moving plate (31) is respectively fixed with diaphragm (32), one end of two said diaphragm (32) is respectively fixed with push plate (33), two said push plate (33) are respectively located the both sides of operation piece (1).
3. The embedded erection mechanism of pipeline for electric installation of claim 1, characterized in that, two clamping unit (7) are all including riser (71), second arc (72), catch bar (73) and supporting spring (74), two riser (71) sliding connection respectively is at the both ends of bracing piece (5), the top of two riser (71) is all fixed mounting has second arc (72), the surface of two riser (71) is all fixed mounting has catch bar (73), two spring (74) activity cup joints respectively at the both ends of bracing piece (5), the one end of two spring (74) all is connected with the fixed surface of supporting shoe (6), the other end of two spring (74) all is connected with the fixed surface of riser (71).
4. The pipeline embedded erecting mechanism for electrical installation as claimed in claim 2, wherein sliding blocks (12) are fixedly mounted at the bottom ends of the two moving plates (31), and sliding grooves matched with the sliding blocks (12) are formed in the bottom ends of the inner walls of the operating blocks (1).
5. The embedded erecting mechanism of pipeline for electric installation according to claim 3, wherein sliding plates (8) are fixedly installed at the bottom ends of the two vertical plates (71), and moving grooves corresponding to the sliding plates (8) are formed in the bottom ends of the inner walls of the U-shaped plates (4).
6. The pipeline embedded erection mechanism for electrical installation as claimed in claim 1, wherein one end of the screw rod (2) passes through the operation block (1) and is fixedly connected with an adjusting rotating handle (11) arranged outside the operation block (1), and support frames (13) are fixedly mounted on both sides of the bottom end of the operation block (1).
CN202220838868.9U 2022-04-13 2022-04-13 Pre-buried mechanism that erects of pipeline for electrical installation Expired - Fee Related CN217789205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220838868.9U CN217789205U (en) 2022-04-13 2022-04-13 Pre-buried mechanism that erects of pipeline for electrical installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220838868.9U CN217789205U (en) 2022-04-13 2022-04-13 Pre-buried mechanism that erects of pipeline for electrical installation

Publications (1)

Publication Number Publication Date
CN217789205U true CN217789205U (en) 2022-11-11

Family

ID=83907389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220838868.9U Expired - Fee Related CN217789205U (en) 2022-04-13 2022-04-13 Pre-buried mechanism that erects of pipeline for electrical installation

Country Status (1)

Country Link
CN (1) CN217789205U (en)

Similar Documents

Publication Publication Date Title
CN210662115U (en) Communication equipment mounting bracket
CN216904771U (en) Fixing piece of solar photovoltaic panel
CN109039252A (en) A kind of high stability photovoltaic fixture for roofing
CN217789205U (en) Pre-buried mechanism that erects of pipeline for electrical installation
CN212085718U (en) Electric cable fixing device
CN111355182A (en) Adjustable compact air insulation looped netowrk cabinet uses electrical apparatus installation device
CN107178202B (en) Adjustable mounting rack for motor rotation driving base
CN217394180U (en) Steel pipe tower picture peg welding frock
CN210467481U (en) Novel transformer convenient to maintenance
CN215375638U (en) Device for positioning power distribution network line fault
CN214445791U (en) Electric power fitting for preventing cable from loosening
CN212483780U (en) Floating type automatic clamping device of frame circuit breaker
CN216868099U (en) Auxiliary stand is used in electromechanical installation
CN113145773A (en) Steel bar cutting device for constructional engineering
CN220964636U (en) Inverter mounting structure
CN112478927A (en) Height-adjustable electromechanical mounting support frame
CN219082509U (en) Pipeline connecting device for municipal water supply and drainage
CN212011908U (en) Adjustable compact air insulation looped netowrk cabinet uses electrical apparatus installation device
CN216680801U (en) Automatic welding device for interlayer of power switch cabinet
CN217741250U (en) Rail mounted intelligence bus duct
CN218426536U (en) Auxiliary support for welding processing of television foot stool
CN216479927U (en) Projection equipment for internet education convenient to angle regulation
CN220446317U (en) Support type frame
CN216939321U (en) Device convenient to photovoltaic power plant connector dismouting operation
CN217037685U (en) Connecting device based on electric installation usefulness

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221111