CN217782528U - Concrete floor atress reinforcing bar and girder steel connection structure of encorbelmenting - Google Patents
Concrete floor atress reinforcing bar and girder steel connection structure of encorbelmenting Download PDFInfo
- Publication number
- CN217782528U CN217782528U CN202221974937.5U CN202221974937U CN217782528U CN 217782528 U CN217782528 U CN 217782528U CN 202221974937 U CN202221974937 U CN 202221974937U CN 217782528 U CN217782528 U CN 217782528U
- Authority
- CN
- China
- Prior art keywords
- steel
- girder steel
- reinforcing bar
- main part
- steel beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a floor atress reinforcing bar and girder steel connection structure are encorbelmented to concrete, its structure includes the girder steel main part, the girder steel main part is the I shape, still includes fixed connector, peg and the tension reinforcing bar, girder steel main part roof one side is equipped with a plurality of fixed connector, and girder steel main part roof middle part is equipped with a plurality of pegs, the tension reinforcing bar one end is connected with fixed connector. The number of the studs is the same as that of the fixed connecting pieces, the studs correspond to the fixed connecting pieces one by one, and the top walls of the studs are provided with clamping grooves matched with the tensioned steel bars. One side of the top wall of the steel beam, which is provided with the fixed connecting piece, is provided with a sliding groove, the fixed connecting piece is a connecting plate, and the bottom of the connecting plate is in sliding connection with the sliding groove of the top wall of the steel beam. According to the connecting structure, the connecting plates, the longitudinal tension steel bars and the studs are arranged on the steel beam, and the connecting plate on one side of the longitudinal tension steel bar is welded, so that the horizontal force of the floor can be transmitted to the steel beam through the tension steel bars, the studs and the connecting plates, the stress of the wall body is relieved, and the safety of the wall body is improved.
Description
Technical Field
The utility model belongs to the technical field of the assembled structure technique and specifically relates to a floor atress reinforcing bar and girder steel connection structure are cantilevered to concrete.
Background
Various industries have made efforts to achieve the goals of carbon peaking, carbon neutralization. The building industry has become more involved and is continually moving toward this goal. Because the steel structure has advantages such as intensity height, light in weight to in order to reduce site operation, fabricated structure, especially steel structure fabricated development is rapid. But also creates a new set of problems. In particular to the connection of reinforced concrete members with steel members.
At present, in steel structure assembly type engineering, most of main beam main columns adopt box-shaped or I-shaped sections, the materials are Q355B, but most of floor slabs are cast-in-place floor slabs. The toggle pins are welded on the steel beams and are sheared under the action of seismic force, and the seismic force is transmitted to the steel beams and then to the main columns. However, when the steel beam is used as the bearing outer wall and the interior is provided with a stair floor slab for forming a hole, as shown in the following figure, the inner side of the steel beam under the outer wall is used for enclosing, the stair is arranged on the inner side, and the floor slab is formed with a hole at the elevation of the floor. In order to bear the external maintenance wall, a concrete cantilever floor needs to be arranged, at the moment, the upper reinforcing steel bars of the concrete cantilever floor need to bear the hogging moment generated by the wall, and a new scheme is needed to solve the problem of how to transmit the bending moment borne by the tensile reinforcing steel bars to the steel beams.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a floor atress reinforcing bar and girder steel connection structure are encorbelmented to concrete, have solved how to the problem on the moment of flexure that the floor bore changes the girder steel. The structure can transmit the negative bending moment generated by the wall body to the steel beam, reduce the stress of the wall body and improve the safety of the wall body.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides a floor atress reinforcing bar and girder steel connection structure are hung to concrete, its structure includes the girder steel main part, the girder steel main part is the I shape, still includes fixed connector, peg and tension reinforcing bar, girder steel main part roof one side is equipped with a plurality of fixed connector, and girder steel main part roof middle part is equipped with a plurality of pegs, tension reinforcing bar one end is connected with fixed connector.
Furthermore, the studs and the fixed connecting pieces are the same in number and correspond to each other one by one, and clamping grooves matched with the tensioned steel bars are formed in the top walls of the studs.
Further, one side of the roof installation fixed connection spare of girder steel is equipped with the spout, fixed connection spare is the connecting plate, the bottom of connecting plate and the spout sliding connection of girder steel roof.
Furthermore, the sliding groove is a dovetail groove, and a dovetail block in sliding fit with the dovetail groove is arranged at the lower end of the connecting plate.
Further, one side that the girder steel roof was equipped with fixed connection spare is equipped with the scale sign that can guarantee that the fixed connection spare interval is accurate.
Furthermore, the tension steel bar is a U-shaped longitudinal tension steel bar capable of bearing the weight of the enclosure wall, and one end of the longitudinal tension steel bar is welded with the fixed connecting piece.
The utility model has the advantages that:
the utility model discloses a connection structure is through setting up a plurality of connecting plate, vertically pulling reinforcing bar and toggle bolt on the girder steel, vertically pulls one side connecting plate welding of reinforcing bar, can pass through the horizontal force of floor on pulling reinforcing bar, toggle bolt and connecting plate transmit the girder steel, alleviates the atress of wall body, improves the security of wall body.
Because sliding connection can be realized through the spout to connecting plate and girder steel roof, and set up the scale mark in one side of girder steel roof, the position of every connecting plate of installation that can be accurate through the scale mark ensures that the interval of connecting plate equals, makes vertical tension bar atress even, has improved the safe and reliable degree of this structure.
Drawings
Fig. 1 is a perspective view of the present invention;
fig. 2 is a transverse sectional view of the present invention;
fig. 3 is a partially enlarged view of fig. 2.
In the figure:
1 girder steel main part, 2 stiffening rib one, 3 stiffening rib two, 4 connecting plates, 5 pegs, 6 vertical tension reinforcing bar, 7 spouts, 8 girder steel roofs, 9 scale marks.
Detailed Description
The concrete cantilever floor stressed steel bar and steel beam connecting structure of the utility model is described in detail below with reference to the attached drawings of the specification.
As shown in fig. 1 to 3, the utility model discloses a floor atress reinforcing bar and girder steel connection structure are hung to concrete, including girder steel main part 1, girder steel main part 1 is the I shape, and one side of girder steel main part 1 is equipped with a plurality of stiffening ribs 2, and the opposite side is equipped with a plurality of stiffening ribs two 3, and this connection structure still includes fixed connector, peg 5 and the reinforcing bar that is drawn 6, 1 roof one side of girder steel main part is equipped with a plurality of fixed connector, and fixed connector's specific quantity sets up a plurality ofly according to the difference of installation demand, can be with every fixed connector and girder steel roof welding, and girder steel main part roof middle part is equipped with a plurality of pegs 5, peg 5 is the same and the one-to-one with fixed connector quantity, the peg also weld with the girder steel roof, the roof of peg be equipped with the draw reinforcing bar complex draw-in groove, draw reinforcing bar one end and fixed connector lateral wall welding, the horizontal pole and the draw-in groove cooperation joint of peg roof, have improved the bearing capacity of the reinforcing bar that is drawn.
In order to facilitate the installation of the fixed connecting pieces and improve the accuracy of the distance between the fixed connecting pieces, a sliding groove 7 is formed in one side, where the fixed connecting pieces are installed, of the top wall of the steel beam top plate 8, the sliding groove 7 is a dovetail groove, the fixed connecting pieces are connecting plates 4, and dovetail blocks in sliding fit with the dovetail grooves are arranged at the lower ends of the connecting plates 4. One side that the girder steel roof was equipped with fixed connection spare is equipped with the scale sign 9 that can guarantee that the fixed connection spare interval is accurate. When the connecting plates 4 are installed, the connecting plates 4 are sequentially slid into the sliding grooves 7 of the steel beam top wall, each connecting plate is slid to the required scale through the scale marks 9 on the side edges of the steel beam top wall, the same interval between every two adjacent connecting plates is guaranteed, and the bearing stress of the longitudinal tension steel bars 6 is uniform. In addition, in order to guarantee the firmness of connecting plate and girder steel connection, can weld in connecting plate and girder steel roof junction after the connecting plate confirms the mounted position.
The load of the wall body is built on the floor slab, the weight of the wall body is firstly transmitted to the edge of the overhanging plate of the floor slab, and at the moment, the reinforcing steel bar on the upper part of the floor slab is the longitudinal tension reinforcing steel bar 6 and bears the negative bending moment generated by the wall body. The floor slab is an overhanging stress component, and the reinforcing steel bars on the upper part of the floor slab are longitudinal tension reinforcing steel bars 6 according to the stress characteristic and bear the weight of the enclosure wall body. The connecting plate 4 is a steel plate, the height of the connecting plate 4 is required to be smaller than that of a concrete floor slab, the longitudinal tension steel bar 6 is welded with the connecting plate 4, and the force of the longitudinal tension steel bar can be transmitted to the steel beam through the connecting plate and further transmitted to the main structure. The bending moment of the section of the I-shaped steel beam in the weak axis direction is weak, so that the I-shaped steel beam is easy to twist under the condition of eccentric stress, and the stiffening ribs on the two sides of the steel beam can avoid the condition. Under the action of an earthquake, the floor assumes rigidity and horizontal forces are transmitted through the floor to the steel beams. The studs 5 and 4 on the top of the steel beam are used as connecting plates for shearing resistance, and can transmit the horizontal force of the floor slab to the steel beam and further to the main structure. Normally, when the floor slab is not perforated, the longitudinal tension steel bar 6 needs to extend to the inner side of the floor slab, and the anchoring length Lab of the tension steel bar is about 35d. When the floor slab is provided with the hole, the anchoring length is difficult to meet the standard requirement.
The utility model discloses, adopt to weld in the connecting plate 4 of girder steel and the welding of the reinforcing bar that is drawn, welding length adopts the equal strength connection, can satisfy the calculation requirement, guarantees structure safe and reliable. The welding position of connecting plate is adjustable, can satisfy different bearing demands, and the suitability is strong.
The above description is only used for illustrating some principles of the present invention, and the present specification does not limit the present invention to the specific structure and the application range shown, so all the corresponding modifications and equivalents that may be utilized all belong to the claims of the present invention.
Other technical features than those described in the specification are known to those skilled in the art.
Claims (6)
1. The utility model provides a floor atress reinforcing bar and girder steel connection structure are hung to concrete, includes the girder steel main part, the girder steel main part is the I shape, and characterized by still includes fixed connector, peg and tension reinforcing bar, girder steel main part roof one side is equipped with a plurality of fixed connector, and girder steel main part roof middle part is equipped with a plurality of pegs, tension reinforcing bar one end is connected with fixed connector.
2. A concrete cantilever floor stressed steel bar and steel beam connecting structure as claimed in claim 1, wherein the said pegs are the same in number and correspond to the fixed connecting pieces one by one, and the top wall of the said peg is provided with a slot matched with the tensioned steel bar.
3. A concrete cantilever floor stress steel bar and steel beam connection structure as claimed in claim 1 or 2, wherein the top wall of the steel beam is provided with a sliding groove at one side thereof where the fixed connecting member is mounted, the fixed connecting member is a connecting plate, and the bottom of the connecting plate is slidably connected with the sliding groove of the top wall of the steel beam.
4. A concrete cantilever floor stressed steel bar and steel beam connecting structure as claimed in claim 3, wherein the sliding groove is a dovetail groove, and the lower end of the connecting plate is provided with a dovetail block in sliding fit with the dovetail groove.
5. A structure for connecting a stressed reinforcement of a concrete cantilever floor to a steel beam as claimed in claim 3, wherein the side of the top wall of the steel beam on which the fixing-connecting members are provided is provided with a scale mark for ensuring the accurate distance between the fixing-connecting members.
6. The structure of claim 1, wherein the tension bars are U-shaped longitudinal tension bars capable of bearing the weight of the enclosure wall, and one end of the longitudinal tension bar is welded to the fixing connector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221974937.5U CN217782528U (en) | 2022-07-28 | 2022-07-28 | Concrete floor atress reinforcing bar and girder steel connection structure of encorbelmenting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221974937.5U CN217782528U (en) | 2022-07-28 | 2022-07-28 | Concrete floor atress reinforcing bar and girder steel connection structure of encorbelmenting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217782528U true CN217782528U (en) | 2022-11-11 |
Family
ID=83942379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221974937.5U Active CN217782528U (en) | 2022-07-28 | 2022-07-28 | Concrete floor atress reinforcing bar and girder steel connection structure of encorbelmenting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217782528U (en) |
-
2022
- 2022-07-28 CN CN202221974937.5U patent/CN217782528U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101107300B1 (en) | Steel plate shear wall | |
CN101377088A (en) | Waveform plate web girder | |
CN103410102A (en) | H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof | |
KR101160763B1 (en) | Composite beam using deck plate having plulality of cap plate | |
CN217782528U (en) | Concrete floor atress reinforcing bar and girder steel connection structure of encorbelmenting | |
CN112160479B (en) | Rib plate skeleton concrete cast-in-place board | |
EP4332319A1 (en) | Reusable support beam for roof of concrete frame building and a concrete frame building constructed with such support beams | |
CN210032128U (en) | Dry construction connecting structure of corner post and beam for fabricated frame structure building | |
KR101191545B1 (en) | Deck plate having plulality of cap plate | |
CN111139722A (en) | Novel steel box girder and steel-concrete composite girder structure | |
CN109594461B (en) | Assembled steel concrete composite beam and forming method thereof | |
CN216663807U (en) | Cable tower upper beam structure and cable tower | |
CN215800931U (en) | Concrete-filled steel tube truss suitable for high-speed railway | |
CN215907025U (en) | Connecting joint of U-shaped steel-clad concrete beam and steel-reinforced concrete precast column | |
CN211499306U (en) | Prefabricated assembled concrete shear force wall | |
CN101881051B (en) | Beam-beam connecting node structure | |
CN2752353Y (en) | Cold bending steel-concrete composite top chord steel truss | |
CN111005497A (en) | Assembled house ground reinforcing plate structure | |
CN216893061U (en) | Prefabricated floor connection structure of assembled | |
CN214656267U (en) | T-beam prefabricated steel pedestal | |
CN215702588U (en) | Prefabricated concrete beam slab comb tooth fender device | |
CN212175442U (en) | Novel steel box girder structure | |
CN214935408U (en) | Portal frame large-span track beam | |
CN216949092U (en) | Spandrel girder structure is built in room | |
CN215442622U (en) | Easy-to-assemble steel bar truss floor support plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |