Prior art keywords
steel pipe
connection
stand
temporary support
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221236362.7U
Other languages
Chinese (zh)
Inventor
金海�
王鹏亮
陈剑卫
徐坚震
秦伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Original Assignee
HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HENGDA STEEL STRUCTURE CO Ltd filed Critical HANGZHOU HENGDA STEEL STRUCTURE CO Ltd
Priority to CN202221236362.7U priority Critical patent/CN217782396U/en
Application granted granted Critical
Publication of CN217782396U publication Critical patent/CN217782396U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a support steel pipe transition node structure temporarily, characterized by for connect two steel pipes, including stand connecting piece and connect buckle, the stand connecting piece includes the connection stand at both ends and the connection link plate at middle part, connects stand and steel pipe grafting cooperation, exists the connect buckle that is equipped with cooperation connection link plate on the at least steel pipe. The utility model has the advantages that the splicing with the inside of the steel pipe is realized through the upright post connecting piece, and the convenience of lengthening the steel pipe is improved through connecting the buckle limiting upright post connecting piece and the steel pipe; through the cooperation of grafting and joint, can reduce the quantity of steel and bolt, simple to operate reduces high altitude construction's intensity of labour.

Description

Temporary support steel pipe transition node structure
Technical Field
The application relates to the technical field of box beam strips, in particular to a temporary support steel pipe transition joint structure.
Background
The steel structure support frame is as supplementary and the safety device during construction, and support frame stand connection height changes along with the change of demand, and in order to improve the utilization ratio of steel pipe, the connected mode is the key. In addition, there is the danger of high altitude construction when the steel construction is connected, if the connected node is complicated, will improve the construction degree of difficulty.
In chinese patent literature, patent No. CN 2021102352096, 6.15.2021, entitled "a rigid connection node of rectangular steel beam and H-shaped steel column and construction method", discloses a rigid connection node of rectangular steel beam and H-shaped steel column, which includes: the first number piece is an H-shaped steel column; a second part; the third part is a channel steel; the fifth part is a rectangular steel beam; the fourth part is a rectangular steel plate. The first member and the fifth member form a basic form of a rigid connecting node by using the second member and the third member as intermediate members, and the basic form is rigidly fixed by using the fourth member and a bolt.
The steel structure support frame stand of prior art adopts the mode realization nodal connection of outside cladding cooperation bolt usually, has the bolt number many, twists and moves inconveniently, and the coaxiality of stand junction is difficult to be guaranteed, the yielding problem of node.
Disclosure of Invention
In order to overcome the above-mentioned not enough of prior art, this application provides a support steel pipe transition node structure temporarily, can reduce the quantity of steel and bolt, and simple to operate reduces high altitude construction's intensity of labour.
In order to achieve the above purpose, the present invention adopts the following technical solution.
The utility model provides a support steel pipe transition node structure temporarily, characterized by for connect two steel pipes, including stand connecting piece and connection buckle, the stand connecting piece includes the connection stand at both ends and the connection ring board at middle part, connects stand and steel pipe grafting cooperation, has the connection buckle that is equipped with cooperation connection ring board on at least one steel pipe.
The steel pipe lengthening device realizes the insertion connection with the interior of the steel pipe through the upright post connecting piece, and improves the convenience of lengthening the steel pipe by connecting the buckle to limit the upright post connecting piece and the steel pipe; through the cooperation of grafting and joint, can reduce the quantity of steel and bolt, simple to operate reduces high altitude construction's intensity of labour.
Preferably, the connection clip is provided at an upper end of a lower steel pipe of the two vertically arranged steel pipes. Connect buckle and downside steel pipe and can lock stand connecting piece and downside steel pipe after fixed, form stable structure, guarantee the reliability of stand connecting piece and downside steel pipe, the upside steel pipe can realize the stable connection through the dead weight after with the stand connecting piece grafting cooperation, reduces the work load of connection operation, and it is also higher to support the reliability simultaneously.
Preferably, connect the buckle and include the base and rotate the pothook that sets up on the base, the axis setting of the perpendicular steel pipe axis of rotation axis of pothook and base, base and place steel pipe welded connection. The clamping matching is completed through the rotation of the clamping hook, and the operation is convenient.
Preferably, the steel pipe is provided with four groups of connecting buckles in a circumferential array around the axis of the steel pipe. So that the connecting buckle can be used for fixing the locking upright post connecting piece in a buckling manner.
Preferably, the connecting ring plate is provided with a sunken connecting ring groove, and the connecting ring groove corresponds to the clamping hook in position. The hook is clamped into the connecting ring groove and has good anti-loosening performance.
Preferably, the connecting ring plate is welded and fixed with the connecting upright post. The integral structure stability of the upright post connecting piece is ensured.
Preferably, the outer end of the connecting upright post is provided with a transition chamfer. The connecting upright column is convenient to be matched into the steel pipe.
The utility model discloses following beneficial effect has: the use amount of steel and bolts can be reduced, the installation is convenient, and the labor intensity of high-altitude operation is reduced; connecting piece, buckle and stand are independent and can used repeatedly, and stand length can be adjusted at will, has improved the turnover rate of utilization of material.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of the present invention.
Fig. 2 isbase:Sub>A cross-sectional view atbase:Sub>A-base:Sub>A in fig. 1.
Fig. 3 is a schematic structural view of the pillar connector of the embodiment shown in fig. 1.
Fig. 4 is a schematic structural diagram of a second embodiment of the present invention.
In the figure: the steel pipe 11 at the lower side of the upper steel pipe 1 is connected with the upright post 2, the connecting ring plate 3, the connecting ring groove 4, the transition chamfer 5, the base 6 and the hook 7.
Detailed Description
The invention is further illustrated with reference to the accompanying drawings and specific embodiments.
In the case of the example 1, the following examples are given,
as shown in fig. 1 to 3, a temporary support steel pipe transition joint structure is used for connecting two steel pipes, which may be square pipes or circular pipes. The temporary support steel pipe transition joint structure comprises a stand column connecting piece and a connecting buckle, the stand column connecting piece comprises a connecting stand column 2 at two ends and a connecting ring plate 3 at the middle part, the connecting stand column 2 can be of a hollow structure or a solid structure, and the connecting ring plate 3 and the outer side surface of the connecting stand column 2 are welded and fixed. The outer end of the connecting upright post 2 is provided with a transition chamfer 5. The connecting upright post 2 is matched with the steel pipe in an inserting way, and the connecting upright post 2 is inserted into the steel pipe and clamped in place through the connecting ring plate 3. One of the steel pipes is provided with a connecting buckle which is matched with the connecting ring plate 3. Specifically, the connection buckle is provided at the upper end of the lower steel pipe 11 of the two steel pipes arranged vertically. The upper steel pipe 1 is not provided with connecting buckles, and the lower steel pipe 11 is provided with four groups of connecting buckles in a circumferential array around the axis. The connecting buckle comprises a base 6 and a clamping hook 7 which is hinged on the base 6, the rotating axes of the clamping hook 7 and the base 6 are perpendicular to the axis of the steel pipe, and the base 6 is connected with the steel pipe in a welded mode. The connecting ring plate 3 is provided with a sunken connecting ring groove 4, and the connecting ring groove 4 corresponds to the hook 7.
In the case of the example 2, the following examples are given,
as shown in FIG. 4, the temporary support steel pipe transition joint structure is used for connecting two steel pipes and comprises a stand column connecting piece and a connecting buckle, wherein the connecting buckle matched with the connecting ring plate 3 is arranged on each of the two steel pipes. The two steel pipes are arranged up and down, and the connecting buckles are respectively arranged at the upper end of the lower steel pipe 11 and the lower end of the upper steel pipe 1. The steel pipe is provided with four groups of connecting buckles in a circumferential array around the axis of the steel pipe. The connecting buckle comprises a base 6 and a clamping hook 7 which is rotatably arranged on the base 6, the rotating axes of the clamping hook 7 and the base 6 are perpendicular to the axis of the steel pipe, and the base 6 is connected with the steel pipe in a welded mode. The stand connecting piece includes the connection stand 2 at both ends and the connection ring plate 3 at middle part, connects stand 2 and steel pipe grafting cooperation, and inside connection stand 2 pegged graft the steel pipe, through the location of blocking of connection ring plate 3, is equipped with sunken connection annular 4 on the connection ring plate 3, and connection annular 4 all has the setting in the both sides of connection ring plate 3, connection ring plate 3 and connection stand 2 welded fastening. The outer end of the connecting upright post 2 is provided with a transition chamfer 5.
This application is when using, the downside steel pipe 11 that will weld connection buckle base 6 is vertical fixed, peg graft into the stand connecting piece in 11 upper ends of downside steel pipe that have fixed, connect stand 2 of stand connecting piece lower extreme inserts in downside steel pipe 11, it is spacing to block the upper end of downside steel pipe 11 with link plate 3, the upper end of stand connecting piece is pegged graft to the lower extreme of upside steel pipe 1, later make 7 tip of pothook and the cooperation of joint ring groove 4 around 6 rotations of base with pothook 7, can accomplish the extension installation of two steel pipes, the benefit that all sets up connection buckle on two steel pipes lies in can playing the effect of preventing drawing to the steel pipe after the assembly, further improve the reliability after two steel pipe equipment.
The connecting form of the existing steel pipe support frame upright is complicated, and the length of the upright cannot be adjusted at will, so that inconvenience is brought to the turnover use of materials. By adopting the connection mode, the connecting piece, the buckle and the stand column are independent and can be repeatedly used, the length of the stand column can be adjusted at will, the turnover utilization rate of materials is improved, the operation is simple, the using amount of steel and bolts can be reduced, the installation is convenient, and the labor intensity of high-altitude operation is reduced.

Claims (7)

1. The utility model provides a support steel pipe transition node structure temporarily, characterized by for connect two steel pipes, including stand connecting piece and connection buckle, the stand connecting piece includes the connection stand at both ends and the connection ring board at middle part, connects stand and steel pipe grafting cooperation, has the connection buckle that is equipped with cooperation connection ring board on at least one steel pipe.
2. The transition node structure of temporary support steel pipes according to claim 1, wherein the connection buckle is provided at an upper end of a lower steel pipe of two steel pipes arranged up and down.
3. The temporary support steel pipe transition joint structure as claimed in claim 1, wherein the connection buckle comprises a base and a hook rotatably disposed on the base, the hook and the rotation axis of the base are perpendicular to the axis of the steel pipe, and the base is welded to the steel pipe.
4. A temporary support steel pipe transition joint structure as claimed in claim 1 or 3 wherein said steel pipe is provided with four sets of connector clips in a circumferential array around its axis.
5. The temporary support steel pipe transition joint structure as claimed in claim 3, wherein the connection ring plate is provided with a recessed connection ring groove corresponding to the position of the hook.
6. The temporary support steel pipe transition joint structure as claimed in claim 1 or 5, wherein the connection ring plate is welded and fixed with the connection upright post.
7. The temporary support steel pipe transition joint structure as claimed in claim 1, wherein the outer ends of the connection pillars are provided with transition chamfers.
CN202221236362.7U 2022-05-20 2022-05-20 Temporary support steel pipe transition node structure Active CN217782396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221236362.7U CN217782396U (en) 2022-05-20 2022-05-20 Temporary support steel pipe transition node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221236362.7U CN217782396U (en) 2022-05-20 2022-05-20 Temporary support steel pipe transition node structure

Publications (1)

Publication Number Publication Date
CN217782396U true CN217782396U (en) 2022-11-11

Family

ID=83910001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221236362.7U Active CN217782396U (en) 2022-05-20 2022-05-20 Temporary support steel pipe transition node structure

Country Status (1)

Country Link
CN (1) CN217782396U (en)

Similar Documents

Publication Publication Date Title
CN111877554A (en) Assembled steel construction connected node structure
CN217782396U (en) Temporary support steel pipe transition node structure
CN215759234U (en) Pile foundation reinforcing apparatus for highway design
CN214498590U (en) Totally enclosed type truss activity covering or awning on a car, boat, etc. room
CN215802696U (en) Vertical steel bar positioning device of column
CN211597685U (en) Scaffold convenient to assemble and disassemble for green building
CN218668526U (en) Overhanging type steel reinforced concrete component side template bottom fixing device
CN218757943U (en) Cross supporting device for round tubes
CN219411955U (en) Cross steel construction reinforcing support beam structure
CN216893421U (en) Scaffold frame pole setting fixing device encorbelments
CN221168685U (en) Special-shaped template supporting component
CN206174123U (en) Grid structure truss column is hole ball connecting device alternately
CN218375373U (en) Assembly type canopy bifurcated column assembling jig frame
CN219060848U (en) Inclined support structure for stable scaffold
CN205421997U (en) Embedded U-shaped slotted hole steel pipe support
CN215888570U (en) Support system for tree-shaped column structure installation
CN116335376B (en) Detachable steel construction is with combination scaffold frame
CN218990633U (en) Light steel keel structure for construction site
CN213015368U (en) Water conservancy building construction tubular column supports system connecting piece
CN219864354U (en) Connecting structure of traffic rod piece
CN211975597U (en) Heavy ball joint base of finished product support and hanger
CN217924863U (en) Small-size beam template support system of dish knot formula scaffold frame
CN219471511U (en) Height-adjustable mobile positioning base applicable to overhanging scaffold upright rod