CN217779669U - Building site is with dismantling dustbin - Google Patents

Building site is with dismantling dustbin Download PDF

Info

Publication number
CN217779669U
CN217779669U CN202220970034.3U CN202220970034U CN217779669U CN 217779669 U CN217779669 U CN 217779669U CN 202220970034 U CN202220970034 U CN 202220970034U CN 217779669 U CN217779669 U CN 217779669U
Authority
CN
China
Prior art keywords
piece
fixedly connected
guardrail
pipe
side guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220970034.3U
Other languages
Chinese (zh)
Inventor
王亚超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Giant Metal Technology Co ltd
Original Assignee
Hebei Giant Metal Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Giant Metal Technology Co ltd filed Critical Hebei Giant Metal Technology Co ltd
Priority to CN202220970034.3U priority Critical patent/CN217779669U/en
Application granted granted Critical
Publication of CN217779669U publication Critical patent/CN217779669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to an environmental protection equipment technical field specifically is building site is with dismantling dustbin, including preceding guardrail piece and side guardrail piece, fixedly connected with rebar hook on the preceding guardrail piece, and fixed mounting has the sleeve pipe on the side guardrail piece, and rebar hook connects in the sleeve pipe, fixedly connected with mounting on the side guardrail piece, and fixedly connected with rotates the piece on the mounting, and the mounting with rotate the piece and constitute by pipe box and steel sheet, rotate on the piece and be connected with the lid, and the spacing pipe of fixedly connected with on the lid, fixedly connected with base on the side guardrail piece, and slidable mounting has on the base to participate in, participate in and be connected with the structure of extracting that has laborsaving function. The utility model discloses utilize the common guardrail net piece of building site to constitute the dustbin, the cost is lower to can design size and shape by oneself according to concrete demand, still have good intensity, it is not fragile.

Description

Building site is with dismantling dustbin
Technical Field
The utility model relates to an environmental protection equipment technical field specifically is building site is with dismantling dustbin.
Background
The existing high-rise building is usually long in construction period, a building site is usually formed around a construction site of the building, and not only is basic construction equipment, but also a simple residential area is often formed through container houses for building workers to live in.
Therefore, a lot of garbage is generated on the construction site, including not only construction garbage but also a lot of household garbage, and must be collected and disposed in time. But present dustbin often structural strength is relatively poor, and the volume is less, and the rubbish volume on the building site is great to the environment is complicated, and present common dustbin often is difficult to be suitable for, and very easily is damaged, and if carry out the customization production then can produce higher cost.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building site is with dismantling dustbin to reach and make the low-cost and durable purpose of dustbin, with the problem of proposing in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: building site is with dismantling dustbin, including front guardrail piece and side guardrail piece, fixedly connected with rebar hook on the front guardrail piece, and fixed mounting has the sleeve pipe on the side guardrail piece, and rebar hook connects in the sleeve pipe, fixedly connected with mounting on the side guardrail piece, and fixedly connected with rotates the piece on the mounting, and the mounting with rotate the piece and constitute by pipe box and steel sheet, it is connected with the lid to rotate on the piece, and the spacing pipe of fixedly connected with on the lid, fixedly connected with base on the side guardrail piece, and slidable mounting has participates in on the base, it has laborsaving function's the structure of extracting to participate in to be connected with on.
Preferably, preceding guardrail piece, side guardrail piece and lid are building site guardrail net piece, constitute by steel pipe and cross welded steel wire, and just preceding guardrail piece, side guardrail piece and lid all are provided with two.
Preferably, the steel bar hook is welded on the vertical steel pipe of the front guardrail piece, and the sleeve is welded on the vertical steel pipe of the side guardrail piece.
Preferably, the fixed part and the rotating part are connected through a bolt, the steel pipe of the cover is rotatably connected in the pipe sleeve of the rotating part, and the length of the limiting pipe is greater than that of the side guardrail piece.
Preferably, the plug pins are installed in the sliding grooves of the base, and the base is welded on the bottom steel pipe of the side guardrail piece.
Preferably, the pulling-out structure comprises an end block fixedly connected to the top of the plug foot, and a lever rotatably mounted on the base, and the lever is connected with the end block through a pull rope.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses utilize the common guardrail net piece of building site to constitute the dustbin, the cost is lower to can design size and shape by oneself according to concrete demand, still have good intensity, not fragile, the guardrail net piece that is used for constituting the dustbin divide into preceding guardrail piece, side guardrail piece and lid, preceding guardrail piece and side guardrail piece carry out the high-speed joint through rebar hook and sleeve pipe, need not extra accessory and screw, convenient, save time, laborsaving;
2. the utility model discloses utilize the mounting and the rotating part of being convenient for to connect on the side guardrail piece simultaneously, the equipment of lid has been carried out, and the lid symmetry is provided with two, can open a lid alone or open two lids simultaneously, and is simple, convenient, and every lid is lighter, compares a big lid, and little lid is easier to operate;
3. in order to ensure the stability of the dustbin, the side guardrail piece is provided with the base for mounting the plug pins, the plug pins can be stepped into ground soil to fix the dustbin, and meanwhile, when the dustbin needs to be moved, the plug pins can be pulled out through a labor-saving pulling-out structure, so that the dustbin is very convenient to use.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the present invention;
FIG. 3 is a schematic view of the structure of the cover of the present invention;
fig. 4 is a schematic view of the structure of the fixing leg of the present invention.
In the figure: the front guardrail piece 1, the side guardrail piece 2, the reinforcing steel bar hook 3, the sleeve 4, the fixing piece 5, the rotating piece 6, the cover 7, the limiting pipe 8, the base 9, the plug pin 10, the end block 11, the lever 12 and the pull rope 13.
Detailed Description
In the following description of the present invention, reference is made to the accompanying drawings and detailed description of the embodiments, it is to be understood that the embodiments described below may be combined with each other or with each other to form new embodiments without conflict, and it is to be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: building site is with dismantling dustbin, including preceding guardrail piece 1 and side guardrail piece 2, fixedly connected with rebar hook 3 on the preceding guardrail piece 1, and fixedly connected with sleeve pipe 4 on the side guardrail piece 2, and rebar hook 3 articulates in sleeve pipe 4, fixedly connected with mounting 5 on the side guardrail piece 2, and fixedly connected with rotates piece 6 on the mounting 5, and mounting 5 and rotation piece 6 constitute by pipe box and steel sheet, it has lid 7 to rotate on the piece 6, and fixedly connected with spacing pipe 8 on the lid 7, fixedly connected with base 9 on the side guardrail piece 2, and slidable mounting has on the base 9 and participates in 10, participate in being connected with the extraction structure that has laborsaving function on 10.
The front guardrail sheet 1, the side guardrail sheet 2 and the cover 7 are all building site guardrail net sheets and are composed of steel pipes and steel wires which are welded in a crossed mode, and the number of the front guardrail sheet 1, the number of the side guardrail sheet 2 and the number of the cover 7 are two;
the utility model utilizes the common guardrail net piece of the construction site to form the dustbin, has lower cost, can design the size and the shape according to the specific requirement, has good strength and is not easy to damage, and the guardrail net piece used for forming the dustbin is divided into a front guardrail piece 1, a side guardrail piece 2 and a cover 7;
the steel bar hook 3 is welded on the vertical steel pipe of the front guardrail sheet 1, and the sleeve 4 is welded on the vertical steel pipe of the side guardrail sheet 2;
the front guardrail sheet 1 and the side guardrail sheet 2 are quickly connected through the steel bar hook 3 and the sleeve 4, additional accessories and screws are not needed, and the garbage can is convenient, time-saving and labor-saving, so that a basic enclosure structure of the garbage can is formed;
the fixed piece 5 is connected with the rotating piece 6 through a bolt, the steel pipe of the cover 7 is rotatably connected in the pipe sleeve of the rotating piece 6, and the length of the limiting pipe 8 is greater than that of the side guardrail piece 2;
meanwhile, the fixed part 5 and the rotating part 6 which are convenient to connect are utilized on the side guardrail plate 2 to assemble the covers 7, two covers 7 are symmetrically arranged, one cover can be opened independently or two covers can be opened simultaneously, the operation is simple and convenient, each cover 7 is light, and compared with a large cover, a small cover is easier to operate;
the plug pins 10 are arranged in the sliding grooves of the base 9, and the base 9 is welded on the bottom steel pipe of the side guardrail sheet 2;
in order to ensure the stability of the dustbin, the side guardrail piece 2 is provided with the pins 10 through the base 9, and the pins 10 can be stepped into ground soil to fix the dustbin;
the pulling-out structure comprises an end block 11 fixedly connected to the top of the pin 10 and a lever 12 rotatably mounted on the base 9, and the lever 12 is connected with the end block 11 through a pull rope 13;
meanwhile, when the dustbin needs to be moved, the plug pins 10 can be pulled out through a labor-saving pulling structure, the plug pins 10 can be pulled out by stepping on the lever 12 to pull the pull ropes 13, and the dustbin is very convenient to use;
during the use, firstly, the utility model discloses utilize the common guardrail net piece of building site to constitute the dustbin, the cost is lower, and can design size and shape by oneself according to concrete demand, still have good intensity, it is not fragile, a guardrail net piece for constituting the dustbin divide into preceding guardrail piece 1, side guardrail piece 2 and lid 7, preceding guardrail piece 1 and side guardrail piece 2 carry out the high-speed joint through rebar hook 3 and sleeve pipe 4, need not extra accessory and screw, it is convenient, save time, laborsaving, thereby constitute the basic envelope of dustbin, simultaneously, utilize the mounting 5 and the rotation piece 6 that are convenient for connect on side guardrail piece 2, the equipment of lid 7 has been carried out, lid 7 symmetry is provided with two, can open a lid alone or open two lids simultaneously, it is simple, it is convenient, and every lid 7 is lighter, compare a big lid and operate more easily, little lid, the stability of dustbin is guaranteed to the present invention, still, the installation of participating in 10 has been carried out through base 9 on side guardrail piece 2, participate in 10 can be gone into the ground, it fixes to participate in the dustbin, simultaneously, it can extract simultaneously, the pull out through the laborsaving pull out to participate in the stay cord, can also pull out, can very the pull out, can use, it can also to step on the stay cord through the pull out, it is convenient.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereto, and those skilled in the art can make various changes without creative work from the above concepts, and all of them fall within the protection scope of the present invention.

Claims (6)

1. Building site is with dismantling dustbin, including front guardrail piece (1) and side guardrail piece (2), its characterized in that: fixedly connected with rebar hook (3) on preceding guardrail piece (1), and fixed mounting has sleeve pipe (4) on side guardrail piece (2), and rebar hook (3) articulate in sleeve pipe (4), fixedly connected with mounting (5) on side guardrail piece (2), and fixedly connected with rotates piece (6) on mounting (5), and mounting (5) and rotate piece (6) and constitute by pipe box and steel sheet, it has lid (7) to rotate on piece (6), and spacing pipe (8) of fixedly connected with on lid (7), fixedly connected with base (9) is gone up in side guardrail piece (2), and slidable mounting has on base (9) to participate in (10), participate in being connected with the structure of extracting that has laborsaving function on (10).
2. The detachable trash can for construction sites according to claim 1, wherein: preceding guardrail piece (1), side guardrail piece (2) and lid (7) are building site guardrail net piece, constitute by steel pipe and cross welded steel wire, and just preceding guardrail piece (1), side guardrail piece (2) and lid (7) all are provided with two.
3. The detachable trash can for construction sites according to claim 1, wherein: the steel bar hook (3) is welded on a vertical steel pipe of the front guardrail piece (1), and the sleeve (4) is welded on a vertical steel pipe of the side guardrail piece (2).
4. The detachable trash bin for construction sites according to claim 1, wherein: the fixing piece (5) and the rotating piece (6) are connected through bolts, the steel pipe of the cover (7) is connected in the pipe sleeve of the rotating piece (6) in a rotating mode, and the length of the limiting pipe (8) is larger than that of the side guardrail piece (2).
5. The detachable trash bin for construction sites according to claim 1, wherein: the plug pins (10) are installed in sliding grooves of the base (9), and the base (9) is welded on a steel pipe at the bottom of the side guardrail piece (2).
6. The detachable trash can for construction sites according to claim 1, wherein: the pulling-out structure comprises an end block (11) fixedly connected to the top of the plug pin (10) and a lever (12) rotatably mounted on the base (9), and the lever (12) is connected with the end block (11) through a pull rope (13).
CN202220970034.3U 2022-04-26 2022-04-26 Building site is with dismantling dustbin Active CN217779669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220970034.3U CN217779669U (en) 2022-04-26 2022-04-26 Building site is with dismantling dustbin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220970034.3U CN217779669U (en) 2022-04-26 2022-04-26 Building site is with dismantling dustbin

Publications (1)

Publication Number Publication Date
CN217779669U true CN217779669U (en) 2022-11-11

Family

ID=83907133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220970034.3U Active CN217779669U (en) 2022-04-26 2022-04-26 Building site is with dismantling dustbin

Country Status (1)

Country Link
CN (1) CN217779669U (en)

Similar Documents

Publication Publication Date Title
CN201180036Y (en) Burying type compression environment friendly garbage station
CN217779669U (en) Building site is with dismantling dustbin
CN210480788U (en) Electric hanging basket for building construction
CN205661936U (en) Put in mouth and utilize automatic buried trash who opens of rubbish dead weight
CN218478434U (en) Prefabricated shear wall lifting device for building convenient to dismantle installation
CN209778245U (en) Hoisting accessory suitable for cable well lid
CN212609232U (en) Tool for assisting installation of light partition board
CN2379090Y (en) Multi-purpose miniature machine for cleaning windows
CN201339311Y (en) Turning plate device of hanging rack
CN215055924U (en) A pole setting device for wire pole construction
CN208955180U (en) It is a kind of can fast erecting mast and its installation tool
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN205955578U (en) Hoisting opening safety butt plate
CN208378372U (en) Power transmission cable well cover opening device
CN216105684U (en) Municipal garden engineering construction is with device of transplanting seedlings
CN221074066U (en) Ground wire welding platform
CN218148249U (en) Electric heavy type sounding instrument
CN210192097U (en) Convenient storage device of steel pipe for construction
CN217231917U (en) Movable makes somebody a mere figurehead facility basis
CN213922493U (en) A portable dustbin for building place
CN220005816U (en) Caisson prefabricating rib penetrating large disc
CN220013948U (en) Municipal administration rain sewage interception and collection device
CN214326090U (en) Intelligent environmental sanitation dustbin
CN213074207U (en) Sinking type mousetrap
CN209778194U (en) loader for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant