CN217764783U - Device for detecting aperture specification of welding stud - Google Patents

Device for detecting aperture specification of welding stud Download PDF

Info

Publication number
CN217764783U
CN217764783U CN202221214543.XU CN202221214543U CN217764783U CN 217764783 U CN217764783 U CN 217764783U CN 202221214543 U CN202221214543 U CN 202221214543U CN 217764783 U CN217764783 U CN 217764783U
Authority
CN
China
Prior art keywords
inspection head
inspection
head
welding stud
heads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221214543.XU
Other languages
Chinese (zh)
Inventor
代磊落
黄久源
孙志亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Junsheng Energy Equipment Co ltd
Original Assignee
Xinjiang Junsheng Energy Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Junsheng Energy Equipment Co ltd filed Critical Xinjiang Junsheng Energy Equipment Co ltd
Priority to CN202221214543.XU priority Critical patent/CN217764783U/en
Application granted granted Critical
Publication of CN217764783U publication Critical patent/CN217764783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Magnetic Means (AREA)

Abstract

The utility model discloses an inspection welding stud aperture specification's device, including a first inspection head, two second inspection heads, two third inspection heads, two fourth inspection heads and a fifth inspection head, two the fourth inspection head sets up respectively the upper and lower both ends of fifth inspection head, one the third inspection head sets up the below the bottom of fourth inspection head, another one the third inspection head sets up one side of fifth inspection head, one the second inspection head sets up the one end of third inspection head, another one the second inspection head sets up one side of fifth inspection head, one first inspection head sets up the one end of second inspection head, first inspection head sets up to M6 inspection head, the second inspection head sets up to M8 inspection head. The utility model discloses when using, can reduce the inspection required time, avoid using the quality problems that the mistake leads to because of the weldment, practice thrift manufacturing cost.

Description

Device for detecting aperture specification of welding stud
Technical Field
The utility model relates to a wind power generation pylon preparation technical field specifically is a device of inspection welding double-screw bolt aperture specification.
Background
Wind power generation is an important form of wind energy utilization, wind energy is renewable, pollution-free, large-energy and wide-prospect green energy, and the rapid development of clean energy is a strategic choice of countries in the world.
A plurality of specifications exist in tower section of thick bamboo welding stud, and when overall dimension is similar, the condition of error in utilization can appear, and this kind of condition can lead to doing over again when not in time checking out so that follow-up installation and tower section of thick bamboo quality are influenced. When a large number of welding studs exist, the inspection speed is slow, and the manufacturing time is affected.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device of inspection welding stud aperture specification to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an inspection welding stud aperture specification's device, includes a first inspection head, two second inspection heads, two third inspection heads, two fourth inspection heads and a fifth inspection head, two the fourth inspection head sets up respectively the upper and lower both ends of fifth inspection head, one the third inspection head sets up the below the bottom of fourth inspection head, another one the third inspection head sets up one side of fifth inspection head, one the second inspection head sets up the one end of third inspection head, another one the second inspection head sets up one side of fifth inspection head, one first inspection head sets up the one end of second inspection head.
Preferably, the first inspection head is configured as an M6 inspection head.
Preferably, the second inspection head is configured as an M8 inspection head.
Preferably, the third inspection head is provided as an M10 inspection head.
Preferably, the first inspection head is configured as an M12 inspection head.
Preferably, the first inspection head is provided as an M16 inspection head.
Preferably, the first inspection head, the second inspection head, the third inspection head, the fourth inspection head and the fifth inspection head are integrally formed and made of steel.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses be provided with a first inspection head, two second inspection heads, two third inspection heads, two fourth inspection heads and a fifth inspection head, can reduce the inspection required time, avoid the quality problems because of weldment misuse leads to, practice thrift manufacturing cost.
Drawings
Fig. 1 is an external structure diagram of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic view of the top view structure of the present invention.
In the figure: 1. a first inspection head; 2. a second inspection head; 3. a third inspection head; 4. a fourth inspection head; 5. and a fifth inspection head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a device for detecting the aperture specification of a welding stud comprises a first detecting head 1, two second detecting heads 2, two third detecting heads 3, two fourth detecting heads 4 and a fifth detecting head 5, wherein the two fourth detecting heads 4 are respectively arranged at the upper end and the lower end of the fifth detecting head 5, one third detecting head 3 is arranged at the bottom of the lower fourth detecting head 4, the other third detecting head 3 is arranged at one side of the fifth detecting head 5, one second detecting head 2 is arranged at one end of the third detecting head 3, the other second detecting head 2 is arranged at one side of the fifth detecting head 5, and one first detecting head 1 is arranged at one end of the second detecting head 2;
first inspection head 1 installation is M6 inspection head, and the installation of second inspection head 2 is M8 inspection head, and the installation of third inspection head 3 is M10 inspection head, and the installation of first inspection head 1 is M12 inspection head, and the installation of first inspection head 1 is M16 inspection head, and first inspection head 1, second inspection head 2, third inspection head 3, fourth inspection head 4 and the first shaping of fifth inspection head are just made through steel.
The working principle is as follows: in use, according to the specification of the welding stud required by the drawing, a corresponding inspection head is inserted into the welding stud, for example, the welding stud with the M10 specification is inspected and installed: inserting a welding stud by taking the first side as one side of the third inspection head 3, and if the M10 inspection head of the third inspection head 3 can be completely inserted and the M12 inspection head of the connected fourth inspection head 4 cannot be inserted, the welding stud is correctly used; if the welding stud is inserted with the first side as one side of the M10 inspection head of the third inspection head 3, if the M10 inspection head of the third inspection head 3 can be completely inserted, and the M12 inspection head of the connected fourth inspection head 4 can also be inserted, the welding stud is used wrongly; if the welding stud is inserted with the first side of the M10 inspection head of the third inspection head 3 as one side, and the M10 inspection head of the third inspection head 3 cannot be inserted and the M8 inspection head of the second inspection head 2 can be inserted, the welding stud is erroneously used. The utility model discloses a when using, can reduce the inspection required time, avoid using the quality problems that the mistake leads to because of the weldment, practice thrift manufacturing cost.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a device of inspection welding stud aperture specification, includes a first inspection head (1), two second inspection heads (2), two third inspection heads (3), two fourth inspection heads (4) and a fifth inspection head (5), its characterized in that: two fourth inspection head (4) set up respectively the upper and lower both ends of fifth inspection head (5), one third inspection head (3) set up in the below the bottom of fourth inspection head (4), another third inspection head (3) set up one side of fifth inspection head (5), one second inspection head (2) set up the one end of third inspection head (3), another second inspection head (2) set up one side of fifth inspection head (5), one first inspection head (1) sets up the one end of second inspection head (2).
2. The device for inspecting the hole diameter specification of the welding stud according to claim 1, wherein: the first inspection head (1) is configured as an M6 inspection head.
3. The device for inspecting the hole diameter specification of the welding stud according to claim 1, wherein: the second inspection head (2) is arranged as an M8 inspection head.
4. The device for inspecting the hole diameter specification of the welding stud according to claim 1, wherein: the third inspection head (3) is arranged as an M10 inspection head.
5. The apparatus of claim 1, wherein the apparatus further comprises: the first inspection head (1) is configured as an M12 inspection head.
6. The apparatus of claim 1, wherein the apparatus further comprises: the first inspection head (1) is arranged as an M16 inspection head.
7. The apparatus of claim 1, wherein the apparatus further comprises: the first inspection head (1), the second inspection head (2), the third inspection head (3), the fourth inspection head (4) and the fifth inspection head are integrally molded and are made of steel.
CN202221214543.XU 2022-05-20 2022-05-20 Device for detecting aperture specification of welding stud Active CN217764783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221214543.XU CN217764783U (en) 2022-05-20 2022-05-20 Device for detecting aperture specification of welding stud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221214543.XU CN217764783U (en) 2022-05-20 2022-05-20 Device for detecting aperture specification of welding stud

Publications (1)

Publication Number Publication Date
CN217764783U true CN217764783U (en) 2022-11-08

Family

ID=83885761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221214543.XU Active CN217764783U (en) 2022-05-20 2022-05-20 Device for detecting aperture specification of welding stud

Country Status (1)

Country Link
CN (1) CN217764783U (en)

Similar Documents

Publication Publication Date Title
CN217764783U (en) Device for detecting aperture specification of welding stud
CN210622975U (en) Blade root anti-deformation device for marine big fan
CN201993403U (en) Single sealing structure of electric energy meter
CN206344089U (en) A kind of flange hole guiding mechanism
CN207184012U (en) A kind of extra large cable protects tubular construction
CN207196541U (en) Pulse igniter and gas-cooker
CN205984463U (en) Insulator having protection cover
CN207650582U (en) Egg collection completes monitoring, alarming automated system
CN209936115U (en) Photovoltaic welding device, photovoltaic module manufacturing equipment and solar cell
CN220306323U (en) Device for verifying electrode lugs of storage battery electrode group
CN207261167U (en) A kind of variable pitch cabinet of wind generator system
CN205752345U (en) The battery core attachment structure of battery modules
CN202779001U (en) Battery string component cleaning device
CN110212317B (en) Quick and locking electric wire connection box
CN206711773U (en) A kind of button-shaped ultracapacitor is connected in series structure
CN216563462U (en) A novel electricity core insulating piece for new energy automobile is last
CN206331126U (en) A kind of plastic scintillant lucifuge box
CN205051136U (en) Electric connecting component
CN114875467B (en) Sensor tube seat lead electroplating tooling equipment
CN220106853U (en) Secondary acid adding tool for rich liquid flat plate power battery
CN108505533A (en) A kind of offshore wind farm single-pile foundation mechanism and its construction method
CN210623355U (en) High-strength wind power fastening nut
CN106785079B (en) Up- coiler catching robot and its battery core screening technique
CN203021141U (en) Standard knob taper pipe of construction hoist
CN214589156U (en) Tubular battery copper connecting strip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant