CN217762347U - Pipeline laying device for road construction - Google Patents

Pipeline laying device for road construction Download PDF

Info

Publication number
CN217762347U
CN217762347U CN202221740090.4U CN202221740090U CN217762347U CN 217762347 U CN217762347 U CN 217762347U CN 202221740090 U CN202221740090 U CN 202221740090U CN 217762347 U CN217762347 U CN 217762347U
Authority
CN
China
Prior art keywords
fixedly connected
pipeline
road construction
shell
laying device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221740090.4U
Other languages
Chinese (zh)
Inventor
宋小锋
周利锋
黄远锋
余仕壹
林桂兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meizhou Municipal Construction Group Co ltd
Original Assignee
Meizhou Municipal Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meizhou Municipal Construction Group Co ltd filed Critical Meizhou Municipal Construction Group Co ltd
Priority to CN202221740090.4U priority Critical patent/CN217762347U/en
Application granted granted Critical
Publication of CN217762347U publication Critical patent/CN217762347U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a pipe laying device for road construction, which comprises a housin, the top intercommunication of casing has the control shell, the top fixedly connected with motor of control shell inner chamber, the bottom fixedly connected with threaded rod of motor output, the surface cover of threaded rod is equipped with the telescopic link, the bottom of telescopic link extends to the inner chamber and the fixedly connected with fly leaf of casing, the bottom fixedly connected with control box of fly leaf, the inner chamber of control box is provided with the spring. The utility model discloses a set up motor, threaded rod, telescopic link, fly leaf, connecting rod, centre gripping frame, ejector pad, electric putter, pinch roller, cylinder, clamp plate and backup pad, solved current pipeline laying device for road construction and be not convenient for adjust the position of pipeline and to the fixed problem firm inadequately of pipeline, this pipeline laying device for road construction possesses the advantage of being convenient for adjust the pipeline position and fix firm to the pipeline, is worth promoting.

Description

Pipeline laying device for road construction
Technical Field
The utility model relates to a pipeline laying technical field specifically is a pipeline laying device for road construction.
Background
Pipe laying means transporting the pipeline to the gallery, erection joint and the process of filling up, pipe laying is a consuming time and consuming effort engineering, need be connected the pipeline with the pipeline and lay, in order to guarantee that all pipelines can transport fluid, need use pipe laying device in road construction at present, lay work to the pipeline, however, present pipe laying device for road construction need use wire rope to lift by crane the pipeline to the gallery in, be not convenient for adjust the fixed position of pipeline, staff's the work degree of difficulty has been increased, and fixed steadiness is relatively poor, take place easily to drop, danger is higher, be unfavorable for people's use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipe laying device for road construction possesses the advantage of being convenient for adjust the pipeline position and firm to the pipeline is fixed, has solved current pipe laying device for road construction and has been not convenient for adjust the position of pipeline and fix the problem firm inadequately to the pipeline.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline laying device for road construction, includes the casing, the top intercommunication of casing has the control shell, the top fixedly connected with motor of control shell inner chamber, the bottom fixedly connected with threaded rod of motor output, the surface cover of threaded rod is equipped with the telescopic link, the bottom of telescopic link extends to the inner chamber and the fixedly connected with fly leaf of casing, the bottom fixedly connected with control box of fly leaf, the inner chamber of control box is provided with the spring, the equal fixedly connected with limiting plate in both sides of spring, the equal fixedly connected with connecting rod in one side that two limiting plates are opposite, one side that the limiting plate was kept away from to the connecting rod runs through to the outside and the fixedly connected with centre gripping frame of casing, the equal fixedly connected with ejector pad in one side that two connecting rods are opposite, the both sides at fly leaf top all are provided with electric putter, electric putter's bottom runs through to the bottom of fly leaf, the bottom fixedly connected with pinch roller of electric putter output, the bottom fixedly connected with cylinder of control box, the bottom fixedly connected with clamp plate of cylinder output, the equal fixedly connected with backup pad in both sides of casing.
Preferably, both sides at the top of the shell are fixedly connected with a protective shell, and the rear side of the inner cavity of the protective shell is fixedly connected with a storage battery.
Preferably, the surface of threaded rod and telescopic link threaded connection, the opening that uses with the connecting rod cooperation is all seted up to the both sides of control box.
Preferably, both sides of the movable plate are fixedly connected with sliding blocks, and both sides of the inner cavity of the shell are provided with sliding grooves matched with the sliding blocks for use.
Preferably, the bottom of one side of the supporting plate, which is far away from the shell, is fixedly connected with moving wheels, and the number of the moving wheels is four.
Preferably, the top of the front surface of the shell is movably connected with an access door through a hinge, and the front side of the access door is fixedly connected with a control panel.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up motor, threaded rod, telescopic link, fly leaf, connecting rod, centre gripping frame, ejector pad, electric putter, pinch roller, cylinder, clamp plate and backup pad, solved current pipeline laying device for road construction and be not convenient for adjust the position of pipeline and to the fixed problem firm inadequately of pipeline, this pipeline laying device for road construction possesses the advantage of being convenient for adjust the pipeline position and fix firm to the pipeline, is worth promoting.
2. The utility model discloses a set up the threaded rod, can with the use height of motor cooperation control telescopic link and fly leaf, through setting up the limiting plate, can prevent that the connecting rod from breaking away from the inner chamber of control box, through setting up the centre gripping frame, can carry out the centre gripping to the pipeline and fix, through setting up electric putter, can control the use height of pinch roller, through setting up the ejector pad, can cooperate the service position of control connecting rod and centre gripping frame with the pinch roller, through setting up the protecting crust, can protect the battery, through setting up slider and spout, can make things convenient for the use of fly leaf.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a schematic structural view of the present invention;
FIG. 3 is an enlarged view of a portion of A of FIG. 2 according to the present invention;
fig. 4 is a top view of the present invention.
In the figure: 1. a housing; 2. a control housing; 3. a motor; 4. a threaded rod; 5. a telescopic rod; 6. a movable plate; 7. a control box; 8. a spring; 9. a limiting plate; 10. a connecting rod; 11. a clamping frame; 12. a push block; 13. an electric push rod; 14. a pinch roller; 15. a cylinder; 16. pressing a plate; 17. a support plate; 18. a protective shell; 19. a storage battery; 20. a slider; 21. a chute; 22. the wheel is moved.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a pipe laying apparatus for road construction includes a housing 1, a control housing 2 is connected to a top of the housing 1, a motor 3 is fixedly connected to a top of an inner cavity of the control housing 2, a threaded rod 4 is fixedly connected to a bottom of an output end of the motor 3, a telescopic rod 5 is sleeved on a surface of the threaded rod 4, a movable plate 6 is fixedly connected to a bottom of the telescopic rod 5 extending to the inner cavity of the housing 1, a control box 7 is fixedly connected to a bottom of the movable plate 6, a spring 8 is disposed in the inner cavity of the control box 7, a limiting plate 9 is fixedly connected to both sides of the spring 8, a pinch roller 14 is fixedly connected to one side of the two limiting plates 9 opposite to each other, a cylinder 15 is fixedly connected to a bottom of an output end of the cylinder 15, a support plate 17 is fixedly connected to both sides of the top of the movable plate 6, a pinch roller 14 is fixedly connected to a bottom of the movable push rod 13, a push plate 16 is fixedly connected to both sides of the top of the output end of the movable plate 10, a support plate 17 is fixedly connected to both sides of the top of the movable plate 1, a push roller 22 is connected to a rear side of the movable plate 10, a door 20, a push roller 22 is connected to the inner cavity of the movable plate 6, a rear side of the movable plate 6, a push roller 21 is connected to the movable plate 6, and a rear side of the movable plate 6, and a door 21, front side fixedly connected with control panel of access door, through setting up threaded rod 4, can cooperate the use height of control telescopic link 5 and fly leaf 6 with motor 3, through setting up limiting plate 9, can prevent that connecting rod 10 from breaking away from the inner chamber of control box 7, through setting up centre gripping frame 11, can carry out the centre gripping to the pipeline and fix, through setting up electric putter 13, can control pinch roller 14's use height, through setting up ejector pad 12, can cooperate the use position of control connecting rod 10 and centre gripping frame 11 with pinch roller 14, through setting up protecting crust 18, can protect battery 19, through setting up slider 20 and spout 21, can make things convenient for the use of fly leaf 6, through setting up motor 3, threaded rod 4, telescopic link 5, fly leaf 6, connecting rod 10, centre gripping frame 11, ejector pad 12, electric putter 13, pinch roller 14, cylinder 15, clamp plate 16 and backup pad 17, the problem of having solved current pipeline laying device for road construction and having been convenient for the position of pipeline to adjust and the pipeline fixed firm inadequately firm advantage of pipeline, be worth promoting.
During the use, in the road construction pipeline laying process, move casing 1 to directly over the pipeline through removing wheel 22, start motor 3, motor 3 drives telescopic link 5 and fly leaf 6 downstream with threaded rod 4 cooperation, fly leaf 6 removes and drives control box 7 and centre gripping frame 11 downstream, remove centre gripping frame 11 to the both sides of pipeline, start electric putter 13 afterwards, electric putter 13 drives pinch roller 14 extrusion ejector pad 12, ejector pad 12 receives to drive connecting rod 10 and limiting plate 9 after the extrusion and removes, limiting plate 9 removes extrusion spring 8, centre gripping frame 11 carries out the centre gripping to the pipeline fixedly simultaneously, start cylinder 15 afterwards, cylinder 15 drives clamp plate 16 and moves down, clamp plate 16 removes the extrusion pipeline, carry out spacing fixed to the pipeline through the cooperation of centre gripping frame 11 and clamp plate 16, prevent that the pipeline from taking place the pine and taking off, reset motor 3 makes the pipeline rebound afterwards, move the pipeline to the required position of placing through removing wheel 22, start motor 3 once more makes the pipeline get into the gallery, remove the pipeline through removing wheel 22 and carry out its adjustment, adjust back the back and do not accomplish the electronic push rod 13, make the centre gripping frame 11 reset again, the pipeline work of laying the pipeline.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pipe laying device for road construction, includes casing (1), its characterized in that: the top of the shell (1) is communicated with a control shell (2), the top of an inner cavity of the control shell (2) is fixedly connected with a motor (3), the bottom of an output end of the motor (3) is fixedly connected with a threaded rod (4), the surface of the threaded rod (4) is sleeved with a telescopic rod (5), the bottom of the telescopic rod (5) extends to the inner cavity of the shell (1) and is fixedly connected with a movable plate (6), the bottom of the movable plate (6) is fixedly connected with a control box (7), the inner cavity of the control box (7) is provided with a spring (8), two sides of the spring (8) are both fixedly connected with limiting plates (9), one sides of the two limiting plates (9) which are opposite are both fixedly connected with connecting rods (10), one side of the connecting rods (10) far away from the limiting plates (9) is penetrated to the outer side of the shell (1) and is fixedly connected with a clamping frame (11), one side of the two connecting rods (10) which are opposite are both fixedly connected with a pushing block (12), two sides of the top of the movable plate (6) are both provided with electric push rods (13), the bottom of the electric push rods (13) is penetrated to the bottom of the movable plate (13) which is connected with a control cylinder (7), and the bottom of the movable plate (7) is fixedly connected with a pressing cylinder (14), the bottom fixedly connected with clamp plate (16) of cylinder (15) output, the equal fixedly connected with backup pad (17) in both sides of casing (1).
2. The pipe laying device for road construction according to claim 1, characterized in that: the improved shell is characterized in that both sides of the top of the shell (1) are fixedly connected with a protective shell (18), and the rear side of the inner cavity of the protective shell (18) is fixedly connected with a storage battery (19).
3. The pipe laying device for road construction according to claim 1, characterized in that: the surface of threaded rod (4) and telescopic link (5) threaded connection, the opening that uses with connecting rod (10) cooperation is all seted up to the both sides of control box (7).
4. The pipe laying device for road construction according to claim 1, wherein: the both sides of fly leaf (6) all fixedly connected with slider (20), spout (21) that use with slider (20) cooperation are all seted up to the both sides of casing (1) inner chamber.
5. The pipe laying device for road construction according to claim 1, wherein: the bottom fixedly connected with of casing (1) one side is kept away from in backup pad (17) removes wheel (22), the quantity that removes wheel (22) is four.
6. The pipe laying device for road construction according to claim 1, wherein: the top of the front surface of the shell (1) is movably connected with an access door through a hinge, and the front side of the access door is fixedly connected with a control panel.
CN202221740090.4U 2022-07-07 2022-07-07 Pipeline laying device for road construction Active CN217762347U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221740090.4U CN217762347U (en) 2022-07-07 2022-07-07 Pipeline laying device for road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221740090.4U CN217762347U (en) 2022-07-07 2022-07-07 Pipeline laying device for road construction

Publications (1)

Publication Number Publication Date
CN217762347U true CN217762347U (en) 2022-11-08

Family

ID=83872122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221740090.4U Active CN217762347U (en) 2022-07-07 2022-07-07 Pipeline laying device for road construction

Country Status (1)

Country Link
CN (1) CN217762347U (en)

Similar Documents

Publication Publication Date Title
CN112186237B (en) Lithium cell installation is with battery device of taking that has anti-skidding structure
CN217762347U (en) Pipeline laying device for road construction
CN210985360U (en) Box-type substation box base
CN210970830U (en) Power equipment transportation device with protection function
CN209765740U (en) Mobilizable municipal traffic lamp
CN212198384U (en) Fixing frame for power repair
CN213212319U (en) Lithium battery for solar street lamp
CN211075577U (en) New energy automobile fills anti-falling mechanism of electric pile
CN210060796U (en) Part machining clamping equipment
CN210209507U (en) Fixing device is used in rolling slats door processing
CN206947445U (en) The plastic housing fixing device of storage battery cast-welding
CN216942701U (en) New energy automobile charging device convenient to remove
CN215301135U (en) Online automatic activation system of battery
CN216371492U (en) Optical lens piece polishing equipment
CN218144459U (en) Novel high tenacity toughened glass processing is got with pressing from both sides device
CN220895662U (en) Movable support for electricity storage
CN219576695U (en) Emergency power supply device with energy reserve
CN215768355U (en) Natural gas heat value tester
CN215745396U (en) Dust storage barrel for dust removal
CN217385888U (en) Movable optical fiber fusion splicer
CN219483826U (en) Deformation correcting machine for die steel processing
CN216969754U (en) Special transportation device for moving and changing power facilities of power distribution network along highway
CN215577531U (en) Display device
CN211930265U (en) Intelligent zero-transition switching controller for outdoor power capacitor
CN218499372U (en) Fall-resistant electric vehicle controller

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant