CN217760394U - Safety protective guard for building engineering management - Google Patents

Safety protective guard for building engineering management Download PDF

Info

Publication number
CN217760394U
CN217760394U CN202221744645.2U CN202221744645U CN217760394U CN 217760394 U CN217760394 U CN 217760394U CN 202221744645 U CN202221744645 U CN 202221744645U CN 217760394 U CN217760394 U CN 217760394U
Authority
CN
China
Prior art keywords
guard
fixed
rail
fixed block
engineering management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221744645.2U
Other languages
Chinese (zh)
Inventor
许丽杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221744645.2U priority Critical patent/CN217760394U/en
Application granted granted Critical
Publication of CN217760394U publication Critical patent/CN217760394U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a safety protective guard for building engineering management belongs to safety protective guard technical field, including the rail guard, the fixed slot has been seted up to the rail guard roof, rail guard bottom fixed mounting has the fixed block, mutually support between fixed block and the fixed slot, and fixed block spiral mounting inside the fixed slot, rail guard outside fixed mounting has the fender rod, fender rod one side fixed mounting has the pilot lamp. The device carries out the during operation, through screwed connection between fixed block and the fixed slot, is convenient for make and carries out screwed connection between two rail guards, pegs graft through the fixed block bottom and has blocked the pole, utilizes mutually supporting between fixed block and the fixed slot, blocks the pole to it and extrudees, through the extrusion battery make it unable and circuit piece between contact, it is not hard up to screw connection between fixed block and the fixed slot, makes and is connected between electric spring promotion battery and the circuit piece.

Description

Safety protective guard for building engineering management
Technical Field
The utility model relates to a safety protective guard technical field specifically is a safety protective guard for building engineering management.
Background
The building engineering management refers to an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings. The house building is provided with a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities;
when the safety protective guard for building engineering management is loosened, workers around the safety protective guard cannot be timely prompted, so that danger to a certain extent possibly occurs to the workers, the effect of the safety protective guard for building engineering management cannot be embodied, and meanwhile when the safety protective guard for building engineering management is driven into the bottom surface to be too shallow, the protection effect of the safety protective guard for building engineering management is possibly invalid, and the protection measures for building engineering management are not good.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a safety protective guard for building engineering management to the personnel on every side and carry out better reinforcement effect to its rail guard are convenient for remind when not hard up appear in the rail guard that provides in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a safety protective guard for building engineering management, includes the rail guard, the fixed slot has been seted up to the rail guard roof, rail guard bottom fixed mounting has the fixed block, mutually support between fixed block and the fixed slot, and fixed block spiral mounting inside the fixed slot, rail guard outside fixed mounting has the fender rod, fender rod one side fixed mounting has the pilot lamp.
Preferably, a battery jar is provided at the bottom end inside the guard rail, one end of the battery jar is fixedly connected with an electric spring, one end of the electric spring is fixedly connected with a battery, the battery is located inside the battery jar, a circuit sheet is fixedly connected to the bottom of the battery jar, a blocking rod is inserted in the middle of the circuit sheet, one end of the blocking rod is inserted outside the fixed block, and one end of the blocking rod is detachably connected with the battery.
Preferably, the electric spring, the circuit chip and the indicator light are electrically connected.
Preferably, the upper ends of two sides of the guard bar are both provided with limiting grooves, and fixing plates are inserted between the limiting grooves.
Preferably, a fixing ring is spirally mounted at the bottom end of the protective guard, a spiral column is fixedly mounted inside the fixing ring, a fixing column is sleeved on the outer side of the spiral column, a drill bit is fixedly connected to the bottom end of the fixing column, a plurality of clamping grooves are formed in the outer side of the fixing ring, a plurality of clamping plates are axially and movably connected to the outer side of the top of the fixing column, and the clamping grooves and the clamping plates are matched with each other.
Preferably, the spiral column bottom all meshes and is connected with a plurality of rivets, a plurality of bores have all been seted up to the drill bit outer end, the rivet is located bore inside.
Compared with the prior art, the beneficial effects of the utility model are that:
when the device works, the two protective guards for the building engineering are in spiral connection through the spiral connection between the fixing block and the fixing groove, the blocking rods are inserted at the bottoms of the fixing blocks, the fixing block and the fixing groove are matched with each other to extrude the blocking rods, the battery cannot be in contact with the circuit board through extrusion, when the spiral connection between the fixing block and the fixing groove is loosened, the electric spring pushes the battery to be connected with the circuit board, and through the electric connection among the electric spring, the circuit board and the indicating lamp, the effect of prompting when the protective guards for the building engineering are in danger is achieved, and workers can timely and safely remind the management of the building engineering;
when the device carries out the during operation, mutually support between through draw-in groove and the cardboard, it rotates to drive the fixed column when making it rotate the retainer plate, the drill bit of being convenient for rotates, it fixes to make its rail guard for building engineering, through dismantling draw-in groove and cardboard, it rotates to make its retainer plate drive the spiral post, be connected with a plurality of rivets through spiral post bottom meshing, a plurality of bores have all been seted up to the utilization drill bit outer end, it removes to the drill bit outside to drive the rivet when making its spiral post rotate, insert the inside rail guard for building engineering management of being convenient for of bottom surface through the rivet and consolidate, more firm beneficial effect has been reached.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic view of a front cut structure of the protective guard of the present invention;
FIG. 3 is a schematic view of the front cross-section structure of the fixing ring of the present invention;
fig. 4 is a schematic view of the connection structure of the guard bar of the present invention.
In the figure: 1. protecting a fence; 11. a battery case; 12. an electric spring; 13. a circuit chip; 14. a blocking lever; 15. a battery; 2. a fixing groove; 3. a fixed block; 4. a guard bar; 41. a limiting groove; 42. a fixing plate; 5. an indicator light; 6. a stationary ring; 61. a helical column; 62. a card slot; 7. fixing the column; 71. a drill bit; 72. clamping a plate; 73. riveting; 74. and (6) drilling a hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a safety protective guard for building engineering management, including rail guard 1, fixed slot 2 has been seted up to 1 roof of rail guard, 1 bottom fixed mounting of rail guard has fixed block 3, mutually support between fixed block 3 and the fixed slot 2, and 3 spiral installations of fixed block are inside 2 fixed slots, 1 outside fixed mounting of rail guard has fender rod 4, 4 one side fixed mounting of fender rod has pilot lamp 5, battery jar 11 has been seted up to 1 inside bottom of rail guard, 11 one end fixedly connected with electric spring 12 of battery jar, 12 one end fixedly connected with battery 15 of electric spring, and battery 15 is located inside 11 of battery jar, 11 bottom fixedly connected with circuit piece 13 of battery jar, it has blocking pole 14 to peg graft in the middle of 13 circuit piece, block 14 one end of pole and peg graft in the 3 outsides of fixed block, block 14 one end of pole and can dismantle and be connected with battery 15, and block 14 one end of pole and be located inside 11 battery jars, electric spring 12, electric connection between circuit piece 13 and the pilot lamp 5.
It is specific, through screwed connection between fixed block 3 and the fixed slot 2, be convenient for make and carry out screwed connection between two rail guards 1 for the building engineering, it blocks pole 14 to peg graft through 3 bottoms of fixed block, utilize and mutually support between fixed block 3 and the fixed slot 2, block pole 14 to it and extrude, make it unable and circuit piece 13 between contact through extrusion battery 15, it is not hard up to make spiral connection between fixed block 3 and the fixed slot 2, it is connected to make electric spring 12 promote between battery 15 and the circuit piece 13, through electric spring 12, electric connection between circuit piece 13 and the pilot lamp 5, be convenient for the staff in time carry out safety warning to the building engineering management.
Example 2:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a safety protective guard for building engineering management, 1 bottom spiral of protective guard installs retainer plate 6, the inside fixed mounting of retainer plate 6 has spiral post 61, fixed column 7 has been cup jointed in the spiral post 61 outside, 7 bottom fixedly connected with drill bits 71 of fixed column, a plurality of draw-in grooves 62 have been seted up in the 6 outside of retainer plate, 7 top outside axles of fixed column move and are connected with a plurality of cardboard 72, mutually support between draw-in groove 62 and the cardboard 72, spiral post 61 bottom all meshes and is connected with a plurality of rivets 73, a plurality of bores 74 have all been seted up to drill bit 71 outer end, rivet 73 is located inside bore 74.
Specifically, the clamping groove 62 and the clamping plate 72 are matched with each other, so that the fixing ring 6 is driven to rotate when the fixing ring 6 is rotated, the drill bit 71 is convenient to rotate, the protective guard 1 for the constructional engineering is fixed, the clamping groove 62 and the clamping plate 72 are disassembled, the spiral column 61 is driven to rotate by the fixing ring 6, a plurality of rivets 73 are meshed and connected with the bottom end of the spiral column 61, a plurality of drill openings 74 are formed in the outer ends of the drill bit 71, the screws 73 are driven to move towards the outer side of the drill bit 71 when the spiral column 61 rotates, the rivets 73 are inserted into the bottom of the protective guard 1 for the constructional engineering to reinforce the protective guard 1 for the constructional engineering through the rivets 73, when slack occurs between the protective guard 1 for the constructional engineering and the protective guard 1 for the constructional engineering, the electric spring 12 pushes the battery 15 to move, the blocking rod 14 cannot block the electric connection between the battery 15 and the circuit sheet 13, the electric connection among the circuit sheet 13 and the indicator 5, and the indicator 5 enables the indicator 5 to reinforce the protective guard 1 for the protective guard for the constructional engineering to prompt personnel.
The working principle is as follows: when mutually supporting between draw-in groove 62 and cardboard 72, the workman drives fixed column 7 through rotating retainer plate 6 and rotates, drive drill bit 71 and bore the hole to the bottom surface, it is fixed with rail guard 1 to its building engineering management, through dismantling draw-in groove 62 and cardboard 72, spiral post 61 rotates when the workman rotates retainer plate 6, it is connected with a plurality of rivets 73 to utilize the meshing of spiral post 61 bottom, utilize drill bit 71 outer end all to have seted up a plurality of bores 74, drive rivet 73 and remove to the drill bit 71 outside when making its spiral post 61 rotate, insert the inside rail guard 1 of being convenient for to its building engineering management through rivet 73 and consolidate to its building engineering management.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a safety protective guard for building engineering management, includes rail guard (1), its characterized in that: fixed slot (2) have been seted up to rail guard (1) roof, rail guard (1) bottom fixed mounting has fixed block (3), mutually support between fixed block (3) and fixed slot (2), and fixed block (3) spiral mounting inside fixed slot (2), rail guard (1) outside fixed mounting has fender rod (4), fender rod (4) one side fixed mounting has pilot lamp (5).
2. The safety guard rail for construction engineering management according to claim 1, wherein: battery jar (11) have been seted up to rail guard (1) inside bottom, battery jar (11) one end fixedly connected with electricity spring (12), electricity spring (12) one end fixedly connected with battery (15), and battery (15) are located battery jar (11) inside, battery jar (11) bottom fixedly connected with circuit piece (13), it has blocks pole (14) to peg graft in the middle of circuit piece (13), block pole (14) one end and peg graft in fixed block (3) outside, block pole (14) one end and can dismantle and be connected with battery (15), and block pole (14) one end and be located battery jar (11) inside.
3. The safety guard rail for construction engineering management according to claim 2, wherein: the electric spring (12), the circuit sheet (13) and the indicator light (5) are electrically connected.
4. The safety guard rail for construction engineering management according to claim 1, wherein: the upper ends of two sides of the guard bar (4) are provided with limiting grooves (41), and fixing plates (42) are inserted between the limiting grooves (41).
5. The safety guard rail for construction engineering management according to claim 1, wherein: the protective guard is characterized in that a fixing ring (6) is spirally mounted at the bottom end of the protective guard (1), a spiral column (61) is fixedly mounted inside the fixing ring (6), a fixing column (7) is sleeved outside the spiral column (61), a drill bit (71) is fixedly connected to the bottom end of the fixing column (7), a plurality of clamping grooves (62) are formed in the outer side of the fixing ring (6), a plurality of clamping plates (72) are axially connected to the outer side of the top of the fixing column (7), and the clamping grooves (62) and the clamping plates (72) are matched with each other.
6. The safety guard rail for construction engineering management according to claim 5, wherein: spiral column (61) bottom all meshes and is connected with a plurality of rivets (73), a plurality of bores (74) have all been seted up to drill bit (71) outer end, rivet (73) are located bore (74) inside.
CN202221744645.2U 2022-07-06 2022-07-06 Safety protective guard for building engineering management Expired - Fee Related CN217760394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221744645.2U CN217760394U (en) 2022-07-06 2022-07-06 Safety protective guard for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221744645.2U CN217760394U (en) 2022-07-06 2022-07-06 Safety protective guard for building engineering management

Publications (1)

Publication Number Publication Date
CN217760394U true CN217760394U (en) 2022-11-08

Family

ID=83871054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221744645.2U Expired - Fee Related CN217760394U (en) 2022-07-06 2022-07-06 Safety protective guard for building engineering management

Country Status (1)

Country Link
CN (1) CN217760394U (en)

Similar Documents

Publication Publication Date Title
CN217760394U (en) Safety protective guard for building engineering management
CN215107940U (en) Guardrail bar is prevented in job site design
CN111749535A (en) Building site warning rail guard
CN218346731U (en) Scaffold frame that can quick detach
CN211691646U (en) Emergency rescue is with sheltering from canopy temporarily
CN206521937U (en) A kind of cradle for constructional engineering
CN211900004U (en) Convenient to use's house is isolated column for building engineering
CN214498624U (en) Rail guard is used in railway construction
CN211920584U (en) Elevator shaft protective door structure
CN213477895U (en) Building engineering is with guardrail that has protective structure
CN217872207U (en) Safety protective guard is used in civil engineering
CN206707613U (en) A kind of water conservancy maintenance cat ladder
CN215951326U (en) Building engineering is with convenient lighting device of loading and unloading
CN212543014U (en) Low-voltage distribution cabinet convenient to installation
CN215056044U (en) Rail guard for hydraulic engineering
CN214330195U (en) Building construction is with facing limit entrance to a cave railing fixing device
CN214175610U (en) Safety warning sign is used in construction in room
CN216406722U (en) Drilling equipment is used in municipal administration public works construction
CN213840400U (en) Detector for detecting content of hydrogen sulfide in gas
CN214785783U (en) Adjustable scaffold is used in building engineering construction
CN211874103U (en) Net piece formula rail guard
CN214403059U (en) Water supply and drainage engineering construction safety device
CN216786957U (en) Square tube stand rail guard of easy equipment
CN212271810U (en) BIM-based protective guard for building engineering
CN211201229U (en) Safety device for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221108