CN217759180U - Green's drainage open channel construction fixing device - Google Patents

Green's drainage open channel construction fixing device Download PDF

Info

Publication number
CN217759180U
CN217759180U CN202221727726.1U CN202221727726U CN217759180U CN 217759180 U CN217759180 U CN 217759180U CN 202221727726 U CN202221727726 U CN 202221727726U CN 217759180 U CN217759180 U CN 217759180U
Authority
CN
China
Prior art keywords
wall
plate
threaded rod
threaded
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221727726.1U
Other languages
Chinese (zh)
Inventor
孙鹏
陈在学
代永欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao West Coast Urban Construction Group Co ltd
Original Assignee
Qingdao West Coast Urban Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao West Coast Urban Construction Group Co ltd filed Critical Qingdao West Coast Urban Construction Group Co ltd
Priority to CN202221727726.1U priority Critical patent/CN217759180U/en
Application granted granted Critical
Publication of CN217759180U publication Critical patent/CN217759180U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a green's drainage open channel construction fixing device, including backup pad one and backup pad two, backup pad one with the symmetry is equipped with sliding connection's connecting plate one between the backup pad two, a connecting plate outer wall symmetry is equipped with the threaded sleeve of rotation connection, the threaded sleeve inner wall is equipped with threaded connection's threaded rod one, a threaded rod outer wall is equipped with the pressure board of rotation connection, the pressure board outer wall is equipped with articulated accessory plate, the accessory plate outer wall is equipped with threaded rod two, the pressure board inner wall be equipped with threaded rod two-phase meshing's screw hole. The utility model discloses can adjust the accessory plate respectively at the angle of two directions of perpendicular and level to make its lateral wall of the different open channels of can perfect laminating, improve the suitability of this device, finally can guarantee to fix the cement mould of open channel lateral wall, avoid not dry cement to drop.

Description

Green's drainage open channel construction fixing device
Technical Field
The utility model relates to an open channel construction technical field specifically is green's drainage open channel construction fixing device.
Background
The environmental protection is to protect the natural environment, and the main mode is to reduce pollution and improve environmental protection equipment. In order to respond to the national call and reduce the polluted water resource, industrial sewage is required to be intensively discharged to a sewage treatment plant in each large industrial area, and the sewage can be discharged outwards after being treated. When industrial sewage is discharged, open channels are mostly adopted for conveying. An open channel is a channel having a free surface (each point on the surface is acted on by atmospheric pressure) and is classified into a natural open channel such as a natural river channel and an artificial open channel such as an artificial water delivery channel, a canal, and a pipe not filled with water flow according to its formation. The inner wall of the artificial open channel is built by cement in the construction process, so that the flow of silt can not be driven when water flow in the open channel passes through. Therefore, the baffle plate needs to be attached to the side wall of the artificial open channel during construction, and then the baffle plate is fixed by the fixing device, so that the baffle plate exerts certain pressure on cement to ensure that the cement cannot fall off before being dried.
Because the manual open channel is mostly in the shape of an inverted trapezoid, the fixing device needs to be attached to the side wall of the open channel in an inclined mode, but the angle of the conventional fixing device cannot be well adjusted to be suitable for different open channels, so that the conventional fixing device cannot be well attached to the side walls of different open channels.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green's drainage open channel construction fixing device to solve the problem that proposes in the above-mentioned background art.
In order to solve the technical problem, the utility model provides a following technical scheme: the environment-friendly fixing device for the construction of the open drainage channel comprises a first support plate and a second support plate, wherein a first connecting plate in sliding connection is symmetrically arranged between the first support plate and the second support plate, a threaded sleeve in rotary connection is symmetrically arranged on the outer wall of the first connecting plate, a first threaded rod in threaded connection is arranged on the inner wall of the threaded sleeve, a pressing plate in rotary connection is arranged on the outer wall of the first threaded rod, a hinged auxiliary plate is arranged on the outer wall of the pressing plate, a second threaded rod is arranged on the outer wall of the auxiliary plate, and a threaded hole meshed with the second threaded rod is formed in the inner wall of the pressing plate.
Furthermore, guide rails are symmetrically arranged at the top of the first supporting plate, a second connecting plate in sliding connection is arranged on the inner wall of each guide rail, a third threaded rod in threaded connection is arranged at one end of the inner wall of the second connecting plate, and a jack is arranged at the other end of the inner wall of the second connecting plate.
Furthermore, the outer wall of the first support plate is symmetrically provided with a first guide rod, and the inner wall of the first connecting plate is provided with a first through hole matched with the first guide rod, so that the first connecting plate is guided.
Furthermore, a bidirectional screw rod which is rotatably connected is arranged between the two first guide rods on the outer wall of the first support plate, the two first connecting plates are symmetrically sleeved on the outer wall of the bidirectional screw rod, and a screw nut matched with the bidirectional screw rod is arranged on the inner wall of the first connecting plate to control the first connecting plates to move.
Furthermore, two guide rods are symmetrically arranged on the outer wall of the supporting plate, and two through holes matched with the two guide rods are formed in the inner wall of the connecting plate, so that the connecting plate is guided.
Furthermore, one side, far away from the threaded rod II, of the auxiliary plate is hinged to the pressing plate through a hinge, a bearing is sleeved on the outer wall of one end of the threaded rod II, and a sliding groove matched with the bearing is formed in the outer wall of the auxiliary plate, so that the threaded rod II can be used normally.
Compared with the prior art, the utility model discloses the beneficial effect who reaches is:
1. the utility model discloses a set up connecting plate one, threaded sleeve, threaded rod one, press the clamp plate, accessory plate, threaded rod two, two-way lead screw, bearing and spout, can adjust the accessory plate respectively at the angle of two directions of perpendicular and level to make the lateral wall of its different open channels that can perfectly laminate, improve the suitability of this device, finally can guarantee to fix the cement mould of open channel lateral wall, avoid not dry cement to drop.
2. The utility model discloses a set up guide rail, connecting plate two, threaded rod three and jack, can be according to the position of the length adjustment connecting plate two of open channel both sides ground to usable location nail produces the positioning action to this device, and then can improve the suitability of this device.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall top view structure of the present invention;
fig. 2 is a schematic view of the overall top view structure of the present invention;
fig. 3 is a schematic view of the overall bottom structure of the present invention;
FIG. 4 is a front view of the present invention as a whole;
fig. 5 is a side view of the auxiliary plate of the present invention;
in the figure: 1. a first support plate; 2. a second support plate; 3. a first connecting plate; 4. a threaded sleeve; 5. a first threaded rod; 6. a pressing plate; 7. an auxiliary plate; 8. a second threaded rod; 9. a guide rail; 10. a second connecting plate; 11. a third threaded rod; 12. a jack; 13. a first guide rod; 14. a bidirectional screw rod; 15. a second guide rod; 16. a bearing; 17. a chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the environment-friendly fixing device for the construction of the open drain comprises a first supporting plate 1 and a second supporting plate 2, a first connecting plate 3 in sliding connection is symmetrically arranged between the first supporting plate 1 and the second supporting plate 2, a first threaded sleeve 4 in rotary connection is symmetrically arranged on the outer wall of the first connecting plate 3, a first threaded rod 5 in threaded connection is arranged on the inner wall of the first threaded sleeve 4, a first pressing plate 6 in rotary connection is arranged on the outer wall of the first threaded rod 5, a hinged auxiliary plate 7 is arranged on the outer wall of the first pressing plate 6, a second threaded rod 8 is arranged on the outer wall of the auxiliary plate 7, threaded holes meshed with the second threaded rod 8 are formed in the inner wall of the pressing plate 6, a first guide rod 13 is symmetrically arranged on the outer wall of the first supporting plate 1, a first through hole matched with the first guide rod 13 is formed in the inner wall of the first connecting plate 3, a two-way guide rod 14 in rotary connection is arranged between the first guide rod 13, the first connecting plate 3 is symmetrically sleeved on the outer wall of the two-way, a first guide rod nut matched with the first guide rod 14 is arranged on the inner wall of the first connecting plate 3, a second guide rod 15 is arranged on the outer wall of the pressing plate, a second guide rod 16, and a hinge groove 16 is arranged on one side of the auxiliary plate 7, and a hinge 16 is arranged on one side of the outer wall of the second guide rod.
The specific implementation mode is as follows: when the device is used, a worker can attach the baffle to the outer wall of cement after cement is poured on the side wall of the open channel, then the device is placed in the open channel, the inclination angle of the pressing plate 6 can be adjusted according to the inclination angle of the side wall of the open channel, so that the pressing plate can be completely attached to the baffle, when the angle of the pressing plate 6 in the vertical direction needs to be adjusted, the upper threaded sleeve 4 or the lower threaded sleeve 4 can be selected to rotate according to the inclination angle of the side wall, only one threaded sleeve 4 is rotated each time in use, or two threaded sleeves 4 can be rotated in the reverse direction simultaneously, so that normal adjustment can be ensured, when the threaded sleeves 4 rotate, the threaded rods 5 on the inner wall can be meshed with the inner wall of the threaded sleeves 4 through threads to move, meanwhile, the pressing plate 6 can be driven to move, at the moment, the angle of the pressing plate 6 in the vertical direction can be adjusted, so that the pressing plate is attached to the inner wall of the open channel, then the angle of the auxiliary plate 7 in the horizontal direction can be adjusted by using the second threaded rod 8, the device can be adjusted in multiple angles, the device can be suitable for different open channel inner walls to be perfectly attached, when the second threaded rod 8 is rotated, one end of the second threaded rod 8 rotates in the auxiliary plate 7 through the bearing 16, at the moment, the second threaded rod 8 can move on the inner wall of the pressing plate 6 through the threaded hole, so that the other end of the second threaded rod can drive the auxiliary plate 7 to move, the auxiliary plate 7 can be hinged on the outer wall of the pressing plate 6 by taking a hinge as a hinge line, and when the second threaded rod 8 drives the auxiliary plate 7 to move, the bearing 16 can also move in the sliding groove 17, the normal use of the second threaded rod 8 can be ensured, at the moment, the angle of the auxiliary plate 7 in the horizontal direction can be adjusted, the device can be perfectly attached to different open channel inner walls, the applicability of the device is improved, after the angle is adjusted, the distance between the two pressing plates 6 can be adjusted according to the width of the open channel, make it be applicable to the open channel of different width, the two-way lead screw 14 of forward rotation of commentaries on classics of usable one end during regulation, two-way lead screw 14 can drive connecting plate 3 through screw-nut and remove, and connecting plate 3 can drive pressing plate 6 and remove, makes two pressing plate 6 outwards remove simultaneously to make pressing plate 6 and the baffle contact of open channel lateral wall, exert pressure to it, make it can guarantee that the cement model is normally air-dried, avoid cement to drop.
Referring to fig. 1-5, the present invention provides a technical solution: green's drainage open channel construction fixing device still locates including the symmetry the guide rail 9 at backup pad 1 top, the 9 inner walls of guide rail are equipped with sliding connection's two connecting plates 10, two 10 inner wall one ends of connecting plate are equipped with threaded connection's three threaded rod 11, two 10 inner wall other ends of connecting plate are equipped with jack 12.
The specific implementation mode is as follows: during the use, according to the length of open channel both sides ground, but movable connecting plate two 10 slides in guide rail 9, make two 10 one ends of connecting plate move to the ground of open channel both sides, third 11 of threaded rod rotates this moment, make third 11 of threaded rod move down, thereby can increase the frictional force between third 11 bottoms of threaded rod and backup pad 1, thereby can produce the fixed action to the position of connecting plate two 10, stability when increasing its use, can pass the location nail into the ground behind jack 12 this moment, make two 10 of its accessible connecting plate produce the fixed action to this device holistic position, thereby can improve the stability and the reliability of this device when using.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described above, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. Green's drainage open channel construction fixing device, including backup pad one (1) and backup pad two (2), its characterized in that: the supporting plate I (1) and the supporting plate II (2) are symmetrically provided with a first connecting plate (3) in sliding connection, the outer wall of the first connecting plate (3) is symmetrically provided with a threaded sleeve (4) in rotating connection, the inner wall of the threaded sleeve (4) is provided with a first threaded rod (5) in threaded connection, the outer wall of the first threaded rod (5) is provided with a pressing plate (6) in rotating connection, the outer wall of the pressing plate (6) is provided with a hinged auxiliary plate (7), the outer wall of the auxiliary plate (7) is provided with a second threaded rod (8), and the inner wall of the pressing plate (6) is provided with a threaded hole meshed with the second threaded rod (8).
2. The green drain open channel construction fixing device according to claim 1, characterized in that: the utility model discloses a two-purpose supporting plate, including backup pad one (1) top symmetry and guide rail (9), guide rail (9) inner wall is equipped with sliding connection's connecting plate two (10), connecting plate two (10) inner wall one end is equipped with threaded connection's threaded rod three (11), the connecting plate two (10) inner wall other end is equipped with jack (12).
3. The green and environmentally friendly fixing device for open drain construction according to claim 1, wherein: the outer wall of the first support plate (1) is symmetrically provided with first guide rods (13), and the inner wall of the first connecting plate (3) is provided with first through holes matched with the first guide rods (13).
4. The green and environmentally friendly fixing device for open drain construction according to claim 3, wherein: the outer wall of the first support plate (1) is provided with a bidirectional screw rod (14) which is rotatably connected between the two first guide rods (13), the two first connecting plates (3) are symmetrically sleeved on the outer wall of the bidirectional screw rod (14), and the inner walls of the first connecting plates (3) are provided with screw nuts matched with the bidirectional screw rod (14).
5. The green and environmentally friendly fixing device for open drain construction according to claim 1, wherein: the outer wall of the second support plate (2) is symmetrically provided with a second guide rod (15), and the inner wall of the first connecting plate (3) is provided with a second through hole matched with the second guide rod (15).
6. The green and environmentally friendly fixing device for open drain construction according to claim 1, wherein: one side, far away from the second threaded rod (8), of the auxiliary plate (7) is hinged to the pressing plate (6) through a hinge, a bearing (16) is sleeved on the outer wall of one end of the second threaded rod (8), and a sliding groove (17) matched with the bearing (16) is formed in the outer wall of the auxiliary plate (7).
CN202221727726.1U 2022-07-05 2022-07-05 Green's drainage open channel construction fixing device Active CN217759180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221727726.1U CN217759180U (en) 2022-07-05 2022-07-05 Green's drainage open channel construction fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221727726.1U CN217759180U (en) 2022-07-05 2022-07-05 Green's drainage open channel construction fixing device

Publications (1)

Publication Number Publication Date
CN217759180U true CN217759180U (en) 2022-11-08

Family

ID=83870994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221727726.1U Active CN217759180U (en) 2022-07-05 2022-07-05 Green's drainage open channel construction fixing device

Country Status (1)

Country Link
CN (1) CN217759180U (en)

Similar Documents

Publication Publication Date Title
CN211398794U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN108951567B (en) Upturning type flap gate
CN217759180U (en) Green's drainage open channel construction fixing device
CN113047341B (en) Comprehensive pipe gallery waterproof construction of sponge city ecosystem
CN207760893U (en) A kind of waterproof roll with lifting gear
CN217078922U (en) River course mud scraping device for environmental protection engineering convenient to remove
CN213923830U (en) Pipe burying device for hydraulic and hydroelectric engineering
CN206041890U (en) Solar cell panel installing support of easily installing
CN216007195U (en) Pipeline positioning support for water supply and drainage engineering
CN211922543U (en) Movable gate with water folding structure
CN211621881U (en) Municipal works drainage open channel construction fixing device
CN212536943U (en) Pipeline fixing device for building engineering
CN208056000U (en) A kind of adjustable antiseepage chute of notch for hydraulic engineering
CN208168281U (en) A kind of plastering machine that can consolidate placement
CN212896363U (en) Pour under water with mixing earth grouting pump convenient to clearance material loading mouth
CN220686096U (en) Slope protection device for civil engineering
CN214301527U (en) Reservoir adjusting device that drains
CN213926154U (en) Inclined top type hydraulic gate
CN214094974U (en) Supporting device for solar aerator and convenient for installation of solar panel
CN213014174U (en) A jacking device for water conservancy flashboard
CN220865628U (en) Safety device for tidal flat photovoltaic construction
CN217150591U (en) Portable municipal water utilizes emergent drainage device
CN213978872U (en) Dam structure capable of being independently installed
CN214498395U (en) Lateral concrete pouring device
CN213014292U (en) Channel concrete placement funnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant