CN217751941U - Cover half device is used in road bridge construction - Google Patents

Cover half device is used in road bridge construction Download PDF

Info

Publication number
CN217751941U
CN217751941U CN202220936294.9U CN202220936294U CN217751941U CN 217751941 U CN217751941 U CN 217751941U CN 202220936294 U CN202220936294 U CN 202220936294U CN 217751941 U CN217751941 U CN 217751941U
Authority
CN
China
Prior art keywords
bolt
lateral wall
baffle
cross slot
framed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220936294.9U
Other languages
Chinese (zh)
Inventor
邱顺鹏
林令华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Teda Road And Bridge Construction Co ltd
Original Assignee
Tianjin Teda Road And Bridge Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Teda Road And Bridge Construction Co ltd filed Critical Tianjin Teda Road And Bridge Construction Co ltd
Priority to CN202220936294.9U priority Critical patent/CN217751941U/en
Application granted granted Critical
Publication of CN217751941U publication Critical patent/CN217751941U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a cover half device for road bridge construction, including the fixing base, still include framed and adjustment mechanism, adjustment mechanism is installed to the lateral wall of framed, adjustment mechanism comprises limiting plate, cross slot, bolt, nut, connecting rod and baffle combination, the limiting plate is installed to the outside lateral wall of framed, the cross slot has been seted up to the lateral wall of limiting plate, the inside wall of cross slot is connected with the bolt, and the bolt runs through the cross slot, the lateral wall threaded connection of bolt has the nut, the connecting rod is installed to the lateral wall of bolt, the baffle is installed to the other end of connecting rod. The size in the die frame can be conveniently adjusted through the adjusting mechanism, and products with different sizes can be conveniently formed; and the formed product is conveniently lifted through the lifting mechanism, so that the production efficiency is increased.

Description

Cover half device is used in road bridge construction
Technical Field
The utility model relates to a construction cover half technical field, in particular to cover half device for road bridge construction.
Background
The existing road and bridge building construction is studied in Europe and America, modular production is required, building blocks are piled up and assembled, the construction period is shortened, the cost is reduced, the fixed die device in production is particularly important under the background, and reinforcing steel bars are connected and fixed on concrete according to different requirements.
Patent No. 201721041661.4 discloses a road and bridge construction is with cover half device, including bottom plate, first baffle and second baffle, the top left and right sides of bottom plate all is equipped with first baffle, both sides all are equipped with the second baffle around the top of bottom plate, the left and right sides of second baffle all is equipped with the stand, the right side of first baffle is equipped with first reinforcing bar, first reinforcing bar passes through the second fixture block and links to each other with first baffle. This cover half device is used in road bridge construction, through first baffle, the cooperation of second baffle and draw-in groove, can make first baffle and second baffle assemble on the bottom plate as the building blocks are assembled to the quickness, through the cooperation of pillar and wedge, can make first baffle and second baffle by tight linking together, also can play sealed effect simultaneously, through the lasso, the cooperation of first jack catch and second jack catch, can make first reinforcing bar and second reinforcing bar by quick fixed together, construction worker's the operation degree of difficulty has been simplified.
This cover half device for road bridge construction has following drawback: 1. the device is inconvenient for adjusting the size in the mold frame, so that the mold frame is inconvenient for people to use; 2. the device is inconvenient to the concrete material lifting after the shaping leads to the device production efficiency to reduce. Therefore, we propose a fixed die device for road and bridge construction.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims at providing a cover half device for road bridge building construction, which is convenient for adjusting the size in a mould frame through an adjusting mechanism and is convenient for forming products with different sizes; and the formed product is conveniently lifted through the lifting mechanism, so that the production efficiency is increased, and the problem in the background technology can be effectively solved.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a road bridge is cover half device for construction, includes the fixing base, still includes framed and adjustment mechanism, adjustment mechanism is installed to the lateral wall of framed, adjustment mechanism comprises limiting plate, cross slot, bolt, nut, connecting rod and baffle combination, the limiting plate is installed to the outside lateral wall of framed, the cross slot has been seted up to the lateral wall of limiting plate, the inside wall of cross slot is connected with the bolt, and the bolt runs through the cross slot, the lateral wall threaded connection of bolt has the nut, the connecting rod is installed to the lateral wall of bolt, the baffle is installed to the other end of connecting rod.
Further, still include the liftout mechanism, the liftout mechanism is installed to the lateral wall of fixing base, and the liftout mechanism conveniently lifts the material to the product after the shaping.
Further, it comprises diaphragm, electronic hydraulic stem, montant and plays flitch combination to play material mechanism, the diaphragm is installed to the lateral wall of fixing base, electronic hydraulic stem is installed at the top of diaphragm, the montant is installed to electronic hydraulic stem's output, the flitch of playing is installed to the other end of montant, and electronic hydraulic stem promotes the montant for play the flitch and play the material to the shaping product.
Furthermore, the vertical rod penetrates through the top of the fixing seat, and the material lifting plate is located in the die frame, so that material lifting is facilitated.
Furthermore, the baffle is located the inside wall of framed, conveniently seals framed.
Compared with the prior art, the utility model discloses following beneficial effect has: 1. the die frame is installed at the top of the fixing seat, the adjusting mechanism is installed on the outer side wall of the die frame and comprises a limiting plate, a transverse groove, a bolt, a nut, a connecting rod and a baffle plate in a combined mode, the limiting plate is installed on the outer side wall of the transverse frame, the transverse groove is formed in the outer side wall of the limiting plate, the bolt penetrates through the transverse groove, the bolt can move in the transverse groove, the nut is connected with the outer side wall of the bolt in a threaded mode, the connecting rod is installed on the outer side wall of the bolt, the baffle plate is installed at the other end of the connecting rod, and when personnel adjust the position of the baffle plate in the die frame, the nut is screwed through sliding the position of the bolt in the transverse groove, so that the nut extrudes the outer side wall of the limiting plate, the bolt can be fixed in the transverse groove, the size in the transverse frame can be adjusted conveniently, and products with different sizes can be formed conveniently;
2. the lateral wall of fixing base installs play material mechanism, it is by the diaphragm to play material mechanism, electronic hydraulic stem, montant and play flitch combination constitute, the diaphragm is installed to the lateral wall of fixing base, the diaphragm is used for processing electronic hydraulic stem and fixes, the montant is installed to electronic hydraulic stem's output, thereby electronic hydraulic stem can drive the montant of its output and reciprocate, the montant runs through the top of fixing base, play the flitch is installed to the other end of montant, it is located the inside wall of framed to play the flitch, thereby the montant can drive and play the flitch and remove in the framed, when playing the material, remove the baffle to one side, electronic hydraulic stem promotes the montant rebound, make and play the flitch and play the material to the product, increase production efficiency.
Drawings
Fig. 1 is the utility model relates to a road bridge is overall structure schematic diagram of cover half device for construction.
Fig. 2 is the utility model relates to a bridge construction is with lifting material mechanism schematic structure of cover half device.
In the figure: 1. a fixed seat; 2. a material lifting mechanism; 201. a transverse plate; 202. an electro-hydraulic lever; 203. a vertical rod; 204. a material lifting plate; 3. a mold frame; 4. an adjustment mechanism; 401. a limiting plate; 402. a transverse groove; 403. a bolt; 404. a nut; 405. a connecting rod; 406. and a baffle plate.
Detailed Description
In order to make the utility model realize, the technical means, the creation characteristics, the achievement purpose and the efficacy are easy to understand and understand, the utility model is further explained by combining the specific implementation mode.
As shown in fig. 1-2, a road and bridge construction is with cover half device, including fixing base 1, still include framed 3 and adjustment mechanism 4, adjustment mechanism 4 is installed to framed 3's lateral wall, adjustment mechanism 4 comprises limiting plate 401, cross slot 402, bolt 403, nut 404, connecting rod 405 and baffle 406 combination, framed 3 installs limiting plate 401 to the outside wall, cross slot 402 has been seted up to limiting plate 401's lateral wall, the inside wall of cross slot 402 is connected with bolt 403, and bolt 403 runs through cross slot 402, the outside wall threaded connection of bolt 403 has nut 404, connecting rod 405 is installed to the outside wall of bolt 403, baffle 406 is installed to the other end of connecting rod 405.
Wherein, still including lifting mechanism 2, lifting mechanism 2 is installed to the lateral wall of fixing base 1, and lifting mechanism 2 conveniently lifts the material to the product after the shaping.
Wherein, the material lifting mechanism 2 comprises diaphragm 201, electronic hydraulic stem 202, montant 203 and play flitch 204 combination, diaphragm 201 is installed to the lateral wall of fixing base 1, electronic hydraulic stem 202 is installed at the top of diaphragm 201, montant 203 is installed to the output of electronic hydraulic stem 202, the flitch 204 is installed to the other end of montant 203, and electronic hydraulic stem 202 promotes montant 203 for play flitch 204 plays the material to the shaping product.
The vertical rod 203 penetrates through the top of the fixing seat 1, and the material lifting plate 204 is located in the mold frame 3, so that material lifting is facilitated.
Wherein, the baffle 406 is located at the inner side wall of the mold frame 3, which facilitates sealing the mold frame 3.
It should be noted that, the utility model relates to a cover half device for road and bridge construction, in operation, the top of fixing base 1 is installed with the framed 3, adjustment mechanism 4 is installed to the lateral wall of framed 3, adjustment mechanism 4 comprises limiting plate 401, cross slot 402, bolt 403, nut 404, connecting rod 405 and baffle 406 combination, limiting plate 401 is installed to the lateral wall of cross frame, the lateral wall of limiting plate 401 has seted up cross slot 402, bolt 403 runs through cross slot 402, thereby bolt 403 can move in cross slot 402, because the lateral wall threaded connection of bolt 403 has nut 404, connecting rod 405 is installed to the lateral wall of bolt 403, baffle 406 is installed to the other end of connecting rod 405, when personnel adjust baffle 406 position in framed 3, through the position of sliding bolt 403 in cross slot 402, through twisting nut 404, make nut 404 extrude the lateral wall of limiting plate 401, thereby fixing the bolt 403 in the transverse groove 402, conveniently adjusting the size in the transverse frame and conveniently forming products with different sizes, the material lifting mechanism 2 is installed on the outer side wall of the fixed seat 1, the material lifting mechanism 2 is composed of a transverse plate 201, an electric hydraulic rod 202, a vertical rod 203 and a material lifting plate 204, the transverse plate 201 is installed on the outer side wall of the fixed seat 1, the transverse plate 201 is used for processing the electric hydraulic rod 202 for fixing, the vertical rod 203 is installed on the output end of the electric hydraulic rod 202, so that the electric hydraulic rod 202 can drive the vertical rod 203 on the output end to move up and down, the vertical rod 203 penetrates through the top of the fixed seat 1, the material lifting plate 204 is installed on the other end of the vertical rod 203, the material lifting plate 204 is positioned on the inner side wall of the mold frame 3, so that the vertical rod 203 can drive the material lifting plate 204 to move in the mold frame 3, when lifting, the baffle 406 is moved to one side, the electric hydraulic rod 202 pushes the vertical rod 203 to move upwards, so that the material lifting plate 204 lifts the product and increases the production efficiency.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a road bridge construction is with cover half device, includes fixing base (1), its characterized in that still includes framed (3) and adjustment mechanism (4), adjustment mechanism (4) are installed to the lateral wall of framed (3), adjustment mechanism (4) comprise limiting plate (401), cross slot (402), bolt (403), nut (404), connecting rod (405) and baffle (406) combination, limiting plate (401) are installed to the outer lateral wall of framed (3), cross slot (402) have been seted up to the lateral wall of limiting plate (401), the inside wall of cross slot (402) is connected with bolt (403), and bolt (403) run through cross slot (402), the lateral wall threaded connection of bolt (403) has nut (404), connecting rod (405) are installed to the lateral wall of bolt (403), baffle (406) are installed to the other end of connecting rod (405).
2. The fixed die device for road and bridge construction according to claim 1, wherein: still include material lifting mechanism (2), material lifting mechanism (2) are installed to the lateral wall of fixing base (1).
3. The fixed die device for road and bridge building construction according to claim 2, wherein: the material lifting mechanism (2) is composed of a transverse plate (201), an electric hydraulic rod (202), a vertical rod (203) and a material lifting plate (204) in a combined mode, the transverse plate (201) is installed on the outer side wall of the fixing seat (1), the electric hydraulic rod (202) is installed at the top of the transverse plate (201), the vertical rod (203) is installed at the output end of the electric hydraulic rod (202), and the material lifting plate (204) is installed at the other end of the vertical rod (203).
4. The fixed die device for road and bridge building construction according to claim 3, wherein: the vertical rod (203) penetrates through the top of the fixed seat (1), and the lifting plate (204) is located in the mold frame (3).
5. The fixed die device for road and bridge construction according to claim 1, wherein: the baffle (406) is positioned on the inner side wall of the mold frame (3).
CN202220936294.9U 2022-04-21 2022-04-21 Cover half device is used in road bridge construction Active CN217751941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220936294.9U CN217751941U (en) 2022-04-21 2022-04-21 Cover half device is used in road bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220936294.9U CN217751941U (en) 2022-04-21 2022-04-21 Cover half device is used in road bridge construction

Publications (1)

Publication Number Publication Date
CN217751941U true CN217751941U (en) 2022-11-08

Family

ID=83883127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220936294.9U Active CN217751941U (en) 2022-04-21 2022-04-21 Cover half device is used in road bridge construction

Country Status (1)

Country Link
CN (1) CN217751941U (en)

Similar Documents

Publication Publication Date Title
CN102343377B (en) Toggle lever metal extruder
CN217751941U (en) Cover half device is used in road bridge construction
WO2022116585A1 (en) Push-pull-type disassembling and assembling device and disassembling and assembling method for top mold of double-t-beam pouring mold
CN220052270U (en) Double-block sleeper forming die
CN204725660U (en) A kind of concrete prefabricated sheet material production line mould
CN202238989U (en) Metal extruder with toggle rods
CN213260051U (en) Concrete shaking table
CN201338023Y (en) In-mold shearing device for aluminum extrusion machines
CN212021530U (en) Champignon machine rubber spare forming die
CN220008203U (en) Assembled building stair mould
CN112428486A (en) Plastic mold for producing plastic products
CN217318474U (en) Pull-rod-free type highway prefabricated hydraulic T beam formwork
CN219786456U (en) One-time compression molding forging and pressing mould
CN219992206U (en) Synchronous quick lifting hydraulic climbing formwork structure of inner and outer formwork
CN203957068U (en) A kind of shaped device of being convenient to casting material prefabricated brick moulding
CN205364166U (en) Composite wall panel moulding by casting mould platform
CN216150763U (en) Bending device for steel structure production
CN205201933U (en) Foam molding machine
CN105478708B (en) A kind of automobile metal accessory Casting Equipment
CN215660960U (en) Light high-strength gypsum block forming machine
CN218138743U (en) Mould is used in precast concrete component preparation
CN215289706U (en) Prefabricated bent cap template system of superelevation gradual change section
CN213204962U (en) Needle type concrete pouring construction structure of concrete filled steel tubular column
CN214392312U (en) Pouring frame
CN214187745U (en) Rotatable single-line box girder steel model

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant