CN217751205U CN202221878556.7U CN202221878556U CN217751205U CN 217751205 U CN217751205 U CN 217751205U CN 202221878556 U CN202221878556 U CN 202221878556U CN 217751205 U CN217751205 U CN 217751205U
Authority
CN
China
Prior art keywords
steel structure
structure spare
base
steel
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221878556.7U
Other languages
Chinese (zh)
Inventor
许绪纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yongfeng Steel Structure Co ltd
Original Assignee
Rugao Weiteng Steel Structure Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rugao Weiteng Steel Structure Manufacturing Co ltd filed Critical Rugao Weiteng Steel Structure Manufacturing Co ltd
Priority to CN202221878556.7U priority Critical patent/CN217751205U/en
Application granted granted Critical
Publication of CN217751205U publication Critical patent/CN217751205U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a special installation positioner of steel structure spare, which comprises a base, the lower fixed surface of base is connected with the foundation, and the quantity of foundation is four, four the walking wheel is all installed to the below of foundation. The utility model provides a pair of special installation positioner of steel structure spare, it has fixture to design this device, this design adopts two electric cylinder control that start to push away two first splint of post promotion slide bar forward sliding control and drives second splint inwardly turned and carry steel structure spare to the internal rotation, such design can carry out the centre gripping to steel structure spare and fix, thereby stability when having promoted staff's installation steel structure spare, and it constructs to have still to survey the mechanism of hanging down, this design adopts the rotatory slide that drives of the motor control lead screw of surveying that hangs down of start to control and surveys the board translation that hangs down to steel structure spare surface rather than the laminating, such design convenience carries out the straightness detection that hangs down to steel structure spare, thereby the work efficiency that has improved the staff has still promoted the quality of steel structure spare installation.

Description

Special installation positioner of steel construction spare
Technical Field
The utility model relates to a steel structure spare installation technical field especially relates to a special installation positioner of steel structure spare.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted.
The steel structural member is formed by connecting various parts into a whole in various modes such as welding, riveting or bolt connection, and the like, and the parts are mutually connected and restricted to form an organic whole. When the steel structural member is installed and positioned, the two structural members are positioned and then connected with each other.
The special installation positioner of steel structure spare on the existing market exists in the working use, and traditional technique is difficult to carry out the installation that the centre gripping was fixed to steel structure spare to the stability when having reduced the staff and having installed steel structure spare, and traditional technique is difficult to carry out the straightness that hangs down to the steel structure spare of installation and detects, thereby has reduced staff's work efficiency and the quality of steel structure spare installation.
Therefore, it is necessary to provide a special installation positioning device for steel structural members to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a special installation positioner of steel structure has solved traditional technique and has been difficult to carry out the fixed installation of centre gripping to steel structure to reduce the stability of staff when installing steel structure, and traditional technique is difficult to carry out the straightness that hangs down to the steel structure of installation and detects, thereby has reduced staff's work efficiency and the problem of steel structure installation quality.
In order to solve the technical problem, the utility model provides a pair of special installation positioner of steel structure spare, which comprises a base, the lower fixed surface of base is connected with the foundation, and the quantity of foundation is four, four the walking wheel is all installed to the below of foundation, the mechanism of hanging down is installed to the right side of base and surveyed, the last fixed surface of base is connected with the riser, and the quantity of riser is two, one of them fixture is installed in the left side of riser, and fixture's quantity is two, fixture is including being fixed in the left bottom plate of one of them riser, there is the electric jar upper surface of bottom plate through bolt fixed mounting, the left end sliding connection of electric jar has the post that pushes away, and the quantity of post that pushes away is two, the left side fixedly connected with balladeur train of bottom plate, two the front end fixedly connected with slide bar of post, the last fixed surface of balladeur train is connected with connecting rod, the both ends of slide bar all rotate and are connected with first splint, two the front end of first splint rotates and is connected with the second splint.
Preferably, the lower surface of the sliding rod is attached to the upper surface of the sliding frame, and the rear ends of the two second clamping plates are rotatably connected with the two ends of the connecting rod through bearings.
Preferably, survey the mechanism of hanging down including the backup pad that is fixed in the base right side, the lower surface of backup pad has through bolt fixed mounting surveys the motor of hanging down, survey the output shaft parallel key of the motor of hanging down and be connected with the lead screw, two of them the relative one side fixedly connected with branch of foundation, the outer wall threaded connection of lead screw has the slide, the last fixed surface of slide is connected with surveys the board of hanging down.
Preferably, the both ends of lead screw all through the bearing with wherein two the relative one side of foundation rotates to be connected, the bottom of slide and the outer wall sliding connection of branch.
Preferably, one of them the right side fixedly connected with handrail of riser, two the last fixed surface of riser is connected with the roof, the last fixed surface of roof is connected with frame and connecting plate, and the quantity of connecting plate is two, there is driving motor the top of frame through bolt fixed mounting, driving motor's output shaft keyway is connected with first gear, the outer wall meshing of first gear is connected with the second gear, the keyway of axle center department of second gear is connected with the reel, the outer wall winding of reel has wire rope, wire rope's bottom fixedly connected with couple.
Preferably, both ends of the winding drum are rotatably connected with the opposite sides of the two connecting plates through bearings.
Compared with the prior art, the utility model provides a pair of special installation positioner of steel structure spare has following beneficial effect:
to this device design there is fixture, traditional design is compared in such design, this design adopts two push away post of start-up electric cylinder control to promote two first splint of slide bar forward sliding control and drives second splint inward rotation and carry the steel structure spare to the internal rotation, such design can carry out the centre gripping to the steel structure spare and fix, thereby the stability when having promoted staff's installation steel structure spare, and still the design has the survey mechanism of hanging down, traditional design is compared in such design, this design adopts the rotatory slide that drives of the start survey motor control lead screw that hangs down control survey and hangs down board translation to steel structure spare surface rather than laminating, such design convenience is to steel structure spare go on the straightness that hangs down and detects, thereby the work efficiency that has improved the staff has still promoted the quality of steel structure spare installation.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of a special mounting and positioning device for a steel structural member according to the present invention;
FIG. 2 is a schematic top view of the clamping mechanism shown in FIG. 1;
fig. 3 is a schematic front view of the plumbing mechanism shown in fig. 1.
Reference numbers in the figures: 1. a base; 2. a bottom pillar; 3. a traveling wheel; 4. a verticality measuring mechanism; 41. a support plate; 42. a verticality measuring motor; 43. a lead screw; 44. a strut; 45. a slide base; 46. a vertical measuring plate; 5. a vertical plate; 6. a clamping mechanism; 61. a base plate; 62. an electric cylinder; 63. pushing the column; 64. a carriage; 65. a slide bar; 66. a connecting rod; 67. a first splint; 68. a second splint; 7. a handrail; 8. a top plate; 9. a machine base; 10. a drive motor; 11. a first gear; 12. a second gear; 13. a reel; 14. a connecting plate; 15. a wire rope; 16. and (4) hanging hooks.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1 to fig. 3, wherein fig. 1 is a schematic structural diagram of a preferred embodiment of a special mounting and positioning device for a steel structural member according to the present invention; FIG. 2 is a schematic top view of the clamping mechanism shown in FIG. 1; fig. 3 is a schematic front view of the plumbing mechanism shown in fig. 1. The utility model provides a special installation positioner of steel structure spare, including base 1, the lower fixed surface of base 1 is connected with foundation 2, and the quantity of foundation 2 is four, walking wheel 3 is all installed to the below of four foundation 2, the mechanism 4 that hangs down is installed to the right side of base 1, the last fixed surface of base 1 is connected with riser 5, and the quantity of riser 5 is two, fixture 6 is installed in the left side of one of them riser 5, and fixture 6's quantity is two, fixture 6 is including being fixed in the left bottom plate 61 of one of them riser 5, there is electric cylinder 62 at the upper surface of bottom plate 61 through bolt fixed mounting, the left end sliding connection of electric cylinder 62 has the post 63 that pushes away, and the quantity of post 63 is two, the left side fixedly connected with balladeur train 64 of bottom plate 61, the front end fixedly connected with slide bar 65 of two post 63, the last fixed surface of balladeur train 64 is connected with connecting rod 66, the both ends of slide bar 65 all rotate and are connected with first splint 67, the front end of two first splint 67 rotates and is connected with second splint 68, such design can carry out centre gripping structure spare fixed.
The lower surface of the sliding rod 65 is attached to the upper surface of the sliding frame 64, and the rear ends of the two second clamping plates 68 are rotatably connected with the two ends of the connecting rod 66 through bearings, so that the stability of workers in the process of installing steel structural members is improved.
Survey mechanism 4 of hanging down including being fixed in the backup pad 41 on base 1 right side, the lower surface of backup pad 41 has through bolt fixed mounting surveys motor 42 of hanging down, the output shaft parallel key who surveys motor 42 of hanging down is connected with lead screw 43, wherein two relative one side fixedly connected with branches 44 of foundation column 2, the outer wall threaded connection of lead screw 43 has slide 45, the last fixed surface of slide 45 is connected with surveys board 46 that hangs down, such design convenience is gone on the steel construction spare and is hung down the straightness and detect.
The both ends of lead screw 43 all are connected through bearing and wherein two base prop 2 relative one side rotation, and the outer wall sliding connection of the bottom of slide 45 and branch 44 has improved staff's work efficiency and has still promoted the quality of steel structure installation.
The right side fixedly connected with handrail 7 of one of them riser 5, the last fixed surface of two risers 5 is connected with roof 8, the last fixed surface of roof 8 is connected with frame 9 and connecting plate 14, and the quantity of connecting plate 14 is two, there is driving motor 10 top of frame 9 through bolt fixed mounting, driving motor 10's output shaft keyway is connected with first gear 11, the outer wall meshing of first gear 11 is connected with second gear 12, the axle center department keyway of second gear 12 is connected with reel 13, the outer wall winding of reel 13 has wire rope 15, wire rope 15's bottom fixedly connected with couple 16.
Both ends of reel 13 all are connected with the relative one side rotation of two connecting plates 14 through the bearing, and the mode that the bearing is connected can make the rotatory more stable smooth and easy of reel 13.
The utility model provides a pair of special installation positioner of steel structure spare's theory of operation as follows:
the first step is as follows: firstly, a worker needs to push the traveling wheels 3 to move to the front of a steel structural member to be installed through the handrails 7, then the hooks 16 are hung on one end of the steel structural member, and then the worker needs to start the driving motor 10 to control the first gear 11 to rotate and control the second gear 12 to rotate and drive the winding drum 13 to rotate, so that the steel wire rope 15 rotates on the winding drum 13 to drive the steel structural member to be erected.
The second step is that: firstly, the worker needs to push the handrail 7 to move the erected steel structural member to a corresponding position, and then the worker sequentially starts the electric cylinder 62 to control the two push posts 63 to push the sliding rods 65 to slide forwards to control the two first clamping plates 67 to rotate inwards to drive the second clamping plates 68 to rotate inwards to clamp the steel structural member, so that the steel structural member is fixed and then is installed and positioned.
The third step: after the installation is completed, the worker needs to start the verticality measuring motor 42 to control the lead screw 43 to rotate to drive the sliding seat 45, so that the verticality measuring plate 46 which is 90 degrees vertical to the base 1 is translated to the outer surface of the steel structural member to be attached to the steel structural member, and then the worker needs to observe whether a gap exists between the verticality measuring plate 46 and the steel structural member, so that the verticality of the steel structural installation is checked.
Compared with the prior art, the utility model provides a pair of special installation positioner of steel structure spare has following beneficial effect:
to this device design there is fixture 6, traditional design is compared in such design, this design adopts two push posts 63 of the control of start-up electric jar 62 to promote two first splint 67 of slide bar 65 forward sliding control and drives second splint 68 internal rotation and carry the steel structure spare, such design can carry out the centre gripping to the steel structure spare and fix, thereby stability when having promoted staff's installation steel structure spare, and the design still has the survey mechanism 4 of hanging down, traditional design is compared in such design, this design adopts the rotatory slide 45 control that drives of the start-up motor 42 control lead screw 43 of hanging down to control and surveys the board 46 translation that hangs down to the steel structure spare surface rather than laminating, such convenient design is detected the steel structure spare that hangs down, thereby the work efficiency that has improved the staff has still promoted the quality of steel structure spare installation.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a special installation positioner of steel structure spare, includes base (1), its characterized in that: the lower fixed surface of base (1) is connected with foundation (2), and the quantity of foundation (2) is four, four walking wheel (3) are all installed to the below of foundation (2), the right side of base (1) is installed and is surveyed plumbing system (4), the last fixed surface of base (1) is connected with riser (5), and the quantity of riser (5) is two, one of them fixture (6) are installed in the left side of riser (5), and the quantity of fixture (6) is two, fixture (6) are including being fixed in one of them left bottom plate (61) of riser (5), the upper surface of bottom plate (61) has electric jar (62) through bolt fixed mounting, the left end sliding connection of electric jar (62) has pushing column (63), and the quantity of pushing column (63) is two, the left side fixedly connected with balladeur train (64) of bottom plate (61), two the preceding connected with slide bar (65) that pushes column (63), the last fixed surface of balladeur train (64) is connected with connecting rod (65), the equal second end (67) that rotates splint (67), two splint (67).
2. The special installation and positioning device for the steel structural member as claimed in claim 1, wherein the lower surface of the sliding rod (65) and the upper surface of the sliding frame (64) are attached to each other, and the rear ends of the two second clamping plates (68) are rotatably connected with the two ends of the connecting rod (66) through bearings.
3. The special mounting and positioning device for the steel structural member as claimed in claim 2, wherein the verticality measuring mechanism (4) comprises a supporting plate (41) fixed on the right side of the base (1), a verticality measuring motor (42) is fixedly mounted on the lower surface of the supporting plate (41) through a bolt, an output shaft of the verticality measuring motor (42) is in flat key connection with a lead screw (43), two of the supporting rods (44) are fixedly connected to the opposite side of the bottom column (2), a sliding seat (45) is in threaded connection with the outer wall of the lead screw (43), and a verticality measuring plate (46) is fixedly connected to the upper surface of the sliding seat (45).
4. The special installation and positioning device for the steel structural member as claimed in claim 3, wherein both ends of the lead screw (43) are rotatably connected with the opposite sides of two of the bottom columns (2) through bearings, and the bottom of the sliding seat (45) is slidably connected with the outer wall of the supporting rod (44).
5. The special installation positioning device for the steel structure part according to claim 4, wherein a handrail (7) is fixedly connected to the right side of one of the vertical plates (5), top plates (8) are fixedly connected to the upper surfaces of two vertical plates (5), a base (9) and connecting plates (14) are fixedly connected to the upper surface of each top plate (8), the number of the connecting plates (14) is two, a driving motor (10) is fixedly installed above the base (9) through bolts, a first gear (11) is connected to a key groove of an output shaft of the driving motor (10), a second gear (12) is connected to the outer wall of the first gear (11) in a meshed manner, a winding drum (13) is connected to a key groove at the axis center of the second gear (12), a steel wire rope (15) is wound on the outer wall of the winding drum (13), and a hook (16) is fixedly connected to the bottom end of the steel wire rope (15).
6. The special installation and positioning device for the steel structural part as claimed in claim 5, wherein both ends of the winding drum (13) are rotatably connected with the opposite sides of the two connecting plates (14) through bearings.
CN202221878556.7U 2022-07-20 2022-07-20 Special installation positioner of steel construction spare Active CN217751205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221878556.7U CN217751205U (en) 2022-07-20 2022-07-20 Special installation positioner of steel construction spare

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221878556.7U CN217751205U (en) 2022-07-20 2022-07-20 Special installation positioner of steel construction spare

Publications (1)

Publication Number Publication Date
CN217751205U true CN217751205U (en) 2022-11-08

Family

ID=83876413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221878556.7U Active CN217751205U (en) 2022-07-20 2022-07-20 Special installation positioner of steel construction spare

Country Status (1)

Country Link
CN (1) CN217751205U (en)

Similar Documents

Publication Publication Date Title
US20190316421A1 (en) Drilling rig
CN102943561A (en) Overhead working hanging basket anti-sway device
CN101514542A (en) Device for overhauling bridge approach pier, bent cap and box girder of a bridge
CN112267579A (en) Connection structure for assembled steel construction building
CN217751205U (en) Special installation positioner of steel construction spare
CN105152052B (en) Glass curtain wall component installing method
CN218786485U (en) Crane with moving function
CN111609209A (en) Supporting device for pipe jacking construction
CN217812279U (en) Electric climbing equipment for high-rise residence
CN216105462U (en) Frequency conversion high stability construction elevator
CN112609950B (en) Be used for convenient movable handling frame of outer facade construction
CN113071991B (en) Construction method of municipal water supply pipeline
CN114412192A (en) Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof
JPH1018598A (en) House-up device
CN210393502U (en) Bridge deck crane for mounting steel box girder for bridge
CN112875526A (en) Combined type hoisting device for constructional engineering
CN111945884A (en) Steel structure upright post assembly capable of improving connection strength
CN219863986U (en) Electric erecting device for building scaffold
CN214314414U (en) Novel cable support
CN221911878U (en) Steel construction tubular column processing support
CN218149701U (en) Supporting structure of clamping type scaffold platform on universal H-shaped steel stand column
CN220620988U (en) Support frame for elevator installation
CN116425007B (en) Large-span preassembled full-bolt steel structure hoisting system and method
CN219881719U (en) Municipal administration tube well construction auxiliary device
CN220504631U (en) Novel ladder frame suitable for construction site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240326

Address after: No. 1 Shugang Road, Changjiang Town (Rugaogang), Rugao City, Nantong City, Jiangsu Province, 226500

Patentee after: Jiangsu Yongfeng Steel Structure Co.,Ltd.

Country or region after: China

Address before: 226500 No. 199, Huandao East Road, Changjiang Town, Rugao City, Nantong City, Jiangsu Province

Patentee before: Rugao Weiteng Steel Structure Manufacturing Co.,Ltd.

Country or region before: China