CN217741230U - Pipeline supporting and hanging frame for building electromechanical installation - Google Patents
Pipeline supporting and hanging frame for building electromechanical installation Download PDFInfo
- Publication number
- CN217741230U CN217741230U CN202221854888.1U CN202221854888U CN217741230U CN 217741230 U CN217741230 U CN 217741230U CN 202221854888 U CN202221854888 U CN 202221854888U CN 217741230 U CN217741230 U CN 217741230U
- Authority
- CN
- China
- Prior art keywords
- lower carriage
- jib
- electromechanical installation
- upper bracket
- mounting hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 20
- 230000000694 effects Effects 0.000 description 5
- 210000004907 gland Anatomy 0.000 description 5
- 230000005484 gravity Effects 0.000 description 5
- 238000010616 electrical installation Methods 0.000 description 3
- 241000416536 Euproctis pseudoconspersa Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a gallows field especially relates to a pipeline gallows for building electromechanical installation, including lower carriage and upper bracket, the side cross-section of lower carriage and upper bracket all is "concave" type and notch down, the upper bracket runs through jointly with the upper surface of lower carriage and is provided with two jibs, the lower border screw thread bush that the surface of jib is close to the lower carriage is equipped with the thread bush, the lower extreme of thread bush is provided with the tray with two lower mutual joints in lower carriage, the surface of jib is provided with the piece that compresses tightly near the higher authority of upper bracket, the utility model discloses can ensure permanent stability during installation use.
Description
Technical Field
The utility model relates to a gallows field especially relates to a pipeline gallows for building electromechanical installation.
Background
A pipeline gallows often need be used in building electromechanical installation to fix the pipeline, the pipeline includes the spool, also be called the line box, be used for guiding the electric wire and arrange, but the pipeline gallows that has now is fixed through the bolt with jib and support when fixed spool, in the support department with spool direct contact, the back is screwed in the bolt and nut cooperation, take place not hard up problem between easy and jib, especially be located the bolt and the nut of spool below department, it is big to receive the influence of gravity, the problem of becoming hard up easily takes place for a long time to use, bring inconveniently.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcomings existing in the background technology and providing a pipeline supporting and hanging bracket for the electromechanical installation of a building.
In order to achieve the above purpose, the utility model adopts the technical scheme that: the utility model provides a pipeline gallows for building electromechanical installation, includes lower carriage and upper bracket, the side cross-section of lower carriage and upper bracket all is "concave" type and the notch is down, the upper bracket runs through jointly with the upper surface of lower carriage and is provided with two jibs, the surface of jib is close to the lower border department screw thread cover of lower carriage and is equipped with the thread bush, the lower extreme of thread bush is provided with the tray of two lower borders mutual joint with the lower carriage, the surface of jib is close to the higher authority of upper bracket and is provided with the compressing tightly piece.
Preferably, the position of the outer surface of the suspender, which is close to the lower half part, is provided with a threaded surface, and the threaded sleeve is in threaded fit with the suspender through the threaded surface.
Preferably, the pressing piece comprises a pressing nut, the pressing nut is sleeved on the surface of the threaded surface and is in threaded fit with the threaded surface, and the lower end of the pressing nut is in contact with the upper surface of the upper support.
Preferably, the upper surface of lower carriage runs through and sets up quantity and is no less than two first mounting hole, first mounting hole is the equidistance in the both sides direction and arranges, the middle section position of upper bracket is seted up for platelike portion, platelike portion's upper surface runs through and sets up quantity and is no less than two second mounting hole, the second mounting hole is the equidistance in the both sides direction and arranges.
Preferably, side fixing pieces are arranged at the upper ends of the two first mounting holes, mounting bolts penetrate through the upper surfaces of the side fixing pieces, and nuts are sleeved at the lower ends of the mounting bolts.
Preferably, the jacks are respectively formed in the same vertical position of the lower support and the upper support, the number of the jacks on each side is three, the upper end of the suspender is fixedly connected with a jacking plate, and the upper surface of the jacking plate is provided with at least two third mounting holes in a penetrating manner.
Preferably, the threaded sleeve and the tray are integrally formed, a plurality of groups of channels are formed in the outer surface of the tray, two of the channels are arranged in a group and are arranged in an annular array, the two channels of each group are located on two sides of the threaded sleeve, and the two lower sides of the lower support are correspondingly clamped in one of the groups of channels.
Compared with the prior art, the utility model discloses following beneficial effect has:
the spool is fixed between lower carriage and upper bracket, it is stable to carry out compressing tightly of spool through rotating gland nut, because the channel card is below the lower carriage, consequently can prevent that the relative jib of thread bush and tray from taking place the rotation problem, even under the effect that receives great gravity, still can ensure the stability of this position department in the durable use, play the effect that increases the stability of hoist and mount, in addition, the height-adjustable that the thread bush is located, the height that the spool was arranged can be adjusted promptly, move up the spool in advance, rotating the thread bush again, when reaching suitable height, put down the support again, make the both sides card of lower carriage in the inboard of channel, can ensure stably.
Drawings
Fig. 1 is a schematic structural view of a pipe support hanger for the electromechanical installation of a building of the present invention;
fig. 2 is a schematic view of a partial structure of a pipe support hanger for the electrical installation of a building of the present invention;
FIG. 3 is a schematic view of the utility model of a tray of a pipe support hanger for the electrical installation of a building;
fig. 4 is a schematic view of the utility model of a pipeline support hanger for building electromechanical installation during use.
1. A lower bracket; 2. a first mounting hole; 3. side firmware; 4. installing a bolt; 5. an upper bracket; 6. a jack; 7. a boom; 8. a thread face; 9. a compression nut; 10. a tray; 11. a threaded sleeve; 12. a channel; 13. a plate-shaped portion; 14. a second mounting hole; 15. abutting a plate; 16. a third mounting hole; 17. a conduit.
Detailed Description
The following description is presented to disclose the invention so as to enable any person skilled in the art to practice the invention. The preferred embodiments in the following description are given by way of example only, and other obvious variations will occur to those skilled in the art.
As shown in fig. 1-4, a pipeline supporting and hanging bracket for building machinery electrical installation, including lower carriage 1 and upper carriage 5, the side cross-section of lower carriage 1 and upper carriage 5 all is "concave" type and the notch is downward, improve based on current support shape, upper carriage 5 and the upper surface of lower carriage 1 run through jointly and are provided with two jib 7, the lower extreme threaded bush that the surface of jib 7 is close to lower carriage 1 is equipped with threaded bush 11, the lower extreme of threaded bush 11 is provided with the tray 10 with two lower mutual joint of lower side of lower carriage 1, the surface of jib 7 is close to the higher authority of upper carriage 5 and is provided with compressing means, compressing means includes gland nut 9, gland nut 9 cover is established at 8 surfaces of threaded surface and is screw-thread fit, the lower extreme of gland nut 9 contacts with the upper surface of upper carriage 5, be used for the upper surface of upper carriage 5 of gold after the rotation, it is required to explain: the upper bracket 5 in fig. 1 and 2 should fall directly to the upper surface of the lower bracket 1 by gravity, and the suspension state is only for convenience of marking and explaining components, the threaded sleeve 11 and the tray 10 are integrally formed, a plurality of groups of channels 12 are arranged on the outer surface of the tray 10, two of the channels 12 are in a group and are arranged in a circular array, two channels 12 in each group are located on two sides of the threaded sleeve 11, and two lower edges of the lower bracket 1 are correspondingly clamped in one of the groups of channels 12.
The screw thread surface 8 has been seted up to the surface of jib 7 near the latter half position department, and thread bush 11 carries out screw-thread fit through screw thread surface 8 and jib 7, and the screw thread on jib 7 surface need not set up the overlength.
The upper surface of lower carriage 1 runs through and sets up the first mounting hole 2 that quantity is no less than two, first mounting hole 2 is the equidistance in the both sides direction and arranges, the middle section position of upper bracket 5 is seted up to platelike portion 13, platelike portion 13's upper surface runs through and sets up quantity is no less than two second mounting hole 14, second mounting hole 14 is the equidistance in the both sides direction and arranges, can squeeze into the bolt in first mounting hole 2 and the second mounting hole 14, come to consolidate with spool 17 surface, but even so, lie in the bolt of lower surface department of lower carriage 1, it is still great to receive the influence of gravity, it is still easy not hard up to use for a long time, so squeeze into of bolt plays certain reinforcing effect, still need the joint between tray 10 and lower carriage 1 to stabilize and consolidate.
The upper end of two of them first mounting hole 2 is provided with side firmware 3, and the appearance of side firmware 3 is the right angle board shape, and the upper surface of side firmware 3 runs through and is provided with installation bolt 4, and the lower pot head of 4 is equipped with the nut from the installation, and side firmware 3 corresponds in the both sides of spool 17, plays the effect that stably prevents its both sides and rock.
Jack 6 has been seted up respectively with the same vertical position punishment of upper bracket 5 to lower carriage 1, and the quantity of jack 6 of every side sets up to three groups, can adjust the cartridge position of jib 7 in a flexible way, and the fixedly connected with top connection board 15 of upper end department of jib 7, and the upper surface of top connection board 15 runs through and sets up the third mounting hole 16 that quantity is no less than two to fix between the upper end of jib 7 and fossil fragments or building top surface.
In the installation, spool 17 is fixed between lower carriage 1 and upper bracket 5, compress tightly stably through rotating gland nut 9 and carry out spool 17, because channel 12 card is below lower carriage 1, consequently can prevent that relative jib 7 of thread bush 11 and tray 10 from taking place the rotation problem, even under the effect that receives great gravity, still can ensure the stability of this position department in the permanent use, play the effect that increases the stability of hoist and mount, in addition, the height-adjustable that thread bush 11 is located, the height that the spool 17 was arranged can be adjusted, move up spool 17 in advance, screw bush 11 again, when reaching suitable height, lower carriage 1 again, make the both sides card of lower carriage 1 in the inboard of channel 12, can ensure stably.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the principles of the present invention may be applied to any other embodiment without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a pipe gallows is used in electromechanical installation of building, includes lower carriage (1) and upper bracket (5), its characterized in that: the side cross-section of lower carriage (1) and upper bracket (5) all is "concave" type and notch down, upper bracket (5) run through jointly with the upper surface of lower carriage (1) and are provided with two jib (7), the surface of jib (7) is close to lower level department screw thread cover of lower carriage (1) and is equipped with thread bush (11), the lower extreme of thread bush (11) is provided with tray (10) with two lower level mutual joint of lower carriage (1), the surface of jib (7) is provided with near the higher authority of upper bracket (5) and compresses tightly the piece.
2. The pipe support and hanger for the electromechanical installation of building according to claim 1, wherein: threaded surface (8) have been seted up to the surface of jib (7) near the latter half position department, thread bush (11) carry out screw-thread fit through threaded surface (8) and jib (7).
3. The pipe support and hanger for the electromechanical installation of buildings according to claim 2, characterized in that: the pressing piece comprises a pressing nut (9), the pressing nut (9) is sleeved on the surface of the threaded surface (8) and is in threaded fit with the threaded surface, and the lower end of the pressing nut (9) is in contact with the upper surface of the upper support (5).
4. The pipe support and hanger for the electromechanical installation of building according to claim 1, wherein: the upper surface of lower carriage (1) runs through and sets up quantity and is no less than two first mounting hole (2), first mounting hole (2) are the equidistance in the both sides direction and arrange, the middle section position of upper bracket (5) is seted up for platelike portion (13), the upper surface of platelike portion (13) runs through and sets up quantity and is no less than two second mounting hole (14), second mounting hole (14) are the equidistance in the both sides direction and arrange.
5. The pipe support and hanger for the electromechanical installation of building according to claim 4, wherein: the upper end of the first mounting hole (2) is provided with a side fixing piece (3), the upper surface of the side fixing piece (3) penetrates through a mounting bolt (4), and a nut is sleeved at the lower end of the mounting bolt (4).
6. The pipe support and hanger for the electromechanical installation of building according to claim 1, wherein: jack (6) have been seted up respectively in same vertical position department of lower carriage (1) and upper bracket (5), every side the quantity of jack (6) sets up to three groups, fixedly connected with top connection board (15) are located to the upper end of jib (7), the upper surface of top connection board (15) runs through and sets up quantity and is no less than two third mounting hole (16).
7. The pipe support and hanger for the electromechanical installation of building according to claim 1, wherein: the thread bushing (11) and the tray (10) are integrally formed, a plurality of groups of channels (12) are formed in the outer surface of the tray (10), two channels (12) are used as one group and are distributed in an annular array, the two channels (12) of each group are located on two sides of the thread bushing (11), and two lower sides of the lower support (1) are correspondingly clamped in one group of the channels (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221854888.1U CN217741230U (en) | 2022-07-19 | 2022-07-19 | Pipeline supporting and hanging frame for building electromechanical installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221854888.1U CN217741230U (en) | 2022-07-19 | 2022-07-19 | Pipeline supporting and hanging frame for building electromechanical installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217741230U true CN217741230U (en) | 2022-11-04 |
Family
ID=83850813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221854888.1U Expired - Fee Related CN217741230U (en) | 2022-07-19 | 2022-07-19 | Pipeline supporting and hanging frame for building electromechanical installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217741230U (en) |
-
2022
- 2022-07-19 CN CN202221854888.1U patent/CN217741230U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201587780U (en) | Traveling cable for elevator | |
CN217741230U (en) | Pipeline supporting and hanging frame for building electromechanical installation | |
CN210838761U (en) | A installing support for wire and cable | |
CN216388571U (en) | Supporting device for installing signboard | |
CN214114506U (en) | Paying-off tackle capable of adapting to paying-off direction for power transmission line construction | |
CN215699961U (en) | Machining clamp for caterpillar link of excavator | |
CN210669347U (en) | Make things convenient for welding-free gallows of steel construction building electromechanical pipeline installation | |
CN210286390U (en) | Multifunctional traveling cable up-down segmented fixing device | |
CN209636599U (en) | Autobalance is promoted and hanging device | |
CN205046848U (en) | Gate -type steel sheet mould holder | |
CN110793111A (en) | Air conditioner mounting rack | |
CN216625963U (en) | Communication network wiring device | |
CN214944079U (en) | Oil recovery is with beam-pumping unit polished rod eye of being convenient for equipment | |
CN216336075U (en) | Elevator counterweight block with adjustable weight | |
CN212475902U (en) | Tower crane attachment support universal for prefabricated wall and structural column | |
CN221380383U (en) | Cable guard board for underground coal mining machine of coal mine | |
CN220996182U (en) | Double-lug inclined type carrier cable center anchor wire clamp | |
CN219242960U (en) | Supporting and hanging frame structure for building earthquake resistance | |
CN210898450U (en) | Rodless branch line extension device based on no power failure | |
CN210286374U (en) | Economical counterweight speed limiter mounting support | |
CN216617080U (en) | Concrete pole of easily installing cable | |
CN212240784U (en) | Anchor clamps are assembled to lift stand center pillar | |
CN221633324U (en) | Communication cable wiring device | |
CN217921020U (en) | Stable lifting device of material that construction used | |
CN220098251U (en) | Auxiliary device for hoisting prefabricated vertical component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20221104 |
|
CF01 | Termination of patent right due to non-payment of annual fee |