CN217741178U - Electric power convenient installation butt-joint type bridge - Google Patents

Electric power convenient installation butt-joint type bridge Download PDF

Info

Publication number
CN217741178U
CN217741178U CN202221187631.5U CN202221187631U CN217741178U CN 217741178 U CN217741178 U CN 217741178U CN 202221187631 U CN202221187631 U CN 202221187631U CN 217741178 U CN217741178 U CN 217741178U
Authority
CN
China
Prior art keywords
crane span
bridge frame
electric power
span structure
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221187631.5U
Other languages
Chinese (zh)
Inventor
郑永锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yagao Intelligent Technology Co ltd
Original Assignee
Anhui Yagao Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Yagao Intelligent Technology Co ltd filed Critical Anhui Yagao Intelligent Technology Co ltd
Priority to CN202221187631.5U priority Critical patent/CN217741178U/en
Application granted granted Critical
Publication of CN217741178U publication Critical patent/CN217741178U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a convenient installation dock crane span structure of electric power, be the crane span structure of semi-surrounding structure including the cross section, the both ends of crane span structure are provided with the engaging lug that can be convenient for two crane span structures are connected, the apron that can rotate is installed to the upper end of crane span structure, the internally mounted of crane span structure has the separated time board, the breach that adjustable circuit position was put is seted up at the middle part of separated time board, the bottom side of crane span structure is provided with the wall that can carry out the supporting role to the crane span structure and props, install the cardboard between the engaging lug, the cardboard corresponds the inboard that the engaging lug is located the crane span structure and installs the activity that can carry out the lock with the cardboard and detain.

Description

Electric power convenient installation butt-joint type bridge
Technical Field
The utility model belongs to the technical field of the electric power crane span structure, especially, relate to a convenient installation dock crane span structure of electric power.
Background
In the process of construction and installation of a power system, various lines need to be laid and installed, so that transmission of power signals is facilitated, indoor signal lines are generally located on the sides of galleries or the indoor upper ends, when the lines are long or many, the lines have high weight and can be broken or drooped to cause hidden dangers, the bridge has the function of supporting and collecting the laid lines in a specified area to prevent the lines from being damaged, the bridge needs to be spliced when installed and fixed by a plurality of bolts, and the installation efficiency of the bridge directly influences the speed of line laying in the process of engineering laying;
therefore, the utility model discloses it is the problem of convenient installation that the crane span structure can be quick when the installation of present stage that mainly solves.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a convenient installation dock crane span structure of electric power, what mainly solve is the problem of the convenient installation that the crane span structure can be quick when the installation of present stage.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model provides a convenient installation dock crane span structure of electric power, includes that the cross section is the crane span structure of semi-enclosed structure, the both ends of crane span structure are provided with the engaging lug that can be convenient for two crane span structures are connected, the apron that can rotate is installed to the upper end of crane span structure, the internally mounted of crane span structure has the nozzle plate, the breach of adjustable circuit position is seted up at the middle part of nozzle plate, the bottom side of crane span structure is provided with the wall that can carry out supporting role to the crane span structure and props, install the cardboard between the engaging lug, the cardboard corresponds the inboard that the engaging lug is located the crane span structure and installs the activity that can carry out the lock with the cardboard and detain.
Furthermore, both sides of the inside of the clamping plate are provided with mounting grooves and clamping grooves for the movable buckle to be fastened, and the middle of the clamping plate is provided with a screw groove for mounting a bolt conveniently.
Further, the movable buckle comprises a movable plate, the end of the movable plate is bent, a groove is formed in the middle of the other end of the movable plate, and the movable plates are connected through a shaft column.
Furthermore, a plurality of mounting holes which can be conveniently fixed on the wall body are formed in the wall support.
Furthermore, a stud capable of being tightened is arranged between the clamping plate and the movable buckle, and a nut is arranged on the stud.
Further, a handle which can be opened manually is arranged on the cover plate.
The utility model discloses following beneficial effect has:
at first prop the wall and fix inside the wall body, place the crane span structure and prop the top at the wall, the structural modeling that the wall propped makes the crane span structure can not the landing, engaging lug between the crane span structure can install the cardboard earlier and wear out the double-screw bolt through the spiral shell groove, buckle at crane span structure internally mounted activity this moment, the activity is buckled and can be buckled and place inside the cardboard, and press from both sides the engaging lug in the centre, the both ends that the activity was buckled simultaneously can block into in the draw-in groove of cardboard, under tightening up of double-screw bolt and bolt, the activity is buckled into the horizontality that can be continuous, form the ring with the cardboard, be connected two crane span structures.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages simultaneously.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1: the utility model discloses a bridge structure diagram;
FIG. 2: the utility model discloses a bridge rear view;
FIG. 3: the utility model discloses movable knot structure picture.
In the drawings, the components represented by the respective reference numerals are listed below:
the bridge frame 1, the connecting lug 2, the cover plate 3, the line distribution plate 101, the wall support 4, the clamping plate 5, the movable buckle 6, the mounting groove 501, the clamping groove 502, the thread groove 503, the movable plate 601, the open groove 602, the axle column 603, the mounting hole 401, the stud 7, the nut 8 and the handle 301.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "open hole", "upper", "lower", "thickness", "top", "middle", "length", "inner", "around", etc. indicate an orientation or positional relationship only for the convenience of description of the present invention and to simplify the description, and do not indicate or imply that the component or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
As shown in fig. 1-3: the utility model provides a convenient installation dock crane span structure of electric power, includes that the cross section is the crane span structure 1 of semi-enclosed structure, the both ends of crane span structure 1 are provided with engaging lug 2 that can be convenient for two crane span structure 1 to connect, apron 3 that can rotate is installed to the upper end of crane span structure 1, the internally mounted of crane span structure 1 has distributing plate 101, the logical notch that leads to of adjustable circuit position is seted up at the middle part of distributing plate 101, the bottom side of crane span structure 1 is provided with the wall that can carry out supporting role to crane span structure 1 and props 4, install cardboard 5 between the engaging lug 2, cardboard 5 corresponds engaging lug 2 and is located the inboard of crane span structure 1 and installs the activity that can carry out the lock with cardboard 5 and detain 6.
As shown in fig. 3: the inside both sides of cardboard 5 all are provided with mounting groove 501 and can supply the activity to detain the draw-in groove 502 that carries out the lock, the middle part of cardboard 5 is provided with the spiral groove 503 of being convenient for construction bolt.
As shown in fig. 3: the movable buckle 6 comprises a movable plate 601, the end of the movable plate 601 is bent, a slot 602 is formed in the middle of the other end of the movable plate 601, and the movable plates 601 are connected through a shaft column 603.
As shown in fig. 2: the wall brace 4 is provided with a plurality of mounting holes 401 which can be conveniently fixed on the wall body.
As shown in fig. 3: a stud 7 capable of being tightened is arranged between the clamping plate 5 and the movable buckle 6, and a nut 8 is arranged on the stud 7.
As shown in fig. 1: the cover plate 3 is provided with a handle 301 which can be manually opened.
In the description of the present specification, reference to the description of "one embodiment," "an example," "a specific example," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The utility model provides a convenient installation dock crane span structure of electric power which characterized in that: the cable bridge comprises a bridge frame (1) with a semi-surrounding structure on the cross section, connecting lugs (2) which can facilitate connection of the two bridge frames (1) are arranged at the two ends of the bridge frame (1), a cover plate (3) which can rotate is installed at the upper end of the bridge frame (1), a distributing plate (101) is installed inside the bridge frame (1), a notch capable of adjusting the position of a line is formed in the middle of the distributing plate (101), a wall support (4) which can support the bridge frame (1) is arranged at the bottom side of the bridge frame (1), a clamping plate (5) is installed between the connecting lugs (2), and movable buckles (6) which can be tightly fastened with the clamping plate (5) are installed on the inner side, corresponding to the connecting lugs (2), of the clamping plate (5).
2. The butt-joint type bridge frame convenient to mount in electric power of claim 1, wherein: the clamping plate is characterized in that both sides of the interior of the clamping plate (5) are provided with mounting grooves (501) and clamping grooves (502) for the movable buckles to fasten, and the middle of the clamping plate (5) is provided with screw grooves (503) convenient for mounting bolts.
3. The butt-joint type bridge frame convenient to mount in electric power of claim 1, wherein: the movable buckle (6) comprises a movable plate (601), the end of the movable plate (601) is bent, a slot (602) is formed in the middle of the other end of the movable plate (601), and the movable plates (601) are connected through a shaft column (603).
4. The butt-joint type bridge frame convenient to mount in electric power of claim 1, wherein: and the wall support (4) is provided with a plurality of mounting holes (401) which can be conveniently fixed on the wall body.
5. The butt-joint type bridge frame convenient to mount in electric power of claim 2, wherein: a stud (7) capable of being tightened is installed between the clamping plate (5) and the movable buckle (6), and a nut (8) is installed on the stud (7).
6. The butt-joint type bridge frame convenient to mount in electric power of claim 1, wherein: a handle (301) which can be opened manually is arranged on the cover plate (3).
CN202221187631.5U 2022-05-06 2022-05-06 Electric power convenient installation butt-joint type bridge Active CN217741178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221187631.5U CN217741178U (en) 2022-05-06 2022-05-06 Electric power convenient installation butt-joint type bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221187631.5U CN217741178U (en) 2022-05-06 2022-05-06 Electric power convenient installation butt-joint type bridge

Publications (1)

Publication Number Publication Date
CN217741178U true CN217741178U (en) 2022-11-04

Family

ID=83836079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221187631.5U Active CN217741178U (en) 2022-05-06 2022-05-06 Electric power convenient installation butt-joint type bridge

Country Status (1)

Country Link
CN (1) CN217741178U (en)

Similar Documents

Publication Publication Date Title
CN209585351U (en) A kind of assembling type partition wall wiring pipe laying structure
CN217741178U (en) Electric power convenient installation butt-joint type bridge
CN210739028U (en) LED display screen connecting piece
CN110783825A (en) Power distribution cabinet with good stability
CN209686235U (en) A kind of double anchor web cable-stayed bridge steel cable anchor systems
CN208093049U (en) A kind of power circuit tower number plate or warning sign holder
CN219843397U (en) Weak current box convenient to maintain
CN211321263U (en) Fixed knot constructs convenient to dismouting solar panel
CN219322013U (en) Wire bridge with wire protection function
CN216280180U (en) Modularization base of installation of concatenation large-size screen
CN217607905U (en) Road and bridge accumulated water monitoring integrated machine
CN217545536U (en) Device for preventing high-foundation box-type substation cable from falling
CN220628818U (en) Water conservancy and hydropower engineering cable fixing and protecting device
CN213241382U (en) Acousto-optic alarm device
CN219371968U (en) Waterproof intensive bus duct
CN218714189U (en) Waterproof type curtain plastic-aluminum board
CN217441316U (en) Three nets integration terminal mounting structure with adjustable
CN215563424U (en) A panel concatenation component for assembly type structure
CN221278912U (en) Camera installation U-shaped frame convenient to installation and dismantlement
CN221226869U (en) Power distribution cabinet convenient to install and fix
CN220652932U (en) Waterproof intensive bus duct
CN216981399U (en) Boats and ships cable laying bracket
CN213185333U (en) Cable support convenient to adjust
CN207847094U (en) A kind of mounting structure of building template
CN218672611U (en) Steel construction storehouse is with refrigeration heating mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant