Technical Field
The utility model relates to a construction technical field especially relates to a protection network for construction.
Background
When carrying out building construction, often need use scaffold and load-bearing platform to make things convenient for on-the-spot personnel to carry out the aerial work, when carrying out the operation, usually in order to guarantee personnel's safety, can set up the protection network in load-bearing platform's both sides.
The existing protective net is usually inconvenient to install and fix, most of the existing protective net is wound on a bearing platform or a scaffold by using iron wires, and the existing protective net is also very inconvenient to dismount in the later period; when the staff is operating, the temporary tools on the hands are not convenient to place when too many tools are used. Not enough to prior art, the utility model provides a protection network for construction to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a protection network for construction convenient to detach, stable in structure, convenient to use.
The utility model is used for construction's protection network, including construction lap joint frame, fixedly connected with load-bearing platform on the construction lap joint frame, load-bearing platform side fixedly connected with plane curb plate, be provided with square gomphosis post on the plane curb plate, the side of square gomphosis post is provided with the locking fixed orifices, one side of load-bearing platform is provided with the construction protection network main part, be provided with cavity screens piece in the construction protection network main part, square gomphosis groove on the cavity screens piece can be installed with square gomphosis post cooperation, the inside of cavity screens piece is provided with the spring main part, the spring main part can promote the locking locating lever and insert in the locking fixed orifices, fixedly connected with instrument storage box body on the lateral wall of construction protection network main part.
The utility model is used for construction's protection network, wherein load-bearing platform includes two upper and lower planes, and construction protection network main part sets up between two planes.
The utility model is used for construction's protection network, wherein the side fixedly connected with plane bearing board of construction protection network main part, cavity screens piece sets up on plane bearing board.
The utility model is used for construction's protection network, wherein the position of hollow screens piece is relative with the position of plane curb plate.
The utility model is used for construction's protection network, wherein the inside processing of hollow screens piece has the inner chamber, and the spring main part sets up inside the inner chamber, and the slider is installed at the both ends of spring main part, the other end and the locking locating lever fixed connection of slider.
The utility model is used for construction's protection network, wherein fixedly connected with pushes away the handle on the slider, has seted up on the hollow screens piece and has pushed away the corresponding spout.
The utility model is used for construction's protection network, wherein fixedly connected with side direction support column on the lateral wall of plane curb plate corresponds on the lateral wall of hollow screens piece and has seted up the side direction and support the butt joint hole, and the side direction support column can support the butt joint hole cooperation installation with the side direction.
The utility model discloses a protection network and prior art difference for construction lie in, the utility model is used for construction's protection network when using, conveniently realize fixing the quick installation of construction protection network main part to make construction protection network main part form the protection to load-bearing platform's side, and the instrument storage box body of setting can realize placing the temporarily of instrument, improve the functionality of construction protection network main part, when not needing to use construction protection network main part, also conveniently realize pulling down construction protection network main part fast, therefore the device is used portably, satisfy the user demand.
The following description will be further made on the protection net for building construction according to the present invention with reference to the accompanying drawings.
Drawings
Fig. 1 is a schematic structural view of the protective net for building construction of the present invention;
fig. 2 is a schematic structural view of the protective net for building construction of the utility model after one side of the protective net is omitted;
fig. 3 is a schematic structural view of the protective net for building construction of the utility model after the protective net main bodies are constructed on two sides of the protective net;
fig. 4 is a schematic structural view of a construction protective screening main body in the protective screening for building construction of the utility model;
the notation in the figures means: 1-building construction lap joint frame; 2-a load-bearing platform; 3-a planar side plate; 4-square embedded columns; 5-locking the fixing hole; 6, constructing a protective net main body; 7-a planar support plate; 8-a hollow block of bits; 9-square tabling groove; 10-locking the positioning rod; 11-a spring body; 12-a slide block; 13-pushing the handle; 14-lateral support columns; 15-lateral support docking holes; 16-tool storage case.
Detailed Description
The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in figure 1, the utility model is used for construction's protection network includes construction overlap joint frame 1, and construction overlap joint frame 1 fixed connection is subaerial. Fixedly connected with load-bearing platform 2 on the construction overlap joint frame 1, load-bearing platform 2 includes two upper and lower planes, load-bearing platform side fixedly connected with plane curb plate 3. The plane side plate 3 is provided with paired square embedded columns 4, and the side surfaces of the square embedded columns 4 are provided with locking fixing holes 5.
A construction protective net main body 6 is arranged between the two bearing platforms 2, the upper side and the lower side of the construction protective net main body 6 are fixedly connected with plane bearing plates 7, hollow clamping blocks 8 are arranged on the plane bearing plates 7, and the positions of the hollow clamping blocks 8 are opposite to the positions of the plane side plates 3. As shown in fig. 2, a tool storage case 16 is fixedly connected to a side wall of the construction protection net body 6.
As shown in fig. 4, the hollow block 8 has a square fitting groove 9, the square fitting groove 9 is opposite to the square fitting post 4, and the square fitting post 4 can be inserted into the square fitting groove 9. The inside processing of hollow screens piece 8 has the inner chamber, and inner chamber internally mounted has spring main part 11, and slider 12 is installed at the both ends of spring main part 11, and the other end and the locking locating lever 10 fixed connection of slider 12.
The locking positioning rod 10 can extend into the square embedding groove 9 and can be inserted into the locking fixing hole 5 on the square embedding column 4 which is matched and installed with the square embedding groove 9. The spring body 11 and the sliding block 12 are used for supporting the locking positioning rod 10, supporting the locking positioning rod 10 in a limiting mode, and guaranteeing that the locking positioning rod 10 is stable in stress. Slider 12 sliding connection is in the inner chamber of hollow screens piece 8, and spring body 11 is in compression state, and spring body 11 of setting is in compression state, and its elasticity can guarantee that locking locating lever 10 is when pegging graft in the inside of locking fixed orifices 5, and is fixed stable, difficult pine takes off.
A push handle 13 is fixedly connected to the sliding block 12, a sliding groove corresponding to the push handle 13 is formed in the hollow clamping block 8, and the push handle 13 is arranged to facilitate a user to slide the sliding block 12.
As shown in fig. 3, a lateral support column 14 is fixedly connected to a side wall of the planar side plate 3, a lateral support docking hole 15 is correspondingly formed in a side wall of the hollow block 8, and the lateral support column 14 is movably clamped in the lateral support docking hole 15. The cooperation of side direction support column 14 and side direction support butt joint hole 15 can make the joint of cavity screens piece 8 fix the back in progress, and cavity screens piece 8 receives the side direction support, guarantees that the atress is stable, non-deformable.
When the protective net for building construction is fixedly installed on the protective net main body 6, the pushing handle 13 is firstly pulled, so that the pushing handle 13 drives the sliding block 12 to move and extrude the spring main body 11, and the sliding block 12 can also drive the locking positioning rod 10 to move synchronously and make the locking positioning rod 10 retract into the hollow clamping block 8; at the moment, the hollow clamping block 8 is butted with the plane side plate 3, so that the square embedded column 4 is clamped with the square embedded groove 9, and the lateral support column 14 is clamped with the lateral support butting hole 15; after the locking is completely clamped, the handle pushing handle 13 is loosened, the spring main body 11 is released from a compressed state at the moment, the sliding block 12 and the locking positioning rod 10 are pushed to slide towards two sides, the locking positioning rod 10 is inserted into the locking fixing hole 5, the locking fixing of the construction protective net main body 6 is formed, and the protection of workers is realized through the construction protective net main body 6; when the construction protective net main body 6 needs to be detached, the operation can be performed in the installation and fixing process, the operation is vice versa, the operation is simple and convenient, the whole process is simple and convenient, and time and labor are saved.
The utility model discloses a protection network for construction when using, it is fixed to conveniently realize the quick installation to construction protection network main part to make construction protection network main part form the protection to load-bearing platform's side, and the instrument storage box body of setting can realize placing the interim of instrument, improves the functionality of construction protection network main part, when need not using construction protection network main part, also conveniently realizes pulling down construction protection network main part fast, therefore the device is used portably, satisfies the user demand.
Although the invention has been described in detail with respect to the general description and the specific embodiments, it will be apparent to those skilled in the art that modifications and improvements can be made based on the invention. Accordingly, such modifications and improvements are intended to be within the scope of this invention without departing from the spirit thereof.