CN217734839U - Actual measurement result system construction template for improving main structure stage - Google Patents
Actual measurement result system construction template for improving main structure stage Download PDFInfo
- Publication number
- CN217734839U CN217734839U CN202221336263.6U CN202221336263U CN217734839U CN 217734839 U CN217734839 U CN 217734839U CN 202221336263 U CN202221336263 U CN 202221336263U CN 217734839 U CN217734839 U CN 217734839U
- Authority
- CN
- China
- Prior art keywords
- template
- construction
- wall
- shear wall
- main structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 84
- 238000005259 measurement Methods 0.000 title claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 22
- 239000010959 steel Substances 0.000 claims description 22
- 238000009415 formwork Methods 0.000 claims description 8
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 6
- 239000002390 adhesive tape Substances 0.000 claims description 5
- 230000000149 penetrating effect Effects 0.000 claims description 5
- 230000001737 promoting effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 32
- 230000008569 process Effects 0.000 abstract description 18
- 238000005516 engineering process Methods 0.000 abstract description 5
- 230000002787 reinforcement Effects 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 4
- 230000003014 reinforcing effect Effects 0.000 abstract description 3
- 239000010410 layer Substances 0.000 description 33
- 239000004567 concrete Substances 0.000 description 17
- 239000000463 material Substances 0.000 description 16
- 230000008901 benefit Effects 0.000 description 12
- 238000004519 manufacturing process Methods 0.000 description 7
- 238000013461 design Methods 0.000 description 6
- 230000007613 environmental effect Effects 0.000 description 6
- 230000008439 repair process Effects 0.000 description 6
- 239000002699 waste material Substances 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000004458 analytical method Methods 0.000 description 5
- 230000007547 defect Effects 0.000 description 5
- 238000001514 detection method Methods 0.000 description 5
- 238000007689 inspection Methods 0.000 description 5
- 239000010813 municipal solid waste Substances 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 4
- 235000017491 Bambusa tulda Nutrition 0.000 description 4
- 241001330002 Bambuseae Species 0.000 description 4
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 4
- 239000011425 bamboo Substances 0.000 description 4
- 239000011120 plywood Substances 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000009467 reduction Effects 0.000 description 4
- 238000005070 sampling Methods 0.000 description 4
- HEMHJVSKTPXQMS-UHFFFAOYSA-M Sodium hydroxide Chemical compound [OH-].[Na+] HEMHJVSKTPXQMS-UHFFFAOYSA-M 0.000 description 3
- 238000004026 adhesive bonding Methods 0.000 description 3
- 238000004378 air conditioning Methods 0.000 description 3
- 239000002585 base Substances 0.000 description 3
- 238000012937 correction Methods 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 3
- 239000000428 dust Substances 0.000 description 3
- 239000003292 glue Substances 0.000 description 3
- 239000002994 raw material Substances 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 238000010521 absorption reaction Methods 0.000 description 2
- 239000003513 alkali Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000005034 decoration Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 201000010099 disease Diseases 0.000 description 2
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000004880 explosion Methods 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 238000009432 framing Methods 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- BASFCYQUMIYNBI-UHFFFAOYSA-N platinum Chemical compound [Pt] BASFCYQUMIYNBI-UHFFFAOYSA-N 0.000 description 2
- 238000005498 polishing Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 206010020772 Hypertension Diseases 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000013872 defecation Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 208000019622 heart disease Diseases 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000027939 micturition Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 229910052697 platinum Inorganic materials 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000001915 proofreading effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000000275 quality assurance Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 230000000391 smoking effect Effects 0.000 description 1
- 238000002791 soaking Methods 0.000 description 1
- 235000011121 sodium hydroxide Nutrition 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a promote actual measurement achievement system construction templates in major structure stage relates to construction technical field, promotes major structure quality, reduces the roughness poor, phenomenons such as mould that rises, improves the reinforcement method, and is simple effective, satisfies job site's operation requirement. The method has wide applicability in the construction of the main structure, and the principle of the method is clear and simple. In order to improve the quality of a main structure and reduce the phenomena of poor flatness, mold expansion and the like, the reinforcing method is improved, is simple and effective, and meets the use requirements of a construction site. Compared with the traditional reinforcement process, the system construction method is convenient and quick in construction, good in control effect of impression quality and forming quality, cost-saving, advanced in technology, advanced and novel in technical and economic efficiency and other aspects.
Description
Technical Field
The utility model relates to a construction technical field especially relates to promote actual measurement achievement system construction templates in major structure stage.
Background
In daily construction and construction activities, during construction of a main body structure, a plurality of standards reflecting the quality of the structure construction are available, common quality diseases are frequently found, the actual measurement actual quantity is one of evaluation bases of the quality of the main body structure construction, the method is a relatively simple and scientific detection means for the formed main body structure, related industry departments already set a series of standards, at present, various large developers further set more strict standards on the basis of industry regulations, the ever-developing attention of the building industry to the quality of the main body structure can be seen, furthermore, the main body structure is the basis of subsequent decoration engineering, the defects and the defects of the main body structure can certainly influence subsequent processes, and the cost is increased. However, the common quality problems of the main structure stage are most difficult to solve and most influenced while the common quality problems are the most, so that it is important to improve the quality of the main structure and reduce the quality problems of the main structure.
The main concern in the industry is the perpendicularity and flatness of the wall column beam, the extreme difference and thickness of the floor slab, and common problems are: (1) dislocation and root rot occur at the bottom of the gable; (2) slurry leakage and root rot are generated at the wall column base; (3) the small short-limb shear wall is integrally inclined; (4) the flatness of the joint of the beam and the wall generally does not reach the standard; (5) expanding a shear wall mold; (6) floor downwarping; (7) insufficient plate thickness and the like; moreover, during the construction of the wooden template, along with the increase of the turnover frequency of the template, the quality of the template is reduced, the quality of a main structure of the construction is also reduced, the quality problem of the splicing part of the template is also endless, the root rot and the mold explosion of the root part of a wall column are also very common, the hidden danger and the work load of removing and repairing at the later stage are very large, and effective measures are urgently needed for control.
Disclosure of Invention
For solving above technical problem, the utility model provides a promote major structure stage actual measurement achievement system construction templates, promote major structure quality, reduce the roughness poor, phenomenons such as the mould that rises, improve the reinforcement method, simple effective satisfies job site's operation requirement.
In order to achieve the above purpose, the utility model provides a following scheme:
the utility model provides a construction template of an actual measurement achievement system at a stage of improving a main structure,
the template at the gable is bound and fixed with the reinforcing steel bars by adopting inner supporting strips;
the column foot and the bottom of the wall are provided with a locking template, and sponge adhesive tapes are arranged at gaps;
a support frame is arranged below the template at the top part of the small short-limb shear wall, and an adjusting screw is arranged at the top of the support frame and used for adjusting the height of the template at the top part; the template of the shear wall part of the small short-limb shear wall is provided with a through-wall screw in a penetrating way, and nuts are arranged on the outer sides of the templates at the two sides of the shear wall to fix the templates;
the template at the door opening is a 7-shaped template, the 7-shaped template comprises a horizontal part and a vertical part, and one end of the horizontal part is connected with the top of the vertical part;
the template at the wall surface of the shear wall is provided with a plurality of horizontal screw rods, the screw rods penetrate through the shear wall and the template at the outer side of the shear wall, two ends of each screw rod are respectively provided with a fastener, a steel pipe is arranged between each fastener and the template at the wall surface of the shear wall, and one side of each fastener, facing the end part of each screw rod, is provided with a nut;
a support frame is arranged below the template of the top plate and comprises a support and a plurality of adjusting bolts, and the adjusting bolts are connected with the top of the support through threads.
Optionally, one side of the fastener is provided with two semicircular grooves, and the middle of the fastener is provided with a bolt hole in a through manner.
Optionally, the distance between the adjusting bolt at the edge of the support and the column, wall or beam edge is not more than 300mm, and the distance between the horizontal rod at the uppermost layer of the support and the template of the top plate is not more than 300mm.
The utility model discloses for prior art gain following technological effect:
the method has wide applicability in the construction of the main structure, and the principle of the method is clear and simple.
In order to improve the quality of a main structure and reduce the phenomena of poor flatness, mold expansion and the like, the reinforcing method is improved, is simple and effective, and meets the use requirements of a construction site.
Compared with the traditional reinforcement process, the system construction method is convenient and quick in construction, good in control effect of impression quality and forming quality, cost-saving, advanced in technology, advanced and novel in technical and economic efficiency and the like.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a process flow diagram of the actual measurement result system construction method in the stage of improving the main structure of the utility model;
FIG. 2 is a schematic structural view of a gable template in the actual measurement achievement system construction template in the stage of improving the main structure of the utility model;
FIG. 3 is a schematic structural view of the actual measurement performance system construction form center pillar and the form at the bottom of the wall in the stage of promoting the main structure of the utility model;
FIG. 4 is a schematic view of the planar structure of the small short-limb shear wall in the construction template of the actual measurement achievement system in the stage of improving the main structure of the utility model;
FIG. 5 is a schematic view of the elevation structure of the small short-limb shear wall in the construction template of the actual measurement achievement system in the stage of improving the main structure of the utility model;
FIG. 6 is a schematic structural view of a template at an entrance to a cave in a construction template of the actual measurement achievement system in the stage of improving the main structure of the utility model;
FIG. 7 is a schematic structural view of a shear wall template in a construction template of the actual measurement performance system in the stage of improving the main structure of the utility model;
fig. 8 is a schematic structural view of a template at a floor slab in a construction template of an actual measurement achievement system in a stage of improving a main structure of the utility model;
FIG. 9 is a schematic view of the construction of the panel thickness controller;
fig. 10 is the utility model discloses promote the structural schematic of borer in actual measurement achievement system construction templates in major structure stage.
Description of reference numerals: 1. a steel pipe; 2. a fastener; 3. a nut; 4. a screw; 5. a template; 6. a wall stud; 7. a shear wall; 8. a support; 9. a floor slab; 10. back corrugation; 11. erecting ribs; 12. transverse ribs; 13. The fore shaft template.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
The first embodiment is as follows:
as shown in fig. 1 to 10, the present embodiment provides a construction template of a system for improving actual measurement achievement in a main structure stage, including the following steps:
(1) Preparing a technology;
familiarizing construction drawings, related design data and design basis, construction acceptance criteria and related technical provisions; carrying out deepening design on a construction deepening drawing; carrying out special transaction;
(2) Positioning and paying off;
casting a measuring axis control pile on the first floor plane, and laying internal control mesh points: selecting at least three wire releasing holes on the first floor of each building, nailing a steel nail into a concrete plate at the center position of the axis intersection, drawing a cross line at the nail cap, clearly marking the periphery of the steel nail by red paint and protecting the steel nail by laying bricks, and reserving 200mm wire releasing holes on the multiple layers above the first floor at corresponding positions of the axis control points of the corresponding first floor; the plumb bob instrument and the steel ruler are used for upward transmission; internal control network delivery, requiring switching every 8 layers
(3) Manufacturing a column, a wall lock opening template and a 7-shaped template;
cutting the template according to the requirements of a drawing, designing the template at the position of the door opening into a 7-shaped template in advance, and processing and splicing the template of the underground structure or the template leftover materials in the manufacturing process into a lock opening template according to the drawing;
(4) Erecting a column template and a wall template;
the process flow comprises the following steps: binding reinforcing steel bars on the columns, erecting full framing → erecting a beam slab formwork → reserving and embedding → concealing acceptance → sealing the columns and walls;
(1) when the shear wall is constructed, the arrangement of the wall-penetrating screw rods 4 is to uniformly arrange 5 channels on the inner wall and 6 channels on the outer wall;
(2) before the column and the wall are sealed, the inner stay bars in the gable are firmly bound with the reinforcing steel bars by binding wires;
(3) when the column and the wall are sealed, a pre-embedded outer wall locking screw rod 4 sleeve is reserved at the upper opening, and the sleeve and the main body structure are firmly welded; in the mold sealing process, the locking screw 4 at the lower opening of the shear wall 7 is firmly fixed; the integrity of the 7-shaped template 5 is ensured, and the horizontal abutted seam of the template 5 is kept above the wall as much as possible;
(4) after the column and the wall are sealed, the sponge adhesive tape is timely pasted, and the lock opening template 5 is installed and fixed.
(5) Installing a floor slab template;
after the full framing scaffold is completely built, a floor slab template is installed, the splicing seams of the floor slab template are not too large, and sponge adhesive tapes are adhered to the splicing seams to prevent slurry leakage;
(6) Installing a plate thickness controller;
after the floor slab template is erected, placing a finished product plate thickness controller on the plate surface at an interval of 800 × 800mm, after the placement is finished, penetrating the reinforcing steel bars through the lower opening of the plate thickness controller one by one, and binding firmly; after the binding of the lower layer of steel bars is finished, reserving and embedding, and finally installing the upper layer of steel bars;
(7) Template checking;
after the floor slab steel bars are completely installed and the load tends to be relatively stable, the first template correction is carried out, and the correction standard is higher than the standard after forming; after the proofreading is finished, sprinkling water to wet the template 5;
(8) Pouring;
concrete mixing → concrete transportation → acceptance of the concrete on the approach → concrete pouring, vibrating → shovel primary leveling → secondary primary leveling of a scraper → surface layer surface folding, compaction → secondary surface folding, galling → maintenance;
in the concrete pouring process, firstly pouring column and wall concrete, and then pouring beam and plate concrete, and when the gable concrete is poured, firstly pouring the middle part and then pouring the two sides; when the floor slab 9 is poured, the thickness of the slab is controlled by adopting the mounted slab thickness controller and the dynamic inserted drill rod together;
(9) Secondary die calibration;
after the concrete pouring is finished, immediately checking the template 5 and adjusting the template 5;
(10) Removing the mold;
and after the strength of the concrete meets the requirements of relevant specifications, removing the template 5.
Example two:
as shown in fig. 2 to 10, in the embodiment, a construction template of the system for improving the actual measurement performance of the main structure stage is provided, and a template 5 at a gable is bound and fixed with a steel bar by an inner stay; a locking template 13 is arranged at the bottom of the column foot and the wall, and a sponge adhesive tape is arranged at the gap; a support frame is arranged below the template 5 at the top part of the small short-limb shear wall, and an adjusting screw is arranged at the top of the support frame and used for adjusting the height of the template 5 at the top part; the template 5 of the shear wall 7 part of the small short-limb shear wall is provided with a through-wall screw 4 in a penetrating way, and the outer sides of the templates 5 at the two sides of the shear wall 7 are provided with nuts 3 for fixing the templates 5; the template 5 at the door opening is a 7-shaped template, the 7-shaped template comprises a horizontal part and a vertical part, and one end of the horizontal part is connected with the top of the vertical part; the template 5 at the wall surface of the shear wall 7 is provided with a plurality of horizontal screw rods 4, the screw rods 4 penetrate through the wall surface of the shear wall 7 and the template 5 at the outer side of the wall surface of the shear wall 7, two ends of each screw rod 4 are respectively provided with a fastener 2, a steel pipe 1 is arranged between each fastener 2 and the template 5 at the wall surface of the shear wall 7, one side of each fastener 2, facing the end part of each screw rod 4, is provided with a nut 3, and the steel pipe 1 is in contact with a back ridge 10 of the template 5; a formwork support frame is arranged below the formwork 5 of the top plate and comprises a support 8 and adjusting bolts, the top of the support 8 is provided with a plurality of adjusting bolts, and the adjusting bolts are connected with the top of the support 8 through threads. Fastener 2 one side is provided with two semicircular grooves, the fastener 2 middle part link up be provided with the bolt hole. The distance between the adjusting bolt positioned on the edge of the support 8 and the column, the wall or the beam edge is not more than 300mm, and the distance between the horizontal rod on the uppermost layer of the support 8 and the template 5 of the top plate is not more than 300mm.
Materials and apparatus
Material and equipment designed in the manufacturing process of the construction method
Acceptance criteria for related materials
Bamboo and wood glue compound die plate material
The surface of the plywood template plate is smooth, has a waterproof, wear-resistant and acid-alkali-resistant protective film, and has the characteristics of good heat preservation performance, easiness in demoulding, capability of being used on two sides and the like. The thickness of the plate should not be less than 12mm. And the plywood meets the regulations of the current national standard of plywood for concrete formworks (ZBB 70006).
The moisture content of the raw materials of each layer plate is not more than 15%, and the difference of the moisture content of the raw materials of each layer of the same gluing template is not more than 5%.
The glued template is made of water-resistant glue, the gluing strength of the glued template is not lower than the shear strength and the tensile strength of transverse grains of the wood or bamboo, and the glued template meets the requirement of environmental protection.
The gluing template entering the field is required to have qualified appearance and dimension besides the factory quality certificate.
The technical performance of the bamboo plywood matched mold should meet the specification of the following table.
Mechanical and mechanical properties of bamboo glue die
The thickness of the common wood-plastic mold closing plate is preferably 12mm, 15 mm and 18mm, and the technical performance of the common wood-plastic mold closing plate meets the following specifications:
the thickness of the common composite fiber template is preferably 12mm, 15 mm and 18mm, and the technical performance of the common composite fiber template meets the following specifications:
a static bending strength: the transverse direction is 28.22-32.3N/mm 2; the longitudinal direction is 52.62 to 67.21N/mm2;
b vertical surface tensile strength: greater than 1.8N/mm2;
c 72h Water absorption: <5%;
d 72h water absorption expansion rate: <4%;
e, acid and alkali corrosion resistance: soaking in 1% caustic soda for 24h without softening and corrosion phenomena;
f steam resistance: the surface is not softened and obviously expanded after being steamed in water vapor for 24 hours.
g modulus of elasticity: greater than 6.0X 103N/mm2.
Square steel tube
Master control project
The variety, specification and performance of the section bar and the pipe are in accordance with the regulations of the national current standard and meet the design requirements. When the section bar and the pipe enter the field, the test piece is extracted according to the regulations of the national current standard, the yield strength, the tensile strength, the elongation and the thickness deviation are checked, and the check result meets the regulations of the national current standard.
Checking quantity: checking the quality certificate; the sampling quantity is determined according to sampling inspection schemes of the incoming batches and the products.
The detection method comprises the following steps: checking quality certification documents and sampling inspection reports.
The section bar and the pipe are sampled and retested according to the standard specification, and the retested result meets the national current standard specification and meets the design requirement.
General item
The sectional dimension, thickness and allowable deviation of the a-type section and the pipe should meet the requirements of the product standard.
Checking quantity: 10% of each batch of section bars or pipe materials with the same variety and specification are selected for inspection, and the number of the section bars or pipe materials is not less than 3, and each section bar or pipe material is inspected at 3 positions.
The detection method comprises the following steps: the measurement is carried out by a steel ruler, a vernier caliper and an ultrasonic thickness gauge.
And (b) the allowable deviation of the external dimensions of the section and the pipe should meet the requirements of the product standards.
The number of inspections is: each batch of section bars or pipe materials of the same variety and specification is checked by a sampling method for 10 percent and is not less than 3.
The detection method comprises the following steps: and measuring by using a stay wire and a steel ruler.
The surface appearance quality of the section bar and the pipe material should meet the regulation of No. 4.2.5 of GB50205-2020 acceptance Standard for construction quality of Steel Structure engineering.
Checking quantity: and (6) checking the total number. The detection method comprises the following steps: and (6) observing and checking.
Quality control
Quality standard
Building construction safety inspection Standard JGJ59-2011.
Building construction template safety technical Specification JGJ162-2008.
Building structure load code GB50009-2012.
Specification for acceptance of construction quality of concrete structure engineering GB 50204-2015.
Technical Specification for temporary electricity utilization safety of construction site JGJ46-2005.
Steel structure engineering construction quality acceptance standard GB50205-2020.
Size, shape, weight and allowable deviation of cold-formed hollow section steel for structure GB/T6728-2017.
Quality assurance measures
And (5) the post responsibility system is implemented, the work division is clear, and the work of returning the construction technology before work and organizing the acceptance check is done.
All components and materials must have factory certification and original data, and the raw materials must be available after being retested.
All steel member materials meet the national standard and standard requirements.
The welding of the combined back edge is in accordance with the relevant standard requirements, the welding seam is required to be smooth during welding, welding defects such as air holes and slag inclusion are avoided, and the defects are found and repaired in time.
When the combined back edge is used, gaps can exist between the adjacent 2 back edges, but the gaps are not larger than 200mm.
The cutting of the 7-shaped template is determined according to a deepening design drawing, and the length of the shear wall template extending into the beam end should not be less than 500mm.
The fore shaft template combines the location muscle to be under construction simultaneously, notices the stability of foot mould, should set up the measure of preventing leaking thick liquid with vertical template juncture.
And during secondary calibration of the top plate vertical rod, higher standard control is required, and the requirement can be better met after molding.
Safety measures
The cutting and welding of square steel pipe need the professional electric welder who holds the certificate to carry out the construction, and strictly forbidden no certificate operation is paid attention to fire prevention safety during the construction.
And a perfect construction safety guarantee system is established, and the construction scheme adheres to the collective discussion → the establishment procedure of reporting approval, so that the scheme is safe, reasonable and feasible.
The member manufacturing work is carried out by a specially-assigned person, and people with hypertension, heart disease and the condition that the member is not suitable for high-altitude operation signs cannot carry out bar planting construction.
The safety helmet must be worn when the vehicle enters a construction site. When necessary, the user wears the safety belt and the anti-skid shoes.
Before operation, the following steps are checked to determine whether potential safety hazards exist on the operation surface. If the problem is found, the construction method can be used for timely providing the problem for security personnel or personnel at the department of project, and then construction is carried out after rectification and modification.
The electrical equipment used in the process is connected by electricians in the department of the project and cannot be connected privately.
The tool materials should be stacked in a centralized manner and cleaned uniformly after use. Concrete falling to the ground should be cleaned in time to avoid solidification. After each operation, the rest reinforcing steel bars are cleaned and stacked in stacks for next use.
The templates and the square steel pipes are required to be picked according to the usage amount. If the residue is collected in time, the material is strictly forbidden to be thrown everywhere and wasted.
The process is rationally arranged, the construction at night is reduced as much as possible, and the mechanical noise reduction that the use noise is small.
The generated garbage is cleaned in time, and the civilized construction is well done.
Staff needs to be educated frequently, and safety awareness and self-protection capability of the staff are improved. Workers are strictly prohibited from carrying diseases, drunk operation and illegal operation. Workers need to follow the discipline of labor civilized construction.
The indoor environment is protected, the defecation and the urination are strictly forbidden, and the indoor accommodation is strictly forbidden.
Environmental protection measure
Personnel entering a construction site must wear a safety helmet and wear the safety helmet neatly, and fasten safety belts and antiskid shoes for high-altitude operation, so that smoking is prohibited strictly.
Noise control: the method complies with national and local regulations of environmental noise emission standards in construction site circles, GB 12523-2011 and the like, and effective noise reduction measures must be taken for machines generating large noise to prevent noise diffusion.
Controlling dust: and dust fall measures are taken during construction, so that the construction site is ensured to be neat and civilized.
Building rubbish: and (4) formulating a construction waste reduction plan, enhancing the recycling of construction waste and clearing the waste generated in the construction process in time. The construction site living area is provided with a closed garbage container for classifying the construction garbage and carrying out centralized transportation.
And reasonably arranging the work of purchasing, processing and manufacturing of materials according to the construction progress, the inventory condition and the like.
According to the engineering characteristics, an environment protection operation manual and cautions are compiled, and environmental protection measures for field operators and managers are taken.
The processing site is solid and flat, drainage or water interception measures are arranged, and the produced sewage can be discharged into municipal pipelines after being treated in the sedimentation tank.
Benefit analysis
Economic benefits
The quality problems of the host structure are generally: cracking, mold expansion, sinking, root rot, slab staggering and the like; the processing mode is generally as follows: and (5) polishing and repairing. The statistics is obtained according to the internal condition of the department and the industry consultation: the main structure repair cost is generally 300 yuan/layer, can simply divide according to its repair position, and the broken root of mountain wall wrong platform: structural panel crack =2:1 due to insufficient thickness; the cost of removing the wall column is generally 1200 yuan/layer, can be roughly divided according to the repair area, difficulty and repair probability, the wall column base expands the mould: distortion of the small short-limb shear wall: uneven door opening: uneven wall surface of the shear wall: the top plate is uneven = 3.
From the above information the following analysis can be performed:
gable part
Compared with the traditional process, the process has the advantages that the gable formwork is hung with the thickness of 100mm, the number of embedded screws at the bottom is increased, each embedded screw sleeve is 0.2 yuan, 100 embedded screw sleeves are consumed in each layer, and the screws can be repeatedly used, so that calculation is not carried out.
Compared with the conventional process, the process can save the cost of repairing the embedded sleeve to be avoided by subtracting the cost of the embedded sleeve, namely 200- (0.2 x 100) =180 yuan/layer. The problem that the gable part is not fixed in place is well controlled, so that the cost caused by the fact that the plastering thickness of the outer wall is integrally increased due to the fact that the gable is staggered is avoided, the integrity and the attractiveness of the outer vertical surface of the soil body structure are improved, and the economic benefit and the social benefit are remarkable.
Wall column foot part
Compared with the traditional process, the process adds a circle of locking template, subtracts mortar plugging and reduces the polishing cost by about 300 yuan per layer.
The length of each layer of shear wall is 113.25m, the width of the shear wall is about 12.4m, the lock-up template is made of underground engineering waste templates or leftover materials, the cost is neglected, the templates are repeatedly considered according to 1 layer per 10 layers, and the residual value is 0; the plugging cost of the cement mortar is plugging cross section (simplified into triangle) × 2 × plugging length (wall length + wall width) × mortar unit price =1/2 × 0.05 × 2 (113.25 + 12.4) × 500=157.06 yuan/layer; therefore, the construction method saves 300+157.06=457.06 yuan/layer. And can be fine reduce the concrete waste, reduce the building rubbish and produce, convenient construction.
Small short-limb shear wall
After the small short-limb shear wall is pulled through and reinforced, the deviation problem can be obviously improved, the picking and repairing are avoided, and the cost for manufacturing the communicating screw rod is ignored. Therefore, the cost of the rejecting repair is saved by about 200 yuan/layer.
Flatness of door opening
Wall flatness of shear wall
The adjustment of the flatness of the shear wall surface only reduces the hitting cost by about 300 yuan/layer, so the cost is saved by 300 yuan/layer. And the flatness of the shear wall is improved, and the integral attractiveness is improved.
Flatness of roof
The top plate mainly controls the distance between the first vertical rod and the plate edge to be not more than 300mm, and the secondary die correction is carried out before pouring, so that the disturbance caused by construction is reduced, and no extra cost is increased. The cost is saved by about 100 yuan/layer.
Sheet thickness control
The unit price is about 0.5 yuan/layer by adopting a finished product thickness controller, the extra cost of the finished product thickness controller is 150 x 0.5=75 yuan/layer according to the calculation of using 150 pieces per layer, and the repairing cost of the traditional process is about 100 yuan/layer. So the total cost is saved by =100-75=25 yuan/layer.
In conclusion:
compared with the traditional construction process, the actual measurement achievement system construction method in the stage of improving the main structure saves =180+457+200+300+ 100+25 + 1562 yuan/layer in total, and has remarkable economic benefit.
Environmental protection and energy saving benefits
The construction method can well prevent the phenomena of mold explosion and slurry leakage;
the construction method can well avoid picking and repairing after concrete forming, thereby reducing construction waste and dust, and having high environmental protection and energy saving benefits.
Social benefits
The method systematically standardizes the management of the construction of the main structure and improves the consciousness and level of managers;
the construction method improves the reinforcing mode of the main structure by targeted optimization, and contributes to promoting the standardized production of the construction industry;
the quality problems are managed and prevented in the three stages of the prior, the middle and the later, so that the engineering quality is improved more scientifically and effectively, the actual measurement performance of the main structure is improved, the rejection and repair are reduced, and good conditions are provided for project pioneering and cup evaluation work.
The construction method reduces the quality defect generated by the main structure, can well improve the social image of an enterprise, can also better cooperate with a developer in the next step, and embodies the social responsibility and acting consciousness of the enterprise.
Examples of the applications
Jin Ke integrates the first-stage project of Meishuxiangfu, yaan Jin Kai real estate development company invests in construction, the project is located in No. F2-56 land blocks, 2 underground layers, 19 above ground layers, total building area 84941.68 square meter and is a reinforced concrete frame shear wall structure in the central urban area of the rain city in Yaan. The contract construction period is as follows: 15/06/15/2019-6/15/2022;
according to statistics: the number of the items is 1368 in total, and the number of the air-conditioning holes is 2736. In combination with the relevant data collected by the 10.1 economic benefit analysis, the cost of the project is saved:
(1) the prefabricated lintel of the electric box is saved: 0.12 x 20 x 1368+0.12 x 0.05 x 0.2 x 500 x 1368=4104 yuan
(2) The air conditioner hole prefabricated section is expected to save: 50 x 2736- (0.15 x 0.2-0.00502 x 0.2) 500 x 2736-400 x 30 x 5/2=102017.472 yuan
In summary, the following steps: namely, the project is expected to save the cost by about 0.4104+10.2017472=10.6121472 ten thousand yuan.
Platinum light Yafu II (8-9 building, gatekeeper room 2, 16-20 building, basement and 8-9 building and 16-19 building interior decoration project), is invested and constructed by Chengdu Yasong real estate development Limited company, and the project is located in Xinhua communities 1 and 2 groups of Liucheng streets in the Wenjiang area, 1 underground layer, 33 above ground layers, and a total building area 125399.1 square meter, which is a reinforced concrete frame shear wall structure. The contract period is from 7 months and 12 days in 2020 to 9 months and 30 days in 2022, and the contract period is as follows: 780 days (calendar days).
According to statistics: the number of items is 1457 strong and weak electric boxes, and the number of air-conditioning holes is 2164. In combination with the relevant data collected by the 10.1 economic benefit analysis, the cost of the project is saved:
(1) the prefabricated lintel of the electric box is saved: 0.12 x 20 1457+0.12 x 0.05 x 0.2 x 500 x 1457=4371 yuan
(2) The air conditioner hole prefabricated section is expected to save: 50 x 2164- (0.15 x 0.2-0.00502 x 0.2) 500 x 2164-400 x 30 x 5/2=74417.328 yuan
In conclusion: namely, the project is expected to save the cost by about 0.4371+7.4417328=7.8788328 ten thousand yuan.
Jin Ke integrates the first-stage project of Meixingchen (1, 2, 4, 6, 17, 21-24, 26-30 and basement), is invested and constructed by Neijiangxiang Aoyi Limited company, is located in the West side of the great wall of the Tiancheng, the south side A-5-3 plot of the Tianfu road, 2 underground layers, 2-23 above the ground, and the total building area 98749.19m2 of the Neijiang economic technology, is a shear wall/frame structure, and has a contract construction period of 2019, 21 days in 08 years to 2021, 06 days in 25 days in 2021.
According to statistics: the number of the items is about 1456 in total, and the number of the air-conditioning holes is about 3272. In combination with the relevant data collected by the 10.1 economic benefit analysis, the cost of the project is saved:
(1) the prefabricated lintel of the electric box is saved: 0.12 x 20 x 1456+0.12 x 0.05 x 0.2 x 500 x 1456 x 4368 yuan
(2) The air conditioner hole prefabricated section is expected to save: 50 × 3272- (0.15 × 0.2-0.00502 × 0.2) × 500 × 3272-400 × 30 × 10/2=97880.544 yuan
In conclusion: namely, the project is expected to save the cost by about 0.4368+9.7880544=10.2248544 ten thousand yuan.
It should be noted that, as is obvious to a person skilled in the art, the invention is not limited to details of the above-described exemplary embodiments, but can be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
The principle and the implementation mode of the present invention are explained by applying specific examples in the present specification, and the above descriptions of the examples are only used to help understanding the method and the core idea of the present invention; meanwhile, for the general technical personnel in the field, according to the idea of the present invention, there are changes in the concrete implementation and the application scope. In summary, the content of the present specification should not be construed as a limitation of the present invention.
Claims (3)
1. The construction template of the actual measurement result system in the stage of improving the main structure is characterized in that,
the template at the gable is bound and fixed with the reinforcing steel bars by adopting inner supporting strips;
the column foot and the bottom of the wall are provided with a locking template, and sponge adhesive tapes are arranged at gaps;
a support frame is arranged below the template at the top part of the small short-limb shear wall, and an adjusting screw is arranged at the top of the support frame and used for adjusting the height of the template at the top part; the template of the shear wall part of the small short-limb shear wall is provided with a through-wall screw in a penetrating way, and nuts are arranged on the outer sides of the templates at the two sides of the shear wall to fix the templates;
the template at the door opening is a 7-shaped template, the 7-shaped template comprises a horizontal part and a vertical part, and one end of the horizontal part is connected with the top of the vertical part;
the template at the wall surface of the shear wall is provided with a plurality of horizontal screw rods, the screw rods penetrate through the shear wall and the template at the outer side of the shear wall, two ends of each screw rod are respectively provided with a fastener, a steel pipe is arranged between each fastener and the template at the wall surface of the shear wall, and one side of each fastener, facing the end part of each screw rod, is provided with a nut;
a support frame is arranged below the template of the top plate and comprises a support and a plurality of adjusting bolts, and the adjusting bolts are connected with the top of the support through threads.
2. The actual measurement achievement system construction formwork in the main structure stage is improved according to claim 1, characterized in that two semicircular grooves are formed in one side of the fastener, and a bolt hole is formed in the middle of the fastener in a penetrating mode.
3. The actual measured performance system construction formwork at the stage of promoting the main structure of claim 1, wherein the distance between the adjusting bolt at the edge of the support and the column, wall or beam edge is not more than 300mm, and the distance between the horizontal rod at the uppermost layer of the support and the formwork at the top plate is not more than 300mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221336263.6U CN217734839U (en) | 2022-05-31 | 2022-05-31 | Actual measurement result system construction template for improving main structure stage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221336263.6U CN217734839U (en) | 2022-05-31 | 2022-05-31 | Actual measurement result system construction template for improving main structure stage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217734839U true CN217734839U (en) | 2022-11-04 |
Family
ID=83838925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221336263.6U Expired - Fee Related CN217734839U (en) | 2022-05-31 | 2022-05-31 | Actual measurement result system construction template for improving main structure stage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217734839U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115217327A (en) * | 2022-05-31 | 2022-10-21 | 浙江城建建设集团有限公司 | Construction method and template for actual measurement result system in stage of improving main structure |
-
2022
- 2022-05-31 CN CN202221336263.6U patent/CN217734839U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115217327A (en) * | 2022-05-31 | 2022-10-21 | 浙江城建建设集团有限公司 | Construction method and template for actual measurement result system in stage of improving main structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tam et al. | Use of prefabrication to minimize construction waste-a case study approach | |
CN110258848A (en) | A kind of construction method of building energy conservation CL composite shear wall | |
CN106149935A (en) | Open cladding hollow ceramic plate curtain wall construction method | |
CN109680938A (en) | A kind of nonstandard layer aluminum wood steel combination template and its construction method, building | |
CN217734839U (en) | Actual measurement result system construction template for improving main structure stage | |
CN113323359A (en) | Novel flower basket pull rod tool type overhanging frame construction method | |
CN113957802A (en) | Construction method for long-span upper beam of single-tower asymmetric cable-stayed bridge high tower | |
CN111058576A (en) | Construction method of assembled roof | |
CN110424710A (en) | Elevator tool-type all steel operation platform construction | |
CN115217327A (en) | Construction method and template for actual measurement result system in stage of improving main structure | |
CN218462537U (en) | Secondary structure prefabricated part | |
Generator | Technical specifications | |
ACS | DSA | |
CN115157437B (en) | Standardization and datamation method for quality control of prefabricated box girder | |
Nikolaichuk | Reconstruction of a dormitory in Luhansk | |
WYATT | Project Manual | |
SAN BERNARDINO et al. | NOT FOR BID | |
FREMONT | DOLLAR TREE | |
TORONTO | TORONTO SHELTER & SUPPORT SERVICES 4222 KINGSTON ROAD | |
Damath | Industrial building in Poltava | |
Roseburg | ROSEBURG URBAN SANITRY AUTHORITY | |
CN116971634A (en) | Safety protection construction method for horizontal tunnel portal of floor | |
Water | 3.03 CONTRACTOR PROVIDED FACILITIES | |
HERREID | BIDDING INFORMATION & REQUIREMENTS | |
HOUSE | Tender Document |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20221104 |
|
CF01 | Termination of patent right due to non-payment of annual fee |