CN217734783U - Special-shaped outer vertical face suspension rail type movable hanging basket - Google Patents

Special-shaped outer vertical face suspension rail type movable hanging basket Download PDF

Info

Publication number
CN217734783U
CN217734783U CN202221033277.0U CN202221033277U CN217734783U CN 217734783 U CN217734783 U CN 217734783U CN 202221033277 U CN202221033277 U CN 202221033277U CN 217734783 U CN217734783 U CN 217734783U
Authority
CN
China
Prior art keywords
track
rail
hanging
building
electric hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221033277.0U
Other languages
Chinese (zh)
Inventor
孙春娥
孟丽娟
隋海涛
刘刚
夏晋霞
朱筱理
宗路超
李赛
常跃辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202221033277.0U priority Critical patent/CN217734783U/en
Application granted granted Critical
Publication of CN217734783U publication Critical patent/CN217734783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model relates to a construction technical field particularly relates to outer facade of dysmorphism hangs rail mounted and removes hanging flower basket, include: a plurality of support structures distributed around the outer contour of the building, the support structures being fixed to a standard or roof level of the building structure; an electric block track connected to each of the support structures; and the hanging basket rail is connected to each supporting structure, is positioned on the outer side of the electric hoist rail and is distributed at equal intervals with the electric hoist rail. The utility model discloses a bearing structure can set up the track to the standard layer or the top layer of building, through the configuration of electric block track, the orbital double track way of hanging flower basket, when can realizing main building construction, utilizes the hanging flower basket to carry out the decorative board installation at the floor of being under construction, can effectively solve outer curtain and roofing engineering simultaneous construction problem, and through the track design on roof layer, can solve the building periphery and protect the higher construction difficult problem of decoration component protrusion roofing.

Description

Special-shaped outer vertical face suspension rail type movable hanging basket
Technical Field
The utility model relates to a construction technical field particularly relates to outer facade of dysmorphism hangs rail mounted and removes hanging flower basket.
Background
In some construction buildings, the decoration of the outer wall is especially important in order to improve the ornamental value of the buildings. For example, at different height levels, the exterior wall system is respectively set as an aluminum alloy show window system, a glass curtain wall system, a frame aluminum-plastic plate curtain wall system, a frame stone curtain wall system, a glass daylighting roof system, a glass railing system, a light steel structure rain shed system, a real stone paint wall surface system and the like.
At present, the construction to cell cube curtain and roofing engineering is generally the roofing engineering of whole building back that finishes, carries out the construction of cell cube curtain again to this engineering roofing major structure design has three-layer overhead beam, and the component is decorated in the overhead layer needs the installation, adopts traditional hanging flower basket construction comparatively inconvenient, especially the installation of the cell cube curtain of overhead layer position, and the installation operation degree of difficulty is great. Therefore, a novel special-shaped outer vertical surface hanging rail type movable hanging basket is needed.
SUMMERY OF THE UTILITY MODEL
Move the defect and not enough of hanging flower basket among the prior art, the utility model aims to make the hanging flower basket solve outer curtain and roofing engineering simultaneous construction problem through the hanging flower basket track of configuration co-altitude not.
An object of the utility model is to provide a dysmorphism facade hangs rail mounted and removes hanging flower basket, include:
a plurality of support structures distributed around the outer contour of the building, the support structures being fixed to a standard or roof level of the building structure;
an electric block track connected to each of the support structures;
the hanging basket rail is connected to each supporting structure, is positioned on the outer side of the electric hoist rail and is distributed at equal intervals with the electric hoist rail;
the electric hoist track and the hanging basket track are divided into a plurality of moving units, a first moving trolley and a first electric hoist are arranged on the electric hoist track in each moving unit, and a second moving trolley, a second electric hoist and a hanging basket are arranged on the hanging basket track;
the first electric hoist can be driven by the first moving trolley to move along the electric hoist track, and the hanging basket can be driven by the second moving trolley to move along the hanging basket track and be driven by the second electric hoist to lift.
Preferably, bearing structure includes the cantilever beam, electric block track and hanging flower basket track all include the I-steel, the I-steel is fixed to the cantilever beam bottom.
Preferably, the cantilever beam is fixed to the standard layer through a connecting structure, the connecting structure comprises a first connecting piece fixed to the lower layer structure of the standard layer and a second connecting piece fixed to the upper layer structure of the standard layer, a third connecting piece is arranged at the suspension end of the cantilever beam, and a suspension steel wire rope is arranged between the second connecting piece and the third connecting piece.
Preferably, the first connecting piece and the second connecting piece comprise angle steel and T-shaped bolts.
Preferably, the cantilever beam is fixed to a roof layer through a connection structure, the connection structure includes a roof layer structure, an embedded structure and a support rod, the embedded structure is embedded in the roof layer structure, the support rod is connected to the embedded structure through an anchor bolt, and the cantilever beam is fixed to the top end of the anchor bolt.
Preferably, the embedded structure comprises angle steel.
Preferably, the plurality of support structures are spaced apart from 2500 to 3000mm.
Preferably, the electric hoist rail and the basket rail are arranged in an arc shape at an external corner of the building structure.
Compared with the prior art, the utility model has the advantages of:
the utility model discloses a bearing structure can set up the track to the standard layer or the top layer of building, through electric block track, the orbital double track way configuration of hanging flower basket, when can realizing main building construction, utilizes the hanging flower basket to carry out the decorative board installation at the floor of being under construction, can effectively solve outer curtain and roofing engineering problem of being under construction simultaneously, and through the track design on roof layer, can solve the building periphery and protect the higher construction difficult problem of decorative component protrusion roofing.
Drawings
The figures are not intended to be drawn to scale. In the drawings, each identical or nearly identical component that is illustrated in various figures may be represented by a like numeral. For purposes of clarity, not every component may be labeled in every drawing. Embodiments of various aspects of the present invention will now be described, by way of example, with reference to the accompanying drawings, in which:
fig. 1 is a schematic view of the track of the present invention distributed in the outer contour of a building;
FIG. 2 is a schematic view of the support structure of the present invention mounted to a standard floor;
FIG. 3 is a schematic view of the support structure of the present invention shown installed in a roof deck;
fig. 4a-4b are schematic views of the usage state of the special-shaped outer vertical face suspension rail type mobile hanging basket shown in the utility model.
Reference numerals
100. A decorative plate; 101. wind rope pulling; 10. a support structure; 20. a track; 1. a cantilever beam; 11a, a standard layer upper layer structure; 11b, a standard layer lower layer structure; 11c, a roof deck structure; 12a, a first connecting piece; 12b, a second connecting piece; 12c, embedding the structure; 2. an electric hoist rail; 3. a basket rail; 4. a first electric hoist; 5. a second electric hoist; 6. a hanging basket.
Detailed Description
For a better understanding of the technical content of the present invention, specific embodiments are described below in conjunction with the accompanying drawings.
Referring to fig. 1, a top view of a construction building is shown, which is divided into two buildings, wherein one building (left side) is higher than the other building (right side), and since the building height is higher (100 m), in order to complete rapid construction, after the construction of the floor with lower height is completed, the construction of the outer wall of the constructed floor is required, and the construction of the upper floor is not affected, and the top three floors of the building are overhead floors, so that the construction of the outer wall decorative plate is not easy to be performed. Therefore, the utility model provides a dysmorphism facade hangs rail mounted and removes hanging flower basket mainly includes bearing structure 10, track 20 and installs hanging flower basket 6 on the track.
Wherein a plurality of support structures 10 are arranged around the outer contour of the building and the support structures 10 are fixed to a standard or roof level of the building structure; when the construction building is constructed to a preset floor and the integral construction is not completed, the supporting structure 10 is fixed to a standard floor of the preset floor, so that the track 20 can be arranged above the constructed floor, the installation of the decorative plate is carried out through a hanging basket electric hoist arranged on the track 20, and meanwhile, the roofing engineering construction can be carried out on the un-constructed floor; after the lower layer decorative sheet is installed and the main building roof engineering construction is completed, the supporting structure 10 is arranged on the top layer, and the decorative sheet can be installed on an undecorated standard layer and an overhead layer.
Due to the large building outline and the height difference between the first span and the second span, in an alternative embodiment, the electric hoist track 2 and the basket track 3 are divided into a plurality of mobile units, and a basket structure is separately arranged in each mobile unit for independent construction.
For example, the first mobile unit is divided into two mobile units, the second mobile unit is divided into two mobile units, and each mobile unit covers two construction surfaces, so that the whole building can be divided into four construction teams to be constructed simultaneously, and the length of the transverse operation of the hanging basket is reduced.
Further, the rails 20 comprise an electric hoist rail 2 and a basket rail 3, both the electric hoist rail 2 and the basket rail 3 are connected to each support structure 10, and the basket rail 3 is preferably located outside the electric hoist rail 2 and equidistantly distributed from the electric hoist rail 2.
In an alternative embodiment, a first moving trolley and a first electric hoist 4 are arranged on the electric hoist track 2, a second moving trolley, a second electric hoist 5 and a hanging basket 6 are arranged on the hanging basket track, the first moving trolley is connected to the electric hoist track 2 and can move on the electric hoist track 2 by receiving instructions of an operator, the first electric hoist 4 is fixed below the first moving trolley, the first electric hoist 4 is provided with a lifting rope 41 and a hook 42 and can be operated to transfer decorative plates from the bottom, and constructors in a standard floor and the hanging basket 6 can mount the decorative plates on corresponding floors.
Further, a second electric hoist 5 is connected to the lower part of the second moving trolley and can be driven to move along the basket rail 3, and a basket 6 is hung below the second electric hoist 5 and can be driven by the second electric hoist 5 to ascend and descend so as to reach a target floor.
Wherein, travelling car and electric block are the model commonly used in the construction.
Referring to fig. 2 to 3, the support structure 10 includes a cantilever beam 1, and the electric hoist rail 2 and the basket rail 3 each include an i-steel fixed to the bottom of the cantilever beam 1. In the preferred embodiment, the cantilever beam 1, the electric hoist rail 2 and the hanging basket rail 3 are all made of 16-size I-steel.
As shown in fig. 2, the cantilever beam 1 is fixed to the standard layer by a connection structure, the connection structure includes a first connection member 12b fixed to the lower structure 11b of the standard layer and a second connection member 12a fixed to the upper structure 11a of the standard layer, a third connection member 14 is provided at the suspended end of the cantilever beam 1, and a suspension wire rope 13 is provided between the second connection member 12a and the third connection member 14.
Thus, the electric hoist track 2 and the hanging basket track 3 are fixed in a mode of using the cantilever beam 1+ the suspension steel wire rope 13, and the electric hoist track and the hanging basket track have good bearing capacity. Wherein, the electric hoist track 2 and the hanging basket track 3 are connected to the cantilever beam 1 by means of bolt connection.
Preferably, the first and second connectors 12b and 12a include angle steel and T-bolts. Specifically, angle steel of 75 × 6mm is adopted, M16T-shaped bolts are used, two groups of first connecting pieces 12b are used for connecting the connecting position of the cantilever beam 1 and the standard storey lower structure 11b, and the suspension steel wire rope 13 is connected with the standard storey upper structure 11a through one group of second connecting pieces 12 a. The suspension wire rope 13 is a wire rope with a diameter of 12 mm.
In an alternative embodiment, as shown in fig. 3, the cantilever beam 1 is fixed to a roof deck by a connection structure including a roof deck structure 11c, an embedded structure 12c, and a support bar 15, the embedded structure 12c is embedded in the roof deck structure 11c, the support bar 15 is connected to the embedded structure 12c by an anchor bolt 16, and the cantilever beam 1 is fixed to the top end of the anchor bolt 16.
So, cantilever beam 1 and bracing piece 15 form T type structure to consolidate through two bracing, the bracing adopts steel square tube bracing, and bracing piece 15 adopts 200 square steel 100 by 10 mm. Cantilever beam 1 is located the top layer of building, can carry out outer curtain wall decorative board construction to the three-layer built on stilts layer of top layer below.
Wherein the attachment structure and the rails 20 are first removed from the standard course when the attachment structure is secured to the roof course.
Optionally, in order to ensure that the supporting rod 15 is stably and reliably connected with the roof deck structure 11c, the embedded structure 12c includes angle steel, and is embedded into the concrete structure when the roof deck structure 11c is formed.
In the above described embodiment the spacing of the support structures 10 is 2500-3000mm. And, preferably, the electric block track 2 and the hanging basket track 3 are arranged in an arc shape at the external corner of the building structure, so that the mobile trolley can smoothly pass through the external corner of the building.
Further, due to the separation of the mobile units, no track is arranged to pass through the building internal corner, and the building internal corner is used as a separation point of the mobile units.
As shown in fig. 4a-4b, in the construction that the cantilever beam 1 is fixed to the standard layer through the connection structure, the cantilever beam 1 is fixed to 20 layers of the standard layer, the construction of the outer curtain wall decorative plate is performed below 20 layers, the construction of the roof engineering is performed above 20 layers, specifically, when the outer curtain wall decorative plate is constructed, the hanging basket 6 is stopped at a floor with a preset height, the decorative plate 100 at the bottom of the building is lifted by using the hook 42 under the control of the first electric hoist 4, during the lifting, the posture of the decorative plate 100 is controlled by the wind rope 101, so that the decorative plate 100 stably reaches a floor with a preset height, the decorative plate 100 is installed on the preset floor by a constructor in the hanging basket 6, and the decorative plates 100 at different positions of the preset floor are installed by the transverse movement of the hanging basket 6 and the first electric hoist 4.
In combination with the above embodiment, the utility model discloses a bearing structure can set up the track to the standard layer or the top layer of building, through the configuration of electric block track, the orbital double track way of hanging flower basket, when can realizing main building construction, utilizes the hanging flower basket to carry out the decorative board installation at the floor of being under construction, can effectively solve outer curtain and roofing engineering simultaneous construction problem, and through the track design on roof layer, can solve the building and protect the higher construction difficult problem of decorative component protrusion roofing outward.
Although the present invention has been described with reference to the preferred embodiments, it is not intended to limit the present invention. The present invention is well known in the art and can be modified and decorated without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention is subject to the claims.

Claims (8)

1. The utility model provides an outer facade of dysmorphism hangs rail mounted and removes hanging flower basket which characterized in that includes:
-a plurality of support structures (10) distributed around the outer contour of the building, said support structures (10) being fixed to a standard or roof level of the building structure;
-an electric block track (2) connected to each of said support structures (10);
a basket rail (3) connected to each support structure (10), located outside the electric block rail (2), and distributed at equal intervals to the electric block rail (2);
the electric hoist track (2) and the hanging basket track (3) are divided into a plurality of moving units, a first moving trolley and a first electric hoist (4) are arranged on the electric hoist track (2) in each moving unit, and a second moving trolley, a second electric hoist (5) and a hanging basket (6) are arranged on the hanging basket track;
the first electric hoist (4) can be driven by the first moving trolley to move along the electric hoist track (2), and the hanging basket (6) can be driven by the second moving trolley to move along the hanging basket track (3) and be driven by the second electric hoist (5) to lift.
2. The profiled facade suspension rail mobile gondola according to claim 1, characterized in that the support structure comprises a cantilever beam (1), the electric block rail (2) and the gondola rail (3) each comprising i-steel fixed to the bottom of the cantilever beam (1).
3. The profiled exterior facade hanging rail type mobile gondola according to claim 2, characterized in that the cantilever beam (1) is fixed to a standard floor by a connection structure comprising a first connection piece (12 b) fixed to a lower floor structure (11 b) of the standard floor and a second connection piece (12 a) fixed to an upper floor structure (11 a) of the standard floor, the free end of the cantilever beam (1) is provided with a third connection piece (14), and a hanging wire rope (13) is provided between the second connection piece (12 a) and the third connection piece (14).
4. The profiled facade hanging rail-mounted mobile gondola according to claim 3, characterised in that the first and second connectors (12 b, 12 a) comprise angle steel and T-bolts.
5. The profiled facade hanging track-type mobile gondola according to claim 2, characterized in that the cantilever beam (1) is fixed to the roof deck by a connection structure comprising a roof deck structure (11 c), a pre-buried structure (12 c) and a support bar (15), the pre-buried structure (12 c) being embedded in the roof deck structure (11 c), the support bar (15) being connected to the pre-buried structure (12 c) by an anchor bolt (16), the cantilever beam (1) being fixed to the top end of the anchor bolt (16).
6. The profiled facade suspended track-type mobile gondola according to claim 5, characterized in that the pre-buried structure (12 c) comprises angle steel.
7. The profiled facade hanging rail-mounted mobile gondola according to any one of claims 1-6, characterized in that the spacing of the plurality of support structures (10) is 2500-3000mm.
8. The profiled facade hanging rail type mobile gondola according to any one of claims 1-6, characterized in that the electric block rail (2), the gondola rail (3) are arranged in an arc shape at the outer corner of the building structure.
CN202221033277.0U 2022-04-29 2022-04-29 Special-shaped outer vertical face suspension rail type movable hanging basket Active CN217734783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221033277.0U CN217734783U (en) 2022-04-29 2022-04-29 Special-shaped outer vertical face suspension rail type movable hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221033277.0U CN217734783U (en) 2022-04-29 2022-04-29 Special-shaped outer vertical face suspension rail type movable hanging basket

Publications (1)

Publication Number Publication Date
CN217734783U true CN217734783U (en) 2022-11-04

Family

ID=83817104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221033277.0U Active CN217734783U (en) 2022-04-29 2022-04-29 Special-shaped outer vertical face suspension rail type movable hanging basket

Country Status (1)

Country Link
CN (1) CN217734783U (en)

Similar Documents

Publication Publication Date Title
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN206128603U (en) Curtain mounting structure that leads a wandering life cornices
CN106948604A (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN113428811A (en) Corridor ceiling mounting plate hoisting structure and construction method thereof
CN210177780U (en) High light gauge steel of security
CN202483154U (en) High bearing capacity suspending scaffold
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN217734783U (en) Special-shaped outer vertical face suspension rail type movable hanging basket
CN103835369B (en) Extensible high-altitude conjoined steel structure
CN102677907A (en) Method for manually installing steel beam at top of silo
CN203034777U (en) Rail-mounted mobile tall operation platform
CN107035037B (en) Tower top curtain wall frame and mounting method thereof
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN216971814U (en) Rack roof boarding loading attachment
CN115583584A (en) Unequal-height double-fulcrum full-rotation type light truss hoisting device and construction method
WO2009093974A1 (en) Frame system for supporting facade elements and use of the frame system
CN114412192A (en) Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof
CN208763390U (en) A kind of suspended operating platform
CN214570326U (en) Curtain wall unit plate rail hoisting and hard protection integrated device
CN218708640U (en) Hoisting device for super high-rise inclined tower crown unit plate
CN216195768U (en) Double-layer curtain wall structure and construction system thereof
CN219100848U (en) Unit type auxiliary house
CN113027146B (en) Method for lifting and hoisting outer wall stone
CN215558540U (en) Movable hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant