CN217714226U - Tunnel monitoring device - Google Patents

Tunnel monitoring device Download PDF

Info

Publication number
CN217714226U
CN217714226U CN202220873413.0U CN202220873413U CN217714226U CN 217714226 U CN217714226 U CN 217714226U CN 202220873413 U CN202220873413 U CN 202220873413U CN 217714226 U CN217714226 U CN 217714226U
Authority
CN
China
Prior art keywords
installation cavity
seted
plate
wall
fixed welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220873413.0U
Other languages
Chinese (zh)
Inventor
沈桉庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Dexin Construction Engineering Co ltd
Original Assignee
Xuzhou Dexin Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Dexin Construction Engineering Co ltd filed Critical Xuzhou Dexin Construction Engineering Co ltd
Priority to CN202220873413.0U priority Critical patent/CN217714226U/en
Application granted granted Critical
Publication of CN217714226U publication Critical patent/CN217714226U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model discloses a tunnel monitoring device, relate to monitoring device technical field, which comprises a supporting wall, spraying plate and supervisory equipment, support inside first installation cavity and the first mounting groove of having seted up of wall, the threaded motor is installed through the bolt in first installation cavity is inside, first mounting groove one end is passed through the axis of rotation and is rotated and install the threaded rod, the threaded rod other end is installed on the output shaft of threaded motor, the meshing cover is equipped with the screw ring on the threaded rod, the fixed welding in screw ring one side has the fixed plate, the fixed welding of spraying plate is on the fixed plate, spraying plate bottom is provided with the atomising head, the fixed welding in spraying plate top has water tank and water pump tank, the fixed welding has the bracing piece on the support wall, fixed welding has the pick-up plate on the bracing piece, supervisory equipment installs on the bracing piece. The utility model discloses can easy to assemble and dismantle supervisory equipment, the tunnel dust fall work is carried out automatically to the self-cleaning camera, the material resources of using manpower sparingly.

Description

Tunnel monitoring device
Technical Field
The utility model relates to a monitoring device specifically is a tunnel monitoring device, belongs to monitoring device technical field.
Background
Along with the development of society, the traffic is more and more convenient, the road that is blocked by the mountain, all according to the needs of road, tunnel one by one has been beaten in the mountain, thereby make things convenient for the vehicle to travel, because be equivalent to confined space in the tunnel, tail gas and dust that produce after the vehicle is driven cause the residue easily, it causes harm to subsequent vehicle travel, special circumstances also easily takes place in the tunnel, so many tunnels have all settled monitoring and control device now, but ordinary monitoring and control device has certain not enough, ordinary monitoring and control device is more troublesome in the installation supervisory equipment in-process, low efficiency, after supervisory equipment uses for a certain time, the camera surface can be stained with the dust, cause the interference to subsequent camera work, when tunnel dust concentration reaches certain numerical value, only can remind monitoring personnel, then send staff to carry out dust fall work, low efficiency, the cost of labor is high. There is therefore a need for a tunnel monitoring and monitoring device that helps to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a tunnel monitoring and controlling device just in order to solve above-mentioned problem, the supervisory equipment installation is dismantled conveniently, changes in maintenance and protection, when the camera is sheltered from to the dust, can the self-cleaning camera, when tunnel dust concentration to certain numerical value, can the automatic start atomizer, reduces the cost of labor, convenient and fast.
The utility model discloses a following technical scheme realizes above-mentioned purpose, a tunnel monitoring device, including supporting wall, spraying plate and supervisory equipment, support inside first installation cavity and the first mounting groove of having seted up of wall, threaded motor is installed through the bolt in the first installation cavity inside, first mounting groove one end is rotated through the axis of rotation and is installed the threaded rod, the threaded rod other end is installed on threaded motor's the output shaft, the meshing cover is equipped with the screw ring on the threaded rod, the fixed welding of screw ring one side has the fixed plate, the fixed welding of spraying plate is in on the fixed plate, spraying plate bottom is provided with the atomising head, the fixed welding in spraying plate top has water tank and water pump box, the fixed welding has the bracing piece on the supporting wall, fixed welding has the pick-up plate on the bracing piece, supervisory equipment installs on the bracing piece.
Preferably, in order to ensure the normal work of the spraying plate, a water pump is installed in the water pump box through a bolt, and the water pump is respectively connected with the water tank and the spraying plate through pipelines.
Preferably, for the convenience of the dismantlement of supervisory equipment, supervisory equipment is including connecting left arm, connecting right arm, control box and camera, first through-hole has been seted up to control box lateral wall, connect left arm with it passes through the rotary rod rotation installation on the control box to connect right arm, the rotary rod card is established in the first through-hole, the camera passes through bolt fixed mounting and is in on the control box.
Preferably, for the convenience of the mounting and dismounting of the monitoring device, a second mounting groove is formed in the left connecting arm, and an iron block is welded on the inner wall of the second mounting groove through a first spring.
Preferably, for the stability of supervisory equipment, connect right arm inside and seted up second installation cavity and draw-in groove, second installation cavity inner wall has the movable block through second spring welding, magnet is installed to movable block one side, the fixed welding in movable block top has the T-shaped piece, the second through-hole has been seted up at second installation cavity top, the T-shaped piece card is established in the second through-hole, the draw-in groove with the second mounting groove corresponds.
Preferably, for the convenience of cleaning dust on the camera, a third installation cavity is formed in the camera, a rotating motor is installed in the third installation cavity through a bolt, a third through hole is formed in one side of the third installation cavity, a rotating block is clamped in the third through hole, a cleaning brush is installed on one side of the rotating block through the bolt, and the other side of the rotating block is installed on an output shaft of the rotating motor.
Preferably, in order to guarantee the stability of the threaded ring when the threaded rod works, the sliding blocks are welded on the two side walls of the threaded ring, sliding grooves are formed in the two sides of the inner wall of the first mounting groove, and the sliding blocks are clamped in the sliding grooves.
The utility model has the advantages that: the utility model can facilitate the disassembly and assembly of the monitoring equipment by the cooperation of the left arm and the right arm, thereby improving the working efficiency; the utility model uses the rotating motor and the cleaning brush in a matching way, so that the dust on the camera can automatically clean when the camera is influenced, and the labor cost is reduced; the utility model discloses a cooperation of threaded motor, threaded rod, screw ring, fixed plate and spraying plate is used, when tunnel dust concentration to certain numerical value, sprays automatically, carries out dust fall work, the material resources of using manpower sparingly.
Drawings
Fig. 1 is a front view of the structure of the present invention.
Fig. 2 is a partial top cross-sectional view of the structure of the present invention.
Fig. 3 is a partial front sectional view of the structure of the present invention.
Fig. 4 is a left sectional view of the structure monitoring device of the present invention.
Fig. 5 is a partial enlarged view of the structure of fig. 4 of the present invention.
Fig. 6 is a sectional view of the camera in the structure diagram 4 of the present invention.
In the figure: 1. supporting wall, 2, spraying plate, 3, screw motor, 4, threaded rod, 5, threaded ring, 6, fixed plate, 7, atomising head, 8, water tank, 9, water pump box, 10, bracing piece, 11, pick-up plate, 12, water pump, 13, connect left arm, 14, connect right arm, 15, control box, 16, camera, 17, first spring, 18, iron plate, 19, second spring, 20, movable block, 21, magnet, 22, T-shaped piece, 23, rotating electrical machines, 24, rotatory piece, 25, cleaning brush, 26, slider.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-6, a tunnel monitoring and controlling device, which includes a supporting wall 1, a spraying plate 2 and a monitoring device, a first installation cavity and a first installation groove are formed inside the supporting wall 1, a threaded motor 3 is installed inside the first installation cavity through a bolt, a threaded rod 4 is installed at one end of the first installation groove through rotation of a rotation shaft, the other end of the threaded rod 4 is installed on an output shaft of the threaded motor 3, a threaded ring 5 is sleeved on the threaded rod 4 in a meshing manner, a fixing plate 6 is fixedly welded at one side of the threaded ring 5, the spraying plate 2 is fixedly welded on the fixing plate 6, a spraying head 7 is arranged at the bottom of the spraying plate 2, a water tank 8 and a water pump tank 9 are fixedly welded at the top of the spraying plate 2, a water pump 12 is installed inside the water pump tank 9 through a bolt, the water pump 12 is respectively connected with the water tank 8 and the spraying plate 2 through a pipeline, a supporting rod 10 is fixedly welded on the supporting wall 1, a detection plate 11 is fixedly welded on the supporting rod 10, and the monitoring device is installed on the supporting rod 10.
As a technical optimization scheme of the utility model, as fig. 4, as shown in fig. 5, supervisory equipment is including connecting left arm 13, connect right arm 14, monitoring box 15 and camera 16, first through-hole has been seted up to monitoring box 15 lateral wall, connect left arm 13 and connect right arm 14 and pass through the rotary rod rotation and install on monitoring box 15, the rotary rod card is established in first through-hole, camera 16 passes through bolt fixed mounting on monitoring box 15, connect left arm 13 inside and has seted up the second mounting groove, second mounting groove inner wall has iron plate 18 through first spring 17 butt fusion, connect right arm 14 inside and seted up second installation cavity and draw-in groove, second installation cavity inner wall has movable block 20 through the 19 butt fusion of second spring, magnet 21 is installed to movable block 20 one side, movable block 20 top fixed welding has T-shaped block 22, the second through-hole has been seted up at second installation cavity top, T-shaped block 22 card is established in the second through-hole, draw-in groove and second mounting groove correspond, under the cooperation of connecting left arm 13 and connecting right arm 14, can let supervisory equipment dismantle and install convenience more.
As a technical optimization scheme, as shown in fig. 6, the third installation cavity has been seted up to 16 inside cameras, rotating electrical machines 23 has been installed through the bolt in the third installation cavity, the third through-hole has been seted up to third installation cavity one side, the third through-hole inside callipers is equipped with rotatory piece 24, cleaning brush 25 is installed through the bolt in rotatory piece 24 one side, install on rotating electrical machines 23's output shaft rotatory piece 24 opposite side, under rotating electrical machines 23 and cleaning brush 25's cooperation is used, automatic washing when making the dust on the camera 16 influence make a video recording, reduce the cost of labor.
As a technical optimization scheme of the utility model, as shown in fig. 2, fig. 3, slider 26 has all been welded to the 5 both sides wall of threaded ring, and the spout has all been seted up to first mounting groove inner wall both sides, and slider 26 card is established in the spout, and the cooperation of slider 26 and spout is used, guarantees the stability of threaded ring 5 when threaded rod 4 moves.
When the utility model is used, firstly, when the worker reaches the height of the support rod 10, the worker respectively takes up the left connecting arm 13 and the right connecting arm 14 with two hands, the left connecting arm 13 and the right connecting arm 14 are closed on the support rod 10, under the action of the magnet 21 in the right connecting arm 14, the iron block 18 in the left connecting arm 13 can enter the clamping groove, at the moment, the monitoring equipment can be firmly installed on the support rod 10, another monitoring equipment is also installed in the other direction, the visual field monitoring blind area is reduced, then the worker returns to the ground after filling the water into the water tank 8, the power supply switch of the monitoring and monitoring device is opened, the monitoring and monitoring device starts to be used, after a period of time, when the dust on the camera 16 influences the camera shooting, the rotating motor 23 can drive the cleaning brush 25 to work, the camera 16 is cleaned, when the dust concentration in the tunnel reaches a certain value, threaded motor 3 and water pump 12 begin to operate, under the effect of water pump 12, water in the water tank 8 can pour into spraying plate 2, spraying plate 2 sprays through atomising head 7, simultaneously at threaded rod 4, threaded ring 5 and fixed plate 6 are under the effect, spraying plate 2 can carry out lateral motion on supporting wall 1, make a round trip to spray in the tunnel, carry out tunnel dust fall work, when needing to maintain supervisory equipment, the staff closes monitoring devices switch, when arriving bracing piece 10 height, supervisory equipment is held in the palm to one hand, T-shaped piece 22 is pressed to the other hand, make movable block 20 and magnet 21 move down in the second installation cavity, iron plate 18 can get back to in the second installation groove under the effect of first spring 17 this moment, connect left arm 13 and connect right arm 14 and separate, supervisory equipment takes off safely, get back to ground and maintain work.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a tunnel monitoring device, includes supporting wall (1), spraying board (2) and supervisory equipment, its characterized in that: support wall (1) inside first installation cavity and the first mounting groove of having seted up, threaded motor (3) are installed through the bolt to first installation cavity inside, threaded rod (4) are installed through the axis of rotation to first mounting groove one end, threaded rod (4) other end is installed on the output shaft of threaded motor (3), the meshing cover is equipped with threaded ring (5) on threaded rod (4), threaded ring (5) one side fixed weld has fixed plate (6), spraying plate (2) fixed welding is in on fixed plate (6), spraying plate (2) bottom is provided with atomising head (7), the fixed welding in spraying plate (2) top has water tank (8) and water pump box (9), fixed welding has bracing piece (10) on support wall (1), fixed welding has pick-up plate (11) on bracing piece (10), supervisory equipment installs on bracing piece (10).
2. A tunnel monitoring and control device according to claim 1, characterized in that: the water pump box (9) is internally provided with a water pump (12) through bolts, and the water pump (12) is respectively connected with the water tank (8) and the spraying plate (2) through pipelines.
3. A tunnel monitoring and control device according to claim 1, characterized in that: the supervisory equipment is including connecting left arm (13), connecting right arm (14), control box (15) and camera (16), first through-hole has been seted up to control box (15) lateral wall, connect left arm (13) with connect right arm (14) and install on control box (15) through the rotary rod rotation, the rotary rod card is established in the first through-hole, camera (16) are through bolt fixed mounting in control box (15) are last.
4. A tunnel monitoring and control device according to claim 3, characterized in that: connect left arm (13) inside and seted up the second mounting groove, second mounting groove inner wall has iron plate (18) through first spring (17) butt fusion.
5. A tunnel monitoring and control apparatus according to claim 3, wherein: connect right arm (14) inside and seted up second installation cavity and draw-in groove, the second installation cavity inner wall has movable block (20) through second spring (19) butt fusion, magnet (21) are installed to movable block (20) one side, movable block (20) top fixed welding has T-shaped piece (22), the second through-hole has been seted up at second installation cavity top, T-shaped piece (22) card is established in the second through-hole, the draw-in groove with the second mounting groove corresponds.
6. A tunnel monitoring and control device according to claim 3, characterized in that: the camera (16) is inside to be seted up the third installation cavity, rotating electrical machines (23) are installed through the bolt in the third installation cavity, the third through-hole has been seted up to third installation cavity one side, the downthehole card of third through-hole is equipped with rotatory piece (24), cleaning brush (25) are installed through the bolt in rotatory piece (24) one side, install rotatory piece (24) opposite side on the output shaft of rotating electrical machines (23).
7. A tunnel monitoring and control device according to claim 1, characterized in that: slider (26) have all been welded to screw ring (5) both sides wall, the spout has all been seted up to first mounting groove inner wall both sides, slider (26) card is established in the spout.
CN202220873413.0U 2022-04-15 2022-04-15 Tunnel monitoring device Expired - Fee Related CN217714226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220873413.0U CN217714226U (en) 2022-04-15 2022-04-15 Tunnel monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220873413.0U CN217714226U (en) 2022-04-15 2022-04-15 Tunnel monitoring device

Publications (1)

Publication Number Publication Date
CN217714226U true CN217714226U (en) 2022-11-01

Family

ID=83791102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220873413.0U Expired - Fee Related CN217714226U (en) 2022-04-15 2022-04-15 Tunnel monitoring device

Country Status (1)

Country Link
CN (1) CN217714226U (en)

Similar Documents

Publication Publication Date Title
CN110665577B (en) Concrete waste recovery device for civil engineering
CN212010270U (en) Advertising board with artificial intelligence
CN216253054U (en) Quality safety supervision and management alarm device for building engineering
CN217714226U (en) Tunnel monitoring device
CN108212893B (en) Intelligent control has cleaning function's solar cell mount device
CN208136744U (en) A kind of road and bridge direction board
CN110700159A (en) Municipal works road guardrail belt cleaning device
CN215718907U (en) Dust device is used in tunnel construction with high-efficient dust removal function
CN216520602U (en) Monitoring device for construction of building engineering construction site
CN216864902U (en) LED diversion indicating screen
CN210164501U (en) Monitoring facilities is used in colliery control that dustproof effectual
CN208944690U (en) A kind of window opener dust guard
CN220574241U (en) Cleaning and maintaining device for building steel structure
CN219555058U (en) Building supervisory equipment
CN220493063U (en) Entrance guard's camera based on thing networking
CN220236776U (en) Metal window with automatic cleaning function
CN219437066U (en) Road monitoring equipment with dustproof function
CN218122627U (en) Touch display screen with good dustproof effect
CN213239024U (en) Outdoor environmental monitor
CN220118953U (en) Monitoring device for maintenance of generator stator of hydropower plant
CN216896500U (en) Monitoring device for green construction safety of constructional engineering
CN220727776U (en) Electric power monitoring device
CN219143752U (en) Enterprise IP image display window
CN215184286U (en) Battery frame waterproofing mechanism for watering lorry
CN215344780U (en) Waterproof intelligent monitoring system for construction site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221101