CN217711097U - Prefabricated concrete's assembled frame construction - Google Patents

Prefabricated concrete's assembled frame construction Download PDF

Info

Publication number
CN217711097U
CN217711097U CN202221560526.1U CN202221560526U CN217711097U CN 217711097 U CN217711097 U CN 217711097U CN 202221560526 U CN202221560526 U CN 202221560526U CN 217711097 U CN217711097 U CN 217711097U
Authority
CN
China
Prior art keywords
splint
mounting panel
wall
joint
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221560526.1U
Other languages
Chinese (zh)
Inventor
朱会见
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221560526.1U priority Critical patent/CN217711097U/en
Application granted granted Critical
Publication of CN217711097U publication Critical patent/CN217711097U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled frame construction of precast concrete belongs to concrete dress building technical field, and it includes first beam slab, the surface of first beam slab and the inner wall joint of second beam slab, the front of mounting panel and the back sliding connection of first splint, the front of mounting panel and the back sliding connection of second splint, be provided with the gag lever post in the second splint. This precast concrete's assembled frame construction, through setting up the draw-in groove, the cardboard, the threaded rod, the carousel, first splint, second splint and gag lever post, this frame is when connecting, through adopting the threaded rod, first splint and second splint, can be with the stable joint of cardboard at the inner wall of mounting panel, make this frame node need not to carry out welding process, and this mounting means is convenient for the follow-up dismantlement of operating personnel and handles first beam slab and second beam slab, operating personnel's working strength has not only been reduced, and the effectual suitability that ensures this frame.

Description

Prefabricated concrete's assembled frame construction
Technical Field
The utility model belongs to the technical field of the concrete dress building, specifically be a precast concrete's assembled frame construction.
Background
The prefabricated reinforced concrete frame is a structure system for housing industrialization, industrial production can be realized by all components of the prefabricated reinforced concrete frame, the anti-seismic performance of the prefabricated reinforced concrete frame depends on the connection of the components to a great extent, wet-type connecting nodes are adopted for beam column nodes of the existing frame structure, and the nodes need to be welded, so that operators are inconvenient to disassemble beam columns subsequently, the welding mode is complex, the working strength of the operators is increased, and the applicability of the frame is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome the above-mentioned defect of prior art, the utility model provides a precast concrete's assembled frame construction has solved present frame construction beam column node and has adopted wet-type connected node more, and the node needs to carry out welding process to be not convenient for the follow-up roof beam column of dismantling of operating personnel, and welded mode is comparatively complicated, has not only increased operating personnel's working strength, and has reduced the problem of frame suitability.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an assembled frame construction of precast concrete, includes first beam slab, the surface of first beam slab and the inner wall joint of second beam slab, the right flank of first beam slab and the left surface fixed connection of fixed plate, the right flank of second beam slab and the left surface fixed connection of mounting panel, the lower surface of fixed plate and the last fixed surface of cardboard are connected, the left surface of mounting panel inner wall and the left surface joint of carousel, the right flank of carousel and the left end fixed connection of threaded rod, the front of mounting panel and the back sliding connection of first splint, the front of mounting panel and the back sliding connection of second splint, the spout has been seted up in the front of mounting panel, be provided with the gag lever post in the second splint.
As a further aspect of the present invention: the right side of mounting panel is provided with the handle, the upper surface of mounting panel and the lower surface overlap joint of fixed plate.
As a further aspect of the present invention: the upper surface of mounting panel has seted up the draw-in groove, the inner wall of draw-in groove and the surface joint of cardboard.
As a further aspect of the present invention: the outer surface of the threaded rod is in threaded connection with the inner wall of the mounting plate, and the right end of the threaded rod is fixedly connected with the left side face of the handle.
As a further aspect of the present invention: the back of first splint is provided with the slider, the surface of slider and the inner wall sliding connection of spout.
As a further aspect of the present invention: the left side of first splint inner wall and the left end fixed connection of spring, the right-hand member of spring and the right side fixed connection of second splint inner wall.
As a further aspect of the present invention: the left surface of carousel and the right flank joint of second connecting plate, the inner wall of second connecting plate and the surface joint of gag lever post, the right flank of carousel and the left surface joint of first connecting plate, the right flank of first connecting plate and the right flank joint of first splint inner wall.
(III) advantageous effects
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. this precast concrete's assembled frame construction, through setting up the draw-in groove, the cardboard, the threaded rod, the carousel, first splint, second splint and gag lever post, when operating personnel is using this frame, earlier with the inner wall of first beam slab joint at the second beam slab, make the fixed plate on first beam slab right side can carry out the overlap joint with the handle, and the cardboard of fixed plate below then can the joint at the inner wall of draw-in groove, and the slider at the first splint back also can slide in the spout, make first splint and second splint can carry out the centre gripping with the cardboard and fix, this frame is when connecting, through adopting the threaded rod, first splint and second splint, can be with the stable joint of cardboard at the inner wall of mounting panel, make this frame node need not to carry out welding process, and this mounting means is convenient for the follow-up dismantlement processing to first beam slab and second beam slab of operating personnel, operating personnel's working strength has not only been reduced, and the effectual suitability that ensures this frame.
2. This precast concrete's assembled frame construction, through setting up the spring, first connecting plate and second connecting plate, then can drive first connecting plate and second connecting plate when the carousel is rotatory and overturn, make first connecting plate and second connecting plate can exert thrust to first splint and second splint respectively, make first splint and second splint remove, and first splint and second splint can drag the drag spring when removing, make the spring can absorb the impact force that slows down first splint and second splint produced when removing, and first connecting plate and second connecting plate have certain limiting displacement to first splint and second splint, the phenomenon of landing has taken place when removing to first splint and second splint has been avoided, the effectual flexibility that improves this mounting means.
3. This precast concrete's assembled frame construction through setting up the spout, can remove under the effect that receives first splint when first splint, and the slider at the first splint back also can slide in the spout for the spout has certain guide effect to the slider, has avoided the slider phenomenon of bumping when removing, the effectual life who ensures first splint.
Drawings
Fig. 1 is a schematic three-dimensional structure of the present invention;
fig. 2 is a three-dimensional structure diagram of the fixing plate of the present invention;
fig. 3 is a schematic three-dimensional structure diagram of the mounting plate of the present invention;
fig. 4 is a schematic three-dimensional structure view of the first clamping plate of the present invention;
in the figure: 1 first beam slab, 2 second beam slabs, 3 fixed plates, 4 mounting panels, 5 handles, 6 draw-in grooves, 7 cardboard, 8 threaded rods, 9 carousel, 10 first splint, 11 second splint, 12 spouts, 13 sliders, 14 springs, 15 gag lever posts, 16 first connecting plates, 17 second connecting plates.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
As shown in fig. 1-4, the utility model provides a technical solution: the utility model provides an assembled frame construction of precast concrete, including first beam slab 1, the surface of first beam slab 1 and the inner wall joint of second beam slab 2, the right flank of first beam slab 1 and the left surface fixed connection of fixed plate 3, the right flank of second beam slab 2 and the left surface fixed connection of mounting panel 4, the lower surface of fixed plate 3 and the last fixed surface of cardboard 7 are connected, the left surface joint of the left surface of mounting panel 4 inner wall and carousel 9, the right flank of carousel 9 and the left end fixed connection of threaded rod 8, the front of mounting panel 4 and the back sliding connection of first splint 10, the front of mounting panel 4 and the back sliding connection of second splint 11, spout 12 has been seted up in the front of mounting panel 4, through setting up spout 12, can remove when first splint 10 receives the effect of first splint 16, and the slider 13 at the back of first splint 10 also can slide in spout 12, make spout 12 have certain guide effect to slider 13, the phenomenon of slider 13 when removing has been avoided, the effectual life who ensures first splint 10, be provided with the gag lever 15 in the second splint 11.
Specifically, as shown in fig. 1 and fig. 2, the right flank of mounting panel 4 is provided with handle 5, the upper surface of mounting panel 4 and the lower surface overlap joint of fixed plate 3, draw-in groove 6 has been seted up to the upper surface of mounting panel 4, through setting up draw-in groove 6, when fixed plate 3 carries out the overlap joint with mounting panel 4, cardboard 7 of fixed plate 3 below can the joint in draw-in groove 6, make draw-in groove 6 have certain supporting role to fixture block 7, the phenomenon that fixed plate 3 takes place to drop under receiving the effect of external force has been avoided, the inner wall of draw-in groove 6 and the surface joint of cardboard 7, the surface of threaded rod 8 and the inner wall threaded connection of mounting panel 4, through setting up threaded rod 8, this frame is through adopting threaded rod 8, first splint 10 and second splint 11, can be with the stable joint of cardboard 7 at the inner wall of mounting panel 4, make this frame node need not to carry out welding process, and this mounting mode is convenient for the follow-up dismantlement processing to first beam slab 1 and second beam slab 2 of operating personnel, operating personnel's working strength has not only been reduced, and the effectual suitability that has ensured this frame, the right-hand member 8 and the left flank fixed connection of threaded rod 5.
Specifically, as shown in fig. 3, a sliding block 13 is arranged on the back of the first clamping plate 10, the outer surface of the sliding block 13 is connected with the inner wall of the sliding groove 12 in a sliding manner, the left side surface of the inner wall of the first clamping plate 10 is fixedly connected with the left end of a spring 14, by arranging the spring 14, when the first clamping plate 10 and the second clamping plate 11 move, the spring 14 can be pulled by the first clamping plate 10 and the second clamping plate 11, so that the spring 14 can absorb the impact force generated when the first clamping plate 10 and the second clamping plate 11 move, the phenomenon that the first clamping plate 10 and the second clamping plate 11 collide when moving is avoided, and the right end of the spring 14 is fixedly connected with the right side surface of the inner wall of the second clamping plate 11.
Specifically, as shown in fig. 4, the left side of carousel 9 and the right flank joint of second connecting plate 17, the inner wall of second connecting plate 17 and the surface joint of gag lever post 15, the right flank joint of carousel 9 and the left flank joint of first connecting plate 16, through setting up first connecting plate 16, carousel 9 then can drive first connecting plate 16 and second connecting plate 17 when rotatory and overturn, make first connecting plate 16 can exert thrust to first splint 10, make first splint 10 and second splint 11 remove, make first connecting plate 16 have certain limiting displacement to first splint 10, the phenomenon of landing has been avoided first splint 10 to take place when removing, the effectual flexibility that improves this mounting means, the right flank joint of first connecting plate 16 and the right flank joint of first splint 10 inner wall.
The utility model discloses a theory of operation does:
when operating personnel is using this frame, earlier with the inner wall of first roof beam board 1 joint at second roof beam board 2, make fixed plate 3 on first roof beam board 1 right side can carry out the overlap joint with handle 5, and cardboard 7 of fixed plate 3 below then can the joint at the inner wall of draw-in groove 6, then 5 drive threaded rod 8 of rethread handle rotate, make threaded rod 8 can drive carousel 9 when rotating and rotate, and carousel 9 is connected with second splint 11 and first splint 10 respectively through second connecting plate 17 and first connecting plate 16, then can drive first splint 10 and second splint 11 and remove to the opposite face when carousel 9 is rotatory, and slider 13 at the first splint 10 back also can slide in spout 12, make first splint 10 and second splint 11 can carry out the centre gripping with cardboard 7 fixed.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (7)

1. An assembled frame construction of precast concrete, includes first beam slab (1), its characterized in that: the surface of first roof beam board (1) and the inner wall joint of second roof beam board (2), the right flank of first roof beam board (1) and the left surface fixed connection of fixed plate (3), the right flank of second roof beam board (2) and the left surface fixed connection of mounting panel (4), the lower surface of fixed plate (3) and the last fixed surface of cardboard (7) are connected, the left surface joint of the left surface of mounting panel (4) inner wall and carousel (9), the right flank of carousel (9) and the left end fixed connection of threaded rod (8), the front of mounting panel (4) and the back sliding connection of first splint (10), the front of mounting panel (4) and the back sliding connection of second splint (11), spout (12) have been seted up in the front of mounting panel (4), be provided with gag lever post (15) in second splint (11).
2. A precast concrete fabricated frame structure according to claim 1, wherein: the right flank of mounting panel (4) is provided with handle (5), the upper surface of mounting panel (4) and the lower surface overlap joint of fixed plate (3).
3. A precast concrete fabricated frame structure according to claim 1, wherein: the upper surface of mounting panel (4) has seted up draw-in groove (6), the inner wall of draw-in groove (6) and the surface joint of cardboard (7).
4. The fabricated frame structure of precast concrete according to claim 1, wherein: the outer surface of threaded rod (8) and the inner wall threaded connection of mounting panel (4), the right-hand member of threaded rod (8) and the left surface fixed connection of handle (5).
5. A precast concrete fabricated frame structure according to claim 1, wherein: the back of the first clamping plate (10) is provided with a sliding block (13), and the outer surface of the sliding block (13) is connected with the inner wall of the sliding groove (12) in a sliding mode.
6. A precast concrete fabricated frame structure according to claim 1, wherein: the left side face of the inner wall of the first clamping plate (10) is fixedly connected with the left end of the spring (14), and the right end of the spring (14) is fixedly connected with the right side face of the inner wall of the second clamping plate (11).
7. The fabricated frame structure of precast concrete according to claim 1, wherein: the left surface joint of the left surface of carousel (9) and the right flank joint of second connecting plate (17), the inner wall of second connecting plate (17) and the surface joint of gag lever post (15), the right flank of carousel (9) and the left surface joint of first connecting plate (16), the right flank of first connecting plate (16) and the right flank joint of first splint (10) inner wall.
CN202221560526.1U 2022-06-21 2022-06-21 Prefabricated concrete's assembled frame construction Active CN217711097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221560526.1U CN217711097U (en) 2022-06-21 2022-06-21 Prefabricated concrete's assembled frame construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221560526.1U CN217711097U (en) 2022-06-21 2022-06-21 Prefabricated concrete's assembled frame construction

Publications (1)

Publication Number Publication Date
CN217711097U true CN217711097U (en) 2022-11-01

Family

ID=83801651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221560526.1U Active CN217711097U (en) 2022-06-21 2022-06-21 Prefabricated concrete's assembled frame construction

Country Status (1)

Country Link
CN (1) CN217711097U (en)

Similar Documents

Publication Publication Date Title
CN209194816U (en) A kind of connection structure of prefabricated assembled concrete floor and girder steel
CN217711097U (en) Prefabricated concrete's assembled frame construction
CN110905283A (en) Fast assembly rail
CN208057132U (en) Tunnel Central drain self-propelled moveable formwork
CN103898975A (en) Modularized multi-high-layer assembly type steel-structure framework eccentric supporting system
CN217412896U (en) Photovoltaic support welding device
CN214816161U (en) Box column assembling machine
CN213515194U (en) Plate type heat exchanger
CN209907679U (en) Disassembly-free template panel supporting structure for cast-in-place concrete member
CN212978059U (en) Connecting piece of steel structure building
CN209853643U (en) Supporting equipment for aluminum template
CN212078772U (en) Cutting unloading device for building steel structure engineering
CN209682506U (en) A kind of composable mold for window frame prefabricated components
CN202611255U (en) Assembled steel bar processing shed
CN219219818U (en) Building templates cleaning equipment
CN216007808U (en) Building beam bottom aluminum template
CN212271559U (en) Building scaffold structure of encorbelmenting
CN209742408U (en) Novel building safety protection net convenient to dismouting installation
CN215253529U (en) Bolt welding hybrid connection's two steel sheet fixed knot construct
CN215926798U (en) Laminated beam mounting device for assembly type building
CN219587331U (en) Stable strong splicing fixed prefabricated component
CN210935847U (en) Vibrating screen
CN218148334U (en) Building pile driver
CN215999264U (en) Bridge construction is with pier skeleton welding auxiliary assembly
CN217992964U (en) Assembling type hollow slab beam reinforcement jig frame