CN217704176U - Cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring - Google Patents

Cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring Download PDF

Info

Publication number
CN217704176U
CN217704176U CN202221319104.5U CN202221319104U CN217704176U CN 217704176 U CN217704176 U CN 217704176U CN 202221319104 U CN202221319104 U CN 202221319104U CN 217704176 U CN217704176 U CN 217704176U
Authority
CN
China
Prior art keywords
cooling water
water
temperature cooling
low
pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221319104.5U
Other languages
Chinese (zh)
Inventor
温声平
曾诚
刘新平
李裕乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Guangyuan New Materials Co ltd
Original Assignee
Jiangxi Guangyuan New Materials Co ltd
Jiangxi Guangyuan Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Guangyuan New Materials Co ltd, Jiangxi Guangyuan Chemical Co Ltd filed Critical Jiangxi Guangyuan New Materials Co ltd
Priority to CN202221319104.5U priority Critical patent/CN217704176U/en
Application granted granted Critical
Publication of CN217704176U publication Critical patent/CN217704176U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring, includes high temperature cooling water pond (1), high temperature cooling water inlet tube (2), low temperature cooling water outlet pipe (3), water raising water spray set (4), low temperature cooling water pond (5), low temperature cooling water delivery port (6), drain (7) and first high pressure water pump (8). The device of the utility model carries out centralized treatment on the cooling water of the water ring granulating equipment of all master batch production lines, efficiently cools the cooling water and dissipates heat, and solves the problem of poor cooling effect of cooling water in summer; and meanwhile, the problem that each water ring granulating device of the master batch production workshop is provided with one water pump is effectively solved, and the equipment cost is greatly reduced.

Description

Cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring
Technical Field
The utility model relates to a cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring belongs to cooling water comprehensive utilization technical field.
Background
With the development of plastic industry and the advancement of technology, and the national emphasis on environmental protection, the use of master batch in plastic processing is more and more popular. The use of the master batch simplifies the complex procedure of the batching, the granulated master batch is convenient to measure, and the flying of the dust is reduced; the master batch has an ideal structure, not only improves the processability of commercial products, but also is beneficial to fully and uniformly dispersing all components, prevents raw materials from coagulating, improves the quality of the products, improves the labor conditions and reduces the cost.
The plastic wire drawing produced by plastic particles can be cut into particles and packaged after being cooled, the previous master batch production mainly adopts air cooling particle cutting, the length of an air cooling device reaches more than ten meters at most, and a production plant is seriously occupied. The development of two years is mainly cut grain with the water ring, very big production efficiency that has satisfied, but the cooling water is not cyclic utilization cooling effect best among the grain is cut to conventional water ring, but has wasted the water resource greatly, if cyclic utilization cooling water tank is less, the circulation frequency is too frequent, especially summer, and the cooling water can not in time dispel the heat the cooling influence production efficiency. In addition, master batch small particles exist in cooling water of the water ring dicing, and can impact a water pump impeller, so that the service life of the water pump is shortened.
The conventional water ring granulating cooling water tank has small volume and poor cooling effect, and small plastic particles in cooling water can damage a water pump impeller and cannot meet the requirement of mass continuous production, particularly in summer. Therefore, it is necessary to develop a device for recycling and comprehensively utilizing cooling water in the water ring granulation in the master batch production.
Disclosure of Invention
The invention aims to solve the problem of recycling of industrial water, and develops a cooling water recycling device in water ring granulation in master batch production.
The utility model discloses the technical scheme who realizes as follows, a cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring, including high temperature cooling water pond, low temperature cooling water pond, pumping up water jet equipment, first high pressure water pump and second high pressure water pump. The high-temperature cooling water pool and the low-temperature cooling water pool are rectangular pools, the long edge of the high-temperature cooling water pool is close to the side of the long edge of the low-temperature cooling water pool, and the high-temperature cooling water pool is higher than the low-temperature cooling water pool; a water pumping and spraying device is arranged in the high-temperature cooling water pool, a water pumping and spraying pipe is horizontally arranged at the upper part of high-temperature cooling water Chi Changbian close to the low-temperature cooling water pool, and a water inlet at the upper part of the high-temperature cooling water pool is connected with a high-temperature cooling water inlet pipe; a water outlet at the lower part of the left side of the low-temperature cooling water pool in the length direction is connected with a water inlet of a first high-pressure water pump; and a sewage draining outlet is formed in the lower part of the right side of the low-temperature cooling water pool in the length direction.
The water pumping and spraying device comprises a water pumping and spraying pipe and a second high-pressure water pump; the high-pressure water pump is connected with a water pumping and spraying pipe through a pipeline; the two ends of the water raising and spraying pipe are packaged, and a plurality of water spraying holes are uniformly drilled on the pipe body.
And the water outlet of the first high-pressure water pump is connected with a low-temperature cooling water outlet pipe.
The utility model discloses a working process as follows: high-temperature cooling water of the water ring granulating device is concentrated and then is conveyed to a high-temperature cooling water pool through a water pump by a high-temperature cooling water inlet pipe; the water is pressurized by a high-pressure water pump and then sprayed into a low-temperature cooling water pool through a water-lifting spray pipe with an opening; in the process, the contact area of water and air is increased, so that the purposes of quickly dissipating heat and reducing temperature are achieved; meanwhile, the low-temperature cooling water tank settles fine particles in the cooling water and is cleaned regularly through a sewage discharge outlet; cryogenic cooling water is delivered to the cryogenic cooling water outlet pipe through the high-pressure water pump and then is distributed to the water inlet of each water ring granulating device in the production workshop for recycling.
The utility model has the advantages that the cooling water of the water ring granulating equipment of all master batch production lines is intensively treated by the device, the cooling water is efficiently cooled and radiated, and the problem of poor cooling effect of cooling water in summer is solved; the device can filter and precipitate particles in the cooling water, reduce the damage to the water pump and prolong the service life of the water pump; the device can effectively solve the problem that every water ring of master batch workshop cuts grain equipment configuration water pump, greatly reduced equipment cost. The utility model discloses the effectual cyclic utilization of device has cooled water in the grain is cut to the water ring, the waste of the water resource that has significantly reduced has also reduced manufacturing cost.
The water-pumping spray pipe sprays cooling water into the air, so that the cooling water is efficiently radiated and cooled, and meanwhile, a fountain landscape of a plant area is formed, and the appearance of the plant is beautified and greened.
Drawings
FIG. 1 is a schematic structural view of a cooling water circulation comprehensive utilization device in the water ring dicing in the masterbatch production of the utility model;
FIG. 2 is a schematic view of a water-lifting and spraying device;
in the figure, 1 is a high-temperature cooling water pool; 2 is a high-temperature cooling water inlet pipe; 3 is a low-temperature cooling water outlet pipe; 4 is a water pumping and spraying device; 5 is a low-temperature cooling water pool; 6 is a low-temperature cooling water outlet; 7 is a sewage draining outlet; 8 is a first high pressure water pump; 9 is a water-raising spray pipe; 10 is a water jet hole; 11 is a second high pressure water pump; 12 is a water inlet pipe; and 13 is a water inlet filter screen.
Detailed Description
The specific embodiment of the present invention is shown in fig. 1 and 2.
As shown in fig. 1, this embodiment is a cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring, including high temperature cooling water pond 1, high temperature cooling water inlet tube 2, low temperature cooling water outlet pipe 3, water raising water jet equipment 4, low temperature cooling water pond 5, low temperature cooling water delivery port 6, drain 7 and first high pressure water pump 8.
As shown in fig. 2, the water pumping and spraying device of the present embodiment is composed of a water pumping and spraying pipe 9, a water spraying hole 10, a second high pressure water pump 11, a water inlet pipe 12 and a water inlet screen 13.
The high-temperature cooling water pool 1 of the embodiment is built above the ground, and has the length of 4m, the width of 2m and the depth of 1m; firstly building bricks and painting, and then pasting the tiles on the inner wall and the bottom; the high-temperature cooling water inlet pipe 2 and the low-temperature cooling water outlet pipe 3 are both PE plastic pipes with the diameter of 5cm; the low-temperature cooling water pool 4 is built below the horizontal plane, is 4m long, 3m wide and 2m deep, a deep pit is dug firstly, then bricks are built, tiles are pasted on the inner wall and the bottom after painting, and the low-temperature cooling water pool is close to the high-temperature cooling water pool; the distance between the low-temperature cooling water outlet 6 and the bottom of the low-temperature cooling water pool is 1.5m, and the diameter of the hole is 10cm; the sewage outlet 7 is positioned at the bottom corner of the tank, has the diameter of 20cm and is provided with a sealing valve; the water pressure of the first high-pressure water pump 8 is adjustable, the water pump inlet is connected with the low-temperature cooling water outlet 6, and the water pump outlet is connected with the low-temperature cooling water outlet pipe 3; the water pumping and spraying device is fixed between the high-temperature cooling water pool 1 and the low-temperature cooling water pool 4, the water pumping and spraying pipe 9 is a steel pipe with the length of 3m and the diameter of 20cm, two ends of the steel pipe are sealed, 15 water spraying openings 10 are arranged on the upper part of the pipe at an angle of 45 degrees to the left at equal intervals, the hole diameter is 2cm, the hole distance is 20cm, and an opening welded water inlet pipe 12 with the diameter of 10cm is arranged on the lower part of the middle of the pipe at an angle of 30 degrees to the right; the water pressure of the second high-pressure water pump 11 is adjustable, and a 40-mesh filter screen is arranged at a water inlet of the water pump.
After high-temperature cooling water of the water ring granulating device in the master batch production workshop is concentrated, the high-temperature cooling water is conveyed to a high-temperature cooling water pool 1 through a high-temperature cooling water inlet pipe 2 by a water pump, is pressurized by a second high-pressure water pump 11 and then is sprayed to a nearby low-temperature cooling water pool 4 through a water lifting spray pipe 9 with an opening, so that the contact area of water and air is increased in the process, and the effect of quickly dissipating heat and cooling is achieved; the low-temperature cooling water tank 4 is deep in depth, can settle fine particles in cooling water, and is used for discharging and cleaning through the sewage discharge outlet 7 regularly. Cryogenic cooling water is delivered to the cryogenic cooling water outlet pipe 3 through the first high-pressure water pump 8 and then flows to the water inlet of each water ring dicing device in the production workshop, so that the circulating use is formed.

Claims (4)

1. A cooling water circulation comprehensive utilization device in water ring grain cutting in master batch production is characterized by comprising a high-temperature cooling water pool, a low-temperature cooling water pool, a water pumping and spraying device, a first high-pressure water pump and a second high-pressure water pump; the high-temperature cooling water pool and the low-temperature cooling water pool are rectangular pools, the long edge of the high-temperature cooling water pool is close to the side of the long edge of the low-temperature cooling water pool, and the high-temperature cooling water pool is higher than the low-temperature cooling water pool; a water pumping and spraying device is arranged in the high-temperature cooling water pool, a water pumping and spraying pipe is horizontally arranged at the upper part of high-temperature cooling water Chi Changbian close to the low-temperature cooling water pool, and a water inlet at the upper part of the high-temperature cooling water pool is connected with a high-temperature cooling water inlet pipe; a water outlet at the lower part of the left side of the low-temperature cooling water pool in the length direction is connected with a water inlet of a first high-pressure water pump; and a sewage draining outlet is formed in the lower part of the right side of the low-temperature cooling water pool in the length direction.
2. The device for recycling and comprehensively utilizing cooling water in the water ring cutting process in the master batch production according to claim 1, wherein the water pumping and spraying device comprises a water pumping and spraying pipe and a second high-pressure water pump; the high-pressure water pump is connected with a water-raising spray pipe through a pipeline; the two ends of the water raising and spraying pipe are packaged, and a plurality of water spraying holes are uniformly drilled on the pipe body.
3. The cooling water circulation comprehensive utilization device in the masterbatch production water ring cutting according to claim 1, characterized in that the bottom of the high temperature cooling water tank is as high as the top of the low temperature cooling water tank.
4. The cooling water circulation comprehensive utilization device in the water ring cutting of master batch production according to claim 1, characterized in that the water outlet of the first high-pressure water pump is connected with a low-temperature cooling water outlet pipe.
CN202221319104.5U 2022-05-30 2022-05-30 Cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring Active CN217704176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221319104.5U CN217704176U (en) 2022-05-30 2022-05-30 Cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221319104.5U CN217704176U (en) 2022-05-30 2022-05-30 Cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring

Publications (1)

Publication Number Publication Date
CN217704176U true CN217704176U (en) 2022-11-01

Family

ID=83797240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221319104.5U Active CN217704176U (en) 2022-05-30 2022-05-30 Cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring

Country Status (1)

Country Link
CN (1) CN217704176U (en)

Similar Documents

Publication Publication Date Title
CN203428286U (en) Wine tank spraying device
CN106350651B (en) Quenching apparatus when Multifunctional controlling
CN217704176U (en) Cooling water circulation comprehensive utilization device in grain is cut to master batch production water ring
CN201672820U (en) Energy-saving environment-friendly cooling tower of glass fiber reinforced plastics
CN207214849U (en) A kind of mechanical-draft cooling tower group
CN202823065U (en) External-spraying type anti-abrasion venturi dust removal device
CN202185420U (en) Silicon chip box cleaning device
CN209094208U (en) A kind of high-efficiency helix tube cooling device for processing
CN209131436U (en) A kind of cooling circulating water accelerated cooling device
CN201713540U (en) Cooling system for heat treatment medium
CN206993928U (en) A kind of afforestation Water saving type watering arrangement
CN107963816A (en) Glass frosting process equipment
CN211854858U (en) Energy-saving rotary kiln cooling system
CN211256002U (en) Energy-saving quenching device for silicon-barium alloy production
CN210206376U (en) Chlorine-containing tail gas treatment device
CN207581422U (en) A kind of condensed water precision treatment device spray equipment
CN215173193U (en) Pipeline cooling device
CN208029777U (en) A kind of mining area improved spraying device
CN202470568U (en) Water cooling circulation device
CN206562713U (en) A kind of green building
CN206575970U (en) A kind of environmentally friendly field irrigation equipment
CN213363444U (en) Steam recycling device
CN206240316U (en) A kind of absorption tower entrance silicon fluoride gas cleaning unit
CN205966796U (en) Steel sheet surface oxidation iron sheet sweeps device
CN204382626U (en) Plastic pipe production line cooling vacuum case apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230705

Address after: 343000 Industrial Park South District, Yongfeng County, Ji'an City, Jiangxi Province

Patentee after: JIANGXI GUANGYUAN NEW MATERIALS Co.,Ltd.

Address before: 331500 South Industrial Park, Yongfeng County, Ji'an City, Jiangxi Province

Patentee before: JIANGXI GUANGYUAN CHEMICAL Co.,Ltd.

Patentee before: JIANGXI GUANGYUAN NEW MATERIALS Co.,Ltd.

TR01 Transfer of patent right