CN217698058U CN202221461733.1U CN202221461733U CN217698058U CN 217698058 U CN217698058 U CN 217698058U CN 202221461733 U CN202221461733 U CN 202221461733U CN 217698058 U CN217698058 U CN 217698058U
Authority
CN
China
Prior art keywords
storehouses
bin
sedimentation tank
storehouse
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221461733.1U
Other languages
Chinese (zh)
Inventor
周对对
张林明
周海东
商伐
杨飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Binchang Dafosi Mining Co ltd
Original Assignee
Shaanxi Binchang Dafosi Mining Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Binchang Dafosi Mining Co ltd filed Critical Shaanxi Binchang Dafosi Mining Co ltd
Priority to CN202221461733.1U priority Critical patent/CN217698058U/en
Application granted granted Critical
Publication of CN217698058U publication Critical patent/CN217698058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a multistage sedimentation tank belongs to sewage treatment technical field, multistage sedimentation tank, including the sedimentation tank body, sedimentation tank body inboard is provided with a storehouse, no. two storehouses, no. three storehouses, no. four storehouses and No. five storehouses, the first baffle of fixedly connected with between a storehouse and No. two storehouses, fixedly connected with second baffle between No. two storehouses and No. three storehouses, fixedly connected with third baffle between a storehouse and No. four storehouses, fixedly connected with fourth baffle between No. three storehouses, no. four storehouses and No. five storehouses, it can realize, can satisfy current working face drainage through multistage sedimentation tank, and the coal slime of sediment is located the outer storehouse of sedimentation tank, makes things convenient for the coal slime loading of personnel with the clearance to retrieve, has avoided personnel to get into the sump clearance, has increased work efficiency, practices thrift the human cost, has reduced operation personnel's work load and the degree of difficulty, reduces the risk of operating personnel operation of ascending a height.

Description

Multistage sedimentation tank
Technical Field
The utility model relates to a sewage treatment technical field, more specifically say, relate to multistage sedimentation tank.
Background
4034, 3 times of drain pipes are laid on the working face 11 in a reversing way, 6 water pumps are arranged at the upper corners, the reversing way is 250m, the downward slope is formed from the outside to the main roadway, if the water gushing on the working face is increased, a water sump and a water ditch are easy to cause that a drainage system cannot meet the drainage requirement due to the accumulation of coal slime, in order to fully utilize the field drainage condition and reduce the coal slime entering the drainage system, aiming at the current situation of the reversing system on the working face 4034, a sedimentation tank needs to be arranged to correspond to the water gushing on the working face.
Establish multistage sedimentation tank through building, carry out multistage sediment with the coal slime in advance, avoid the coal slime directly to get into the sump, lead to operation personnel work load and the degree of difficulty to increase, demolish equipment and retrieve the roof go-between, personnel stand on ground simultaneously, increased the risk of the operation of ascending a height, so we have proposed multistage sedimentation tank and have solved the problem that above-mentioned exists.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a multistage sedimentation tank, it can realize satisfying current working face drainage through multistage sedimentation tank, and the coal slime of sediment is located the sedimentation tank outer storehouse, makes things convenient for the coal slime loading that personnel will clear up to retrieve, has avoided personnel to get into the sump clearance, has increased work efficiency, practices thrift the human cost, has reduced operation personnel work load and the degree of difficulty, reduces the risk that operating personnel ascended the operation.
2. Technical scheme
In order to solve the problem, the utility model adopts the following technical proposal.
Multistage sedimentation tank, including the sedimentation tank body, sedimentation tank body inboard is provided with a storehouse, no. two storehouses, no. three storehouses, no. four storehouses and No. five storehouses, the first baffle of fixedly connected with between a storehouse and No. two storehouses, the fixedly connected with second baffle between No. two storehouses and No. three storehouses, the fixedly connected with third baffle between a storehouse and No. four storehouses, the fixedly connected with fourth baffle between No. three storehouses, no. four storehouses and No. five storehouses.
Furthermore, two notches are symmetrically formed in the top end of the first partition plate, and the two notches correspond to the first bin, the second bin and the fourth bin respectively.
Furthermore, a notch is formed in the top of the second partition plate, and the notch corresponds to the second bin and the third bin respectively.
Furthermore, a notch is formed in the top of the third partition plate, and the notch corresponds to the first bin and the fourth bin respectively.
Furthermore, the fourth partition plate is of an L-shaped structure, two notches are formed in the top of the fourth partition plate, and the two notches correspond to the third bin, the fourth bin and the fifth bin respectively.
Furthermore, a water inlet is formed in the top opening of the first bin, and a water outlet is formed in the top opening of the fifth bin.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
this scheme can satisfy current working face drainage through multistage sedimentation tank, and the coal slime of sediment is located the outer storehouse of sedimentation tank, makes things convenient for the coal slime loading that personnel will clear up to retrieve, has avoided personnel to get into the sump clearance, has increased work efficiency, practices thrift the human cost, has reduced operation personnel work load and the degree of difficulty, reduces the risk that operating personnel ascended a height the operation.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
The numbering in the figures illustrates:
1. a sedimentation tank body; 2. a first bin; 3. a second bin; 4. a third bin; 5. a fourth bin; 6. a fifth bin; 7. a first separator; 8. a second separator; 9. a third partition plate; 10. a fourth separator; 11. a water inlet; 12. and (7) a water outlet.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
Example (b):
referring to fig. 1, the multistage sedimentation tank includes a sedimentation tank body 1, a first bin 2, a second bin 3, a third bin 4, a fourth bin 5 and a fifth bin 6 are arranged at the inner side of the sedimentation tank body 1, a first partition plate 7 is fixedly connected between the first bin 2 and the second bin 3, a second partition plate 8 is fixedly connected between the second bin 3 and the third bin 4, a third partition plate 9 is fixedly connected between the first bin 2 and the fourth bin 5, and a fourth partition plate 10 is fixedly connected between the third bin 4, the fourth bin 5 and the fifth bin 6;
divide into five bins with individual sedimentation tank body 1, let the water coal slime in the ditch get into a storehouse 2 earlier, deposit the coal cinder and reduce water coal slime impulsive force, no. two storehouses 3 of reentrant carry out the secondary and deposit, reentrant No. three storehouse 4, carry out the cubic and deposit, reentrant No. five storehouse 6, carry out the quartic and deposit, if gush water when great, no. two storehouse 3 ponding get into No. four storehouses 5, reentrant No. five storehouse 6 carries out the drainage.
Referring to fig. 1, two notches are symmetrically formed in the top end of the first partition plate 7, the two notches correspond to the first bin 2, the second bin 3 and the fourth bin 5 respectively, water coal slime in the ditch firstly enters the first bin 2, coal briquettes are deposited and the impact force of the water coal slime is reduced, then the coal briquettes enter the second bin 3, secondary deposition is carried out, then the coal briquettes enter the third bin 4, tertiary deposition is carried out, if water gushes greatly, 3 accumulated water in the second bin enters the fourth bin 5, and then the coal briquettes enter the fifth bin 6 for water drainage.
Referring to fig. 1, a gap is formed in the top of the second partition plate 8 and corresponds to the second bin 3 and the third bin 4 respectively, the water coal slurry firstly enters the first bin 2, the coal briquettes are deposited, the water coal slurry impact force is reduced, the water coal slurry enters the second bin 3 again for secondary deposition, and the water coal slurry enters the third bin 4 again for tertiary deposition.
Referring to fig. 1, the top of the third partition 9 is provided with a notch, and the notch corresponds to the first bin 2 and the fourth bin 5 respectively, if the water gushes greatly, the water accumulated in the second bin 3 enters the fourth bin 5, and then enters the fifth bin 6 for drainage.
Referring to fig. 1, the fourth partition plate 10 is in an L-shaped structure, two notches are formed in the top of the fourth partition plate 10, and the two notches correspond to the third bin 4, the fourth bin 5 and the fifth bin 6 respectively, so that sewage in the third bin 4 and the fourth bin 5 can enter the fifth bin 6, and therefore, the sewage can be divided.
Referring to fig. 1, a water inlet 11 is formed at the top opening of the first bin 2, a water outlet 12 is formed at the top opening of the fifth bin 6, and sewage enters the inner side of the sedimentation tank body 1 through the water inlet 11 and is discharged through the water outlet 12.
When in use: divide into five bins with individual sedimentation tank body 1, let the water coal slime in the ditch get into storehouse 2 earlier, deposit the coal cinder and reduce water coal slime impulsive force, get into storehouse No. two 3 again, carry out the secondary and deposit, get into storehouse No. three 4 again, carry out the cubic and deposit, get into storehouse No. five 6 again, carry out the quartic and deposit, if gush water when great, 3 ponding in storehouse No. two get into storehouse No. four 5, get into storehouse No. five 6 again and carry out the drainage, multistage sedimentation tank can satisfy current working face drainage, the coal slime of deposit is located sedimentation tank outer storehouse, make things convenient for the coal slime loading of personnel with the clearance to retrieve, avoided personnel to get into the storehouse clearance, work efficiency has been increased, and manpower cost is saved.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the protection scope of the present invention by replacing or changing the technical solution and the modified concept of the present invention within the technical scope of the present invention.

Claims (6)

1. Multistage sedimentation tank, its characterized in that: including sedimentation tank body (1), sedimentation tank body (1) inboard is provided with storehouse (2), no. two storehouses (3), no. three storehouses (4), no. four storehouses (5) and No. five storehouses (6), first baffle of fixedly connected with (7) between storehouse (2) and No. two storehouses (3), fixedly connected with second baffle (8) between No. two storehouses (3) and No. three storehouses (4), fixedly connected with third baffle (9) between storehouse (2) and No. four storehouses (5), fixedly connected with fourth baffle (10) between No. three storehouses (4), no. four storehouses (5) and No. five storehouses (6).
2. The multistage sedimentation tank of claim 1, wherein: two notches are symmetrically formed in the top end of the first partition plate (7), and the two notches correspond to the first bin (2), the second bin (3) and the fourth bin (5) respectively.
3. The multistage sedimentation tank of claim 1, wherein: a notch is formed in the top of the second partition plate (8), and the notch corresponds to the second bin (3) and the third bin (4) respectively.
4. The multistage sedimentation tank of claim 1, wherein: a notch is formed in the top of the third partition plate (9), and the notch corresponds to the first bin (2) and the fourth bin (5) respectively.
5. The multistage sedimentation tank of claim 1, wherein: the fourth partition plate (10) is arranged in an L-shaped structure, two notches are formed in the top of the fourth partition plate (10), and the two notches correspond to the third bin (4), the fourth bin (5) and the fifth bin (6) respectively.
6. The multistage sedimentation tank of claim 1, wherein: a water inlet (11) is formed in the top opening of the first bin (2), and a water outlet (12) is formed in the top opening of the fifth bin (6).
CN202221461733.1U 2022-06-10 2022-06-10 Multistage sedimentation tank Active CN217698058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221461733.1U CN217698058U (en) 2022-06-10 2022-06-10 Multistage sedimentation tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221461733.1U CN217698058U (en) 2022-06-10 2022-06-10 Multistage sedimentation tank

Publications (1)

Publication Number Publication Date
CN217698058U true CN217698058U (en) 2022-11-01

Family

ID=83801319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221461733.1U Active CN217698058U (en) 2022-06-10 2022-06-10 Multistage sedimentation tank

Country Status (1)

Country Link
CN (1) CN217698058U (en)

Similar Documents

Publication Publication Date Title
CN206135372U (en) Multifunctional cable ditch
CN217698058U (en) Multistage sedimentation tank
CN114592563B (en) Unpowered roof rainwater drainage system and method in low-lying area
CN212641678U (en) Rainwater collection device of underground garage
CN212127752U (en) Improved oil separation tank
CN215161889U (en) Vertical sewage treatment plant based on RABF technique
CN214574059U (en) Outdoor transformer substation cable trench
CN110173019B (en) Superposed group water inlet lifting pump room
CN209323544U (en) A kind of construction site drainage system
CN209338355U (en) A kind of precipitating anaerobism integral pool that can make mud decrement
CN214495860U (en) Buried anaerobic biological filter tank
CN218151050U (en) Steel case that tunnel construction period drainage was used
CN216689022U (en) Bridge drainage structures
CN219011427U (en) Drainage system of sinking museum
CN212974285U (en) District sewage integration pump station control system
CN210482531U (en) Drainage work well
CN217961405U (en) Portable sedimentation tank convenient to installation
CN214714560U (en) Siphon type sewage discharge system of high-efficiency inclined tube sedimentation tank for water treatment
CN214460810U (en) Assembled building rainwater collection device
CN212001469U (en) Rainwater drainage guide and collection system of refuse landfill
CN212772689U (en) Multifunctional regulation and storage system integrating regulation, waterlogging drainage and water treatment
CN219080553U (en) Environment-friendly type gully
CN210216673U (en) Multifunctional rainwater grate for trash blocking overflow well
CN212224153U (en) Drainage device is collected to construction scene waste water
CN218405761U (en) Movable water collecting bin