CN217692436U - Steel cable bridge capable of being efficiently connected and fixed - Google Patents

Steel cable bridge capable of being efficiently connected and fixed Download PDF

Info

Publication number
CN217692436U
CN217692436U CN202221052815.0U CN202221052815U CN217692436U CN 217692436 U CN217692436 U CN 217692436U CN 202221052815 U CN202221052815 U CN 202221052815U CN 217692436 U CN217692436 U CN 217692436U
Authority
CN
China
Prior art keywords
fixed
span structure
crane span
fixed block
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221052815.0U
Other languages
Chinese (zh)
Inventor
唐亮
张有生
唐翠珍
钱文平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Liangsheng Aluminum Co ltd
Original Assignee
Jiangsu Liangsheng Aluminum Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Liangsheng Aluminum Co ltd filed Critical Jiangsu Liangsheng Aluminum Co ltd
Priority to CN202221052815.0U priority Critical patent/CN217692436U/en
Application granted granted Critical
Publication of CN217692436U publication Critical patent/CN217692436U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a high-efficient fixed steel cable testing bridge of connecting, including a plurality of connection ground crane span structure main parts of dismantling, the one end of crane span structure main part is provided with side fixed plate and bottom fixed plate respectively, and side fixed plate outside front end all is provided with a plurality of first fixed blocks with the tail end, the other end of crane span structure main part is seted up and is supplied the side fixed plate male jack of adjacent crane span structure main part, the both sides of jack are provided with a plurality of groups second fixed block, every group second fixed block is two, all run through in first fixed block and the second fixed block and set up the fixed orifices that can supply fastening bolt to peg graft, a high-efficient fixed steel cable testing bridge of connecting, can the efficient installation that realizes the crane span structure, improved work efficiency greatly, through the design of crane span structure outside fixed block for later stage maintenance is more convenient, reduces the dismantlement time, improves staff's work efficiency, has higher practical value.

Description

Steel cable bridge capable of being efficiently connected and fixed
The technical field is as follows:
the utility model relates to a cable testing bridge technical field, more specifically say, in particular to fixed steel cable testing bridge is connected to high efficiency.
Background art:
the cable bridge is divided into structures of a groove type, a tray type, a ladder type, a grid type and the like, and comprises a support, a supporting arm, an installation accessory and the like.
When a traditional bridge frame on the market is installed at present, joints are fixed by connecting plates on two sides of end heads, each connecting plate needs a plurality of sets of connecting bolts, the installation efficiency is low, and the installation progress is delayed seriously. When the maintenance is dismantled and inconvenient simultaneously, loaded down with trivial details cable testing bridge dismantles and can consume a large amount of time, seriously influences work efficiency, thereby, the utility model provides a fixed steel cable testing bridge is connected to high efficiency.
The utility model has the following contents:
the utility model aims at prior art's defect, provide a fixed steel cable testing bridge is connected to high efficiency, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a fixed steel cable testing bridge is connected to high efficiency, includes a plurality of connection that dismantle crane span structure main part, the one end of crane span structure main part is provided with a plurality of side fixed plates and bottom fixed plate respectively, the bottom fixed plate sets up on crane span structure main part bottom end face, the side fixed plate symmetry sets up on crane span structure main part both sides terminal surface, and front end and the tail end on the side fixed plate all are provided with a plurality of first fixed blocks, and the other end of crane span structure main part is seted up the side fixed plate male jack that can supply adjacent crane span structure main part, and the both sides of jack are provided with a plurality of second fixed blocks of group, and every second fixed block of group is two, the second fixed block can pass through fastening bolt with the first fixed block of adjacent crane span structure main part and be connected, and all run through in first fixed block and the second fixed block and set up the fixed orifices that can supply fastening bolt to peg graft.
Preferably, a plurality of heat dissipation holes are formed in the bottom of the bridge frame body.
Preferably, reinforcing plates are symmetrically arranged on two sides of the bottom in the bridge frame main body.
Preferably, the fixing hole is internally provided with an internal thread matched with the fastening bolt.
Preferably, the thicknesses of the side fixing plate and the bottom fixing plate are smaller than that of the bridge frame main body.
Preferably, the bridge main body is connected with the second fixing block in a welding mode.
The utility model has the advantages that:
this kind of fixed steel cable testing bridge is connected to high efficiency, side fixed plate and end fixing plate with setting up in the crane span structure main part, cooperation through side fixed plate jack and bottom end fixing plate jack is used, realize the function of quick installation, second fixed block through crane span structure main part side uses with the cooperation of the first fixed block on the side fixed plate, realize the reinforcement effect of connecting, and it is more convenient when dismantling and maintaining, whole cable testing bridge simple structure, the simple operation, can realize dismantling and installing fast, reduce the dismantlement time of overhauing the internal line in the future effectively, the work efficiency is greatly improved, it is more high-efficient for traditional mode.
Description of the drawings:
fig. 1 is a schematic view of an overall structure of a steel cable bridge frame with high-efficiency connection and fixation according to the present invention;
FIG. 2 is a schematic view of a portion of the steel cable bridge of the present invention with high efficiency;
fig. 3 is a schematic structural view of a side fixing plate of a steel cable bridge frame efficiently connected and fixed according to the present invention;
in the figure: 1. a bridge frame body; 2. a bottom end fixing plate; 3. a side fixing plate; 4. heat dissipation holes; 5. fastening a bolt; 6. a fixing hole; 7. a first fixed block; 8. a reinforcing plate; 9. a jack; 10. a bottom end fixing plate jack; 11. and a second fixed block.
The specific implementation mode is as follows:
the following detailed description of the preferred embodiments of the present invention will be provided in conjunction with the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, and the protection scope of the present invention can be clearly and clearly defined.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
As shown in fig. 1 and 2, a high-efficient fixed steel cable testing bridge of connecting, including a plurality of connection of dismantling crane span structure main part 1, the one end of crane span structure main part 1 is provided with a plurality of side fixing plate 3 and bottom fixing plate 2 respectively, and bottom fixing plate 2 is the rectangle, bottom fixing plate 2 sets up on crane span structure main part 1 bottom terminal surface, side fixing plate 3 symmetry sets up on crane span structure main part 1 both sides terminal surface, and front end and the tail end on the side fixing plate 3 all are provided with 2 first fixed block 7, first fixed block is the rectangle, and crane span structure main part 1's the other end is seted up and is supplied the side fixing plate 3 male jack 9 of adjacent crane span structure main part 1, and the both sides of jack 9 are provided with 2 groups of second fixed block 11, the second fixed block is the rectangle, and every group second fixed block 11 is two, as shown in fig. 3, second fixed block 11 can pass through fastening bolt 5 with the first fixed block 7 of adjacent crane span structure main part 1 and connect, and all run through in first fixed block 7 and the second fixed block 11 and set up and can supply fastening bolt 5 to peg graft fixed block 6.
The bottom of the bridge frame main body 1 is provided with a plurality of radiating holes 4, so that the radiating performance of the cable bridge frame is improved.
The reinforcing plates 8 are symmetrically arranged on two sides of the bottom in the bridge frame main body 1, so that the bearing capacity of the cable bridge frame is improved.
Wherein, be equipped with the internal thread that agrees with mutually with fastening bolt 5 in the fixed orifices 6, adopt the screw thread can dismantle the connection more easy to assemble to more convenient the dismantlement when later stage maintenance, the time cost that has significantly reduced and more convenient.
The thickness of the side fixing plate 3 and the thickness of the bottom fixing plate 2 are both smaller than that of the bridge main body 1, the bridge is connected in an inserting mode, the thickness of the fixing plate is smaller than that of the bridge main body 1, so that the bridge main body 1 can wrap the fixing plate when being inserted, the bridge is connected more firmly, and bearing capacity is increased.
The bridge frame main body 1 is connected with the second fixing block 11 in a welding mode, so that the second fixing block 11 is connected with the first fixing block 7 more firmly, firmness is enhanced, the bridge frame is connected more tightly, and bearing capacity is improved.
The specific use mode and function of the embodiment are as follows:
when using this kind of product, at first check whether each mechanism inside this kind of high-efficient fixed steel cable testing bridge of connecting is complete, two crane span structure heads and tails that will be in same water flat line align, in pegging graft jack 9 and bottom end fixing plate jack 10 respectively with bottom end fixing plate 2 with side fixing plate 3, after the grafting finishes, first fixed block 7 will be in same water flat line with second fixed block 11, pass first fixed block 7 in proper order through fastening bolt 5 and be connected with fixed orifices 6 on the second fixed block 8, this kind of high-efficient fixed steel cable testing bridge of connecting, it is more efficient when making the installation through the mode of pegging graft, only need a small amount of fastening bolt 5 to connect to make the maintenance dismantle more convenient, staff's time cost has been reduced, use through the cooperation of first fixed block 7 with second fixed block 11, make the connection between the crane span structure inseparabler, it is more firm, it is more convenient, the reinforcing plate makes the bearing capacity and the intensity of crane span structure main part 1 obtain improving.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The above-mentioned embodiments only represent some embodiments of the present invention, and the description thereof is specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several variations and modifications can be made, which are within the scope of the present invention.

Claims (6)

1. The utility model provides a fixed steel cable testing bridge of high-efficient connection, includes a plurality of connection ground crane span structure main parts (1) of dismantling, its characterized in that: the one end of crane span structure main part (1) is provided with a plurality of side fixed plate (3) and bottom mounting plate (2) respectively, bottom mounting plate (2) set up on crane span structure main part (1) bottom end face, side fixed plate (3) symmetry sets up on crane span structure main part (1) both sides terminal surface, and front end and tail end on side fixed plate (3) all are provided with a plurality of first fixed block (7), and side fixed plate (3) male jack (9) that can supply adjacent crane span structure main part (1) are seted up to the other end of crane span structure main part (1), and the both sides of jack (9) are provided with a plurality of groups second fixed block (11), and every group second fixed block (11) are two, second fixed block (11) can be connected through fastening bolt (5) with first fixed block (7) of adjacent crane span structure main part (1), and all run through in first fixed block (7) and the second fixed block (11) and set up fixed orifices (6) that can supply fastening bolt (5) to peg graft.
2. The steel cable bridge frame capable of being efficiently connected and fixed according to claim 1, wherein: the bottom in the bridge frame main body (1) is provided with a plurality of heat dissipation holes (4).
3. The steel cable bridge frame capable of being efficiently connected and fixed according to claim 1, wherein: reinforcing plates (8) are symmetrically arranged on two sides of the bottom in the bridge frame main body (1).
4. The steel cable bridge capable of being efficiently connected and fixed according to claim 1, wherein: and internal threads matched with the fastening bolts (5) are arranged in the fixing holes (6).
5. The steel cable bridge frame capable of being efficiently connected and fixed according to claim 1, wherein: the thickness of the side fixing plate (3) and the thickness of the bottom fixing plate (2) are both smaller than that of the bridge main body (1).
6. The steel cable bridge frame capable of being efficiently connected and fixed according to claim 1, wherein: the bridge frame main body (1) is connected with the second fixing block (11) in a welding mode.
CN202221052815.0U 2022-05-05 2022-05-05 Steel cable bridge capable of being efficiently connected and fixed Active CN217692436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221052815.0U CN217692436U (en) 2022-05-05 2022-05-05 Steel cable bridge capable of being efficiently connected and fixed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221052815.0U CN217692436U (en) 2022-05-05 2022-05-05 Steel cable bridge capable of being efficiently connected and fixed

Publications (1)

Publication Number Publication Date
CN217692436U true CN217692436U (en) 2022-10-28

Family

ID=83736540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221052815.0U Active CN217692436U (en) 2022-05-05 2022-05-05 Steel cable bridge capable of being efficiently connected and fixed

Country Status (1)

Country Link
CN (1) CN217692436U (en)

Similar Documents

Publication Publication Date Title
CN217811715U (en) Displacement amplification type double-order yield coupling beam damper
CN217692436U (en) Steel cable bridge capable of being efficiently connected and fixed
CN220896613U (en) Flexible photovoltaic support sectional fixture
CN218440059U (en) Novel chain staple bolt
CN205424354U (en) Magazine support frame
CN116614072A (en) Photovoltaic module mounting structure
CN213508987U (en) Window edge sealing fixing piece of assembled building external wall heat insulation integrated plate
CN215521498U (en) Connector structure
CN213234103U (en) Multi-use architecture assembled externally-hung wallboard
CN210688064U (en) Pin-connected panel solar street lamp
CN221487296U (en) Aluminum alloy bridge frame with high bearing capacity
CN215718140U (en) Reinforced heat-insulation bridge-cut-off aluminum
CN221727850U (en) Improved cable bridge with high assembly and disassembly efficiency
CN220521605U (en) Composite heat insulation board connecting structure
CN212613870U (en) Assembled building fixed knot constructs
CN2502437Y (en) Plugging cable bridge support
CN216340287U (en) High-rise steel structure and high-strength concrete composite structure
CN217759491U (en) Steel construction building carrier plate convenient to installation
CN217353570U (en) Novel connecting clamp for building templates
CN215370814U (en) High-efficient davit belt drive of simple installation
CN216852535U (en) Circuit board assembly and display device
CN220377517U (en) Building steel structure
CN221688552U (en) Support base of photovoltaic module and photovoltaic system
CN219547577U (en) Temporary telescopic equipment for bridge
CN210716272U (en) BIM-based structural steel double-spliced combined support for electromechanical integrated pipeline installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant