CN217688657U - Lee's boiling box for detecting stability performance of cement - Google Patents

Lee's boiling box for detecting stability performance of cement Download PDF

Info

Publication number
CN217688657U
CN217688657U CN202220387164.4U CN202220387164U CN217688657U CN 217688657 U CN217688657 U CN 217688657U CN 202220387164 U CN202220387164 U CN 202220387164U CN 217688657 U CN217688657 U CN 217688657U
Authority
CN
China
Prior art keywords
box
cement
sets
upper portion
stability
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220387164.4U
Other languages
Chinese (zh)
Inventor
刘江华
王平
郑金焕
高策
贾凤超
甄继东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Yantong Testing Technology Service Co ltd
Original Assignee
Baoding Yantong Testing Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Yantong Testing Technology Service Co ltd filed Critical Baoding Yantong Testing Technology Service Co ltd
Priority to CN202220387164.4U priority Critical patent/CN217688657U/en
Application granted granted Critical
Publication of CN217688657U publication Critical patent/CN217688657U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model discloses a lei shi boils and boils case for cement stability can detects, the power distribution box comprises a box body, the both sides of box are run through respectively and are installed electric heater and play water valve pipe, the inside fixed mounting of box has spacing frame, and the upper portion of spacing frame is provided with filter plate to filter plate's upper portion fixed mounting has four group's poles, four groups the support is installed to the top of pole, the apron is installed to the opening part of box, and the upper portion of apron installs the controller, one side fixed mounting of box has the preheating cabinet. Has the advantages that: the utility model discloses a prop up pole and preheating cabinet, through the cement board that sets up, need not just can take out support and upper portion cement board with the help of the instrument, through the preheating cabinet that sets up, the leishi that can make full use of be used for cement stability can detect boils the hot resource that the case produced, uses the leishi that the cement stability can detect to boil the theory that the case accords with green development.

Description

Lee's boiling box for detecting stability performance of cement
Technical Field
The utility model relates to a boil case technical field, particularly, relate to a lei shi that is used for cement stability can detect boils case.
Background
The boiling box is an appliance for cement experiments, is widely applied to places such as construction sites, laboratories, factories and the like, is one of the boiling boxes, is mostly used for detecting the stability of cement, completes the stability detection of the cement, and has the advantages of simple structure, stable temperature control, high detection accuracy and the like in practical use.
However, after the existing lei's boiling box for detecting cement stability performance is boiled, the bracket and the upper cement board thereof need to be taken out, the bracket is soaked in boiling water and has higher temperature, an operator needs to take out the bracket and the upper cement board thereof by means of tools, when no tools are arranged around the operator, the bracket and the upper cement board thereof are difficult to take out, which brings inconvenience to the operation and use of the lei's boiling box for detecting cement stability performance, and secondly, hot water boiled inside the lei's boiling box for detecting cement stability performance generates steam which is directly discharged into the air, which causes waste of heat resources, and the lei's boiling box for detecting cement stability performance does not accord with the concept of green environmental development.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
To prior art not enough, the utility model provides a lei shi that is used for cement stability to detect boils case, need not just can take out support and upper portion cement slab, can make full use of be used for the lei shi that cement stability detected to boil the advantage of the hot resource that the case produced with water, and then solve the problem in the above-mentioned background art with the help of the instrument.
(II) technical scheme
For realize above-mentioned need not just can take out support and upper portion cement board, can make full use of be used for the advantage of the hot resource that the lei shi that cement stability can detect boils the case and produces with the help of the instrument, the utility model discloses a specific technical scheme as follows:
the utility model provides a lei shi boils and boils case for cement stability can detects, includes the box, the both sides of box are run through respectively and are installed electric heater and play water valve pipe, the inside fixed mounting of box has spacing frame, and the upper portion of spacing frame is provided with filter plate to filter plate's upper portion fixed mounting has four groups to prop up the pole, four groups prop up the top of pole and install the support, the apron is installed to the opening part of box, and the upper portion of apron installs the controller, one side fixed mounting of box has the preheating cabinet.
Further, the lower part fixed mounting of apron has two sets of screwed pipes, and two sets of the screw rod is all installed to the inside of screwed pipe, and four groups built-in protruding type groove has all been seted up to the upper end tip of propping up the pole, and four groups the inside in built-in protruding type groove all runs through and installs T type pole, and four groups the equal fixed mounting of one end tip of T type pole has a limiting plate, four groups the equal fixed mounting in lower part of limiting plate has expanding spring, and four groups expanding spring's one end tip respectively with four groups the inside bottom surface fixed connection in built-in protruding type groove.
Furthermore, the two groups of threaded pipes are meshed with the two groups of threaded rods.
Further, the intake chamber has been seted up on the upper portion of preheating cabinet, and the inside of intake chamber runs through and installs the sealing plug, the internally mounted of preheating cabinet has the spiral pipe, and the inside both sides of preheating cabinet are run through respectively at the both ends of spiral pipe, one side of box is run through to the one end of spiral pipe, the fixed aqueduct that runs through in lower part of preheating cabinet, and the one end of aqueduct runs through one side of box, the valve is installed to the lateral wall of aqueduct.
Furthermore, the cross section size of the filter screen plate is larger than the internal cross section size of the limiting frame.
Furthermore, four groups of supporting seats are fixedly arranged at the lower part of the box body.
Further, the controller is electrically connected with the electric heater through an electric wire.
(III) advantageous effects
Compared with the prior art, the utility model provides a lei shi boils and boils case for cement stability can detect possesses following beneficial effect:
(1) The utility model discloses a prop up the pole, in-service use is used for the lei shi that cement stability can detect to boil when the case, the operation workman places the upper portion of support with the cement board with the hand earlier, utilize two sets of screwed pipes and two sets of screw rod intermeshing, the operation workman is with the hand in the same direction as, two sets of screw rods of counter-clockwise turning, the operation workman removes the apron, the support is pushed down to two sets of screw rods of accessible, it moves down in step to drive the cement board, meanwhile, four group's T type poles and four group's limiting plate can extrude four group's expanding spring, when the apron is sealed with the box opening part, support and cement board are stable fixed, when needs take out support and cement board, the operation workman shifts up the apron, lose the conflict of two sets of screw rods, four group's expanding spring receives self elastic force effect, through four group's T type poles of conflict and four group's limiting plate, make support and cement board shift up and reset, when support and cement board shift out the box inside, can take out support and cement board out, through the cement board that sets up, need not just can take out support and upper portion cement board with the help of instrument, boil the case operation and use convenience for the lei shi that boils that cement stability can detect.
(2) The utility model discloses a preheating cabinet, a lei shi that is used for cement stability to detect boils before the case work, the operation workman adds normal atmospheric temperature water to the inside of preheating cabinet through the intake chamber earlier, after the interpolation finishes, the operation workman utilizes the sealing plug to block up the intake chamber, can make electric heater work through the controller this moment, when the inside clear water of box boils, the vapor accessible spiral pipe of production derives, utilize the heat transfer principle, vapor can be with self heat transfer to the inside normal atmospheric temperature water of preheating cabinet, when needs add the clear water to the box, the operation workman opens the valve, preheating water inside the preheating cabinet passes through inside the leading-in box of aqueduct, reduce electric heater operating time, through the preheating cabinet that sets up, can make full use of the lei shi that is used for cement stability to detect boils the heat resource that the case produced, the lei shi that is used for cement stability to detect boils the case and accords with the theory of green development.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a Leeb boiling box for detecting stability of cement according to the present invention;
FIG. 2 is a front view of a Leeb boiling box for testing stability of cement according to the present invention;
fig. 3 is a perspective view of the support rod according to the present invention;
fig. 4 is an enlarged view of a in fig. 1 according to the present invention;
fig. 5 is an enlarged view of B in fig. 1 according to the present invention.
In the figure:
1. a box body; 2. an electric heater; 3. a water outlet valve pipe; 4. a limiting frame; 5. a filter screen plate; 6. a support rod; 7. a support; 8. a cover plate; 9. a controller; 10. a preheating box; 11. a spiral tube; 12. a screw; 13. a convex groove is arranged inside; 14. a T-shaped rod; 15. a limiting plate; 16. a tension spring; 17. a water inlet groove; 18. a sealing plug; 19. a threaded pipe; 20. a water conduit; 21. and (4) a valve.
Detailed Description
For further explanation of the embodiments, the drawings are provided as part of the disclosure and serve primarily to illustrate the embodiments and, together with the description, to explain the principles of operation of the embodiments, and to provide further explanation of the invention and advantages thereof, it will be understood by those skilled in the art that various other embodiments and advantages of the invention are possible, and that elements in the drawings are not to scale and that like reference numerals are generally used to designate like elements.
According to the utility model discloses an embodiment provides a lei shi boils and boils case that is used for cement stability can to detect.
Now combine the attached drawing and detailed description to the utility model discloses it further explains, as shown in fig. 1-5, according to the utility model discloses a lei shi that is used for cement stability can to detect boils and boils case, including box 1, the both sides of box 1 are run through respectively and are installed electric heater 2 and play water valve pipe 3, the inside fixed mounting of box 1 has spacing frame 4, and the upper portion of spacing frame 4 is provided with filter plate 5, and filter plate 5's upper portion fixed mounting has four group's play pole 6, and support 7 is installed to four group's play top of pole 6, and apron 8 is installed to the opening part of box 1, and the controller 9 is installed on the upper portion of apron 8, and one side fixed mounting of box 1 has preheating cabinet 10, and electric heater 2 and controller 9 are current structure, do not much to describe here.
In one embodiment, two sets of threaded pipes 19 are fixedly mounted on the lower portion of the cover plate 8, threaded rods 12 are mounted inside the two sets of threaded pipes 19, built-in convex grooves 13 are formed in the upper end portions of the four sets of support rods 6, T-shaped rods 14 are mounted inside the four sets of built-in convex grooves 13 in a penetrating mode, limiting plates 15 are fixedly mounted at one end portions of the four sets of T-shaped rods 14, telescopic springs 16 are fixedly mounted on the lower portions of the four sets of limiting plates 15, one end portions of the four sets of telescopic springs 16 are fixedly connected with the inner bottom surfaces of the four sets of built-in convex grooves 13 respectively, the support 7 and an upper cement plate of the support can be taken out through the arranged cement plates without tools, and convenience is brought to the operation and use of the leisurely boiling box for detecting the stability of cement.
In one embodiment, two sets of threaded tubes 19 intermesh with two sets of threaded rods 12 to facilitate adjustment of the use positions of the two sets of threaded rods 12.
In one embodiment, a water inlet tank 17 is arranged on the upper portion of the preheating tank 10, a sealing plug 18 is installed inside the water inlet tank 17 in a penetrating manner, a spiral pipe 11 is installed inside the preheating tank 10, two ends of the spiral pipe 11 respectively penetrate through two sides inside the preheating tank 10, one end of the spiral pipe 11 penetrates through one side of the tank body 1, a water guide pipe 20 is fixedly installed on the lower portion of the preheating tank 10 in a penetrating manner, one end of the water guide pipe 20 penetrates through one side of the tank body 1, a valve 21 is installed on the side wall of the water guide pipe 20, through the arranged preheating tank 10, heat resources generated by the Leeb boiling tank for detecting the cement stability performance can be fully utilized, and the Leeb boiling tank for detecting the cement stability performance conforms to the concept of green environmental development.
In one embodiment, the cross-sectional dimension of the screen plate 5 is larger than the internal cross-sectional dimension of the limiting frame 4, so as to avoid that the screen plate 5 cannot be placed on the upper part of the limiting frame 4 due to the over-small cross-sectional dimension of the screen plate 5.
In one embodiment, four sets of supporting seats are fixedly installed at the lower part of the box body 1, and the four sets of supporting seats play a role in supporting and fixing the Leeb boiling box for detecting the stability performance of the cement.
In one embodiment, the controller 9 is electrically connected to the electric heater 2 through an electric wire, and the controller 9 can be implemented through simple programming by those skilled in the art, which belongs to the common knowledge in the art, and is used only without modification, so that the control mode and the circuit connection are not described in detail.
The working principle is as follows:
when the Lee boiling box for detecting the cement stability is actually used, an operator firstly places a cement board on the upper part of a bracket 7 by hands, the two groups of threaded pipes 19 are meshed with the two groups of screw rods 12, the operator rotates the two groups of screw rods 12 clockwise and anticlockwise by hands, the operator moves a cover plate 8, the bracket 7 can be pressed down by the two groups of screw rods 12 to drive the cement board to synchronously move downwards, meanwhile, four groups of T-shaped rods 14 and four groups of limiting plates 15 extrude four groups of expansion springs 16, when the opening of the box body 1 is sealed by the cover plate 8, the bracket 7 and the cement board are stably fixed, when the bracket 7 and the cement board need to be taken out, the operator moves the cover plate 8 up and loses the interference of the two groups of screw rods 12, the four groups of expansion springs 16 are under the action of self elasticity, the bracket 7 and the cement board move upwards to reset by interfering with the four groups of T-shaped rods 14 and the four groups of limiting plates 15, when the bracket 7 and the cement board are moved out of the box body 1, the bracket 7 and the cement board can be taken out by the arranged cement board, the bracket 7 and the water heater can be used for detecting the normal temperature water inlet pipe 10 and the normal temperature of the water of the preheating box can be controlled by the normal temperature water inlet pipe 10, when the water heater is added into the normal temperature water tank 1, the normal temperature water heater, the normal temperature water tank 1 is added, the normal temperature water inlet pipe 17, the normal temperature water heater is controlled by the normal temperature water heater, the normal temperature water inlet pipe 17, the normal temperature water inlet of the normal temperature water inlet pipe is controlled by the normal temperature water inlet pipe 17, the working time of the electric heater 2 is shortened, and through the arranged preheating box 10, the heat resources generated by the Leeb boiling box for detecting the stability of the cement can be fully utilized, so that the Leeb boiling box for detecting the stability of the cement conforms to the concept of green environmental development.
In the present invention, unless otherwise explicitly specified or limited, the terms "mounted", "disposed", "connected", "fixed", "screwed" and the like are to be understood broadly, and may be, for example, a fixed connection, a detachable connection, or an integral body; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a lei shi boils and boils case for cement stability can detect, a serial communication port, including box (1), the both sides of box (1) are run through respectively and are installed electric heater (2) and play water valve pipe (3), the inside fixed mounting of box (1) has spacing frame (4), and the upper portion of spacing frame (4) is provided with filter plate (5) to filter plate's (5) upper portion fixed mounting has four groups to prop up pole (6), four groups prop up the top of pole (6) and install support (7), apron (8) are installed to the opening part of box (1), and the upper portion of apron (8) installs controller (9), one side fixed mounting of box (1) has preheating cabinet (10).
2. The Lee boiling box for detecting the stability of cement according to claim 1, wherein two sets of threaded pipes (19) are fixedly mounted at the lower part of the cover plate (8), screw rods (12) are mounted inside the two sets of threaded pipes (19), built-in convex grooves (13) are formed in the upper end parts of the four sets of support rods (6), T-shaped rods (14) are mounted inside the four sets of built-in convex grooves (13) in a penetrating manner, limiting plates (15) are fixedly mounted at one end parts of the four sets of T-shaped rods (14), expansion springs (16) are fixedly mounted at the lower parts of the four sets of limiting plates (15), and one end parts of the four sets of expansion springs (16) are fixedly connected with the inner bottom surfaces of the four sets of built-in convex grooves (13) respectively.
3. The Lee boiling tank for cement stability performance detection according to claim 2, wherein two sets of the threaded pipes (19) and two sets of the threaded rods (12) are meshed with each other.
4. The Lee's boiling box for detecting the stability of cement of claim 1, characterized in that a water inlet tank (17) is opened on the upper portion of the preheating box (10), a sealing plug (18) is installed inside the water inlet tank (17) in a penetrating manner, a spiral pipe (11) is installed inside the preheating box (10), two ends of the spiral pipe (11) respectively penetrate through two sides inside the preheating box (10), one end of the spiral pipe (11) penetrates through one side of the box body (1), a water guide pipe (20) is fixedly installed on the lower portion of the preheating box (10) in a penetrating manner, one end of the water guide pipe (20) penetrates through one side of the box body (1), and a valve (21) is installed on the side wall of the water guide pipe (20).
5. The Lee boiling box for cement stability performance detection according to claim 1, wherein the cross-sectional dimension of the filter screen plate (5) is larger than the inner cross-sectional dimension of the limiting frame (4).
6. The Lee boiling box for detecting the stability of cement according to claim 1, wherein four groups of supporting seats are fixedly arranged at the lower part of the box body (1).
7. The Lee boiling tank for cement stability performance detection according to claim 1, wherein the controller (9) is electrically connected with the electric heater (2) through an electric wire.
CN202220387164.4U 2022-02-25 2022-02-25 Lee's boiling box for detecting stability performance of cement Active CN217688657U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220387164.4U CN217688657U (en) 2022-02-25 2022-02-25 Lee's boiling box for detecting stability performance of cement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220387164.4U CN217688657U (en) 2022-02-25 2022-02-25 Lee's boiling box for detecting stability performance of cement

Publications (1)

Publication Number Publication Date
CN217688657U true CN217688657U (en) 2022-10-28

Family

ID=83729175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220387164.4U Active CN217688657U (en) 2022-02-25 2022-02-25 Lee's boiling box for detecting stability performance of cement

Country Status (1)

Country Link
CN (1) CN217688657U (en)

Similar Documents

Publication Publication Date Title
CN217688657U (en) Lee's boiling box for detecting stability performance of cement
CN203212897U (en) Water storage cup of steam generator on garment steamer
CN202813324U (en) Heat pipe type vapor generator for nuclear power unit
CN201367537Y (en) Novel clothes steamer
CN113776040A (en) Environment-friendly boiler with energy-saving function
CN209117212U (en) A kind of temperature testing organization of steam boiler
CN209655437U (en) The containment structures and household electrical appliance of household electrical appliance
CN209003540U (en) A kind of float and its electric steam furnace of improvement
CN210624896U (en) Water-saving boiler
CN109631627A (en) A kind of heat exchanger mounting structure of gas heater
CN201426636Y (en) Multifunctional household steam case
CN210601553U (en) Novel energy-saving through-flow steam generator device
CN214536099U (en) Interface reverse type double-heating-pipe steam generator
CN210179587U (en) Temperature maintaining device for electric power boiler
CN215062943U (en) Solar sealing waterproof frame
CN213991063U (en) Energy-saving vertical heater
CN217565667U (en) Steam box water control device for steaming rice
CN216481037U (en) Automatic unmanned soot blower of environmental protection
CN205286029U (en) Liquid heating container
CN210961461U (en) Electric water tank utilization mechanism of steam oven
CN214250151U (en) Convenient maintenance heat exchanger for condensation wall-mounted furnace
CN215675784U (en) Novel intelligent electric boiler
CN205107343U (en) Mounting structure of electric kettle temperature control device electrode
CN206300336U (en) A kind of bar desk stepping water boiler
CN210831922U (en) Improved generation electrical heating steam generator is used in shampoo production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant