CN217680424U - Building sound insulation heat preservation wall's supplementary construction equipment - Google Patents

Building sound insulation heat preservation wall's supplementary construction equipment Download PDF

Info

Publication number
CN217680424U
CN217680424U CN202220292748.3U CN202220292748U CN217680424U CN 217680424 U CN217680424 U CN 217680424U CN 202220292748 U CN202220292748 U CN 202220292748U CN 217680424 U CN217680424 U CN 217680424U
Authority
CN
China
Prior art keywords
base
fixed mounting
spacing
building
preservation wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220292748.3U
Other languages
Chinese (zh)
Inventor
李时锋
王治刚
张乾坤
王礼军
许岩
吴雪翠
付志鹏
雷智慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Smcc Road And Bridge Engineering Co ltd
Original Assignee
Smcc Road And Bridge Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Smcc Road And Bridge Engineering Co ltd filed Critical Smcc Road And Bridge Engineering Co ltd
Priority to CN202220292748.3U priority Critical patent/CN217680424U/en
Application granted granted Critical
Publication of CN217680424U publication Critical patent/CN217680424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model belongs to the technical field of the construction, and a building sound insulation heat preservation wall's supplementary construction equipment is disclosed, the on-line screen storage device comprises a base, the top of base is equipped with the protection frame, the equal fixed mounting in both sides has spacing around the protection frame bottom, the spacing groove has all been seted up to both sides around the base medial surface, the protection frame is through activity joint between spacing and the spacing groove. The utility model discloses a constructor can stand in the inside of protective frame, and cup joint the protective ring and accomplish fixedly at the lateral surface of health and with carrying out the joint between pull rod and the fixed column, can be under construction to the outer wall this moment, but the positive reverse of direct control motor can drive the threaded rod rotation when needs translate, can drive about the activity strip this moment, and control about spacing can be in the inside of spacing groove, and finally drive protective frame about the translation of displacement realization constructor, make the constructor stabilize the translation, thereby the higher advantage of factor of safety has been realized.

Description

Building sound insulation heat preservation wall's supplementary construction equipment
Technical Field
The utility model belongs to the technical field of the construction, specifically a supplementary construction equipment of building sound insulation heat preservation wall.
Background
The external wall heat insulation is formed by compounding polymer mortar, glass fiber gridding cloth, external wall flame-retardant heat insulation boards or fireproof heat insulation boards and the like, and is used for on-site bonding construction. The fireproof heat-insulation board of the outer wall is as follows: graphite modified cement base heated board, rock wool board, foaming cement board, foaming ceramic heated board etc. in the work progress of building outer wall, except outermost decoration curtain wall can carry out the construction of heat preservation wall that gives sound insulation in the building outer wall usually, and it is building sound insulation and heat retaining basis.
In the work progress of building outer wall, in order to carry out effective construction to the outer wall inside, generally need constructor to be under construction in the outside of building outer wall, need constructor stand in the work progress and carry out work on the scaffold frame, still need carry out operations such as translation usually, because the space is narrow and small in the translation in-process, high simultaneously, danger coefficient is high, very easily causes the incident, also has the inconvenient condition of instrument carrying simultaneously, and the urgent need improves.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above problem, the utility model provides a supplementary construction equipment of building sound insulation heat preservation wall has the higher advantage that makes things convenient for the instrument to use of factor of safety.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a building sound insulation heat preservation wall's supplementary construction equipment, includes the base, the top of base is equipped with the protective frame, the equal fixed mounting in both sides has spacing around the protective frame bottom, the spacing groove has all been seted up to both sides around the base medial surface, the protective frame passes through activity joint between spacing and the spacing groove, the middle part movable mounting of base medial surface has the threaded rod, the bottom fixed mounting of protective frame has movable strip, threaded connection between the medial surface of movable strip and the threaded rod.
As the utility model discloses a building sound insulation heat preservation wall's preferred technical scheme of supplementary construction equipment, one side fixed mounting of base has the fixing base, the top fixed mounting of fixing base has the motor, the one end of motor output shaft and the one end fixed connection of threaded rod.
As the utility model discloses a building sound insulation heat preservation wall's preferred technical scheme of supplementary construction equipment, the equal fixed mounting in four corners department of base lateral surface has the otic placode, the fixed orifices that runs through completely is all seted up on the top of otic placode.
As the utility model discloses a building sound insulation heat preservation wall's preferred technical scheme of supplementary construction equipment, the equal fixed mounting in four corners department on protective frame top has the fixed column, the middle part on protective frame top is equipped with the guard ring, the guard ring lateral surface is close to the equal fixed mounting in protective frame four corners department has the pull rod, the activity cup joints between pull rod and the fixed column, during the construction, fixes between the fixed orifices that sets up on the otic placode all around through the base and the scaffold at first, constructor can stand in protective frame's inside to cup joint the guard ring at the lateral surface of health and accomplish fixedly with carrying out the joint between pull rod and the fixed column, can be under construction to the outer wall this moment, can drive the threaded rod rotation if the just reversal of direct control motor when needing to carry out the translation, can drive about this moment the movable strip and remove, and about the spacing can be in the inside of spacing groove, and finally drive the displacement about protective frame and realize constructor's translation for constructor stabilizes the translation.
As the utility model discloses a building sound insulation heat preservation wall's preferred technical scheme of supplementary construction equipment, equal fixed mounting has the guide rail on the position at both ends about both sides are close to around the protective frame, the front end of guide rail is equipped with the material case, movable joint between material case and the guide rail.
As the utility model discloses a preferred technical scheme of supplementary construction equipment of building sound insulation heat preservation wall, the equal fixed mounting in the left and right sides of material bottom of the case portion has spacing spring, the top fixed mounting of spacing spring has the fly leaf that is located the material incasement portion, the cross sectional area and the shape of fly leaf are the same with the cross sectional area and the shape of material bottom of the case portion, movable joint between fly leaf and the material case can place various instruments and materials in the inside of material case when the construction of building outer wall for easily take in the work progress, the pressure that the reduction that is located the spacing spring of fly leaf bottom along with instrument and material received reduces, and the corresponding reduction of compressed volume can drive the relative material case of fly leaf and upwards displace makes the instrument and the material on fly leaf top be in higher position all the time and conveniently take.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a top at the base is provided with the protective frame, simultaneously install spacing in both sides around the protective frame bottom, and the medial surface at the base has been seted up spacing groove and spacing between activity joint, in actual work progress, at first fix between fixed orifices and the scaffold frame of seting up on the otic placode all around through the base, constructor can stand in the inside of protective frame, and cup joint the protective ring at the lateral surface of health and accomplish fixedly with carrying out the joint between pull rod and the fixed column, can construct to the outer wall this moment, but direct control motor's positive and negative rotation can drive the threaded rod rotation when needing to carry out the translation, can drive about the activity strip this moment, and spacing can control about the inside of spacing groove, and finally drive the left and right sides displacement of protective frame and realize constructor's translation, make the constructor stabilize the translation, thereby the higher advantage of factor of safety has been realized.
2. The utility model discloses a guide rail is installed to both sides around the protective frame, and there is the material case at the internally mounted of guide rail, there is the fly leaf simultaneously at the inside movable mounting of material case, when the construction of building outer wall, can place various instruments and materials in the inside of material case, make and easily take in the work progress, the pressure that the reduction that is located the spacing spring of fly leaf bottom along with instrument and material reduces, the corresponding reduction of compressed volume can drive the relative material case of fly leaf and upwards displace makes instrument and the material on fly leaf top be in higher position conveniently to take all the time, thereby realized the advantage that makes things convenient for the instrument to use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an exploded view of the base structure of the present invention;
FIG. 3 is an exploded view of the structure of the pull rod and the protection frame of the present invention;
FIG. 4 is an exploded view of the material box structure of the present invention;
fig. 5 is a cross-sectional view of the internal structure of the material box of the present invention.
In the figure: 1. a base; 2. an ear plate; 3. a fixing hole; 4. a fixed seat; 5. a motor; 6. a threaded rod; 7. a limiting groove; 8. a limiting strip; 9. a movable bar; 10. a protective frame; 11. fixing the column; 12. a pull rod; 13. a guard ring; 14. a guide rail; 15. a material box; 16. a movable plate; 17. and a limiting spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in figures 1, 2 and 3, the utility model provides an auxiliary construction device for a building sound-insulation and heat-preservation wall, which comprises a base 1, a protective frame 10 is arranged above the base 1, the front side and the rear side of the bottom end of the protective frame 10 are both fixedly provided with a limit strip 8, the front side and the rear side of the inner side surface of the base 1 are both provided with limit grooves 7, the protective frame 10 is movably clamped with the limit grooves 7 through the limit strips 8, the middle part of the inner side surface of the base 1 is movably provided with a threaded rod 6, the bottom end of the protective frame 10 is fixedly provided with a movable strip 9, the inner side surface of the movable strip 9 is in threaded connection with the threaded rod 6, one side of the base 1 is fixedly provided with a fixed seat 4, the top end of the fixed seat 4 is fixedly provided with a motor 5, one end of the output shaft of the motor 5 is fixedly connected with one end of the threaded rod 6, four corners of the outer side surface of the base 1 are both fixedly provided with ear plates 2, the top ends of the ear plates 2 are all provided with fixing holes 3 which completely run through, the four corners of the top end of the protective frame 10 are all fixedly provided with fixed columns 11, the middle part of the top end of the protective frame 10 is provided with a protective ring 13, the outer side surface of the protective ring 13, which is close to the four corners of the protective frame 10, is all fixedly provided with pull rods 12, the pull rods 12 are movably sleeved with the fixed columns 11, during construction, firstly, the fixed holes 3 arranged on the ear plates 2 around the base 1 are fixed with a scaffold, constructors can stand in the protective frame 10, the protective ring 13 is sleeved on the outer side surface of a body and is clamped between the pull rods 12 and the fixed columns 11 to complete fixation, at the moment, the outer wall can be constructed, if translation is needed, the positive rotation and the negative rotation of the motor 5 can be directly controlled to drive the threaded rod 6 to rotate, at the moment, the movable strips 9 can be driven to move left and right, and the limiting strips 8 can move left and right in the limiting grooves 7, and finally, the protection frame 10 is driven to move left and right to realize the translation of the constructors, so that the constructors can stably translate.
As shown in fig. 4 and 5, guide rails 14 are fixedly mounted on the front side and the rear side of the protective frame 10 near the left end and the right end, a material box 15 is arranged at the front end of each guide rail 14, the material box 15 is movably clamped with the guide rails 14, limiting springs 17 are fixedly mounted on the left side and the right side of the bottom end of the material box 15, a movable plate 16 located inside the material box 15 is fixedly mounted at the top end of each limiting spring 17, the cross sectional area and the shape of the movable plate 16 are the same as those of the bottom end of the material box 15, the movable plate 16 is movably clamped with the material box 15, and during construction of an outer wall of a building, various tools and materials can be placed inside the material box 15, so that the tools and materials can be taken easily during construction, and the tools and materials at the top end of the movable plate 16 can be driven to move upwards relative to the material box 15 by corresponding reduction of the compression amount as the pressure on the limiting springs 17 located at the bottom end of the movable plate 16 is reduced.
The utility model discloses a theory of operation and use flow:
during construction, firstly, fixing is carried out between the scaffold and fixing holes 3 formed in lug plates 2 on the periphery of a base 1, a constructor can stand inside a protection frame 10, a protection ring 13 is sleeved on the outer side face of a body, and a pull rod 12 and a fixing column 11 are clamped and connected to complete fixing, construction can be carried out on the outer wall at the moment, if translation is needed, a threaded rod 6 can be driven to rotate by directly controlling forward and reverse rotation of a motor 5, at the moment, a movable strip 9 can be driven to move left and right, a limiting strip 8 can move left and right inside a limiting groove 7, translation of the constructor is realized by finally driving left and right displacement of the protection frame 10, the constructor can be stably translated, various tools and materials can be placed inside a material box 15 during construction of the outer wall, the constructor is easy to take in the construction process, pressure received by a limiting spring 17 located at the bottom end of a movable plate 16 along with reduction of the tools and materials is reduced, the compressed amount can be correspondingly reduced, the movable plate 16 can be driven to move upwards relative to enable the tools and materials on the movable plate 16 to be located at a higher position of the movable plate 16, and the tools and the materials are convenient to take.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building sound insulation heat preservation wall's supplementary construction equipment, includes base (1), its characterized in that: the top of base (1) is equipped with protecting frame (10), the equal fixed mounting in both sides has spacing (8) around protecting frame (10) bottom, spacing groove (7) have all been seted up to both sides around base (1) medial surface, protecting frame (10) are through the joint that moves about between spacing (8) and spacing groove (7), the middle part movable mounting of base (1) medial surface has threaded rod (6), the bottom fixed mounting of protecting frame (10) has movable strip (9), threaded connection between the medial surface of activity strip (9) and threaded rod (6).
2. The auxiliary construction device for the sound-insulation and heat-preservation wall of the building as claimed in claim 1, wherein: one side fixed mounting of base (1) has fixing base (4), the top fixed mounting of fixing base (4) has motor (5), the one end of motor (5) output shaft and the one end fixed connection of threaded rod (6).
3. The auxiliary construction device of the sound-insulation and heat-preservation wall for the building as claimed in claim 1, wherein: the equal fixed mounting in four corners department of base (1) lateral surface has otic placode (2), fixed orifices (3) that run through completely are all seted up on the top of otic placode (2).
4. The auxiliary construction device of the sound-insulation and heat-preservation wall for the building as claimed in claim 1, wherein: the all fixed mounting in four corners department on protection frame (10) top has fixed column (11), the middle part on protection frame (10) top is equipped with guard ring (13), guard ring (13) lateral surface is close to all fixed mounting in four corners department of protection frame (10) and has pull rod (12), the activity cup joints between pull rod (12) and fixed column (11).
5. The auxiliary construction device for the sound-insulation and heat-preservation wall of the building as claimed in claim 1, wherein: equal fixed mounting has guide rail (14) in the position that both ends were controlled to both sides are close to around protective frame (10), the front end of guide rail (14) is equipped with material case (15), the activity joint between material case (15) and guide rail (14).
6. The auxiliary construction device for the sound-insulation and heat-preservation wall of the building as claimed in claim 5, wherein: the equal fixed mounting in the left and right sides of material case (15) bottom has spacing spring (17), the top fixed mounting of spacing spring (17) has fly leaf (16) that is located material case (15) inside, the cross sectional area and the shape of fly leaf (16) are the same with the cross sectional area and the shape of material case (15) bottom, activity joint between fly leaf (16) and material case (15).
CN202220292748.3U 2022-02-14 2022-02-14 Building sound insulation heat preservation wall's supplementary construction equipment Active CN217680424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220292748.3U CN217680424U (en) 2022-02-14 2022-02-14 Building sound insulation heat preservation wall's supplementary construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220292748.3U CN217680424U (en) 2022-02-14 2022-02-14 Building sound insulation heat preservation wall's supplementary construction equipment

Publications (1)

Publication Number Publication Date
CN217680424U true CN217680424U (en) 2022-10-28

Family

ID=83729809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220292748.3U Active CN217680424U (en) 2022-02-14 2022-02-14 Building sound insulation heat preservation wall's supplementary construction equipment

Country Status (1)

Country Link
CN (1) CN217680424U (en)

Similar Documents

Publication Publication Date Title
CN217680424U (en) Building sound insulation heat preservation wall's supplementary construction equipment
CN212506848U (en) Sound insulation building board for building
CN215563373U (en) Connection structure of concatenation formula curtain
CN212578824U (en) Slotting device for door of student apartment bed cabinet
CN217925627U (en) Assembly type structure heat preservation sound insulation door and window
CN209580763U (en) A kind of novel aluminium foil plate
CN212143233U (en) Production of rock wool battenboard is with mill equipment of gluing
CN210976876U (en) Sound insulation structure for building planning
CN219344535U (en) Sound insulation type aluminum alloy door and window
CN217756240U (en) Winding and unwinding mechanism for sealing rubber strip
CN219196282U (en) Quick connection structure of frame-type assembled sound insulation house
CN220981562U (en) Constant-temperature dehumidification heat pump unit for swimming pool
CN211639788U (en) Building decorative panel processing platform
CN219152483U (en) Polishing device for machining fireproof wooden door
CN218840226U (en) Glass curtain wall with good protection performance
CN220929202U (en) Sound insulation door structure for noise treatment
CN216372485U (en) Cutting equipment is used in production of inorganic heated board
CN219603005U (en) Elevator car damping device for building material
CN207731641U (en) A kind of ventilating sound-proof cover for very noisy equipment
CN217310094U (en) Noise reduction device for air outlet of dust collector
CN220451736U (en) Mute warm-keeping diamond yarn integrated flat window
CN212470010U (en) Portable environment-friendly panel cutting tool
CN213540074U (en) Fiber reinforced cement decoration panel and window bottom connected node structure
CN217269662U (en) Effectual aluminum alloy fire window gives sound insulation
CN218759623U (en) Protection device for window

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant