CN217679506U - Plastic drainage board construction machine suitable for tailing dam - Google Patents

Plastic drainage board construction machine suitable for tailing dam Download PDF

Info

Publication number
CN217679506U
CN217679506U CN202221553954.1U CN202221553954U CN217679506U CN 217679506 U CN217679506 U CN 217679506U CN 202221553954 U CN202221553954 U CN 202221553954U CN 217679506 U CN217679506 U CN 217679506U
Authority
CN
China
Prior art keywords
frame
drilling tool
keeping
tailing dam
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221553954.1U
Other languages
Chinese (zh)
Inventor
王文宜
干思锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Changjiang Geological Engineering Co ltd
Original Assignee
Maanshan Changjiang Geological Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Changjiang Geological Engineering Co ltd filed Critical Maanshan Changjiang Geological Engineering Co ltd
Priority to CN202221553954.1U priority Critical patent/CN217679506U/en
Application granted granted Critical
Publication of CN217679506U publication Critical patent/CN217679506U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a plastics drain bar construction equipment suitable for tailing dam, including support, screw rod drilling tool and drain bar erector, the drain bar erector welds in the side of screw rod drilling tool bottom and its bottom flushes with the drill bit, the drain bar erector is including keeping in the frame to keep in the frame for upper and lower open type, one side of keeping in the frame welds in the surface of screw rod drilling tool through the welding piece, the bottom of keeping in the frame both sides all articulates through the hinge has the baffle, the top of keeping in the frame is provided with the rubber gag rather than opening looks adaptation. The utility model discloses, the structure is succinct, convenient operation, is particularly suitable for constructing in slope ratio such as tailing dam big, the narrow place of working face, and has simplified the construction flow of traditional technique, improves work efficiency.

Description

Plastic drainage board construction machine suitable for tailing dam
Technical Field
The utility model relates to a plastics drain bar construction machines field, concretely relates to machines are used in the construction of special topography and geomorphic of mine tailing dam class.
Background
The plastic drainage board is applied to the mine tailing pond for decades and mainly has the main function of being arranged in the tailing dam and the tailing pond and combined with horizontal drainage and seepage to communicate a relative impermeable layer in tailing sand, so that the drainage and seepage effect is enhanced.
When the plastic drainage plate is arranged in the reservoir, the original plastic drainage plate construction machine can be used for construction operation due to the fact that the interior of the reservoir is wide in terrain and small in gradient, but when the plastic drainage plate is arranged on a tailing dam, the conventional plastic drainage plate construction machine cannot be adapted due to the fact that the width of the dam body is narrow (usually 2-5 meters), the slope ratio is large (1:5-1:2), and the tailing dam body is not allowed to perform destructive operations such as site leveling. The existing solution is to drill holes by a surveying drilling machine and then manually install the plastic drainage plate, and the drilling and the installation of the drainage plate are performed separately, so that the efficiency is low, the speed is slow, the labor intensity of the manual installation of the drainage plate is high, and a novel plastic drainage plate construction machine tool which is simple, convenient, easy, low in cost and fast in progress is urgently needed in the market.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a plastics drain bar construction equipment suitable for tailing dam to solve above-mentioned technical problem.
The utility model discloses a solve above-mentioned technical problem, adopt following technical scheme to realize:
the plastic drainage plate construction machine suitable for the tailing dam comprises a support, a screw drill and a drainage plate installer, wherein the drainage plate installer is welded on the side surface of the bottom of the screw drill, and the bottom end of the drainage plate installer is flush with a drill bit;
the drain bar erector includes the frame of keeping in to the frame of keeping in is upper and lower open type, the surface of welding piece welding and screw rod drilling tool is passed through to one side of the frame of keeping in, the bottom of the frame both sides of keeping in all hinges through the hinge has the baffle, the top of the frame of keeping in is provided with the rubber gag rather than opening looks adaptation.
Preferably, the support includes installation disc and supporting leg, the top of supporting leg welds in the edge of installation disc bottom to the supporting leg is even altogether is provided with threely, the round hole has been seted up at the middle part of installation disc, and the welding of the interior ring portion of round hole has the steel pipe perpendicular with the installation disc.
Preferably, the top of the screw drill is communicated with a PE hose through a rotary joint, the screw drill is inserted into the short steel pipe, and the inner diameter of the short steel pipe is matched with the outer diameter of the screw drill.
Preferably, the supporting leg comprises a supporting rod and a sleeve, the supporting rod is inserted in the sleeve, and the diameter of the supporting rod is matched with the inner diameter of the sleeve.
Preferably, a plurality of adjusting holes are formed in the sleeve and the supporting rod, and the sleeve and the supporting rod are fixed through the adjusting holes and the bolts.
Preferably, the ends of the two said flaps just touch when they are brought together.
The beneficial effects of the utility model are that:
the utility model provides a plastics drain bar construction machines suitable for tailing dam will creep into pore-forming, the disposable completion of plastics drain bar installation operation, simplifies the construction flow and improves efficiency, and construction machines structure is succinct, use easy operation convenience.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a schematic structural diagram of the installation device for drain board of the present invention;
FIG. 3 is an enlarged view of a portion of the substrate of FIG. 2;
fig. 4 is a schematic structural view of the support leg of the present invention.
Reference numerals: 1. a screw drill; 2. a support; 21. installing a disc; 22. supporting legs; 221. a support bar; 222. a sleeve; 223. an adjustment hole; 224. a bolt; 23. a steel pipe; 3. a drain board mounting device; 31. a temporary storage frame; 32. welding the blocks; 33. a hinge; 34. a baffle plate; 35. a rubber plug cover; 4. a rotary joint; 5. a PE hose.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings, but the following embodiments are only the preferred embodiments of the present invention, and not all embodiments are included. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention.
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
Examples
As shown in fig. 1-3, a plastic drainage plate construction machine suitable for a tailing dam comprises a support 2, a screw drill 1 and a drainage plate installer 3, wherein the support 2 comprises an installation disc 21 and support legs 22, a circular hole is formed in the middle of the installation disc 21, a steel pipe 23 perpendicular to the installation disc 21 is welded on the inner ring portion of the circular hole, the screw drill 1 is inserted into the short steel pipe 23, the inner diameter of the short steel pipe 23 is matched with the outer diameter of the screw drill 1, the top of the screw drill 1 is communicated with a PE hose 5 through a rotary joint 4, high-pressure water flow is injected into the PE hose 5 through a high-pressure water pump to provide power for the drill, a drill bit of the screw drill 1 is driven to cut a covering layer and tailing sand, the crushed tailing sand (soil) returns to the ground under the hydraulic action from a drill hole, and the top of the screw 1 is connected with the PE hose 5 through the rotary joint, so that the hose and the drill can freely rotate, and the connection portion is not easy to break;
the utility model discloses: the drainage plate installer 3 is welded on the side face of the bottom of the screw drill 1, the bottom end of the drainage plate installer 3 is flush with a drill bit, the temporary storage frame 31 is of an upper and lower opening type, one side of the temporary storage frame 31 is welded with the surface of the screw drill 1 through a welding block 32, the bottoms of two sides of the temporary storage frame 31 are hinged with baffle plates 34 through hinges 33, the tail ends of the two baffle plates 34 are just contacted when the two baffle plates are folded, the two baffle plates are manually adjusted before drilling to be in a folded state and parallel to the ground, the two baffle plates 34 are closed and always contacted with the ground during drilling to shield the plastic drainage plate inside the temporary storage frame 31, the plastic drainage plate stays in the temporary storage frame 31 to follow synchronously, the drilling tool is lifted after the bottom of the drilling tool reaches the designed depth, the bottoms of the two baffle plates 34 are suspended and reversely rotated under the action of the self gravity to be in a vertical state, the plastic drainage plate inside the temporary storage frame 31 cannot be shielded, the plastic drainage plate automatically falls off and stays in the drill hole, and a rubber plug 35 matched with the opening is arranged at the top of the temporary storage frame 31.
The utility model discloses: the top of supporting leg 22 welds in the edge of installation disc 21 bottom to supporting leg 22 is provided with threely altogether evenly, and supporting leg 22 has bracing piece 221 and sleeve 222 to constitute, and bracing piece 221 inserts the inside of locating sleeve 222, and the diameter of bracing piece 221 and the internal diameter looks adaptation of sleeve 222, all seted up a plurality of regulation holes 223 on sleeve 22 and the bracing piece 221, and fixed mutually through regulation hole 223 and bolt 224 between sleeve 22 and the bracing piece 221.
When the device is used, firstly, a construction machine is fixed on the dam face or the slope of the tailing dam by using the length-adjustable adjusting support, the control disc at the top of the support is parallel to the dam face by adjusting the length of the supporting legs 22, a drill bit of the screw drill is in contact with the ground, two baffles 34 are ensured to be adjusted to be in a folding state, then, a plastic drainage plate is placed into the temporary storage frame from an opening in the upper part of the temporary storage frame, a plug cover 35 is covered, high-pressure water flow is injected into the PE hose 5 through a high-pressure water pump to provide power for the drill, the drill bit of the screw drill 1 is driven to cut the covering layer of the tailing dam and tailing sand, the crushed tailing sand (soil) returns to the ground under the hydraulic action from the inside of a drill hole, the plastic drainage plate and the drill synchronously follow up when drilling, the drill is lifted up after the bottom of the drill reaches the designed depth, and the plastic drainage plate automatically falls off and remains in the drill hole.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only the preferred embodiments of the present invention, and is not intended to limit the present invention, and that there may be various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. Plastics drain bar construction equipment suitable for tailing dam includes support (2), screw rod drilling tool (1) and drain bar erector (3), its characterized in that: the drainage plate installer (3) is welded on the side surface of the bottom of the screw drilling tool (1), and the bottom end of the drainage plate installer is flush with the drill bit;
drain bar erector (3) are including keeping in frame (31) to keep in frame (31) for upper and lower open type, the one side of keeping in frame (31) is welded in the surface of screw rod drilling tool (1) through welding piece (32), the bottom of keeping in frame (31) both sides all articulates through hinge (33) has baffle (34), the top of keeping in frame (31) is provided with rather than rubber stopper lid (35) of opening looks adaptation.
2. The plastic drainage board construction machine suitable for the tailing dam of claim 1, wherein: support (2) are including installation disc (21) and supporting leg (22), the top of supporting leg (22) welds in the edge of installation disc (21) bottom to supporting leg (22) are the homogeneous three that is provided with altogether, the round hole has been seted up at the middle part of installation disc (21) to the welding of the interior annular portion of round hole has with installation disc (21) vertically short steel pipe (23).
3. The plastic drainage board construction machine suitable for the tailing dam of claim 2, wherein: the top of the screw drilling tool (1) is communicated with a PE hose (5) through a rotary joint (4), the screw drilling tool (1) is inserted into the short steel pipe (23), and the inner diameter of the short steel pipe (23) is matched with the outer diameter of the screw drilling tool (1).
4. The plastic drainage board construction machine suitable for the tailing dam of claim 2, wherein: the supporting leg (22) is composed of a supporting rod (221) and a sleeve (222), the supporting rod (221) is inserted into the sleeve (222), and the diameter of the supporting rod (221) is matched with the inner diameter of the sleeve (222).
5. The plastic drainage board construction machine suitable for the tailing dam of claim 4, wherein: a plurality of adjusting holes (223) are formed in the sleeve (222) and the supporting rod (221), and the sleeve (222) and the supporting rod (221) are fixed through the adjusting holes (223) and the bolts (224).
CN202221553954.1U 2022-06-21 2022-06-21 Plastic drainage board construction machine suitable for tailing dam Expired - Fee Related CN217679506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221553954.1U CN217679506U (en) 2022-06-21 2022-06-21 Plastic drainage board construction machine suitable for tailing dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221553954.1U CN217679506U (en) 2022-06-21 2022-06-21 Plastic drainage board construction machine suitable for tailing dam

Publications (1)

Publication Number Publication Date
CN217679506U true CN217679506U (en) 2022-10-28

Family

ID=83711145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221553954.1U Expired - Fee Related CN217679506U (en) 2022-06-21 2022-06-21 Plastic drainage board construction machine suitable for tailing dam

Country Status (1)

Country Link
CN (1) CN217679506U (en)

Similar Documents

Publication Publication Date Title
CN211472520U (en) Bored pile foundation supporting device pours into
CN106088064A (en) A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN110863773A (en) Pile foundation hole digging machine for building foundation engineering
CN217679506U (en) Plastic drainage board construction machine suitable for tailing dam
CN110939168A (en) Irrigation canals and ditches excavation device for agricultural machine
CN107036841A (en) A kind of water and soil integrated sampling device
CN208537223U (en) Double-jacket tube soil sampler
CN111809631A (en) Ultra-deep foundation pit supporting device and using method
CN110439551A (en) A kind of underground water sampler and tilting groundwater sampling system
CN213088033U (en) Anchor hole grouting water plugging device in confined water stratum
CN207739943U (en) A kind of mixing pile machine broken rock drill bit
CN209129015U (en) Water-bag-type riverway cofferdam
CN205116162U (en) Pile head enlarges drilling bored concrete pile clad steel and protects a section of thick bamboo
CN221441484U (en) Portable slurry overflow preventing device for construction of cement mixing pile
CN218291810U (en) Construction water retaining device
CN211818182U (en) Interim safety device of major diameter pile foundation
CN220538742U (en) Pit digging device for municipal road soft foundation construction
CN113700068B (en) Construction method of rod pit installation chassis
CN216714300U (en) Square pile or special-shaped pile drilling device
CN205296167U (en) Multifunctional informationized grouting equipment
CN211874374U (en) Pile foundation hole digging machine for building foundation engineering
CN216839480U (en) Concrete foundation ditch side slope protective structure
CN216914391U (en) Pile foundation rotary excavating hole protecting wall mud stirring and conveying device
CN220039738U (en) Oil leak detection device of underwater caisson

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221028

CF01 Termination of patent right due to non-payment of annual fee