CN217669964U - Aluminium mould screw hole shutoff precast concrete making devices - Google Patents

Aluminium mould screw hole shutoff precast concrete making devices Download PDF

Info

Publication number
CN217669964U
CN217669964U CN202221510274.1U CN202221510274U CN217669964U CN 217669964 U CN217669964 U CN 217669964U CN 202221510274 U CN202221510274 U CN 202221510274U CN 217669964 U CN217669964 U CN 217669964U
Authority
CN
China
Prior art keywords
screw hole
cylinder body
fixed
precast concrete
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221510274.1U
Other languages
Chinese (zh)
Inventor
王佳鹏
任堂
李艳秋
张明伟
马伟
丁洪亮
陈锟
李栋
龙帅
何星宇
殷吴彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202221510274.1U priority Critical patent/CN217669964U/en
Application granted granted Critical
Publication of CN217669964U publication Critical patent/CN217669964U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The application relates to the field of building construction, discloses an aluminium mould screw hole shutoff precast concrete making devices for the concrete spare in screw hole is clogged in the prefabrication, and it includes that base and both ends are open stack shell, and the stack shell is the toper, and the internal diameter of stack shell is unanimous with the aperture in screw hole, the one end and the base rigid coupling of stack shell. The method has the advantages that the number of required construction persons is more and the construction efficiency is lower in the traditional plugging process.

Description

Aluminium mould screw hole shutoff precast concrete making devices
Technical Field
The application relates to the field of building construction, in particular to an aluminum mould screw hole plugging precast concrete manufacturing device.
Background
In the construction process of wall body, need usually with the help of the screw rod to drawing the fastening template to prevent to pour in-process rise mould, guarantee the roughness of wall. Referring to fig. 1, the aluminum alloy template is tensioned from two sides by the opposite-pulling screw rods, the opposite-pulling screw rods are sleeved with the conical sleeves, the template is fixed by the back edges, and the screw rods are prevented from loosening by the limiting nuts.
After the wall body is poured, later plugging needs to be carried out on a screw hole left by a pull screw, and the related technology states that the traditional plugging process is to fill with waterproof mortar and then tamp with reinforcing steel bars.
In order to solve the above problems, the inventor believes that the traditional plugging process needs multiple persons to work simultaneously when implemented, needs to be tamped by steel bars and also needs to prevent mortar leakage, and has the problems of more required construction persons and lower construction efficiency.
SUMMERY OF THE UTILITY MODEL
In order to effectively improve traditional shutoff technology and to have required construction number more, the lower problem of efficiency of construction, this application provides an aluminium mould screw hole shutoff precast concrete making devices.
The application provides a pair of aluminium mould screw hole shutoff precast concrete making devices adopts following technical scheme:
the utility model provides an aluminium mould screw hole shutoff precast concrete making devices for the concrete spare in screw hole is clogged in the prefabrication, is open stack shell including base and both ends, and the stack shell is the toper, and the internal diameter of stack shell is unanimous with the aperture in screw hole, the one end and the base rigid coupling of stack shell.
By adopting the technical scheme, the inner diameter of the cylinder body is consistent with the aperture of the screw hole, so that the manufactured concrete piece is matched with the screw hole; firstly, a mould is manufactured according to the size of a screw hole, then concrete mortar is poured into the mould from the opening end of the mould, after the concrete mortar is poured, the mould is tamped by using vibration or is arranged on a vibration table to be vibrated and compacted, when a plurality of moulds are arranged, the plurality of moulds can be simultaneously placed on the vibration table to vibrate, when the strength of a prefabricated part meets the requirement, the mould can be detached, the maintenance is carried out after the detachment, after the maintenance is finished, the prefabricated part is directly plugged into the screw hole, and a rubber hammer is used for knocking and filling the prefabricated part to be compacted; the prefab that this mould was made can directly fill in the screw hole, alone can accomplish the work of packing, can effectively practice thrift manpower resources, reduce cost, and this mould high-usage simultaneously can use repeatedly, when a plurality of screw holes are filled to needs, and the staff can once only make a plurality of prefabs, can further improve work efficiency.
Optionally, a fixed disk is arranged at the other end of the cylinder body, and the fixed disk is flush with the opening of the cylinder body.
Through adopting above-mentioned technical scheme, the fixed disk has the sealing effect, and when can reducing the vibration concrete mortar, the possibility that concrete mortar spills, the tip that the prefab can be guaranteed to the fixed disk simultaneously is the leveling condition, fills in the screw hole at the prefab after, and the prefab need not to polish, and the terminal surface and the wall of prefab are located the coplanar, can reduce the construction step, shorten the engineering time, improve the efficiency of construction.
Optionally, the plate surface of the fixed plate is provided with a communicating hole.
Through adopting above-mentioned technical scheme, the intercommunicating pore is convenient for vibrate and is passed, uses when needs vibrate to carry out the vibrations density to concrete mortar in real time, and the tamper gets into the inside concrete mortar tamping with the mould of mould through the intercommunicating pore.
Optionally, the fixed disc is arranged at the large port of the cylinder body, and the base is arranged at the small port of the cylinder body.
Through adopting above-mentioned technical scheme, after the prefab reaches intensity, take off the fixed disk, because the fixed disk sets up in the big port department of stack shell, consequently the prefab can be followed and smoothly deviate from in the mould.
Optionally, one side of the fixed disk is hinged to the barrel body, a buckle is arranged on the other side of the fixed disk, the fixed end of the buckle is fixed to the barrel body, and the clamping end is fixed to the fixed disk.
By adopting the technical scheme, the fixed disk and the cylinder body are stronger in connectivity, and the fixed disk cannot be lost easily after the fixed disk is opened; because concrete mortar in the mould need vibrate closely knit, consequently at the vibrations in-process, the mould can produce and rock, and the leakproofness between buckle can strengthen fixed disk and the stack shell reduces the possibility that concrete mortar spills.
Optionally, the fixed disk is the same as the base in size, so that a plurality of manufacturing devices can be conveniently spliced at the same time.
Through adopting above-mentioned technical scheme, when carrying out the vibration compaction to a plurality of moulds of having irritated concrete mortar simultaneously in real time, base between the adjacent mould can press close to, and fixed disk between the adjacent mould also can press close to, and it is more convenient to splice, can effectively reduce the possibility that the closely knit in-process mould of vibrating falls down.
Optionally, a plurality of groups of mounting rings are arranged on the barrel body at intervals, and a plurality of mounting rings are arranged on each group of mounting rings at intervals along the circumferential direction of the barrel body.
Through adopting above-mentioned technical scheme, when carrying out the compaction of shaking to a plurality of moulds of having irritated concrete mortar simultaneously in real time, penetrate the cloth in the collar, the cloth is binded a plurality of moulds fixedly, can further strengthen the stability of the real-time mould of compaction of shaking.
Optionally, a release agent for facilitating mold removal is coated inside the mold.
By adopting the technical scheme, the release agent can assist in demolding, so that the manufactured concrete prefabricated part can be demolded as soon as possible, the processing construction efficiency is improved, and the construction period is shortened.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the base and the barrel body, the prefabricated part manufactured by the die can be directly plugged into the screw hole, and one person can finish the filling work, so that the manpower resource can be effectively saved, and the cost is reduced;
2. by arranging the fixed disc, the fixed disc has a sealing effect, so that the possibility of concrete mortar leakage when the concrete mortar is vibrated can be reduced;
3. the communicating holes are formed in the plate surface of the fixed disc, so that the vibrating rod can enter the die through the communicating holes to tamp concrete mortar in the die.
Drawings
Fig. 1 is a schematic diagram of a related art.
FIG. 2 is a schematic structural diagram of a precast concrete making device for blocking an aluminum mould screw hole.
Fig. 3 is a schematic illustration of the splicing of multiple production molds.
Description of reference numerals: 1. an aluminum alloy template; 11. oppositely pulling the screw rod; 12. a tapered sleeve; 13. back corrugation; 14. a limit nut; 2. a base; 3. a barrel body; 4. fixing the disc; 41. a communicating hole; 5. buckling; 6. a mounting ring; 7. and (4) cloth strips.
Detailed Description
The present application is described in further detail below with reference to figures 2-3.
The embodiment of the application discloses aluminium mould screw hole shutoff precast concrete making devices.
Referring to fig. 2, an aluminium mould screw hole shutoff precast concrete making devices includes that both ends are open stack shell 3, rigid coupling at the base 2 of stack shell 3 one end to and articulate fixed disk 4 at the stack shell 3 other end. The base 2 is fixed at the small opening end of the cylinder body 3, the fixed disk 4 is arranged at the large opening end of the cylinder body 3, and the fixed disk 4 is flush with the opening part of the cylinder body 3.
The barrel body 3 is conical, and the inner diameter of the barrel body 3 is consistent with the aperture of the screw hole, so that the concrete prefabricated part manufactured by the mold is matched with the screw hole.
Referring to fig. 2, before construction, a mold is made according to the specification of a screw hole, and since the fixed disk 4 is hinged to the barrel 3, the large open end of the barrel 3 can be opened. Concrete mortar is poured into the mould through the large opening end of the barrel body 3, and after the concrete mortar is poured, the mould is tamped by vibration or is placed on a vibrating table to be vibrated to be compact.
Referring to fig. 2, after the concrete mortar meets the strength requirement, the fixed disc 4 is opened, the prefabricated member is removed from the mold, subsequent curing is carried out after the prefabricated member is removed, the prefabricated member is directly plugged into the screw hole after the curing is completed, and the prefabricated member is knocked by a rubber hammer to be filled compactly.
Referring to fig. 2, the installation process of the prefabricated member is simple and convenient, one worker can complete the work, the human resources can be effectively saved, and the construction cost is reduced. Meanwhile, in the traditional construction method, when workers fill concrete mortar into the screw hole, the concrete mortar is very easy to leak from the screw hole due to the fluidity of the concrete mortar, so that waste is caused, and the prefabricated part manufactured by the mold is solid, so that the problem of leakage cannot occur during installation, the raw materials can be saved, and the production cost is reduced.
Referring to fig. 2, one side of the fixing disc 4 is hinged to the barrel body 3, a buckle 5 is arranged at the joint of the other side of the fixing disc 4 and the barrel body 3, the fixed end of the buckle 5 is fixed on the barrel body 3, and the clamping end of the buckle 5 is fixed on the fixing disc 4. When concrete mortar in the mould is vibrated and compacted, the clamping part of the buckle 5 can be clamped with the fixing part of the buckle 5, so that the fixed disc 4 seals the barrel body 3, and the possibility of leakage of the concrete mortar is reduced.
Referring to fig. 2, the fixed disk 4 is provided with a communication hole 41, the communication hole 41 is convenient for the vibration to pass through, and when the concrete mortar in the mould is vibrated by using the vibration, the fixed disk 4 can not only seal the cylinder body 3, but also be used for the vibration to pass through.
Referring to fig. 3, the fixed disc 4 is the same size as the base 2, and when a plurality of molds are arranged at the same time, the bases 2 of adjacent molds can be attached tightly, and the fixed discs 4 of adjacent molds can also be attached tightly. Because the barrel body 3 is conical, the contact surface of the adjacent dies is only the base 2 and the fixed disc 4, the tightness between the adjacent dies is effectively enhanced by the tightly adhered base 2 and the fixed disc 4, and the possibility that the dies cannot stand stably and fall down when the dies vibrate is reduced.
Two groups of mounting rings 6 are arranged on the circumferential surface of the barrel body 3 at intervals along the height of the barrel body 3, and a plurality of mounting rings 6 are arranged at intervals along the circumferential direction of the barrel body 3.
When a plurality of moulds vibrate closely knit work simultaneously, arrange a plurality of moulds and set up to penetrate cloth 7 in collar 6, cloth 7 is binded a plurality of moulds fixedly, can further improve the stability of mould.
The isolating agent is coated in the mould, and can isolate the barrel body 3 from concrete mortar, assist in demoulding the prefabricated part with strength, improve the construction efficiency and shorten the construction period.
The embodiment of the application provides an implementation principle for an aluminum mould screw hole plugging precast concrete manufacturing device: before pouring concrete mortar into, apply paint the separant with a brush in the mould inside, then pour concrete mortar into the mould, and vibrate closely knit to the concrete mortar in the mould, after prefabricated will reach intensity, deviate from the prefab, accomplish the maintenance back, fill in the screw hole with the prefab, and adopt the rubber hammer to strike and fill closely knit, the installation of prefab is simple and convenient, a staff can accomplish work, can effectively practice thrift manpower resources, reduction construction cost.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (4)

1. The utility model provides an aluminium mould screw hole shutoff precast concrete making devices for the concrete spare in screw hole is clogged in the prefabrication, its characterized in that: the screw rod type screw rod drilling machine comprises a base (2) and a barrel body (3) with two open ends, wherein the barrel body (3) is conical, the inner diameter of the barrel body (3) is consistent with the aperture of a screw rod hole, and one end of the barrel body (3) is fixedly connected with the base (2);
the other end of the cylinder body (3) is provided with a fixed disc (4), and the fixed disc (4) is flush with the opening part of the cylinder body (3);
the plate surface of the fixed disc (4) is provided with a communicating hole (41);
the fixed disc (4) is arranged at the large port of the cylinder body (3), and the base (2) is arranged at the small port of the cylinder body (3);
one side of the fixed disk (4) is hinged with the cylinder body (3), a buckle (5) is arranged on the other side of the fixed disk (4), the fixed end of the buckle (5) is fixed on the cylinder body (3), and the clamping end is fixed on the fixed disk (4).
2. The aluminum die screw hole plugging precast concrete preparation device of claim 1, characterized in that: the fixed disc (4) is consistent with the base (2) in size, so that a plurality of manufacturing devices can be conveniently spliced at the same time.
3. The aluminum die screw hole plugging precast concrete preparation device of claim 1, characterized in that: a plurality of groups of mounting rings (6) are arranged on the cylinder body (3) at intervals, and a plurality of mounting rings (6) are arranged on each group at intervals along the circumferential direction of the cylinder body (3).
4. The aluminum die screw hole plugging precast concrete preparation device of claim 1, characterized in that: and a release agent convenient for mold removal is coated in the mold.
CN202221510274.1U 2022-06-17 2022-06-17 Aluminium mould screw hole shutoff precast concrete making devices Active CN217669964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221510274.1U CN217669964U (en) 2022-06-17 2022-06-17 Aluminium mould screw hole shutoff precast concrete making devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221510274.1U CN217669964U (en) 2022-06-17 2022-06-17 Aluminium mould screw hole shutoff precast concrete making devices

Publications (1)

Publication Number Publication Date
CN217669964U true CN217669964U (en) 2022-10-28

Family

ID=83710216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221510274.1U Active CN217669964U (en) 2022-06-17 2022-06-17 Aluminium mould screw hole shutoff precast concrete making devices

Country Status (1)

Country Link
CN (1) CN217669964U (en)

Similar Documents

Publication Publication Date Title
CN106863552B (en) Integral forming die for cement prefabricated member by direct extrusion vibration method and processing method thereof
CN110553898A (en) Cohesive soil sample preparation device for geotechnical test and use method
CN205989416U (en) A kind of horizontal single storekeeper corridor mould
CN110000892A (en) A kind of production technology of prefabricated component stair
CN210316264U (en) Mounting structure of roofing blast pipe support mound mould and wedge cotter pin
CN217669964U (en) Aluminium mould screw hole shutoff precast concrete making devices
CN213390464U (en) Gutter inlet forming tool
CN218766269U (en) Telescopic shield segment mold capable of being recycled
CN112873527A (en) Manufacturing mold and method for supporting pile
CN112412013A (en) Construction method for plugging reserved hole of structural outer wall
CN212027114U (en) Building templates for construction
CN114012887B (en) Casting method and device for precast concrete pipe culvert
CN215549563U (en) Hollow hexagonal concrete prefabricated section assembling die convenient to dismantle
CN214615420U (en) Manufacturing device for formwork splicing section
CN212406108U (en) Structure for pouring concrete column by adopting inflatable template fixed with floor slab
CN211164491U (en) Template for preparing UHPC prefabricated plate
CN108943327B (en) Prefabricated toilet caisson production method, prefabricated toilet caisson and prefabricated toilet
CN104947799A (en) Soft cable connection piece, prefabricated member and wallboard
CN216144576U (en) Mould is made to structure glue mortar benchmark test block
CN220162743U (en) Cement product mould convenient for demoulding
CN214520882U (en) Manufacturing device for aluminum mould wall bolt hole plugging block
CN210477294U (en) Novel brick mould of easy demoulding
CN204914155U (en) Prefab mandrel tube
CN115821778A (en) Semi-automatic anchor sealing device and method for prefabricated box girder
CN219604226U (en) Be applied to prefabricated festival section of barrier rib basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant