CN217662300U - Dust device is used in construction is built in room - Google Patents
Dust device is used in construction is built in room Download PDFInfo
- Publication number
- CN217662300U CN217662300U CN202221946187.0U CN202221946187U CN217662300U CN 217662300 U CN217662300 U CN 217662300U CN 202221946187 U CN202221946187 U CN 202221946187U CN 217662300 U CN217662300 U CN 217662300U
- Authority
- CN
- China
- Prior art keywords
- water
- spray
- dust
- tank
- support body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000428 dust Substances 0.000 title claims abstract description 89
- 238000010276 construction Methods 0.000 title claims abstract description 38
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 152
- 239000007921 spray Substances 0.000 claims abstract description 102
- 238000005086 pumping Methods 0.000 claims abstract description 8
- 239000004576 sand Substances 0.000 claims description 23
- 238000007789 sealing Methods 0.000 claims description 17
- 238000001914 filtration Methods 0.000 claims description 13
- 239000010865 sewage Substances 0.000 claims description 13
- 239000000945 filler Substances 0.000 claims description 12
- 238000010521 absorption reaction Methods 0.000 claims description 6
- 241000220317 Rosa Species 0.000 claims description 3
- 238000007599 discharging Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 10
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000005507 spraying Methods 0.000 description 11
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 6
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Images
Landscapes
- Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
Abstract
The application relates to a dust falling device for building construction, which comprises a water storage tank, a supporting plate and a support, wherein the water storage tank is fixedly arranged on the supporting plate, a water inlet and a water outlet are formed in the water storage tank, and a flow guide pipe is communicated with the water outlet of the water storage tank; the bracket is fixedly arranged on the supporting plate, the atomizing spray head is fixedly arranged on the bracket, the flow guide pipe is communicated with the atomizing spray head, and the flow guide pipe is provided with a first water pump for pumping water in the water storage tank to the atomizing spray head; the bottom wall of the supporting plate is rotatably provided with four rollers, and the four rollers are respectively positioned at four corners of the supporting plate. This application can promote the dust fall effect in the construction place.
Description
Technical Field
The application relates to a construction technical field is built in the room, especially relates to a dust device is used in room construction.
Background
The house construction is one of the basic construction projects in China, not only can ensure the housing of people, but also can provide a large amount of employment for labor crowds; in the work progress, need transport various building materials to the construction site, including some sand and stone cement etc. when loading and unloading and transporting it, can produce great sand and dust, if do not carry out the dust fall to it and handle, can influence operational environment and staff healthy.
At present, the dust device that uses in the construction place mostly all is that the dust fall rail separates the fender to sand and dust, and the fixed atomizer that is provided with on the dust fall rail sprays the sand and dust in the construction place through the atomizer, reaches the dust fall effect. However, the dustfall fence has a small dustfall range and has a poor dustfall effect on dust in a construction site.
SUMMERY OF THE UTILITY MODEL
In order to promote the dust fall effect in the construction place, this application provides a dust device is used in construction in room.
The application provides a pair of dust device is used in room construction adopts following technical scheme:
a dust falling device for building construction comprises a water storage tank, a supporting plate and a support, wherein the water storage tank is fixedly arranged on the supporting plate, a water inlet and a water outlet are formed in the water storage tank, and a flow guide pipe is communicated with the water outlet of the water storage tank; the bracket is fixedly arranged on the support plate, the atomizing spray head is fixedly arranged on the bracket, the guide pipe is communicated with the atomizing spray head, and the guide pipe is provided with a first water pump for pumping water in the water storage tank to the atomizing spray head; the bottom wall of the supporting plate is rotatably provided with four rollers, and the four rollers are respectively positioned at four corners of the supporting plate.
By adopting the technical scheme, when the dust falling treatment is required to be carried out on a construction site, firstly, the first water pump is started, water in the water storage tank is guided to the atomizing nozzle through the guide pipe, and the atomizing nozzle sprays the water flow into the construction site after atomizing the water flow; then, gyro wheel in the rethread backup pad makes the backup pad remove in the construction place, increases the dust fall scope to promote the dust fall effect in the construction place.
Optionally, the support includes first support body and second support body, first support body is fixed to be set up in the backup pad, the second support body set up on first support body and with first support body sliding connection, the atomizer is fixed to be set up on the second support body, be provided with on the first support body and be used for ordering about the gliding drive assembly of second support body along keeping away from or being close to first support body direction.
Through adopting above-mentioned technical scheme, order about the second support body through drive assembly and slide along the direction of keeping away from first support body, change atomizer spray height to increase atomizer spray range.
Optionally, the driving assembly includes a screw rod and a motor, the screw rod is rotatably disposed on the first frame body, and an axial direction of the screw rod is parallel to a sliding direction of the second frame body; threaded holes are formed in the second support body along the sliding direction of the lead screw, the lead screw penetrates through the threaded holes and is in threaded connection with the second support body, and the motor is used for driving the lead screw to rotate.
Through adopting above-mentioned technical scheme, the motor orders about the lead screw at first support body internal rotation, lead screw and second support body threaded connection, and the lead screw orders about the second support body along lead screw endwise slip to realize that the second support body slides along the direction of keeping away from or being close to first support body.
Optionally, the water storage box with the fixed suction box that is provided with between the backup pad, set up the dust inlet with the suction box intercommunication on the diapire of backup pad, one side fixedly connected with spray tank of suction box, the lateral wall of suction box set up with the dust absorption mouth of spray tank intercommunication, dust absorption mouth department is provided with the air exhauster, the air exhauster is used for taking out the dust and sand to spray tank from the suction box, be provided with the spray assembly who is used for spraying the dust and sand in the spray tank.
Through adopting above-mentioned technical scheme, open the air exhauster, take out the husky dirt on road surface of being under construction to spray tank in from the suction box through the air exhauster, then, the spraying assembly in the rethread spray tank sprays the processing to husky dirt, makes husky dirt deposit behind the contact with water in spray tank, realizes the clearance to the husky dirt of road surface of being under construction.
Optionally, a water outlet is formed in the side wall of the spray water tank far away from the dust collection tank, a filter tank is arranged in the spray water tank and between the dust collection port and the water outlet, a plurality of water through holes are formed in both side walls of the filter tank, and a filter filler for filtering sewage is arranged in the filter tank; the spray assembly comprises a spray pipe, a spray nozzle and a second water pump, the spray pipe is fixedly arranged between the filter box and the exhaust fan, the spray nozzle is communicated with the spray pipe, the other end of the spray pipe is communicated with a water outlet of the spray water tank, and the second water pump is used for pumping filtered water in the spray water tank to the spray nozzle.
By adopting the technical scheme, the sand and dust are sprayed by the spraying nozzle after being pumped into the spraying water tank from the dust collection box by the exhaust fan, the sand and dust are deposited in the spraying water tank after contacting with water, and then the sewage is filtered by the filtering filler in the filtering tank; then, pumping the filtered water in the spray water tank to the spray nozzle again through a second water pump, and spraying the sand and dust newly pumped into the spray water tank; thereby realizing the cyclic utilization of water and improving the resource utilization rate.
Optionally, a drain outlet for discharging sand and dust is formed in the side wall of the spray water tank, and a first sealing cover for closing the drain outlet is arranged on the spray water tank.
Through adopting above-mentioned technical scheme, the accessible drain will accumulate the dust and sand in the shower water tank and discharge.
Optionally, a filter screen is arranged at the dust inlet on the supporting plate.
Through adopting above-mentioned technical scheme, when the air exhauster is taking out dirt, prevent to a certain extent that some light debris of weight also from being inhaled in the dust absorption case through the filter screen, block up the dust absorption mouth, cause the air exhauster can't use.
Optionally, a through opening communicated with the filter box is formed in the spray water tank, and a second sealing cover used for closing the through opening is arranged on the spray water tank.
Through adopting above-mentioned technical scheme, after using the rose box for a long time, the filter effect who filters the filler reduces, through opening the second closing cap, will filter and pack to take out from the rose box, is convenient for replace filtering the filler.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when dust falling treatment needs to be carried out on a construction site, firstly, a first water pump is started, water in a water storage tank is guided to an atomizing nozzle through a guide pipe, and the atomizing nozzle sprays water flow into the construction site after atomizing treatment; then, the supporting plate is moved in the construction site through the rollers on the supporting plate, so that the dust fall range is enlarged, and the dust fall effect in the construction site is improved;
2. after the sand and dust are pumped into the spraying water tank from the dust suction box by the exhaust fan, the sand and dust are sprayed by the spraying nozzle, the sand and dust are deposited in the spraying water tank after contacting with water, and then the sewage is filtered by the filter filler in the filter tank; then, pumping the filtered water in the spray water tank to the spray nozzle again through a second water pump, and spraying the sand and dust newly pumped into the spray water tank; thereby realizing the recycling of water and improving the utilization rate of resources;
3. after the filter box is used for a long time, the filtering effect of the filtering filler is reduced, the filtering filler is taken out from the filter box by opening the second sealing cover, and the filtering filler is convenient to replace.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a partial structural sectional view of the embodiment of the present application, which is mainly used for expressing the internal structure of the dust falling device;
fig. 3 is a partial structural sectional view of the embodiment of the present application, which is mainly used for expressing the internal structures of the spray water tank and the dust suction box.
Description of reference numerals: 1. a water storage tank; 11. a water inlet; 12. a water outlet; 13. a flow guide pipe; 14. a first water pump; 2. a support plate; 21. a roller; 22. a dust inlet; 23. filtering with a screen; 3. a support; 31. a first frame body; 311. a chute; 32. a second frame body; 321. an atomizing spray head; 322. a flow guide hole; 33. a drive assembly; 331. a lead screw; 3311. a limiting block; 332. a motor; 4. a spray water tank; 41. a water outlet; 42. a spray assembly; 421. a shower pipe; 422. a spray nozzle; 43. a second water pump; 44. a sewage draining outlet; 441. a first accommodating groove; 442. a first cover; 45. a port; 451. a second accommodating groove; 452. a second cover; 5. a dust collection box; 51. a dust suction port; 52. an exhaust fan; 6. a filter box; 61. a water through hole; 62. and filtering the filler.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses dust device is used in room construction. Referring to fig. 1 and 2, the water storage tank comprises a water storage tank 1, a support plate 2, a bracket 3 and a spray water tank 4; the water storage tank 1 is fixedly arranged on the supporting plate 2, a water inlet 11 and a water outlet 12 are formed in the water storage tank 1, and a flow guide pipe 13 is communicated with the water outlet 12 of the water storage tank 1; a spray water tank 4 is fixedly arranged between the water storage tank 1 and the supporting plate 2; rotate on the diapire of backup pad 2 and be provided with four gyro wheels 21, four gyro wheels 21 are the universal wheel, and four universal wheels are located four edges of backup pad 2 respectively.
Referring to fig. 1 and 2, the bracket 3 includes a first bracket body 31 and a second bracket body 32, the first bracket body 31 is fixedly disposed on the support plate 2, the second bracket body 32 is disposed on the first bracket body 31 and slidably connected with the first bracket body 31, a plurality of atomizing nozzles 321 are fixedly disposed on the second bracket body 32, an inner cavity of the second bracket body 32 is disposed, a sliding groove 311 is formed in the top wall of the first bracket body 31 along the length direction of the first bracket body 31, and the second bracket body 32 is slidably disposed in the sliding groove 311; the lateral wall of first support body 31 and the diapire of second support body 32 have all been seted up and have been supplied water conservancy diversion hole 322 that honeycomb duct 13 passed, honeycomb duct 13 passes water conservancy diversion hole 322 and extends to the cavity of second support body 32 in with a plurality of atomizer 321 intercommunication, be provided with on the honeycomb duct 13 and be used for taking out the first water pump 14 to atomizer 321 with the water in the water storage box 1, be provided with on the first support body 31 and be used for ordering about second support body 32 along keeping away from or being close to the gliding drive assembly 33 of first support body 31 direction.
Referring to fig. 2, the driving assembly 33 includes a lead screw 331 and a motor 332, the lead screw 331 is rotatably disposed in the first frame 31, and an axial direction of the lead screw 331 is parallel to a sliding direction of the second frame 32; threaded holes are formed in the bottom wall of the second frame body 32 along the length direction of the lead screw 331, threaded holes in the second frame body 32 are matched with the lead screw 331, the lead screw 331 penetrates through the threaded holes and is in threaded connection with the second frame body 32, one end, far away from the motor 332, of the lead screw 331 is fixedly provided with a limiting block 3311, the motor 332 is fixedly arranged on the bottom wall of the sliding groove 311 of the first frame body 31, and the output shaft of the motor 332 is arranged along the sliding direction of the second frame body 32.
Referring to fig. 2 and 3, a dust suction box 5 is fixedly connected to one side of the spray water tank 4, a dust inlet 22 communicated with the dust suction box 5 is formed in the bottom wall of the support plate 2, a filter screen 23 is fixedly arranged at the dust inlet 22, and impurities can be effectively prevented from being sucked into the dust suction box 5 through the filter screen 23; the side wall of the dust collection box 5 is provided with a dust collection port 51 communicated with the spray water tank 4, an exhaust fan 52 is fixedly arranged at the dust collection port 51, the exhaust fan 52 is used for pumping sand and dust from the dust collection box 5 to the spray water tank 4, and a spray assembly 42 for spraying sand and dust is arranged in the spray water tank 4.
Referring to fig. 2 and 3, a water outlet 41 is formed in the side wall of the spray water tank 4 away from the dust collection tank 5, a filter tank 6 is fixedly arranged in the spray water tank 4 and between the dust collection port 51 and the water outlet 41, a plurality of water through holes 61 are formed in both side walls of the filter tank 6, the filter tank 6 is abutted against the spray water tank 4, a filter filler 62 for filtering sewage is arranged in the filter tank 6, the filter filler 62 comprises activated carbon, and the activated carbon is coated in gauze; the inner bottom wall of the spray water tank 4 between the filter tank 6 and the exhaust fan 52 is inclined, and the inner bottom wall is gradually close to the support plate 2 from the lower part of the exhaust fan 52 to the filter tank 6, so that sewage can flow to the filter tank 6 conveniently.
Referring to fig. 2 and 3, the spray assembly 42 includes a spray pipe 421, a plurality of spray nozzles 422 and a second water pump 43, the spray pipe 421 is fixedly disposed between the filter tank 6 and the exhaust fan 52, the plurality of spray nozzles 422 are disposed, the plurality of spray nozzles 422 are all communicated with the spray pipe 421, the other end of the spray pipe 421 is communicated with a water outlet 41 of the spray water tank 4, and the second water pump 43 is used for pumping the filtered water in the spray water tank 4 to the spray nozzles 422; after the dust and sand are sucked into the spray water tank 4 from the dust suction box 5 by the exhaust fan 52, the dust and sand are sprayed by the spray nozzle 422, so that the dust and sand are deposited in the spray water tank 4 after contacting with water, and sewage is filtered by activated carbon in the filter box 6; then, the filtered water in the spray water tank 4 is pumped to the spray nozzle 422 again through the second water pump 43, so that the resource utilization rate is improved.
Referring to fig. 1 and 3, a sewage draining outlet 44 is formed in a side wall of the spray water tank 4 between the filter tank 6 and the exhaust fan 52, a first accommodating groove 441 communicated with the sewage draining outlet 44 is formed in a side wall of the spray water tank 4, a first sealing cover 442 for sealing the sewage draining outlet 44 is rotatably arranged on the spray water tank 4, the first sealing cover 442 is hinged to the spray water tank 4, the first sealing cover 442 is matched with the first accommodating groove 441, and the first sealing cover 442 is fixed on the spray water tank 4 through bolts; a seal ring for closing a gap between the spray water tank 4 and the first cover 442 is fixedly provided on the first cover 442.
Referring to fig. 1 and 3, a through hole 45 communicated with the filter tank 6 is further formed in the side wall of the spray water tank 4, a second accommodating groove 451 communicated with the through hole 45 is formed in the side wall of the spray water tank 4, a second sealing cover 452 used for sealing the through hole 45 is rotatably arranged on the spray water tank 4, the second sealing cover 452 is hinged to the spray water tank 4, the second sealing cover 452 is matched with the second accommodating groove 451, and the second sealing cover 452 is fixed on the spray water tank 4 through bolts; a sealing ring for sealing a gap between the spray water tank 4 and the second cover 452 is fixedly arranged on the second cover 452.
The embodiment of the application provides a dust device for house construction's implementation principle does: when dust fall treatment needs to be carried out on a construction site, firstly, the first water pump 14 is started, water in the water storage tank 1 is guided to the atomizing nozzle 321 through the guide pipe 13, and the atomizing nozzle 321 atomizes water and sprays the atomized water into the construction site; afterwards, open motor 332, order about lead screw 331 at first support body 31 internal rotation, adjust second support body 32 to suitable high back, gyro wheel 21 on the rethread backup pad 2 makes backup pad 2 remove in the construction place, increase dust fall scope to promote the dust fall effect in the construction place.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a dust device is used in construction is built in room which characterized in that: the water storage device comprises a water storage tank (1), a supporting plate (2) and a bracket (3), wherein the water storage tank (1) is fixedly arranged on the supporting plate (2), a water inlet (11) and a water outlet (12) are formed in the water storage tank (1), and a flow guide pipe (13) is communicated with the water outlet (12) of the water storage tank (1); the support (3) is fixedly arranged on the support plate (2), the atomizing nozzle (321) is fixedly arranged on the support (3), the guide pipe (13) is communicated with the atomizing nozzle (321), and the guide pipe (13) is provided with a first water pump (14) used for pumping water in the water storage tank (1) to the atomizing nozzle (321); rotate on the diapire of backup pad (2) and be provided with four gyro wheels (21), four gyro wheels (21) are located four edges of backup pad (2) respectively.
2. The house is built construction and is used dust device of claim 1, characterized in that: support (3) include first support body (31) and second support body (32), first support body (31) are fixed to be set up on backup pad (2), second support body (32) set up on first support body (31) and with first support body (31) sliding connection, atomizer (321) are fixed to be set up on second support body (32), be provided with on first support body (31) and be used for ordering about second support body (32) along keeping away from or being close to gliding drive assembly (33) of first support body (31) direction.
3. The house is built construction and is used dust device of claim 2, characterized in that: the driving assembly (33) comprises a lead screw (331) and a motor (332), the lead screw (331) is rotatably arranged on the first frame body (31), and the axial direction of the lead screw (331) is parallel to the sliding direction of the second frame body (32); threaded holes are formed in the second frame body (32) along the sliding direction of the screw rod (331), the screw rod (331) penetrates through the threaded holes and is in threaded connection with the second frame body (32), and the motor (332) is used for driving the screw rod (331) to rotate.
4. The house is built construction and is used dust device of claim 1, characterized in that: water storage tank (1) with fixed suction box (5) of being provided with between backup pad (2), set up on the diapire of backup pad (2) with dust box (5) intercommunication advance dirt mouth (22), one side fixedly connected with spray tank (4) of suction box (5), the lateral wall of suction box (5) seted up with dust absorption mouth (51) of spray tank (4) intercommunication, dust absorption mouth (51) department is provided with air exhauster (52), air exhauster (52) are used for taking out sand and dust from suction box (5) to spray tank (4), be provided with in spray tank (4) and be used for carrying out the spray assembly (42) that spray to sand and dust.
5. The house is built construction and is used dust device according to claim 4, characterized in that: a water outlet (41) is formed in the side wall, away from the dust collection box (5), of the spray water tank (4), a filter box (6) is arranged in the spray water tank (4) and between the dust collection port (51) and the water outlet (41), a plurality of water through holes (61) are formed in the two side walls of the filter box (6), and a filter filler (62) for filtering sewage is arranged in the filter box (6);
spray assembly (42) include shower (421), shower nozzle (422) and second water pump (43), shower (421) are fixed to be set up between rose box (6) and air exhauster (52), shower nozzle (422) and shower (421) intercommunication, the other end of shower (421) and outlet (41) intercommunication of spray tank (4), second water pump (43) are used for taking out the water after filtering in spray tank (4) to shower nozzle (422).
6. The house is built construction and is used dust device of claim 5, characterized in that: a sewage outlet (44) for discharging sand and dust is formed in the side wall of the spray water tank (4), and a first sealing cover (442) for closing the sewage outlet (44) is arranged on the spray water tank (4).
7. The house is built construction and is used dust device of claim 4, characterized in that: a filter screen (23) is arranged at the dust inlet (22) on the supporting plate (2).
8. The house is built construction and is used dust device of claim 5, characterized in that: the spray water tank (4) is provided with a through hole (45) communicated with the filter box (6), and the spray water tank (4) is provided with a second sealing cover (452) used for closing the through hole (45).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221946187.0U CN217662300U (en) | 2022-07-26 | 2022-07-26 | Dust device is used in construction is built in room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221946187.0U CN217662300U (en) | 2022-07-26 | 2022-07-26 | Dust device is used in construction is built in room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217662300U true CN217662300U (en) | 2022-10-28 |
Family
ID=83719798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221946187.0U Expired - Fee Related CN217662300U (en) | 2022-07-26 | 2022-07-26 | Dust device is used in construction is built in room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217662300U (en) |
-
2022
- 2022-07-26 CN CN202221946187.0U patent/CN217662300U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108465336B (en) | Municipal administration road brick cutting dust keeper | |
CN109017895B (en) | Comprehensive handcart for environmental treatment | |
CN111946387A (en) | Circulated automatic spraying dust fall system in colliery underworkings | |
CN209809833U (en) | Building construction environmental protection dust collector | |
CN217662300U (en) | Dust device is used in construction is built in room | |
CN207324416U (en) | A kind of mine dedusting and purifying device | |
CN212577111U (en) | Dust device is used in building site construction | |
CN210024947U (en) | Wall grinding device for building | |
CN218834022U (en) | Novel architectural decoration engineering is with removing dust in succession device | |
CN215352656U (en) | Efficient energy-saving dust-raising-preventing device for building construction | |
CN214401571U (en) | Multifunctional city sanitation vehicle | |
CN213132482U (en) | Dust device for construction | |
CN209989747U (en) | Energy-saving dust-control sweeper | |
CN208894836U (en) | A kind of transportation building construction dust suction dust prevention system | |
CN211935966U (en) | Comprehensive treatment device for dust-containing waste gas | |
CN211080916U (en) | Interior decoration is with high-efficient paint spraying apparatus | |
CN206840319U (en) | Dustless cutting machine and portable cutting machine | |
CN216418797U (en) | Dust collector with prevent raise dust diffusion structure | |
CN210448580U (en) | Movable dust removal equipment for building construction site | |
CN214809440U (en) | House building construction dust collector | |
CN211676977U (en) | Building construction dust collector | |
CN206424808U (en) | A kind of high-efficiency dust removal system | |
CN218834010U (en) | Construction site dust collecting equipment | |
CN221752763U (en) | Environment-friendly exhaust treatment equipment | |
CN211585849U (en) | Movable air purification device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20221028 |
|
CF01 | Termination of patent right due to non-payment of annual fee |