CN217630010U - Equipment for slope support construction - Google Patents

Equipment for slope support construction Download PDF

Info

Publication number
CN217630010U
CN217630010U CN202221472470.4U CN202221472470U CN217630010U CN 217630010 U CN217630010 U CN 217630010U CN 202221472470 U CN202221472470 U CN 202221472470U CN 217630010 U CN217630010 U CN 217630010U
Authority
CN
China
Prior art keywords
motor
puddler
water pipe
mounting bracket
rigid coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221472470.4U
Other languages
Chinese (zh)
Inventor
杨兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221472470.4U priority Critical patent/CN217630010U/en
Application granted granted Critical
Publication of CN217630010U publication Critical patent/CN217630010U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a side slope construction technical field especially relates to an equipment for side slope support construction. A device for slope support construction comprises a moving part, a pushing part, a supporting part and a cleaning part; the removal portion includes base, first motor and with the track chassis of base looks rigid coupling, promotion portion includes second motor, screw rod, guide arm, mounting bracket, pneumatic cylinder, push pedal, the output shaft and the screw rod looks rigid coupling of second motor, the screw rod run through the mounting bracket and with mounting bracket threaded connection, the utility model discloses a removal portion is convenient to be removed the utility model discloses, thereby, promotion portion can promote the mound with the help of the push pedal and carry out plastic, fixed to the mound, and the portion of strutting can strut the mixed concrete pump play and strut the side slope, and the portion of clearing up can with strut the cooperation of portion, clears up the concrete in the box, prevents that the concrete from solidifying the use after the influence in the box.

Description

Equipment for slope support construction
Technical Field
The utility model relates to a side slope construction technical field especially relates to an equipment for side slope support construction.
Background
Along with the large-scale construction of roads in China, a large amount of slope engineering appears, and because the slope often has disasters such as landslide and collapse when meeting rainy days or strong vibration, the slope needs to be supported.
Often can remain some soil piles during side slope construction and influence the support of side slope, but the equipment that is used for side slope support construction current is not convenient for fix the plastic to the soil pile, influences the support effect, and remains the inside concrete of equipment if the untimely clearance often can solidify in equipment, use after the influence.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a can be piled the shaping of fixing to the soil, a convenient equipment that is used for the slope protection construction of clearing up the concrete.
The utility model discloses a solve above-mentioned problem, the technical scheme who proposes is: a device for slope support construction comprises a moving part, a pushing part, a supporting part and a cleaning part; the moving part comprises a base, a first motor and a track chassis fixedly connected with the base, the pushing part comprises a second motor, a screw rod, a guide rod, a mounting frame, a hydraulic cylinder and a push plate, an output shaft of the second motor is fixedly connected with the screw rod, the screw rod penetrates through the mounting frame and is in threaded connection with the mounting frame, the guide rod penetrates through the mounting frame and is in sliding connection with the mounting frame, a second connecting rod and a connecting block are fixedly arranged at one end of the push plate, the first connecting rod is hinged with the mounting frame, the hydraulic cylinder is fixedly connected with the mounting frame, a connecting piece in sliding connection with the connecting block is hinged at one end of the hydraulic cylinder, the supporting part comprises a box body, a second motor, a rotating shaft, a first stirring rod, a second stirring rod, a third stirring rod, a pump body and a spray pipe, the rotating shaft is rotatably connected with the box body, and an output shaft of the second motor is fixedly connected with the rotating shaft, the first stirring rod, the second stirring rod and the third stirring rod are fixedly connected with the rotating shaft, the pump body is communicated with the box body through a first water pipe, the spray pipe is communicated with the pump body through a second water pipe, the cleaning part comprises a scraper blade, a connecting column, a rotating ring, a first connecting rod, a spray head and a water tank, the connecting column and the first connecting rod are fixedly connected with the scraper blade, the first connecting rod penetrates through the third stirring rod and is in sliding connection with the third stirring rod, the connecting column penetrates through the first stirring rod and is in sliding connection with the first stirring rod, the connecting column penetrates through the rotating ring and is in threaded connection with the rotating ring, the rotating ring is in rotating connection with the first stirring rod, the spray head is fixedly arranged at the top of the inner side of the box body, the spray head is communicated with the second water pipe through a fourth water pipe, the water tank is communicated with the first water pipe through the third water pipe, and the controller is fixedly arranged at the top of the base, the first motor, the second motor, the third motor and the pump body are all electrically connected with the controller.
The crawler chassis comprises a crawler, a supporting wheel, an inducer, a riding wheel, a driving wheel and a frame, wherein an output shaft of the first motor is fixedly connected with the driving wheel.
The screw rod top is rotated and is connected with the seat of placing with spray tube looks joint, the guide arm both ends respectively with place seat, base looks rigid coupling.
The first motor is fixedly connected with the crawler chassis, the second motor is fixedly connected with the box body, the third motor is fixedly connected with the base, the box body and the water tank are fixedly connected with the base, and the pump body is fixedly connected with the water tank.
The first water pipe is connected with a first valve, the second water pipe is connected with a second valve, the third water pipe is connected with a third valve, the third water pipe penetrates through the box body, and the fourth water pipe is connected with a fourth valve.
The top of the box body is provided with a hopper, and the top of the water tank is provided with a water filling port.
The spliced pole is through being equipped with screw thread and swivel threaded connection, the box is cylindricly.
The beneficial effects of the utility model are that: the utility model discloses a removal portion conveniently removes the utility model discloses, thereby promotion portion can carry out the plastic with the soil heap promotion to the soil heap with the help of the push pedal, fixes, and support portion can strut the slope with the concrete pump play that mixes, and clearance portion can with support the cooperation of portion, clears up the concrete in the box, prevents that the concrete from solidifying the use after the influence in the box.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic front view of the present invention.
Fig. 3 is an enlarged schematic view of the position a of the present invention.
( 1. A drive wheel; 2. a crawler chassis; 3. a base; 4. a box body; 5. a first link; 6. a first stirring rod; 7. a squeegee; 8. a second stirring rod; 9. a spray head; 10. a hopper; 11. a second motor; 12. a third stirring rod; 13. rotating the ring; 14. connecting columns; 15. a fourth water pipe; 16. a first valve; 17. a pump body; 18. a second water pipe; 19. a nozzle; 20. a placing seat; 21. a screw; 22. a mounting frame; 23. a second link; 24. pushing the plate; 25. connecting blocks; 26. a connecting member; 27. a hydraulic cylinder; 28. a third motor; 29. a water tank; 30. third water pipe )
Detailed Description
The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
A device for slope support construction comprises a moving part, a pushing part, a supporting part and a cleaning part; the utility model discloses a convenient removal of removal portion, removal portion includes base 3, first motor and with the track chassis 2 of base 3 looks rigid coupling, thereby pushing away the soil heap with the help of push pedal 24 and promoting, fix the soil heap, promotion portion includes second motor 11, screw rod 21, guide arm, mounting bracket 22, pneumatic cylinder 27, push pedal 24, the output shaft and the screw rod 21 looks rigid coupling of second motor 11, screw rod 21 runs through mounting bracket 22 and with mounting bracket 22 threaded connection, the guide arm runs through mounting bracket 22 and with mounting bracket 22 sliding connection, the guide arm can carry out the direction of vertical direction to mounting bracket 22, 24 one end of push pedal has set firmly second connecting rod 23, connecting block 25, first connecting rod 5 is articulated mutually with mounting bracket 22, pneumatic cylinder 27 and mounting bracket 22 looks rigid coupling, pneumatic cylinder 27 one end is articulated to have connecting piece 26 with connecting block 25 sliding connection, connecting piece 26 can slide along connecting block 25, support portion can go out the mixed concrete pump slope and strut to the slope, support portion including box 4, second motor 11, pivot, first puddler 6, second puddler 8, third puddler 12, the pump body is equipped with the pump body 4 through the pivot, the rotation of stirring pipe 17, the inside the casing 17, the water pump body is connected with the clear water pump body, the water pump body is prevented to be connected with the water pump body 4, the water pump body 17, the water pump body is connected, clearance portion includes scraper blade 7, spliced pole 14, change 13, first connecting rod 5, shower nozzle 9, water tank 29, spliced pole 14, first connecting rod 5 all with scraper blade 7 looks rigid coupling, and scraper blade 7 can scrape the concrete that remains on the inner wall in the box 4, first connecting rod 5 runs through third puddler 12 and with third puddler 12 sliding connection, spliced pole 14 run through first puddler 6 and with first puddler 6 sliding connection, spliced pole 14 run through change 13 and with change 13 threaded connection for change 13 can drive spliced pole 14 horizontal migration, change 13 rotates with first puddler 6 to be connected, shower nozzle 9 sets firmly in the inboard top of box 4, can spray water on box 4 inner wall, be linked together through being equipped with fourth water pipe 15 between shower nozzle 9 and the second water pipe 18, be linked together through being equipped with third water pipe 30 between water tank 29 and the first water pipe, base 3 tops set firmly has the controller, first motor, second motor 11, third motor 28, the pump body 17 all are connected mutually with the controller electricity.
The crawler chassis 2 comprises a crawler, a supporting wheel, an inducer, a riding wheel, a driving wheel 1 and a frame, and an output shaft of the first motor is fixedly connected with the driving wheel 1.
The top of the screw rod 21 is rotatably connected with a placing seat 20 connected with the spray pipe 19 in a clamping mode, the spray pipe 19 is convenient to place, and two ends of the guide rod are fixedly connected with the placing seat 20 and the base 3 respectively.
The first motor is fixedly connected with the crawler chassis 2, the second motor 11 is fixedly connected with the box body 4, the third motor 28 is fixedly connected with the base 3, the box body 4 and the water tank 29 are fixedly connected with the base 3, and the pump body 17 is fixedly connected with the water tank 29.
The first water pipe is connected with a first valve 16, the second water pipe 18 is connected with a second valve, the third water pipe 30 is connected with a third valve, the third water pipe 30 penetrates through the box body 4, and the fourth water pipe 15 is connected with a fourth valve.
The top of the box body 4 is provided with a hopper 10, so that concrete raw materials are conveniently added, and the top of the water tank 29 is provided with a water filling port, so that water can be conveniently filled.
The connecting column 14 is in threaded connection with the rotating ring 13 through threads, and the box body 4 is cylindrical.
The working principle is as follows: injecting a proper amount of water into the water tank 29, driving the track chassis 2 through the first motor to move the present invention to a side slope support construction site, when the soil pile needs to be pushed to fix and shape the soil pile, as shown in fig. 1, controlling the third motor 28 to rotate, driving the screw 21 to rotate by the third motor 28, moving the mounting frame 22 along the guide rod by the screw 21, thereby adjusting the height of the push plate 24, controlling the hydraulic cylinder 27 to extend, the hydraulic cylinder 27 driving the connecting member 26 to move to the right, the connecting member 26 sliding on the surface of the connecting member 25 and making the connecting member 25, the push plate 24, the second connecting member 23 rotating around the connecting point of the second connecting member 23 and the mounting frame 22 counterclockwise, thereby adjusting the inclination angle of the push plate 24, rotating the push plate 24 to a desired angle, moving the push plate 24 through the track chassis 2, moving the push plate 24 to contact the soil pile and push and shape the soil pile, until making the soil pile contact with the side slope, fixing the soil pile with the concrete pile, when the concrete needs to be used, putting the concrete raw material from the hopper 10 into the tank 4, starting the second motor 11, the second motor 11 driving the first stirring rod 6, the second stirring rod 8, rotating the second stirring rod 8, making the valve 17 to contact with the side slope, opening the inner wall of the second valve 17, making the valve 17 to close the left side slope support pipe 17, and the left side slope support pipe, and the valve 17, and the left side slope support, thereby making the valve 17, and placing the second motor 17, and placing the tank 17, and placing the valve 17, and placing the second motor 17, and making the valve 17 to move the left side slope support pipe in the left side slope support tank 13, and placing the tank 13, and making the water pipe in the left side slope support tank 13, open the third valve, the fourth valve and start second motor 11, the pump body 17 washes away the concrete of box 4 inner wall with the water in the water tank 29 through third water pipe 30, fourth water pipe 15 pump to shower nozzle 9 blowout, simultaneously second motor 11 is through the pivot, first puddler 6, third puddler 12, first connecting rod 5, spliced pole 14 drive scraper blade 7 rotates, thereby scrape the concrete of box 4 inner wall, close the third valve at last, the fourth valve, open first valve 16, the second valve, discharge concrete residue and sewage through the pump body 17, avoid the concrete to solidify in box 4.
The present invention and its embodiments have been described above, but the description is not limited thereto, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (7)

1. The utility model provides an equipment for side slope support construction which characterized in that: comprises a moving part, a pushing part, a supporting part and a cleaning part; removal portion includes base (3), first motor and with track chassis (2) of base (3) looks rigid coupling, promotion portion includes second motor (11), screw rod (21), guide arm, mounting bracket (22), pneumatic cylinder (27), push pedal (24), the output shaft and the screw rod (21) looks rigid coupling of second motor (11), screw rod (21) run through mounting bracket (22) and with mounting bracket (22) threaded connection, the guide arm runs through mounting bracket (22) and with mounting bracket (22) sliding connection, push pedal (24) one end has set firmly second connecting rod (23), connecting block (25), first connecting rod (5) are articulated mutually with mounting bracket (22), pneumatic cylinder (27) and mounting bracket (22) looks rigid coupling, pneumatic cylinder (27) one end is articulated have connecting piece (26) with connecting block (25) sliding connection, portion includes box (4), second motor (11), pivot, first puddler (6), second puddler (8), third puddler (12), the pump body (17), spray tube (19), pivot and second puddler (6) rotation box (11), pivot and second puddler (8), second motor (11) looks rigid coupling, second puddler (6), pivot and second puddler (11), second motor (11) looks rigid coupling, third puddler (12) all with pivot looks rigid coupling, be linked together through being equipped with first water pipe between the pump body (17) and box (4), be linked together through being equipped with second water pipe (18) between spray tube (19) and the pump body (17), clearance portion includes scraper blade (7), spliced pole (14), swivel (13), first connecting rod (5), shower nozzle (9), water tank (29), spliced pole (14), first connecting rod (5) all with scraper blade (7) looks rigid coupling, first connecting rod (5) run through third puddler (12) and with third puddler (12) sliding connection, spliced pole (14) run through first puddler (6) and with first puddler (6) sliding connection, spliced pole (14) run through swivel (13) and with swivel (13) threaded connection, swivel (13) rotate with first puddler (6) and be connected, shower nozzle (9) set firmly in box (4) inboard top, be equipped with between shower nozzle (9) and the second water pipe (18) and the control motor (15) through second water pipe (15), motor (11) are linked together through second water pipe (15), motor (11), water pipe (11) and motor (11) are linked together through second water pipe (6), motor (11) and water tank (6) are equipped with the top, the third motor (28) and the pump body (17) are electrically connected with the controller.
2. An apparatus for slope support construction according to claim 1, wherein: the crawler chassis (2) comprises a crawler, a supporting wheel, an inducer, a riding wheel, a driving wheel (1) and a frame, and an output shaft of the first motor is fixedly connected with the driving wheel (1).
3. An apparatus for slope support construction according to claim 1, wherein: screw rod (21) top is rotated and is connected with and places seat (20) with spray tube (19) looks joint, the guide arm both ends respectively with place seat (20), base (3) looks rigid coupling.
4. An apparatus for slope support construction according to claim 1, wherein: the first motor is fixedly connected with the crawler chassis (2), the second motor (11) is fixedly connected with the box body (4), the third motor (28) is fixedly connected with the base (3), the box body (4) and the water tank (29) are fixedly connected with the base (3), and the pump body (17) is fixedly connected with the water tank (29).
5. An apparatus for use in slope support construction according to claim 1, wherein: the first water pipe is connected with a first valve (16), the second water pipe (18) is connected with a second valve, the third water pipe (30) is connected with a third valve, the third water pipe (30) penetrates through the box body (4), and the fourth water pipe (15) is connected with a fourth valve.
6. An apparatus for use in slope support construction according to claim 1, wherein: the top of the box body (4) is provided with a hopper (10), and the top of the water tank (29) is provided with a water filling port.
7. An apparatus for slope support construction according to claim 1, wherein: the connecting column (14) is in threaded connection with the rotating ring (13) through threads, and the box body (4) is cylindrical.
CN202221472470.4U 2022-06-13 2022-06-13 Equipment for slope support construction Active CN217630010U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221472470.4U CN217630010U (en) 2022-06-13 2022-06-13 Equipment for slope support construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221472470.4U CN217630010U (en) 2022-06-13 2022-06-13 Equipment for slope support construction

Publications (1)

Publication Number Publication Date
CN217630010U true CN217630010U (en) 2022-10-21

Family

ID=83624466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221472470.4U Active CN217630010U (en) 2022-06-13 2022-06-13 Equipment for slope support construction

Country Status (1)

Country Link
CN (1) CN217630010U (en)

Similar Documents

Publication Publication Date Title
CN207942564U (en) A kind of novel concrete stirring instrument
CN112248259B (en) High stability construction machinery slotting device
CN111778930B (en) Material grouting device for hydraulic engineering construction and application method thereof
CN211306791U (en) Grouting device is used in production of cement concrete prefabricated component
CN211330642U (en) Cement bucket belt cleaning device for tunnel construction
CN217630010U (en) Equipment for slope support construction
CN114311310A (en) Municipal construction is with consolidating native agitator tank
CN213078136U (en) Grouting device for hydraulic engineering construction
CN111365557A (en) Small-bore pipeline slip casting repair robot
CN215977265U (en) Pile pulling device for subway civil engineering
CN212801116U (en) A shakeout device for concrete paving road surface
CN114808647A (en) Slip casting platform truck
CN221193653U (en) Drainage dredging device
CN221320600U (en) Road crack repair cementation of fissures machine
CN114961319B (en) Waterproof pressurizing equipment for plugging
CN214556028U (en) Concrete hopper with cleaning function
CN114016510B (en) Grouting equipment for hydraulic engineering construction and grouting method thereof
CN217758799U (en) Grouting device for hydraulic engineering construction
CN220469920U (en) Grouting device of shield tunneling machine
CN214987588U (en) Shield constructs synchronous slip casting material mud storage tank
CN214813583U (en) Soil remediation auxiliary assembly for landscaping
CN214447453U (en) Highway bridge concrete mixing device
CN215800876U (en) Road crack prosthetic devices
CN218108723U (en) Water conservancy pipeline sediment removal device with washing function
CN214561985U (en) Grit weighing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant