CN217610135U - Engineering progress management device - Google Patents

Engineering progress management device Download PDF

Info

Publication number
CN217610135U
CN217610135U CN202220416676.9U CN202220416676U CN217610135U CN 217610135 U CN217610135 U CN 217610135U CN 202220416676 U CN202220416676 U CN 202220416676U CN 217610135 U CN217610135 U CN 217610135U
Authority
CN
China
Prior art keywords
fixed
frame
installing frame
management device
clamping block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220416676.9U
Other languages
Chinese (zh)
Inventor
金亚雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220416676.9U priority Critical patent/CN217610135U/en
Application granted granted Critical
Publication of CN217610135U publication Critical patent/CN217610135U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an engineering progress management device relates to engineering progress management equipment technical field. The utility model discloses an installing frame and the clipboard of fixing in it, it has the closing plate to articulate on the installing frame, the expansion end of closing plate is fixed with hollow rod, slidable mounting has on the installing frame and can inject inserted bar in the hollow rod still includes the detachable installation of symmetry two bracing pieces of installing frame bottom, the installing frame back is fixed with and is used for accomodating the receiver of bracing piece. The utility model discloses a control inserted bar moves on the installing frame and realizes cooperation and the separation with empty core rod, and such design convenience is fixed and is dismantled installing frame and closing plate, and it is more convenient to use, when needs are carried and are transported the device, can pull down the bracing piece from the installing frame and accomodate in putting into the containing box with the bracing piece simultaneously to convenient follow-up carrying and transporting the device.

Description

Engineering progress management device
Technical Field
The utility model relates to an engineering progress management equipment technical field especially relates to an engineering progress management device.
Background
The visual progress of the project is the visual part and the total progress of the construction project which is achieved at a certain time point (usually the end) by the percentage of the text or physical project quantity according to the main component of the project. For example, the visual progress of the frame structure workshop engineering is represented by 'poured reinforced concrete column foundation is finished', 'foundation backfill is finished by 80%' and 'precast reinforced concrete beam and column is finished by 70%', which indicates that the workshop is in the later stage of the foundation engineering construction and the precast stage of the reinforced concrete beam and column, the precast beam and column are not hoisted yet and 30% of the precast beam and column are not precast yet.
In order to accelerate the engineering progress, supervise the engineering construction simultaneously, generally can place a show board that is used for showing the engineering progress at the job site, and can regularly change the engineering progress on the show board, but this kind of show board that uses at present has certain defect when using, at first through the bolt fastening between the protection casing of show board and the show board, need dismantle the protection casing when changing the engineering progress at every turn, consequently, use the trouble of ten minutes, simultaneously because the existence of the bracing piece of show board bottom, can cause inconveniently when carrying the show board, and also can occupy a large amount of spaces when the transportation, design an engineering progress management device for this reason and solve this problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an: because the existence of show board bottom sprag pole causes inconvenient problem to the transport of show board and transportation when using very trouble through the mode of bolt fastening between the protection casing of the show board of solving use at present and the show board, the utility model provides an engineering progress management device.
The utility model discloses a realize above-mentioned purpose and specifically adopt following technical scheme:
the utility model provides an engineering progress management device, includes the installing frame and fixes at its inside clipboard, it has the closing plate to articulate on the installing frame, the expansion end of closing plate is fixed with hollow rod, slidable mounting has on the installing frame and can inject inserted bar in the hollow rod still includes the detachable installation of symmetry two bracing pieces of installing frame bottom, the installing frame back is fixed with and is used for accomodating the receiver of bracing piece.
Further, the sealing plate comprises a frame body, a mounting groove is formed in the frame body, a transparent plate is fixed in the mounting groove, the frame body is hinged to the mounting frame through a hinge, and the hollow rod is fixed to the frame body.
Furthermore, a plate body is fixed on the inserting rod, a first clamping block inserted in the mounting frame is fixed on the plate body, a first clamping groove for allowing the first clamping block to slide is vertically formed in the mounting frame, and a spring for providing thrust for the first clamping block is fixed in the first clamping groove.
Furthermore, the hollow rods are symmetrically fixed on the frame body, the two insertion rods, the two plate bodies, the first clamping blocks and the two springs are arranged, and the movement directions of the two insertion rods are opposite.
Furthermore, a second clamping block is fixed at the bottom of the mounting frame, a second clamping groove for the second clamping block to insert is formed in one side of the supporting rod in a penetrating mode, and a bearing plate is fixed at the bottom of the supporting rod.
Further, the receiver sets up to two and the symmetry is fixed on the installing frame, receiver open-top, a plurality of holes of permeating water have been seted up to the receiver bottom.
The utility model has the advantages as follows:
the utility model discloses a control inserted bar moves on the installing frame and realizes cooperation and separation with hollow pole, and such design convenience is fixed and is dismantled installing frame and closing plate, and it is more convenient to use, when needs are carried and are transported the device, can pull down the bracing piece from the installing frame and accomodate in putting into the containing box with the bracing piece simultaneously to convenient follow-up transport and transportation to the device.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a top view of the present invention;
fig. 3 is a cross-sectional view taken along the direction C-C in fig. 2 according to the present invention.
Reference numerals: 1. installing a frame; 101. a first clamping groove; 2. a writing board; 3. a sealing plate; 301. a frame body; 302. a transparent plate; 4. a hollow shaft; 5. a rod is inserted; 6. a support bar; 601. a second clamping groove; 7. a storage box; 701. water permeable holes; 8. a plate body; 9. a first clamping block; 10. a spring; 11. a second clamping block; 12. a carrier plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention.
As shown in FIG. 1, an embodiment of the present invention provides an engineering progress management device, which comprises a mounting frame 1 and a writing board 2 fixed inside the mounting frame, wherein the mounting frame 1 and the writing board 2 are both configured as a rectangle, a sealing plate 3 is hinged on the mounting frame 1, a hollow rod 4 is fixed at the movable end of the sealing plate 3, the hollow rod 4 is configured as a vertical direction, an inserting rod 5 capable of being inserted into the hollow rod 4 is slidably mounted on the mounting frame 1, the inserting rod 5 is configured as a vertical direction, the hollow rod 4 and the inserting rod 5 are both configured as a cylinder, two support rods 6 are symmetrically and detachably mounted at the bottom of the mounting frame 1, the support rods 6 are configured as a rectangle and are configured as a vertical direction, a storage box 7 for storing the support rods 6 is fixed at the back of the mounting frame 1, the device can be inserted into the hollow rod 4 by controlling the movement of the inserting rod 5 on the mounting frame 1, the realization is fixed closing plate 3 and installing frame 1, thereby effectively protect the engineering progress content on the clipboard 2 in the installing frame 1, when needs update the engineering progress on clipboard 2, control inserted bar 5 moves on installing frame 1 and makes it and hollow rod 4 separation, then rotary closing plate 3 exposes clipboard 2, the renewal of engineering progress can be carried out again, when needs carry and transport the device, can pull down two bracing pieces 6 from installing frame 1 bottom, then accomodate in putting into receiver 7 bracing piece 6, just so reduced the whole area of the device, and conveniently carry and transport the device, consequently such design has been solved between the protection casing of present use show board and the show board and has been used very trouble through the mode of bolt fastening between the protection casing of show board and the show board because the existence of show board bottom support piece 6 is to the transport and the transportation of show board and transport of trouble when very trouble are used to the show board Inconvenient transportation.
As shown in fig. 1 and 2, when the sealing plate 3 is fixed to the mounting frame 1, in order to ensure that the contents of the work progress on the writing board 2 can be seen through the sealing plate 3, the sealing plate 3 includes a frame 301, and a mounting groove is formed in the frame 301, and a transparent plate 302 is fixed in the mounting groove, so that the contents on the writing board 2 can be seen through the transparent plate 302, and the frame 301 is hinged to the mounting frame 1 by a hinge, and the hollow rod 4 is fixed to the frame 301.
As shown in fig. 1, fig. 2 and fig. 3, in an embodiment of the present invention, the insertion rod 5 is installed on the mounting frame 1 in a manner that a plate 8 is fixed on the insertion rod 5, wherein the plate 8 is rectangular and is arranged horizontally, and a first clamping block 9 inserted into the mounting frame 1 is fixed on the plate 8, a first clamping groove 101 for the sliding of the first clamping block 9 is formed on the mounting frame 1 along the vertical direction, and a spring 10 for providing a pushing force to the first clamping block 9 is fixed in the first clamping groove 101, so that when the insertion rod 5 is inserted into the hollow rod 4, the insertion rod 5 is connected with the hollow rod 4 more tightly under the pushing force of the spring 10.
As shown in fig. 1, when the frame body 301 and the mounting frame 1 are fixed, in order to improve the fixing effect of the two, the hollow rod 4 is provided in two and symmetrically fixed on the frame body 301, and the insertion rod 5, the plate body 8, the first latch 9 and the spring 10 are provided in two, and the two insertion rods 5 move in opposite directions, it should be noted that the two insertion rods 5 are symmetrically provided, one plate body 8 is fixed at the bottom of the upper insertion rod 5, the other plate body 8 is fixed at the top of the lower insertion rod 5, and the moving directions of the two first latches 9 are opposite, and the thrust directions of the two springs 10 are also opposite.
As shown in fig. 2 and fig. 3, specifically, the detachable mounting manner between the supporting rod 6 and the mounting frame 1 is that a second clamping block 11 is fixed at the bottom of the mounting frame 1, a second clamping groove 601 for the second clamping block 11 to insert is formed at one side of the supporting rod 6 in a penetrating manner, and meanwhile, in order to improve the supporting effect of the supporting rod 6, a bearing plate 12 is fixed at the bottom of the supporting rod 6, and the bearing plate 12 is rectangular and is arranged in a horizontal direction, and the horizontal area of the bearing plate 12 is larger than the horizontal area of the supporting rod 6.
As shown in fig. 1 and 2, it is preferable that the storage cases 7 are provided in two and symmetrically fixed to the mounting frame 1, and one support rod 6 and one loading plate 12 are received in each storage case 7, where the storage case 7 is open at the top, and a plurality of water permeable holes 701 are opened at the bottom of the storage case 7 in consideration of the convenience of discharging water in the storage case 7 during raining.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides an engineering progress management device, its characterized in that includes installing frame (1) and fixes clipboard (2) inside it, it has closing plate (3) to articulate on installing frame (1), the expansion end of closing plate (3) is fixed with hollow rod (4), slidable mounting has on installing frame (1) and can inject inserted bar (5) in hollow rod (4), still include the detachable installation of symmetry two bracing pieces (6) of installing frame (1) bottom, installing frame (1) back is fixed with and is used for accomodating receiver (7) of bracing piece (6).
2. A project progress management device according to claim 1, characterized in that the sealing plate (3) comprises a frame body (301), a mounting groove is formed on the frame body (301), a transparent plate (302) is fixed in the mounting groove, the frame body (301) is hinged on the mounting frame (1) through a hinge, and the hollow rod (4) is fixed on the frame body (301).
3. The project schedule management device according to claim 2, characterized in that a plate body (8) is fixed on the insertion rod (5), a first clamping block (9) inserted into the mounting frame (1) is fixed on the plate body (8), a first clamping groove (101) for the sliding of the first clamping block (9) is vertically formed on the mounting frame (1), and a spring (10) for providing thrust for the first clamping block (9) is fixed in the first clamping groove (101).
4. A project progress management device according to claim 3, characterized in that, the hollow rods (4) are arranged in two and symmetrically fixed on the frame (301), the two insertion rods (5), the plate body (8), the first clamping block (9) and the spring (10) are arranged in two, and the moving directions of the two insertion rods (5) are opposite.
5. The project schedule management device according to claim 1, characterized in that a second clamping block (11) is fixed at the bottom of the mounting frame (1), a second clamping groove (601) for the second clamping block (11) to insert is formed at one side of the supporting rod (6) in a penetrating manner, and a bearing plate (12) is fixed at the bottom of the supporting rod (6).
6. The project schedule management device according to claim 1, characterized in that, the storage boxes (7) are arranged in two and symmetrically fixed on the mounting frame (1), the top of the storage box (7) is opened, and a plurality of water permeable holes (701) are opened at the bottom of the storage box (7).
CN202220416676.9U 2022-02-26 2022-02-26 Engineering progress management device Active CN217610135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220416676.9U CN217610135U (en) 2022-02-26 2022-02-26 Engineering progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220416676.9U CN217610135U (en) 2022-02-26 2022-02-26 Engineering progress management device

Publications (1)

Publication Number Publication Date
CN217610135U true CN217610135U (en) 2022-10-21

Family

ID=83645147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220416676.9U Active CN217610135U (en) 2022-02-26 2022-02-26 Engineering progress management device

Country Status (1)

Country Link
CN (1) CN217610135U (en)

Similar Documents

Publication Publication Date Title
CN217610135U (en) Engineering progress management device
CN213741111U (en) Building foundation pit supporting structure
KR102381329B1 (en) Upright device for retaining wall block
CN105236055A (en) Vertical box device of vertical trash compression transfer station
CN205397108U (en) Portable large garbage truck bucket
CN207511194U (en) The vertical transfer station of intelligent environment protection garbage-compressing
CN205169486U (en) Upright case device of vertical rubbish compression transfer station
CN210369047U (en) Portable movable template support
CN219060806U (en) Environment-friendly waterproof and anti-corrosion construction frame
CN204642844U (en) A kind of garbage transfer station of charging safety labor-saving
CN207512746U (en) A kind of earth excavation conversion platform
CN215476699U (en) TRD replacement soil storage device
CN215513405U (en) Handling device is used in hydraulic engineering pile foundation construction convenient to use
CN212710653U (en) A prefabricated plate conveyer for piping lane construction
CN219060348U (en) Temporary protection shed for construction engineering convenient to lap
CN215437413U (en) Evaporate and press anti-falling tray that aerated concrete block transported
CN211128563U (en) Prepackage type power cabinet convenient to transportation
CN214561845U (en) Simple and easy reinforcing bar location in precast beam field and integral hoisting shift unit
CN215252903U (en) Prevent supporting construction for basement deep basal pit construction of deformation under complex environment
CN217969658U (en) Longitudinal beam structure of bin gate type semitrailer
CN217106289U (en) Prefabricated block wall component preformed hole position supplementing device
CN217203674U (en) Box culvert pipeline installation structure penetrating through flood discharge tunnel
CN214192108U (en) Small-size prefabricated assembled electronic bulk bin
CN217327433U (en) Mine mining engineering monitoring and early warning device
CN213087507U (en) Waterproof blanket patching device of bentonite

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant