CN217602312U - Dustproof partition wall that building engineering used - Google Patents
Dustproof partition wall that building engineering used Download PDFInfo
- Publication number
- CN217602312U CN217602312U CN202220834199.8U CN202220834199U CN217602312U CN 217602312 U CN217602312 U CN 217602312U CN 202220834199 U CN202220834199 U CN 202220834199U CN 217602312 U CN217602312 U CN 217602312U
- Authority
- CN
- China
- Prior art keywords
- seat
- division board
- sound
- sound absorption
- partition wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005192 partition Methods 0.000 title claims description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 81
- 238000002347 injection Methods 0.000 claims abstract description 31
- 239000007924 injection Substances 0.000 claims abstract description 31
- 238000010521 absorption reaction Methods 0.000 claims abstract description 22
- 229920000742 Cotton Polymers 0.000 claims abstract description 13
- 229920002635 polyurethane Polymers 0.000 claims abstract description 9
- 239000004814 polyurethane Substances 0.000 claims abstract description 9
- 238000010276 construction Methods 0.000 claims description 14
- 238000002955 isolation Methods 0.000 claims description 8
- 239000006260 foam Substances 0.000 claims description 7
- 229920001971 elastomer Polymers 0.000 claims description 6
- 230000000694 effects Effects 0.000 abstract description 10
- 238000009792 diffusion process Methods 0.000 abstract description 4
- 239000000428 dust Substances 0.000 description 6
- 238000004806 packaging method and process Methods 0.000 description 4
- 239000004568 cement Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000007921 spray Substances 0.000 description 3
- 238000009413 insulation Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 239000006096 absorbing agent Substances 0.000 description 1
- 239000006098 acoustic absorber Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 230000002633 protecting effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 210000002268 wool Anatomy 0.000 description 1
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to a division wall technical field especially relates to a dustproof division wall that building engineering used. The technical scheme comprises the following steps: fastening seat, division board and water injection seat, the mount pad is installed at water injection seat top, and the connecting seat is installed through the mounting groove to the mount pad inside, and the division board is installed at the connecting seat top, and division board outside equidistance is provided with the sound absorption hump, and the inside polyurethane board that is provided with of division board, the polyurethane board outside is provided with inhales the cotton layer of sound, and the fastening seat is installed at the division board top, and the inside hoop that extends through spring mounting of fastening seat. The utility model discloses a sound absorption convex peak can make the division board surface form amortization peak valley, increases the amortization performance of division board, and the amortization peak valley that utilizes the sound absorption convex peak to form can absorb the noise effectively, recycles the effectual propagation of isolated sound of inhaling the cotton layer characteristic impedance of sound to reach the highest sound absorption effect, the inside sound diffusion of effectual isolated building has increased the performance of making an uproar falls in the syllable-dividing of division board.
Description
Technical Field
The utility model relates to a division wall technical field specifically is a dustproof division wall that building engineering used.
Background
The building engineering refers to a general name of various buildings and engineering facilities which provide material and technical foundations for human life and production, the main scope of the building engineering is engineering mechanics, soil mechanics, surveying, housing architecture and structural engineering subjects, technical support is provided in the construction process of the building engineering, in order to avoid the intrusion of external personnel in the construction process of the building engineering, the building scope is isolated through an isolation wall, the safety of the construction of the building engineering is ensured, accidents are avoided, and therefore the dustproof isolation wall for the building engineering is provided.
Through the retrieval, patent publication No. is CN211691778U discloses a building engineering construction device of making an uproar that prevents dust, including the division wall body, the division wall body comprises the inside hollow division board concatenation that is of a plurality of, be provided with in the division board and carry out the absorptive subassembly of making an uproar that falls to the noise, the top of division board is provided with the dust fall subassembly that carries out the dust fall, the fixed connecting rod that is provided with in middle part of division board bottom, the bottom mounting of connecting rod is provided with and is square spacing post, the bottom of spacing post is provided with the stone base, spacing post cooperatees and arranges the spacing inslot of seting up on stone base top in, the fixed fixture block that is provided with in middle part of division board one side, the draw-in groove with fixture block matched with is seted up at the middle part of division board opposite side.
The existing dustproof partition wall for constructional engineering has the defects that:
1. the existing dustproof partition wall for constructional engineering usually adopts a cement base, the cement base is inconvenient to carry and move, the assembly efficiency of the device is reduced, meanwhile, the cement base cannot perform buffer protection when collision occurs, the protection effect of the device is reduced, a fire-fighting water source cannot be provided when a fire disaster is caused by collision, a worker needs to search for the fire-fighting water source additionally, the optimal rescue time is influenced, the fire disaster loss is serious, and the practicability of the device is reduced;
2. the existing dustproof partition wall for the constructional engineering is poor in sound insulation and noise reduction effects, noise generated in the constructional engineering construction process cannot be effectively absorbed, the periphery of the constructional engineering is subjected to noise interference, living or office quality is affected, the practicability of the device is reduced, and therefore the dustproof partition wall for the constructional engineering is provided to solve the existing problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a dustproof division wall that building engineering used to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a dustproof division wall that building engineering used, includes fastening seat, division board and water injection seat, the water filling port is installed at water injection seat one side top, and installs the outlet bottom water injection seat one side, the mount pad is installed at water injection seat top, the inside mounting groove that is provided with of mount pad, the connecting seat is installed through the mounting groove to the mount pad is inside, the division board is installed at the connecting seat top, division board outside equidistance is provided with the sound absorption hump, the inside polyurethane slab that is provided with of division board, the polyurethane slab outside is provided with inhales the cotton layer of sound, fastening seat is installed at the division board top, the inside hoop that extends through spring mounting of fastening seat, the water pipe is installed through hoop at fastening seat top.
Can store the water source through the seat of annotating water, the whole weight of the multiplicable water injection seat of water source, thereby the stability of multiplicable device, the water injection seat has good cushioning effect through inside water source when taking place the striking, thereby the security of device has been promoted, the protecting effect of device has been improved, and the inside water source of water injection seat can provide the fire control water source for the conflagration that the striking caused, thereby the staff can in time rescue and put out a fire, the device fire extinguishing function has been increased, simultaneously when the device transport removes, can discharge the inside water source of water injection seat, thereby alleviate water injection seat weight, make things convenient for the seat of annotating water to carry the equipment, the packaging efficiency of device has been improved, can make the surface of the division board form the amortization peak valley through the sound absorption peak, increase the amortization performance of division board, the amortization peak valley that utilizes the sound absorption peak that the sound absorption peak formed can absorb the noise effectively, the effectual isolated sound propagation of sound cotton layer characteristic impedance of sound again, thereby reach the highest sound absorption effect, the inside sound diffusion of effectual isolated building, the performance of making an uproar is fallen of division has been increased.
Preferably, the front equidistance of water pipe is provided with atomizer, and the link is installed at the water pipe both ends. The water source is carried through the outer pipe fitting of link to the water pipe, and the water source in the water pipe atomizes through atomizer and sprays, and atomizing water source can carry out the dust fall to the dust that produces in the building engineering construction, guarantees construction environment's safety.
Preferably, a rubber pad is installed on the inner side of the hoop member, and a limiting groove is formed in the inner side of the fastening seat. Can increase the anti-skid property of the hoop member through the rubber pad, guarantee the stability of the hoop member for fixing the water pipe, and limit the position of the water pipe for the limit groove.
Preferably, plug pins are arranged on one side of the isolation plate at equal intervals, and plug holes are arranged on the other side of the isolation plate at equal intervals. The partition board can be assembled through the inserting pins and the inserting holes, and the assembling efficiency of the partition board is improved.
Preferably, the sound-absorbing foam board is arranged on the outer side of the sound-absorbing cotton layer, and the extruded sheet is arranged on the outer side of the sound-absorbing foam board. The sound gradually transits through the sound-absorbing cotton layer, the sound-absorbing foam plate and the extruded sheet, and the acoustic impedance of the material can be well matched with that of air, so that the sound waves are transmitted into the sound absorber and are efficiently absorbed.
Preferably, two groups of connecting holes are formed in two sides of the interior of the mounting seat, and the front face of the mounting seat is equidistantly provided with through mounting bolts. The mount pad is assembled through the cooperation of the external connecting rod of connecting hole, has improved two sets of mount pads concatenation efficiency, and mounting bolt can fix the connecting seat, has guaranteed the fastness of connecting seat installation.
Compared with the prior art, the beneficial effects of the utility model are that:
1. can store the water source through the seat of annotating water, the whole weight of the multiplicable water injection seat in water source, thereby the stability of multiplicable device, the water injection seat has good cushioning effect through inside water source when taking place the striking, thereby the security of device has been promoted, the protective effect of device has been improved, and the inside water source of water injection seat can provide the fire control water source for the conflagration that the striking caused, thereby the staff can in time rescue and put out a fire, the device fire extinguishing function has been increased, simultaneously when the device transport removes, the inside water source of the seat of annotating water of can discharging, thereby alleviate water injection seat weight, conveniently annotate the seat of annotating water and carry the equipment, the packaging efficiency of device has been improved.
2. Can make the division board surface form amortization peak valley through the sound absorption peak, increase the amortization performance of division board, the amortization peak valley that utilizes the sound absorption peak to form can absorb the noise effectively, recycles the effectual isolated sound of inhaling the cotton layer characteristic impedance of sound propagation to reach the highest sound absorption effect, the inside sound diffusion of effectual isolated building has increased the performance of making an uproar that gives sound insulation of division board and has fallen.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a schematic diagram of the structure of the isolation board of the present invention;
FIG. 3 is a schematic view of a partial structure of the fastening seat of the present invention;
FIG. 4 is a schematic sectional view of the partition board of the present invention;
fig. 5 is a schematic view of a local structure of the mounting base of the present invention.
In the figure: 1. a water pipe; 101. an atomizing spray head; 102. a connecting end; 2. a fastening seat; 201. a spring; 202. a hoop member; 203. a rubber pad; 3. a separator plate; 301. a plug pin; 302. sound absorption convex peaks; 303. a connecting seat; 304. inserting holes; 4. a polyurethane board; 401. a sound absorbing cotton layer; 402. a sound absorbing foam sheet; 403. extruding a plastic plate; 5. a mounting seat; 501. mounting grooves; 502. connecting holes; 503. installing a bolt; 6. a water injection seat; 601. a water injection port; 602. and a water outlet.
Detailed Description
The technical solution of the present invention will be further explained with reference to the accompanying drawings and specific embodiments.
Example one
As shown in fig. 1-5, the utility model provides a dustproof division wall that building engineering used, including fastening seat 2, division board 3 and water injection seat 6, water filling port 601 is installed at 6 one side tops of water injection seat, and water injection seat 6 one side bottom installs outlet 602, mount pad 5 is installed at 6 top of water injection seat, the inside mounting groove 501 that is provided with of mount pad 5, connecting seat 303 is installed through mounting groove 501 to mount pad 5 inside, division board 3 is installed at connecting seat 303 top, 3 outside equidistance of division board is provided with sound absorption hump 302, the inside polyurethane board 4 that is provided with of division board 3, polyurethane board 4 outside is provided with inhales cotton layer 401, fastening seat 2 is installed at 3 tops of division board, the inside hoop 202 that installs the extension through spring 201 of fastening seat 2, water pipe 1 is installed through hoop 202 at fastening seat 2 top.
The working principle of the dustproof isolation wall for the construction engineering based on the first embodiment is as follows: two sets of mount pads 5 are inside to be assembled through the external connecting rod of mounting groove 501, two sets of mount pads 5 concatenation efficiency has been improved, mount pad 5 passes through connecting hole 502 and connecting seat 303 cooperation installation division board 3, division board 3 can be assembled through peg pin 301 and peg hole 304, division board 3 packaging efficiency has been improved, can make division board 3 surface form amortization peak valley through sound absorption peak 302, increase division board 3's amortization performance, the amortization peak valley that utilizes sound absorption peak 302 to form can absorb the noise effectively, recycle the effectual propagation of isolated sound of sound absorption cotton layer 401 characteristic impedance, thereby reach the highest sound absorption effect, the inside sound diffusion of effectual isolated building, the performance of making an uproar falls in the syllable-dividing of division board 3 has been increased, can store the water source through the water injection seat 6, the whole weight of water source multiplicable water injection seat 6, thereby the stability of multiplicable device, water injection seat 6 has good cushioning effect when taking place the striking through inside water source, thereby the security of device has been promoted, water injection protective device's effect has been improved, and the water injection seat 6 can be in time for the conflagration that causes, the water injection seat can carry out the convenience is assembled when carrying device, thereby the transportation efficiency has been improved.
Example two
As shown in fig. 1-5, the utility model provides a dustproof division wall for building engineering compares in embodiment one, and this embodiment still includes: 1 front equidistance of water pipe is provided with atomizer 101, link 102 is installed at 1 both ends of water pipe, rubber pad 203 is installed to hoop 202 inboard, and 2 inboards of fastening seat are provided with the spacing groove, 3 one side equidistance of division board is provided with grafting round pin 301, and 3 opposite side equidistance of division board are provided with spliced eye 304, inhale the cotton layer 401 outside of sound and be provided with and inhale sound cystosepiment 402, it is provided with extruded sheet 403 to inhale the sound cystosepiment 402 outside, 5 inside both sides of mount pad are provided with two sets of connecting holes 502, and 5 front equidistance of mount pad install the construction bolt 503 that runs through.
In this embodiment, water pipe 1 carries the water source through the external pipe fitting of link 102, the water source in the water pipe 1 atomizes through atomizer 101 and sprays, the dust that the atomizing water source produced in can being under construction building engineering falls, guarantee the safety of construction environment, can increase hoop 202 non-skid property through rubber pad 203, the stability that hoop 202 is fixed to water pipe 1 has been guaranteed, can inject water pipe 1's position for the spacing groove, division board 3 can assemble with spliced eye 304 through peg pin 301, division board 3 packaging efficiency has been improved, sound passes through acoustic wool layer 401, acoustic foam board 402 and extruded sheet 403 transition nature gradually, the acoustic impedance of material and the acoustic impedance of air can match betterly, make the sound wave spread into the acoustic absorber, and absorbed by the efficient, mount pad 5 assembles through the cooperation of the external connecting rod of connecting hole 502, two sets of 5 concatenation efficiencies of mount pad have been improved, mounting bolt 503 can fix connecting seat 303, the fastness of connecting seat 303 installation has been guaranteed.
The above embodiments are merely some preferred embodiments of the present invention, and those skilled in the art can make various alternative modifications and combinations to the above embodiments based on the technical solution of the present invention and the related teachings of the above embodiments.
Claims (6)
1. The utility model provides a dustproof partition wall that building engineering used, includes fastening seat (2), division board (3) and water injection seat (6), its characterized in that: water filling port (601) is installed at water injection seat (6) one side top, and installs outlet (602) bottom water injection seat (6) one side, mount pad (5) are installed at water injection seat (6) top, inside mounting groove (501) that is provided with of mount pad (5), connecting seat (303) are installed through mounting groove (501) to mount pad (5) inside, division board (3) are installed at connecting seat (303) top, division board (3) outside equidistance is provided with sound absorption hump (302), inside polyurethane board (4) that is provided with of division board (3), polyurethane board (4) outside is provided with inhales cotton layer of sound (401), fastening seat (2) are installed at division board (3) top, inside hoop (202) of installing the extension through spring (201) of fastening seat (2), water pipe (1) is installed through hoop (202) at fastening seat (2) top.
2. The dustproof partition wall for constructional engineering as claimed in claim 1, wherein: the front of the water pipe (1) is equidistantly provided with atomizing nozzles (101), and connecting ends (102) are arranged at two ends of the water pipe (1).
3. The dustproof partition wall for construction engineering according to claim 1, wherein: a rubber pad (203) is installed on the inner side of the hoop member (202), and a limiting groove is formed in the inner side of the fastening seat (2).
4. The dustproof partition wall for construction engineering according to claim 1, wherein: plug pins (301) are arranged on one side of the isolation plate (3) at equal intervals, and plug holes (304) are arranged on the other side of the isolation plate (3) at equal intervals.
5. The dustproof partition wall for construction engineering according to claim 1, wherein: the outer side of the sound absorption cotton layer (401) is provided with a sound absorption foam plate (402), and the outer side of the sound absorption foam plate (402) is provided with an extruded sheet (403).
6. The dustproof partition wall for constructional engineering as claimed in claim 1, wherein: two groups of connecting holes (502) are formed in two sides of the interior of the mounting seat (5), and the front face of the mounting seat (5) is equidistantly provided with through mounting bolts (503).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220834199.8U CN217602312U (en) | 2022-04-12 | 2022-04-12 | Dustproof partition wall that building engineering used |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220834199.8U CN217602312U (en) | 2022-04-12 | 2022-04-12 | Dustproof partition wall that building engineering used |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217602312U true CN217602312U (en) | 2022-10-18 |
Family
ID=83565561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220834199.8U Expired - Fee Related CN217602312U (en) | 2022-04-12 | 2022-04-12 | Dustproof partition wall that building engineering used |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217602312U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115613721A (en) * | 2022-11-09 | 2023-01-17 | 山东泰山建工发展集团有限公司 | Noise pollution's environment-friendly division wall is built in room job site noise control |
-
2022
- 2022-04-12 CN CN202220834199.8U patent/CN217602312U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115613721A (en) * | 2022-11-09 | 2023-01-17 | 山东泰山建工发展集团有限公司 | Noise pollution's environment-friendly division wall is built in room job site noise control |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217602312U (en) | Dustproof partition wall that building engineering used | |
CN116289683A (en) | Novel light totally-enclosed sound barrier for urban viaduct | |
CN210340751U (en) | Multifunctional flame-retardant sponge | |
CN214531304U (en) | Effectual energy-conserving building wall body gives sound insulation | |
CN212718472U (en) | Noise-reducing and shock-absorbing water supply and drainage pipe structure for building construction | |
CN111997225B (en) | Building wall with heat preservation and sound insulation functions | |
CN116044247A (en) | Road construction protective structure | |
CN213418124U (en) | Waterproof sound insulation type heat preservation board | |
CN109680976B (en) | Mine blasting rubble protector | |
CN215373732U (en) | Blasting protection device for building demolition | |
CN215803033U (en) | Noise reduction type building construction platform device | |
CN213927756U (en) | Civil air defense engineering shock isolation device | |
CN210032556U (en) | Noise reduction structure of building construction platform | |
CN217157704U (en) | Environmental protection inhales sound and falls equipment of making an uproar | |
CN211922470U (en) | Building construction working face sprays dust fall heat sink | |
CN216131113U (en) | Centrifugal fire control smoke exhaust fan convenient to it is fixed | |
CN218780121U (en) | Guardrail structure for construction | |
CN219654982U (en) | Vibration and noise reduction device for axial flow fan | |
CN216551941U (en) | Noise reduction barrier for rotary drilling rig | |
CN218863472U (en) | Oil pipe assembly for eliminating vibration and reducing noise | |
CN214573456U (en) | Nonmetal light-duty sound absorption sound insulation sound barrier cell board | |
CN220080959U (en) | Dustproof noise reduction and sound insulation house | |
CN212896952U (en) | Building steel structure with high flame retardant type membrane structure | |
CN217028627U (en) | Energy-saving noise-reducing safety glass | |
CN210509161U (en) | Shock absorption and noise reduction device for coal mining machine for coal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20221018 |
|
CF01 | Termination of patent right due to non-payment of annual fee |