CN217601836U - Combined building block for laying wall at threading pipe - Google Patents

Combined building block for laying wall at threading pipe Download PDF

Info

Publication number
CN217601836U
CN217601836U CN202220021123.3U CN202220021123U CN217601836U CN 217601836 U CN217601836 U CN 217601836U CN 202220021123 U CN202220021123 U CN 202220021123U CN 217601836 U CN217601836 U CN 217601836U
Authority
CN
China
Prior art keywords
building block
shaped building
shaped
gap
threading pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220021123.3U
Other languages
Chinese (zh)
Inventor
刘小军
何玲
王飞
薛燕琴
马峰远
杨嘉辉
张钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Engineering And Construction Co ltd
Original Assignee
Jinchuan Group Engineering And Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Engineering And Construction Co ltd filed Critical Jinchuan Group Engineering And Construction Co ltd
Priority to CN202220021123.3U priority Critical patent/CN217601836U/en
Application granted granted Critical
Publication of CN217601836U publication Critical patent/CN217601836U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a threading pipe department wall body is built by laying bricks or stones and is used combination building block, this combination building block by U type building block I with II butt joints of U type building block constitute. A gap I is formed between the short end I of the U-shaped building block I and the long end II of the U-shaped building block II; a gap II is formed between the long end I of the U-shaped building block I and the short end II of the U-shaped building block II; masonry mortar is filled in the gap I and the gap II. The utility model discloses the processing cost is low, and easy operation has not only guaranteed the wall body and has built by laying bricks or stones the quality, has strengthened wall body wholeness and anti-seismic performance, and appearance quality is good moreover, has reduced the later stage and has reworked and repair, has improved work efficiency to reduce construction cost.

Description

Combined building block for laying wall at threading pipe
Technical Field
The utility model relates to a building engineering field especially relates to a threading pipe department wall body is built by laying bricks or stones and is used combination building block.
Background
Indoor block terminal of civil construction, module case inlet wire steel threading pipe are more, and are not of uniform size, adopt earlier to install the threading pipe at present usually and carry out the wall body to build by laying bricks or stones, but this kind of mode makes this department's wall body disconnection, can not become whole, and anti-seismic performance is poor, and later stage repair manpower, material waste are serious, and appearance quality is poor, and wall body stability is low, and construction cost increases.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a threading pipe department wall body is built by laying bricks or stones and is used combination building block with low costs, easy operation is provided.
In order to solve the problem, a threading pipe department wall body build by laying bricks or stones with combination building block, its characterized in that: the combined building block is formed by butting a U-shaped building block I and a U-shaped building block II; a gap I is formed between the short end I of the U-shaped building block I and the long end II of the U-shaped building block II; a gap II is formed between the long end I of the U-shaped building block I and the short end II of the U-shaped building block II; masonry mortar is filled in the gap I and the gap II.
The height and width of the U-shaped building block I and the U-shaped building block II are consistent with those of the wall building block.
The length of the side wall of the U-shaped building block I and the length of the side wall of the U-shaped building block II are staggered.
The length from the top of the short end I to the bottom of the U-shaped building block I is smaller than the length from the top of the short end II to the bottom of the U-shaped building block II.
The length from the top of the long end I to the bottom of the U-shaped building block I is smaller than the length from the top of the long end II to the bottom of the U-shaped building block II.
The space formed between the U-shaped building block I and the U-shaped building block II is matched with the size of a wire inlet threading pipe of the distribution box.
Compared with the prior art, the utility model has the following advantage:
1. the utility model discloses constitute by II butt joints of U type building block I and U type building block, can not only guarantee the wall body and built by laying bricks or stones the quality according to the not equidimension building block of the big or small preparation of threading pipe, strengthened wall body wholeness and anti-seismic performance, appearance quality is good moreover, has reduced the later stage and has reworked and repair, has improved work efficiency to reduce construction cost.
2. The utility model discloses the processing cost is low, easy operation.
Drawings
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
Fig. 1 is a plan view of the present invention.
Fig. 2 is a front elevation view of the present invention.
Fig. 3 is a back view of the present invention.
In the figure: 1-U-shaped building block I; 11-short end i; 12-long end I; 2-U-shaped building blocks II; 21-short end ii; 22-long end ii; 3, a distribution box; 4-threading pipe.
Detailed Description
As shown in figure 1, the combined building block for building the wall at the position of the threading pipe is formed by butting a U-shaped building block I1 and a U-shaped building block II 2. A gap I is formed between the short end I11 of the U-shaped building block I1 and the long end II 22 of the U-shaped building block II 2; a gap II is formed between the long end I12 of the U-shaped building block I1 and the short end II 21 of the U-shaped building block II 2; masonry mortar is filled in the gap I and the gap II.
Wherein: the height and width of the U-shaped building block I1 and the U-shaped building block II 2 are consistent with those of the wall building block.
The length of the side wall of the U-shaped building block I1 and the length of the side wall of the U-shaped building block II 2 are staggered.
The length from the top of the short end I11 to the bottom of the U-shaped building block I1 is smaller than the length from the top of the short end II 21 to the bottom of the U-shaped building block II 2.
The length from the top of the long end I12 to the bottom of the U-shaped building block I1 is smaller than the length from the top of the long end II 22 to the bottom of the U-shaped building block II 2.
U type building block I1 and U type building block II 2 adopt C25 pea gravel concreten to make, and the size differs, can crisscross building by laying bricks or stones. The brick can be jointed with the wall design building blocks effectively in the building process.
The space formed between the U-shaped building block I1 and the U-shaped building block II 2 is matched with the size of the wire inlet threading pipe 4 of the distribution box 3.
During the building, horizontal direction and vertical direction are well calculated and are built by laying bricks or stones the modulus, build U type building block I1 and U type building block II 2 earlier, build by laying bricks or stones with the horizontal layer wall body building block later, and second floor U type building block I1 and II 2 of U type building block are crisscross to be built by laying bricks or stones, form abutment raft, build by laying bricks or stones layer by layer in proper order. The building blocks have 150mm of error difference and are constructed in a staggered mode, and a through seam can not be formed.

Claims (6)

1. The utility model provides a threading pipe department wall body is built by laying bricks or stones and is used combination building block which characterized in that: the combined building block is formed by butt joint of a U-shaped building block I (1) and a U-shaped building block II (2); a gap I is formed between the short end I (11) of the U-shaped building block I (1) and the long end II (22) of the U-shaped building block II (2); a gap II is formed between the long end I (12) of the U-shaped building block I (1) and the short end II (21) of the U-shaped building block II (2); masonry mortar is filled in the gap I and the gap II.
2. The combined building block for building the wall at the position of the threading pipe according to claim 1, which is characterized in that: the height and width of the U-shaped building block I (1) and the U-shaped building block II (2) are consistent with those of the wall building block.
3. The combined building block for building the wall at the position of the threading pipe according to claim 1, which is characterized in that: the length of the side wall of the U-shaped building block I (1) and the length of the side wall of the U-shaped building block II (2) are staggered.
4. The combined building block for building the wall at the position of the threading pipe according to claim 1, wherein: the length from the top of the short end I (11) to the bottom of the U-shaped building block I (1) is smaller than the length from the top of the short end II (21) to the bottom of the U-shaped building block II (2).
5. The combined building block for building the wall at the position of the threading pipe according to claim 1, wherein: the length from the top of the long end I (12) to the bottom of the U-shaped building block I (1) is smaller than the length from the top of the long end II (22) to the bottom of the U-shaped building block II (2).
6. The combined building block for building the wall at the position of the threading pipe according to claim 1, wherein: the space formed between the U-shaped building block I (1) and the U-shaped building block II (2) is matched with the size of a wire inlet threading pipe (4) of the distribution box (3).
CN202220021123.3U 2022-01-06 2022-01-06 Combined building block for laying wall at threading pipe Active CN217601836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220021123.3U CN217601836U (en) 2022-01-06 2022-01-06 Combined building block for laying wall at threading pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220021123.3U CN217601836U (en) 2022-01-06 2022-01-06 Combined building block for laying wall at threading pipe

Publications (1)

Publication Number Publication Date
CN217601836U true CN217601836U (en) 2022-10-18

Family

ID=83561609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220021123.3U Active CN217601836U (en) 2022-01-06 2022-01-06 Combined building block for laying wall at threading pipe

Country Status (1)

Country Link
CN (1) CN217601836U (en)

Similar Documents

Publication Publication Date Title
CN103831507A (en) Large-span steel truss girder bridge whole joist full-welding joint welding method
CN111042392A (en) Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN217601836U (en) Combined building block for laying wall at threading pipe
CN107268675A (en) Laying method and structure of combined multi-bin underground comprehensive pipe gallery
CN109763669A (en) Agriculture occupies the bilateral transverse direction jointing reinforcement Shockproof reinforcing method of masonry building
CN204001424U (en) Super large caliber assembled crotch post
CN105544869A (en) Steel pipe and concrete combination special-shaped column suitable for industrial production
CN208023830U (en) One kind exempting from plastering and exempts from common brick ribbed panel
CN207776225U (en) A kind of hollowed-block masonry structure with high shear behavior
CN215519946U (en) Wall body corner constructional column exempts from formwork construction structures
CN211548336U (en) Concrete hollow block product group special for assembled reinforced block masonry wall structure
CN212453206U (en) Evaporate and press lightweight aerated concrete modularization scale panel wall structure
CN2329717Y (en) Inserting hollow brick
CN206233224U (en) Wave mode concrete sheet-piling
CN111962901A (en) Existing masonry structure reconstruction construction method
CN105735547B (en) A kind of walling unit and the wall assembly construction method based on the walling unit
CN111894171A (en) Construction method of light steel structure system replacing ring beam constructional column
CN215801829U (en) Basement side wall anti-seepage system based on fixed stagnant water steel sheet
CN204000958U (en) A kind of novel ater-casting place braced structures
CN215519450U (en) Mutual wedge type automatic alignment grouting brick
CN211817213U (en) Connection structure of prefabricated building wallboard
CN217518671U (en) Tunnel inverted arch cleaning device
CN103590509B (en) Based on the wall wall connecting joint structure of assembled architecture
CN221524222U (en) Wall body yin-yang angle template
CN203742017U (en) Wall-to-wall connection node structure based on prefabricated building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant