CN217581346U - Post-cast strip pre-sealing structure - Google Patents

Post-cast strip pre-sealing structure Download PDF

Info

Publication number
CN217581346U
CN217581346U CN202221068201.1U CN202221068201U CN217581346U CN 217581346 U CN217581346 U CN 217581346U CN 202221068201 U CN202221068201 U CN 202221068201U CN 217581346 U CN217581346 U CN 217581346U
Authority
CN
China
Prior art keywords
cast strip
post
apron
sets
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221068201.1U
Other languages
Chinese (zh)
Inventor
李强
杜圣洋
童春辉
陈华明
蔡俊沂
陈卫发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen C&d Construction Operation Management Co ltd
Original Assignee
Xiamen C&d Construction Operation Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen C&d Construction Operation Management Co ltd filed Critical Xiamen C&d Construction Operation Management Co ltd
Priority to CN202221068201.1U priority Critical patent/CN217581346U/en
Application granted granted Critical
Publication of CN217581346U publication Critical patent/CN217581346U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a construction field, in particular to post-cast strip enclosed construction in advance, including earlier cast strip and post-cast strip, the post-cast strip is between the earlier cast strip in both sides, and the post-cast strip upper cover is equipped with the apron that sets up more than two sets of side by side, and the cross sectional shape of apron is character cut in bas, and the earlier cast strip of both sides is seted up the buckler that mutually supports with apron both sides bellying, and the interval is inserted and is equipped with the grout pipe on the apron more than two sets of, the utility model discloses can lay the apron on the post-cast strip before post-cast strip grout construction to neither influence the major structure and subside, can solve the normal male problem of basement antiseep and outdoor engineering again, can guarantee that basement fitment and main part are synchronous, outdoor engineering and exterior wall fitment are synchronous, guarantee the engineering quality when the engineering progress, the cross sectional shape of apron is character cut in bas simultaneously to set up on the earlier cast strip and have apron mutually supporting buckler, thereby can block effectively rainwater etc. from post-cast strip seepage, avoid the reinforcing bar to corrode.

Description

Post-cast strip pre-sealing structure
Technical Field
The utility model relates to a construction field, in particular to post-cast strip enclosed construction in advance.
Background
In the field of building construction engineering, a post-cast strip is a temporary construction joint which is reserved at a corresponding position of a foundation slab, a wall, a beam and the like where concrete is firstly poured in order to prevent a cast-in-place reinforced concrete structure from possibly generating harmful cracks due to nonuniform self shrinkage or nonuniform settlement, and concrete needs to be poured into the construction joint after a period of time.
At present, in the sealing construction of the telescopic post-cast strip of the large-scale ground reservoir, the construction is carried out after the age of concrete on two sides of the post-cast strip reaches 60-90 days in the traditional method, and for the post-cast strip which is settled, the construction is carried out after the main body of the high-rise structure is capped and the settlement is stable, and then the construction of working procedures such as roof covering, greening, municipal administration and the like can be carried out. According to the method, the roof of the ground reservoir can be poured after the stretching deformation, the settling deformation and the like are basically finished, and the landscape earthing cannot be inserted in advance before the later pouring belt is not closed, so that the construction is long in time consumption and much in time consumption, and in the current time period with the emphasis on time cost, the construction period is long and the efficiency is low.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to solve the technical problems that: the utility model provides a post-cast strip is enclosed structure in advance, solves the post-cast strip construction prospect among the prior art and sees the unable alternate construction of earthing in advance, leads to its construction consuming time longer, the more condition of cost time.
In order to solve the technical problem, the utility model discloses a technical scheme be:
the utility model provides a post-cast strip enclosed construction in advance, includes post-cast strip and two earlier cast strips, the post-cast strip sets up between two earlier cast strips, the post-cast strip upper cover is equipped with the apron that just sets up more than two, the cross sectional shape of apron is character cut in bas-relief shape, two equally divide on the earlier cast strip and do not set up the capillary groove of mutually supporting with apron both sides bellying, more than two carry out the locking cooperation through the retaining member after the apron sets up side by side, more than two the interval is inserted and is equipped with the grout pipe on the apron.
Further, the retaining member includes spliced pole and two nuts, the relative both ends of spliced pole all seted up with nut complex thread groove, the one end of spliced pole is passed two above apron and threaded connection in proper order has the nut, the other end threaded connection relative in one end of spliced pole has the nut, the apron runs through and sets up the connecting hole of mutually supporting with the spliced pole.
Furthermore, the quantity of retaining member is two, and two retaining members set up respectively in apron both sides.
Furthermore, a mounting pipe matched with the grouting pipe is pre-embedded in the cover plate, and the grouting pipe is detachably connected with the mounting pipe through threads.
Furthermore, a lifting ring is arranged on one side face of the cover plate.
The beneficial effects of the utility model reside in that:
the utility model discloses in can lay the apron on the post-cast strip before post-cast strip grout construction, thereby neither influence the major structure and subside, can solve the normal male problem of basement antiseep and outdoor engineering again, can guarantee that basement fitment and main part are synchronous, outdoor engineering and outer wall fitment are synchronous, guarantee the engineering quality when guaranteeing the engineering progress, the cross sectional shape of apron is the font simultaneously, and set up on the earlier-cast strip and have the apron to mutually support the water-proof tank, thereby can block effectively that rainwater etc. locate the seepage from the post-cast strip, avoid the reinforcing bar to corrode.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
fig. 3 is a schematic structural view of the middle cover plate of the present invention after being laid;
fig. 4 is a schematic structural view of the middle cover plate of the present invention
Description of the reference symbols:
1. firstly, casting a belt; 2. post-pouring a belt; 3. a cover plate; 31. a boss portion; 32. connecting holes; 4. a waterproof groove; 5. a locking member; 51. connecting columns; 52. a nut; 6. grouting pipes; 7. installing a pipe; 8. lifting a lifting ring; 9. a waterproof roll.
Detailed Description
In order to explain the technical contents, the objects and the effects of the present invention in detail, the following description is made with reference to the accompanying drawings in combination with the embodiments.
Please refer to fig. showing, the technical solution provided by the present invention:
the utility model provides a post-cast strip enclosed construction in advance, includes post-cast strip and two earlier cast strips, the post-cast strip sets up between two earlier cast strips, the post-cast strip upper cover is equipped with the apron that just sets up more than two, the cross sectional shape of apron is character cut in bas-relief shape, two equally divide on the earlier cast strip and do not set up the capillary groove of mutually supporting with apron both sides bellying, more than two carry out the locking cooperation through the retaining member after the apron sets up side by side, more than two the interval is inserted and is equipped with the grout pipe on the apron.
From the above description, the beneficial effects of the present invention are:
the utility model discloses in can lay the apron on the post-cast strip before post-cast strip grout construction, thereby neither influence the major structure and subside, can solve the normal male problem of basement antiseep and outdoor engineering again, can guarantee that basement fitment and main part are synchronous, outdoor engineering and outer wall fitment are synchronous, guarantee the engineering quality when guaranteeing the engineering progress, the cross sectional shape of apron is the font simultaneously, and set up on the earlier-cast strip and have the apron to mutually support the water-proof tank, thereby can block effectively that rainwater etc. locate the seepage from the post-cast strip, avoid the reinforcing bar to corrode.
The working principle of the post-cast strip pre-sealing structure is as follows:
during construction, the bulges on the two sides of the cover plate are respectively clamped into the waterproof grooves of the pouring belts on the two sides, then the cover plates above two groups are sequentially attached to the water tank, and the cover plates are locked and matched through the locking parts, so that the cover plates can be in close contact with each other.
Further, the retaining member includes spliced pole and two nuts, the relative both ends of spliced pole all seted up with nut complex thread groove, the one end of spliced pole is passed two above apron and threaded connection in proper order has the nut, the other end threaded connection relative in one end of spliced pole has the nut, the apron runs through and sets up the connecting hole of mutually supporting with the spliced pole.
From the above description, lay the back that finishes at the apron, pass the connecting hole of apron with the spliced pole to all lock fixedly through the nut at the both ends of spliced pole, thereby remain stable between the apron and can not produce relative slip, connect conveniently, and the retaining member of this kind of structure makes and to adopt same mould to produce man-hour at the apron.
Furthermore, the number of the locking pieces is two, and the two locking pieces are respectively arranged on two sides of the cover plate.
From the above description, the stability of locking can be guaranteed by providing two sets of locking members.
Furthermore, a mounting pipe matched with the grouting pipe is pre-embedded in the cover plate, and the grouting pipe is detachably connected with the mounting pipe through threads.
From the above description, make can dismantle the grout pipe before the apron is laid for avoid the grout pipe to influence the construction, also can select the grout pipe of different length according to the earthing height simultaneously.
Furthermore, a lifting ring is arranged on one side face of the cover plate.
As can be seen from the above description, the hoisting ring is provided on one side surface of the cover plate, so that the cover plate can be conveniently hoisted and transported.
Referring to fig. 1 to 4, a first embodiment of the present invention is:
please refer to fig. 1, fig. 2 and fig. 3: the utility model provides a post-cast strip enclosed construction in advance, includes post-cast strip 2 and two earlier cast strips 1, post-cast strip 2 is between two earlier cast strips 1, 2 upper covers in post-cast strip are equipped with more than two and set up side by side apron 3, the cross sectional shape of apron 3 is character cut in bas-relief shape, and apron 3 can pour for concrete mould an organic whole and form, two earlier cast strip 1 on equally divide and do not set up the capillary groove 4 of mutually supporting with 3 both sides bellying 31 of apron, more than two carry out the locking fit through retaining member 5 after the apron 3 sets up side by side, more than two the interval is inserted on the apron 3 and is equipped with grout pipe 6, and the PVC pipe can be chooseed for use to the grout pipe, can cut off the part that stretches out through external instrument after the earthing finishes when possessing certain compressive strength, can not exert an influence to the construction.
Please refer to fig. 3 and fig. 4: retaining member 5 includes spliced pole 51 and two nuts 52, spliced pole 51's relative both ends all seted up with nut 52 complex thread groove, spliced pole 51's one end passes apron 3 and threaded connection more than two in proper order has nut 52, the other end threaded connection that spliced pole 51's one end is relative has nut 52, apron 3 runs through and sets up the connecting hole 32 of mutually supporting with spliced pole 51, and the connecting hole adds man-hour, can process through pre-buried mode, and processing is convenient, and can not lead to the fact secondary damage to the apron.
Please refer to fig. 3: the quantity of retaining member 5 is two, and two retaining members 5 set up respectively in 3 both sides of apron.
Please refer to fig. 4: the pre-buried installation pipe 7 that has and grout pipe 6 to mutually support in the apron 3, through screw thread releasable connection between grout pipe 6 and the installation pipe 7, the installation pipe adopts pre-buried mode to process, and the hole is got again to the convenient and follow-up needs of avoiding of processing.
Please refer to fig. 3: be provided with rings 8 on the side of apron 3, rings process through adopting pre-buried mode when the apron is pour.
The working principle of the post-cast strip pre-sealing structure is as follows:
during construction, constructors cut out the waterproof grooves 4 on the pre-pouring belts 1 on two sides through a cutting machine, cover plates 3 formed by pouring concrete are moved to the post-pouring belts 3 and laid on the post-pouring belts 3 through a lifter or manually, the bulges 31 on two sides of the cover plates 3 are inserted into the waterproof grooves 4, the cover plates 3 are laid in sequence, and the adjacent cover plates 3 are in close contact with each other, so that the laying of the cover plates 3 is completed, the cover plates 3 with the installation pipes 7 are laid at construction positions according to construction requirements during the laying, then the grouting pipes 6 are installed, finally the connecting columns 51 penetrate through the connecting holes 32 of the cover plates 3, nuts 52 are installed at two ends of the connecting columns 51, the laying of the cover plates 3 is completed, one layer of waterproof coiled materials 9 is laid on the cover plates 3 after the laying is completed, the waterproof and anti-seepage problems are further achieved, and the pre-sealing construction of the post-pouring belts 2 is completed.
To sum up, the utility model provides a pair of post-cast strip enclosed construction in advance can lay the apron on the post-cast strip before post-cast strip grout construction to neither influence the major structure and subside, can solve the normal male problem of basement antiseep and outdoor engineering again, can guarantee that basement fitment is synchronous with the main part, outdoor engineering is synchronous with the outer wall fitment, guarantee the engineering quality when guaranteeing the engineering progress, the cross sectional shape of apron is the font of caving in simultaneously, and set up on the earlier-cast strip and have the waterproof groove of apron mutually supporting, thereby can block rainwater etc. effectively and locate the seepage from the post-cast strip, avoid the reinforcing bar corrosion.
The above mentioned is only the embodiment of the present invention, and not the limitation of the patent scope of the present invention, all the equivalent transformations made by the contents of the specification and the drawings, or the direct or indirect application in the related technical field, are included in the patent protection scope of the present invention.

Claims (5)

1. The utility model provides a post-cast strip enclosed construction in advance, includes post-cast strip and two pre-cast strips, the post-cast strip sets up between two pre-cast strips, its characterized in that, the post-cast strip upper cover is equipped with the apron that just sets up more than two side by side, the shape of cross section of apron is character cut in bas-relief shape, two equally divide on the pre-cast strip and do not set up the waterproof slot of mutually supporting with apron both sides bellying, more than two carry out the locking fit through the retaining member after the apron sets up side by side, more than two interval is inserted on the apron and is equipped with the grout pipe.
2. The post-cast strip pre-sealing structure as claimed in claim 1, wherein the locking member comprises a connecting column and two nuts, the opposite ends of the connecting column are provided with thread grooves matched with the nuts, one end of the connecting column sequentially passes through more than two cover plates and is in threaded connection with the nuts, the other end of the connecting column opposite to the one end is in threaded connection with the nuts, and the cover plates are provided with connecting holes matched with the connecting column in a penetrating way.
3. The post-cast strip pre-sealing structure as claimed in claim 2, wherein the number of the locking members is two, and the two locking members are respectively disposed at both sides of the cover plate.
4. The pre-closed structure of the post-cast strip according to claim 1, wherein a mounting pipe matched with the grouting pipe is pre-embedded in the cover plate, and the grouting pipe and the mounting pipe are detachably connected through threads.
5. The post-cast strip pre-close structure as claimed in claim 1, wherein a lifting ring is provided on one side of the cover plate.
CN202221068201.1U 2022-05-06 2022-05-06 Post-cast strip pre-sealing structure Active CN217581346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221068201.1U CN217581346U (en) 2022-05-06 2022-05-06 Post-cast strip pre-sealing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221068201.1U CN217581346U (en) 2022-05-06 2022-05-06 Post-cast strip pre-sealing structure

Publications (1)

Publication Number Publication Date
CN217581346U true CN217581346U (en) 2022-10-14

Family

ID=83547661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221068201.1U Active CN217581346U (en) 2022-05-06 2022-05-06 Post-cast strip pre-sealing structure

Country Status (1)

Country Link
CN (1) CN217581346U (en)

Similar Documents

Publication Publication Date Title
CN102758451B (en) Concrete cable channel construction process
CN109162296B (en) Single-side formwork supporting system and construction method for pouring outer wall by utilizing same
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN1112484C (en) Prestressed underground continuous Wall
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN113944240A (en) Fixed prefabricated structure for sealing basement outer wall post-cast strip in advance and construction method thereof
CN209873873U (en) Prefabricated assembled power pipeline working well
CN214784228U (en) Prefabricated plate advanced closing structure of outer wall post-cast strip
CN111173042B (en) Advanced water stop post-cast strip of foundation slab and construction method
CN217581346U (en) Post-cast strip pre-sealing structure
CN113513183A (en) Parapet anti-seismic integrity reinforcing method and structure
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN210288465U (en) Assembled retaining wall post-cast strip plugging member
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN112112295A (en) Reinforcing construction method for post-cast strip of post-sealed outer wall
CN205839811U (en) A kind of post-cast strip exterior wall advanced water-stopping processes structure
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN113073727A (en) Construction method of sewage structure
CN210658439U (en) Double-wing type anti-floating pipe gallery unit suitable for high-groundwater-level area
CN218508482U (en) Bottom plate structure combined with hydrophobic layer
CN214696178U (en) Pre-closing device for lower support upper cover of post-cast strip
CN209873874U (en) Well chamber and shaft connecting structure of prefabricated cable working well
CN217439120U (en) Pipe diameter inspection shaft that prefabricated frame-type is adjustable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant