CN217581105U - Operation platform for construction - Google Patents
Operation platform for construction Download PDFInfo
- Publication number
- CN217581105U CN217581105U CN202221104656.4U CN202221104656U CN217581105U CN 217581105 U CN217581105 U CN 217581105U CN 202221104656 U CN202221104656 U CN 202221104656U CN 217581105 U CN217581105 U CN 217581105U
- Authority
- CN
- China
- Prior art keywords
- platform
- operation platform
- mounting plate
- fixedly connected
- supporting legs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forklifts And Lifting Vehicles (AREA)
Abstract
The utility model discloses an operation platform for building construction, which comprises a platform and supporting legs fixedly connected at four corners of a platform bottom plate, wherein a mounting plate is fixedly connected between the lower parts of the supporting legs, screw rods are symmetrically and rotatably arranged at the middle part of the platform bottom plate, the other ends of the screw rods penetrate through the mounting plate, driven sprockets are respectively arranged at the corresponding positions of the end parts, screw nuts are respectively screwed on the two screw rods, and a material conveying box is fixedly connected between the two screw nuts; a positive and negative rotation motor is arranged on the mounting plate, the output end of the positive and negative rotation motor penetrates through the mounting plate, a driving chain wheel is arranged at the end part of the positive and negative rotation motor, and the driving chain wheel is connected with the two driven chain wheels through a chain; and a through hole for the material conveying box to pass through is formed in the position, corresponding to the material conveying box, on the platform. The utility model discloses simple structure, reasonable in design through this operation platform's setting, to some heavier materials, can directly carry to the platform on, it is effectual to go up and down, has not only reduced workman's intensity of labour, and labour saving and time saving has improved the efficiency of construction moreover.
Description
Technical Field
The utility model relates to a construction technical field, concretely relates to operation platform for construction.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities. During construction of a building site, a common tool is an operation platform in order to obtain a sufficient construction height. Workers work on construction scaffolding using a variety of work materials. The existing operation platform generally delivers materials to workers on the operation platform through workers below the operation platform, and the materials with larger weight, such as concrete mortar, putty materials, paint and the like, are difficult to deliver, so that the labor intensity of the workers is high, time and labor are wasted, and the construction efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model discloses just to prior art exist not enough, provide an operation platform for construction.
The utility model provides an operation platform for construction, includes platform, the landing leg of fixed connection in four edges of platform bottom plate, fixedly connected with mounting panel between the landing leg lower part, platform bottom plate middle part position symmetry rotates installs the lead screw, the lead screw other end runs through the mounting panel, and the driven sprocket is all installed to the tip correspondence position, and equal spiro union has screw-nut on two lead screws, fixedly connected with fortune workbin between two screw-nut. The mounting plate is provided with a positive and negative rotation motor, the output end of the positive and negative rotation motor penetrates through the mounting plate, the end part of the positive and negative rotation motor is provided with a driving chain wheel, and the driving chain wheel is connected with the two driven chain wheels through a chain. A through hole for the material conveying box to pass through is formed in the position, corresponding to the material conveying box, of the platform, and a control cabinet is mounted on one supporting leg.
Furthermore, a circle of fence I is arranged at the edge of the platform top plate.
Furthermore, a circle of fence II is arranged at the edge of the upper part of the through hole.
Furthermore, universal wheels are installed at the bottoms of the supporting legs, and brakes are arranged on the universal wheels.
Furthermore, the supporting rods are fixedly connected to the same positions between two adjacent supporting legs, and integrity between the supporting legs is enhanced.
Furthermore, a crawling ladder is arranged on one side of the platform and is fixedly connected with the platform and the adjacent supporting legs through connecting pieces.
Further, a bearing is arranged between the screw rod and the mounting plate.
Furthermore, the control cabinet is electrically connected with the forward and reverse rotating motor, and the control cabinet controls the forward and reverse rotating motor to work.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses simple structure, reasonable in design through this operation platform's setting, to some heavier materials, can directly carry to the platform on, it is effectual to go up and down, has not only reduced workman's intensity of labour, and labour saving and time saving has improved the efficiency of construction moreover.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic diagram of the position of the through hole on the platform according to the present invention.
In the figure: platform 1, landing leg 11, universal wheel 111, branch 112, through hole 12, rail one 13, rail two 14, mounting panel 2, lead screw 3, driven sprocket 31, screw-nut 32, fortune workbin 4, positive and negative motor 5, drive sprocket 51, chain 52, switch board 6, cat ladder 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, an operation platform for building construction comprises a platform 1 and support legs 11 fixedly connected at four corners of a bottom plate of the platform 1. Universal wheel 111 is all installed to landing leg 11 bottom, all be provided with the brake on the universal wheel 111. The movement of the operation platform can be facilitated by the arrangement of the universal wheels 111. The supporting rods 112 are fixedly connected to the same positions between two adjacent supporting legs 11, so that the integrity between the supporting legs 11 is enhanced. A circle of fence I13 is arranged at the edge of a top plate of the platform 1, and the fence I13 can play a good protection role, so that a worker is prevented from falling off the platform 1 due to accidents. A ladder stand 7 is arranged on one side of the platform 1, and the ladder stand 7 is fixedly connected with the platform 1 and the adjacent supporting legs 11 through connecting pieces.
Fixedly connected with mounting panel 2 between 11 lower parts of landing leg, 1 bottom plate middle part position symmetry of platform rotates installs lead screw 3, the 3 other ends of lead screw run through mounting panel 2, and driven sprocket 31 is all installed to the tip correspondence position, be provided with the bearing between lead screw 3 and mounting panel 2. The two screw rods 3 are both screwed with screw rod nuts 32, and a material conveying box 4 is fixedly connected between the two screw rod nuts 32. A through hole 12 for the material conveying box 4 to pass through is formed in the station 1 corresponding to the material conveying box 4, and a circle of fence II 14 is arranged at the upper edge of the through hole 12.
Install positive reverse motor 5 on the mounting panel 2, positive reverse motor 5 output runs through mounting panel 2, and drive sprocket 51 is installed to the tip, drive sprocket 51 passes through chain 52 with two driven sprocket 31 and is connected. A supporting leg 11 is provided with a control cabinet 6, the control cabinet 6 is electrically connected with the forward and reverse rotating motor 5, and the control cabinet 6 controls the forward and reverse rotating motor 5 to work.
When the operation platform is used, the operation platform is placed at a construction position and is electrified, a worker climbs the platform 1 through the crawling ladder 7 to construct materials with large weight, such as concrete mortar, putty materials, paint and the like, and the operation platform is placed in the material transporting box 4, the forward and reverse motor 5 is started through the control cabinet 6, the output end of the forward and reverse motor 5 rotates anticlockwise to drive the driving chain wheel 51 to rotate, the driving chain wheel 51 drives the driven chain wheel 31 and the screw rod 3 to rotate through the chain 52, so that the screw rod nut 32 and the material transporting box 4 move upwards, when the material transporting box 4 ascends to a proper position, the forward and reverse motor 5 is turned off through the control cabinet 6, after the worker on the platform 1 takes off the materials from the material transporting box 4, the forward and reverse motor 5 is started through the control cabinet 6 to enable the output end of the forward and reverse motor 5 to rotate clockwise, so that the material transporting box 4 moves downwards, and when the material transporting box 4 reaches the proper position, the forward and reverse motor 5 is turned off through the control cabinet 6. The utility model discloses simple structure, reasonable in design through this operation platform's setting, to some heavier materials, can directly carry to platform 1 on, it is effectual to go up and down, has not only reduced workman's intensity of labour, and labour saving and time saving has improved the efficiency of construction moreover.
Claims (8)
1. The utility model provides an operation platform for construction, includes landing (11) of platform (1), fixed connection in four edges of platform (1) bottom plate, its characterized in that: the lower parts of the supporting legs (11) are fixedly connected with a mounting plate (2), the middle position of a bottom plate of the platform (1) is symmetrically and rotatably provided with a screw rod (3), the other end of the screw rod (3) penetrates through the mounting plate (2), the corresponding positions of the end parts of the screw rod are respectively provided with a driven chain wheel (31), screw nuts (32) are respectively screwed on the two screw rods (3), and a material conveying box (4) is fixedly connected between the two screw nuts (32); a forward and reverse rotation motor (5) is mounted on the mounting plate (2), the output end of the forward and reverse rotation motor (5) penetrates through the mounting plate (2), a driving chain wheel (51) is mounted at the end part of the forward and reverse rotation motor, and the driving chain wheel (51) is connected with the two driven chain wheels (31) through a chain (52); a through hole (12) for the conveying box (4) to pass through is formed in the position, corresponding to the conveying box (4), of the platform (1), and a control cabinet (6) is installed on one leg (11).
2. An operation platform for building construction according to claim 1, wherein: a circle of first fence (13) is arranged at the edge of a top plate of the platform (1).
3. An operation platform for building construction according to claim 1, wherein: and a circle of fence II (14) is arranged at the upper edge of the through hole (12).
4. An operation platform for building construction according to claim 1, wherein: the universal wheels (111) are installed at the bottoms of the supporting legs (11), and brakes are arranged on the universal wheels (111).
5. The operation platform for building construction according to claim 1, wherein: the same position between two adjacent supporting legs (11) is fixedly connected with a supporting rod (112) to strengthen the integrity between the supporting legs (11).
6. An operation platform for building construction according to claim 1, wherein: a crawling ladder (7) is arranged on one side of the platform (1), and the crawling ladder (7) is fixedly connected with the platform (1) and the adjacent supporting legs (11) through connecting pieces.
7. An operation platform for building construction according to claim 1, wherein: and a bearing is arranged between the screw rod (3) and the mounting plate (2).
8. An operation platform for building construction according to claim 1, wherein: the control cabinet (6) is electrically connected with the forward and reverse rotating motor (5), and the control cabinet (6) controls the forward and reverse rotating motor (5) to work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221104656.4U CN217581105U (en) | 2022-05-10 | 2022-05-10 | Operation platform for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221104656.4U CN217581105U (en) | 2022-05-10 | 2022-05-10 | Operation platform for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217581105U true CN217581105U (en) | 2022-10-14 |
Family
ID=83551449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221104656.4U Active CN217581105U (en) | 2022-05-10 | 2022-05-10 | Operation platform for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217581105U (en) |
-
2022
- 2022-05-10 CN CN202221104656.4U patent/CN217581105U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210370012U (en) | Liftable hand formula building strutting arrangement | |
CN211524016U (en) | Double-working-surface guide frame climbing type working platform and system | |
CN217581105U (en) | Operation platform for construction | |
CN110552541B (en) | Lifting operation platform for tower mast structure | |
CN111959590A (en) | Material transportation device for constructional engineering | |
CN212642069U (en) | Scaffold for bridge and tunnel construction | |
CN201212250Y (en) | Mobile wheel track installation platform for large-sized network frame engineering | |
CN110561604B (en) | Maintenance bin construction method for PC component assembly line | |
CN210342627U (en) | Connecting structure for preventing falling and protective frame | |
CN204357024U (en) | Portable bed board equipment | |
CN210342628U (en) | Protective frame | |
CN210342629U (en) | Protection frame and lifting structure thereof | |
CN220036073U (en) | Assembled stairwell construction is with operation steel platform | |
CN220954445U (en) | Wall painting device for building | |
CN220644033U (en) | Building ground construction scarfing cinder machine | |
CN214886791U (en) | Prefabricated cabin cat ladder structure of light weight type | |
CN212507263U (en) | Multifunctional construction platform | |
CN216072626U (en) | Material lifting device between many floors of aluminium mould | |
CN220990141U (en) | Fixed climbing frame spray set for building construction | |
CN219316353U (en) | Height-adjustable construction scaffold for construction site | |
CN214364847U (en) | Scaffold convenient for transporting building materials for building | |
CN217680337U (en) | Prefabricated staircase installation positioner | |
CN217756798U (en) | Power station boiler platform supporting beam | |
CN218988606U (en) | Lifting and overturning tool for vertical multi-stage pump | |
CN211775572U (en) | Climbing scaffold with unloading platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |