CN217580987U - Structure is hung futilely to advance construction stone material - Google Patents

Structure is hung futilely to advance construction stone material Download PDF

Info

Publication number
CN217580987U
CN217580987U CN202220656327.4U CN202220656327U CN217580987U CN 217580987 U CN217580987 U CN 217580987U CN 202220656327 U CN202220656327 U CN 202220656327U CN 217580987 U CN217580987 U CN 217580987U
Authority
CN
China
Prior art keywords
dry
hanging
pendant
stone
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220656327.4U
Other languages
Chinese (zh)
Inventor
张勋来
刘宝堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202220656327.4U priority Critical patent/CN217580987U/en
Application granted granted Critical
Publication of CN217580987U publication Critical patent/CN217580987U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses an advance construction stone dry hanging structure, which belongs to the technical field of construction of building wall engineering, and comprises a main keel and a stone plate, wherein a connecting piece is installed outside the main keel, a bolt is installed on one side of the connecting piece and is suitable for being connected with a building wall surface, a secondary keel is installed on the other side of the connecting piece and is fixedly connected with the main keel, a dry hanging component is installed in the middle of the secondary keel, connecting pieces are installed at one ends of the dry hanging component, which are far away from the secondary keel, and the connecting pieces are suitable for being respectively connected with the stone plate; the utility model discloses a reduce the quantity of the dry pendant of installation and the mounted position of injecing the adhesive.

Description

Structure is hung futilely to advance construction stone material
Technical Field
The utility model belongs to the technical field of building wall engineering construction, specifically speaking relates to an advance construction stone material and hang structure futilely.
Background
The high-quality building structure outer wall mainly comprises concrete, and the outer decorative surface is preferably made of stone. In the long-term construction practice of the exterior facing stone facing of the building, the conventional method mainly adopts dry hanging, namely, the concrete is poured to form the wall surface of the building, and then the construction of dry hanging the facing stone is carried out.
In the prior art, the installation mode of dry hanging stones is basically kept consistent, namely, the installation mode of the main keel, the secondary keel and the dry hanging pieces is adopted, but the stone plates used on the whole wall surface are large in using amount, the types of the dry hanging pieces are more, and the installation number of the dry hanging pieces is more on the whole, so that the installation efficiency is not high; secondly, the installation of the installation adhesive between the stone plates is mostly random, which also causes the later reworking step to be larger and the quality to be poorer.
In view of this, the present invention is provided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem that will solve is: the number of dry hanging pieces is reduced and the mounting position of the adhesive is limited.
In order to solve the technical problem, the inventor reachs through practice and summary the utility model discloses a structure is hung futilely to leading construction stone material, including main joist and stone plate, the connecting piece is installed in the outside of main joist, the bolt is installed to one side of connecting piece and is suitable for and is connected with the building wall, install the secondary joist on the opposite side of connecting piece, secondary joist and main joist fixed connection, the middle of secondary joist is installed and is hung the subassembly spare futilely, hang the subassembly futilely and keep away from the one end of secondary joist and all install the connection piece, the connection piece is suitable for being connected the stone plate respectively.
Further, the connecting piece includes right-angle portion and lower bottom, the main joist is the hollow form of rectangle, the laminating of right-angle portion is in main joist department and width dimension is less than main joist width dimension, lower bottom and right-angle portion an organic whole are connected.
Furthermore, the secondary keel is E-shaped, the secondary keel comprises a middle body, and a first mounting hole is formed in the middle body;
and a second mounting hole is formed in the dry hanging component and matched with the first mounting hole, and a locking bolt is suitable to be mounted between the first mounting hole and the second mounting hole to fix the dry hanging component.
Furthermore, hang the subassembly futilely and include connecting portion, connecting portion include lamellar body and lower lamellar body, it is suitable for the both sides of connecting at the midbody with lower lamellar body to go up the lamellar body, it all is provided with mounting hole two with lower lamellar body to go up the lamellar body, the connection piece is located the one end that the subassembly was hung futilely and is kept away from connecting portion.
Furthermore, the dry hanging assembly further comprises a fixing part, the fixing part comprises a chute track and a remaining hanging plate, the slope surface of the chute track is suitable for being lowered outwards from the building wall surface, and the height of the remaining hanging plate is smaller than the height of the bottom of the stone plate on the connecting sheet arranged at the upper dry hanging part;
the hanging plate is a bending plate, a notch is formed in the hanging plate and is suitable for flowing, and the hanging plate is suitable for blocking adhesives located at the joint of the stone plates.
Further, the dry hanging assembly comprises an upper dry hanging piece and a lower dry hanging piece, and the second mounting holes are formed in the upper dry hanging piece and the lower dry hanging piece;
limiting grooves are formed in the upper side and the lower side of the secondary keel, upper bending portions are arranged on the upper dry hanging pieces, lower bending portions are arranged on the lower dry hanging pieces, and the upper bending portions and the lower bending portions are arranged in the limiting grooves;
the upper dry hanging piece and the lower dry hanging piece are both provided with connecting pieces, the connecting pieces are positioned at one ends, far away from the main keel, of the upper dry hanging piece or the lower dry hanging piece, glue seam grooves are formed in the upper end and the lower end of the stone plate, and the connecting pieces are suitable for being connected into the glue seam grooves and filled with adhesives.
Furthermore, the upper dry hanging piece and the lower dry hanging piece are respectively provided with a notch part, the notch part at the position of the upper dry hanging piece is sunken downwards, the notch part at the position of the lower dry hanging piece is sunken upwards, the notch parts are symmetrically arranged, a stop strip is arranged in each notch part, the upper dry hanging piece and the lower dry hanging piece at the position of the secondary keel are respectively provided with a plurality of groups, and the stop strip is suitable for limiting the positions of the upper dry hanging piece and the lower dry hanging piece at the position of the building wall surface in each notch part.
Compared with the prior art, the utility model discloses can obtain following technological effect:
the utility model discloses a erection joint spare realizes prescribing a limit to and fixing the position of main joist, support the secondary joist through lower bottom, the connection structure of integration has reduced the use quantity of corresponding connection dry-hanging spare, the secondary joist is installed on the main joist, secondly hang the subassembly futilely through the installation, realize supporting the position of stone material board, stay the link plate through the installation and realize the effect of staying the wall and articulate to the adhesive, most bonding connection connects in the gap of two adjacent stone material boards, the manual work is paintd comparatively randomly, the connection effect is unstable, also can lead to construction quality's effect to discount greatly.
Secondly, through setting up the chute track, realize the effect of being connected of hanging subassembly and stone material board futilely, strengthen the effect of being connected of hanging the piece and hanging the piece futilely in the upper reaches through the spacing groove for the mounted position can be confirmed, convenient constructor's installation.
Through the installation of the whole stone plate on the connecting sheet, the phenomena of deformation, distortion, damage and falling of the stone surface layer material of the outer wall are reduced, and the construction quality of the stone veneer of the outer wall is ensured.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is an installation schematic diagram of embodiment 1 of the present invention;
fig. 2 is an installation structure diagram of embodiment 1 of the present invention;
FIG. 3 is a view of the structure of the connector of the present invention;
fig. 4 is a structural view of a connecting portion according to embodiment 1 of the present invention;
fig. 5 is a structural view of a connecting portion according to embodiment 2 of the present invention;
fig. 6 is a notch schematic view of embodiment 2 of the present invention;
fig. 7 is a structural view of a connecting portion according to embodiment 3 of the present invention;
fig. 8 is a sectional view of the installation place of the secondary keel and the connecting part of the embodiment 3 of the invention;
fig. 9 is a sectional view of the installation place of the secondary joist and the connecting part in embodiment 4 of the invention;
fig. 10 is a structure view of the secondary keel according to embodiment 4 of the invention.
In the figure: 1. a main keel; 2. a stone plate; 21. glue slot; 3. a connecting member; 4. a secondary keel; 5. connecting sheets; 6. a connecting portion; 31. a right angle portion; 32. a lower bottom; 41. an intermediate; 42. a first mounting hole; 63. a second mounting hole; 44. locking the bolt; 61. an upper sheet body; 62. a lower sheet body; 71. a chute track; 72. leaving the hanging plate; 73. a notch; 8. hanging parts are arranged; 81. an upper bending part; 9. drying the pendant; 91. a lower bent portion; 10. a limiting groove; 11. a stop strip; 12. a notch portion; 100. building wall surfaces; 200. and (4) an adhesive.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The application of the principles of the present invention will be further described with reference to the accompanying drawings and specific embodiments.
Example 1
As shown in fig. 1 to 4, for the utility model discloses an embodiment, an advance construction stone material hangs structure futilely, including main joist 1 and stone plate 2, connecting piece 3 is installed in main joist 1's the outside, and the bolt is installed to one side of connecting piece 3 and is suitable for being connected with building wall 100, installs secondary joist 4 on the opposite side of connecting piece 3, and secondary joist 4 and 1 fixed connection of main joist, the middle of secondary joist 4 is installed and is hung the subassembly spare futilely, and the one end of hanging the subassembly futilely and keeping away from secondary joist 4 all installs connection piece 5, and connection piece 5 is suitable for being connected stone plate 2 respectively. The secondary keel 4 is E-shaped, the secondary keel 4 comprises a middle body 41, and a first mounting hole 42 is formed in the middle body 41; and a second mounting hole 63 is formed in the dry hanging component, the second mounting hole 63 is matched with the first mounting hole 42, and a locking bolt 44 is suitable for being mounted between the first mounting hole 42 and the second mounting hole 63 to fix the dry hanging component.
As shown in fig. 3, the connecting member 3 includes a right angle portion 31 and a lower bottom portion 32, the main joist 1 is rectangular hollow, the right angle portion 31 is attached to the main joist 1, the width of the right angle portion 31 is smaller than the width of the main joist 1, the lower bottom portion 32 is integrally connected with the right angle portion 31, the installation effect is guaranteed through the integrated arrangement, and the position of the secondary joist 4 is limited.
The dry-hanging assembly comprises a connecting portion 6, the connecting portion 6 comprises an upper sheet body 61 and a lower sheet body 62, the upper sheet body 61 and the lower sheet body 62 are suitable for being connected to two sides of the intermediate body 41, the upper sheet body 61 and the lower sheet body 62 are provided with two mounting holes 63, and the connecting sheet 5 is located at one end, away from the connecting portion 6, of the dry-hanging assembly.
Example 2
As shown in fig. 5 and 6, for another embodiment of the present invention, on the basis of example 1, the dry hanging assembly further comprises a fixing portion 7, the fixing portion 7 comprises a chute track 71 and a remaining hanging plate 72, the slope surface of the chute track 71 is suitable for being lowered outwards from the building wall surface 100, and the height of the remaining hanging plate 72 is less than the bottom height of the stone plate 2 on the connecting sheet 5 installed at the upper dry hanging piece 8;
the remaining hanging plate 72 is a bent plate, a notch 73 is formed in the remaining hanging plate 72, the notch 73 is suitable for flowing, and the remaining hanging plate 72 is suitable for blocking the adhesive 200 at the joint of the stone plates 2.
Example 3
As shown in fig. 7 and 8, in another embodiment of the present invention, on the basis of example 1, fig. 7 is a modification of the structure shown in fig. 4, and is used in a non-four-corner position of the whole building wall 100, so as to effectively connect the stone plates 2.
Example 4
As shown in fig. 9 and 10, for another embodiment of the present invention, on the basis of example 1, in order to facilitate installation and disassembly, the dry hanging assembly includes an upper dry hanging piece 8 and a lower dry hanging piece 9, and a second mounting hole 63 is formed on both the upper dry hanging piece 8 and the lower dry hanging piece 9;
limiting grooves 10 are formed in the upper side and the lower side of the secondary keel 4, an upper bending part 81 is arranged on the upper dry hanging piece 8, lower bending parts 91 are arranged on the lower dry hanging piece 9, and the upper bending part 81 and the lower bending parts 91 are both arranged in the limiting grooves 10;
the upper dry hanging piece 8 and the lower dry hanging piece 9 are both provided with connecting pieces 5, the connecting pieces 5 are located at one ends, far away from the main keel 1, of the upper dry hanging piece 8 or the lower dry hanging piece 9, glue seam grooves 21 are formed in the upper end and the lower end of the stone plate 2, and the connecting pieces 5 are suitable for being connected into the glue seam grooves 21 and filled with adhesives 200.
The upper drying hanger 8 and the lower drying hanger 9 are respectively provided with a notch part 12, the notch parts 12 located at the upper drying hanger 8 are downwards sunken, the notch parts 12 located at the lower drying hanger 9 are upwards sunken, the two groups of notch parts 12 are symmetrically arranged, stop strips 11 are installed in the notch parts 12, the upper drying hanger 8 and the lower drying hanger 9 located at the secondary keel 4 are respectively provided with a plurality of groups, and the stop strips 11 are suitable for being installed in the notch parts 12 to limit the positions of the upper drying hanger 8 and the lower drying hanger 9 at the building wall surface 100.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides an advance construction stone material hangs structure futilely which characterized in that: including main joist (1) and stone plate (2), connecting piece (3) are installed in the outside of main joist (1), the bolt is installed to one side of connecting piece (3) and is suitable for being connected with building wall (100), install secondary joist (4) on the opposite side of connecting piece (3), secondary joist (4) and main joist (1) fixed connection, the centre of secondary joist (4) is installed and is hung the subassembly futilely, hang the subassembly futilely and keep away from the one end of secondary joist (4) and all install connection piece (5), connection piece (5) are suitable for being connected stone plate (2) respectively.
2. An advanced construction stone dry-hanging structure as claimed in claim 1, wherein: connecting piece (3) are including right angle portion (31) and lower bottom (32), main joist (1) is the hollow form of rectangle, right angle portion (31) laminating is less than main joist (1) width size in main joist (1) department and width size, lower bottom (32) and right angle portion (31) body coupling.
3. An advanced construction stone dry-hanging structure as claimed in claim 2, wherein: the secondary keel (4) is E-shaped, the secondary keel (4) comprises a middle body (41), and a first mounting hole (42) is formed in the middle body (41);
and a second mounting hole (63) is formed in the dry hanging component, the second mounting hole (63) is matched with the first mounting hole (42), and a locking bolt (44) is suitable to be mounted between the first mounting hole (42) and the second mounting hole (63) to fix the dry hanging component.
4. An advanced construction stone dry-hanging structure as claimed in claim 3, wherein: the dry-hanging component comprises a connecting portion (6), the connecting portion (6) comprises an upper sheet body (61) and a lower sheet body (62), the upper sheet body (61) and the lower sheet body (62) are suitable for being connected to two sides of an intermediate body (41), the upper sheet body (61) and the lower sheet body (62) are provided with two mounting holes (63), and the connecting sheet (5) is located at one end, far away from the connecting portion (6), of the dry-hanging component.
5. The advanced construction stone dry-hanging structure as claimed in claim 4, wherein: the dry hanging assembly further comprises a fixing part (7), the fixing part (7) comprises a chute track (71) and a remaining hanging plate (72), the slope surface of the chute track (71) is suitable for being lowered outwards from a building wall surface (100), and the height of the remaining hanging plate (72) is smaller than the bottom height of the stone plate (2) on the connecting sheet (5) arranged at the upper dry hanging part (8);
the stone slab is characterized in that the hanging plate (72) is a bending plate, a notch (73) is formed in the hanging plate (72), the notch (73) is suitable for flowing, and the hanging plate (72) is suitable for blocking the adhesive (200) at the joint of the stone slab (2).
6. An advanced construction stone dry-hanging structure as claimed in claim 4, wherein: the dry hanging assembly comprises an upper dry hanging piece (8) and a lower dry hanging piece (9), and the second mounting holes (63) are formed in the upper dry hanging piece (8) and the lower dry hanging piece (9);
limiting grooves (10) are formed in the upper side and the lower side of the secondary keel (4), an upper bending part (81) is arranged on the upper dry hanging part (8), lower bending parts (91) are arranged on the lower dry hanging part (9), and the upper bending part (81) and the lower bending parts (91) are both arranged in the limiting grooves (10);
go up dry pendant (8) and dry pendant (9) and all be provided with connection piece (5), connection piece (5) are located the one end of going up dry pendant (8) or dry pendant (9) keeping away from main joist (1) relatively, glue seam groove (21) have all been seted up at the upper and lower both ends of stone material board (2), connection piece (5) are suitable for to connect in glue seam groove (21) and fill adhesive (200).
7. An advanced construction stone dry-hanging structure as claimed in claim 6, wherein: all be provided with notch portion (12) on last pendant (8) and the lower pendant (9), be located notch portion (12) undercut of last pendant (8) department, be located notch portion (12) undercut of lower pendant (9) department, two sets of notch portion (12) symmetry sets up, install stop strip (11) in notch portion (12), be located secondary keel (4) department last pendant (8) and lower pendant (9) all are provided with the multiunit, stop strip (11) are suitable for the position of installing last pendant (8) and lower pendant (9) of restriction building wall (100) department in notch portion (12).
CN202220656327.4U 2022-03-24 2022-03-24 Structure is hung futilely to advance construction stone material Active CN217580987U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220656327.4U CN217580987U (en) 2022-03-24 2022-03-24 Structure is hung futilely to advance construction stone material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220656327.4U CN217580987U (en) 2022-03-24 2022-03-24 Structure is hung futilely to advance construction stone material

Publications (1)

Publication Number Publication Date
CN217580987U true CN217580987U (en) 2022-10-14

Family

ID=83540102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220656327.4U Active CN217580987U (en) 2022-03-24 2022-03-24 Structure is hung futilely to advance construction stone material

Country Status (1)

Country Link
CN (1) CN217580987U (en)

Similar Documents

Publication Publication Date Title
CN105040944A (en) Integrally-installed wallboard
CN102900193B (en) Cellular board ceiling system
CN218437676U (en) Inclined plane daylighting top curtain wall structure capable of being flexibly and quickly installed
CN217580987U (en) Structure is hung futilely to advance construction stone material
CN101725198A (en) Ceramic plate dry-hanging system
CN215949066U (en) Assembled wall body connection angle sign indicating number
WO2023040648A1 (en) Concrete-filled steel tube special-shaped column unit, and concrete-filled steel tube special-shaped combined column
CN212427880U (en) Wall surface hanging system
CN216075872U (en) Single-layer keel hanging piece structure
CN210767284U (en) Green wall body insulation construction of assembly type structure
CN209907780U (en) Connecting and decorating device for new wall building body
CN209191401U (en) A kind of aluminum honeycomb panel
CN219569267U (en) Assembled partition wall
CN216920954U (en) Assembled furred ceiling individual layer fossil fragments clamp structure
CN220377717U (en) Decorative board dry hanging type connecting piece and hanging plate type wall surface
CN219671959U (en) Wallboard fixing piece for hanging wall surface
CN211775294U (en) Internal corner structure of decorative wall
CN220814650U (en) Decoration structure for steel column
CN220539092U (en) Stone decoration wall boss construction structure
CN217353342U (en) Plate dry hanging structure
CN220504245U (en) Stone plate connecting device of stone curtain wall
CN214614921U (en) Indoor ceiling lamp groove connecting node structure
CN216713494U (en) Broken line dislocation unit curtain
CN220954999U (en) Green wall-planting and extension net staggered building envelope
CN217000573U (en) Hidden joint connecting structure of gypsum component

Legal Events

Date Code Title Description
GR01 Patent grant