CN217580178U - Photovoltaic high-efficiency continuous pile casting device - Google Patents

Photovoltaic high-efficiency continuous pile casting device Download PDF

Info

Publication number
CN217580178U
CN217580178U CN202221290948.1U CN202221290948U CN217580178U CN 217580178 U CN217580178 U CN 217580178U CN 202221290948 U CN202221290948 U CN 202221290948U CN 217580178 U CN217580178 U CN 217580178U
Authority
CN
China
Prior art keywords
plate
photovoltaic
bolt
plugging plate
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221290948.1U
Other languages
Chinese (zh)
Inventor
周健
蒲建军
鲁力
孙立伟
李戬
李淳
刘红梅
谢畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Original Assignee
China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Mechanical and Electrical Construction Co Ltd filed Critical China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Priority to CN202221290948.1U priority Critical patent/CN217580178U/en
Application granted granted Critical
Publication of CN217580178U publication Critical patent/CN217580178U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a photovoltaic high-efficiency continuous pile casting device, which comprises a material leaking pipe, wherein the top of the material leaking pipe forms a feed inlet, and the bottom of the material leaking pipe forms a discharge outlet; the mounting piece is arranged on one side of the material leakage pipe; the plugging plate is arranged at a discharge port at the bottom of the material leakage pipe, one end of the plugging plate is connected with the mounting piece, and the plugging plate rotates by taking the joint of the plugging plate and the mounting piece as a circle center to open or close the discharge port. The device of the utility model is simple in structure, the cost of manufacture is low, easy operation. After the pile casting device is used, on the basis of reducing 50% of casting labor and labor intensity, the pile casting efficiency can be improved by more than 50%, meanwhile, the concrete loss is obviously reduced, and the comprehensive benefits in the aspects of pile casting period control and cost control are obvious.

Description

Photovoltaic high-efficiency continuous pile casting device
Technical Field
The utility model relates to a photovoltaic power generation project pile foundation pours construction technical field, particularly, relates to a pile device is watered in succession to photovoltaic high efficiency.
Background
At present, influenced by many hills in photovoltaic project construction operation area, abrupt slope topography, the concrete mixing truck can't directly transport to pour the ground, and the pile foundation is pour the construction operation degree of difficulty great, and the tradition waters a stake mode and for transporting the vehicle for the concrete to the more flat section of relief after, adopts 8 ~ 10 people, with in the stake basic hole of pouring into of a bucket with concrete. The traditional method consumes a large amount of manpower, material resources and materials, is low in efficiency, is easy to fatigue for operating personnel, prolongs the pile casting operation period of the whole photovoltaic area, causes serious concrete waste in the manual transfer process, can complete the pile casting for a plurality of times on the same pile foundation, can cause cold joints (the cold joints refer to construction quality joints formed by the casting time interval of the upper layer concrete and the lower layer concrete exceeding the initial setting time), ensures that a concrete pump continuously works during the transportation of the concrete, and immediately washes the residual concrete in the pipe by using pressure water or other methods if the concrete pump fails, and the stop time exceeds 45 minutes or the concrete is separated.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least.
Therefore, the utility model provides a high-efficient stake device of watering in succession of photovoltaic.
The utility model provides a high-efficient stake device of watering in succession of photovoltaic, include:
the top of the material leaking pipe is provided with a feeding hole, and the bottom of the material leaking pipe is provided with a discharging hole;
the mounting piece is arranged on one side of the material leakage pipe;
the plugging plate is arranged at a discharge port at the bottom of the material leaking pipe, one end of the plugging plate is connected with the mounting piece, and the plugging plate rotates by taking the joint with the mounting piece as the circle center to open or close the discharge port.
The utility model provides a high-efficient stake device that waters in succession of photovoltaic, including leaking material pipe, installed part and closure plate. Wherein, the perforated pipe is used for bearing and flowing out of concrete. Specifically, with leaking the hopper pipe welding in the scraper bowl bottom of loader to at the scraper bowl bottom opening of loader, make it and leak the hopper pipe intercommunication, consequently can guarantee that the concrete in the scraper bowl has flowed into in leaking the hopper, and do not influence the use of scraper bowl. The installed part is used for guaranteeing the rotation connection of the blocking plate, and the opening or the closing of the discharge hole of the material leaking pipe is realized through the rotation of the blocking plate. Specifically, the loader is driven to a place where a mixer can reach, the blocking plate is closed, concrete is poured into a loader bucket, then the loader is driven to the side of a foundation pile, the pipe opening of the material leaking pipe is aligned with the foundation pile, the blocking plate is opened, the concrete is poured into the foundation pile, after pouring is completed, the blocking plate is closed, the loader is driven to the side of the next foundation pile for pouring, and when the concrete in the bucket is used up, the loader is driven to the side of the mixer to load the concrete and perform later pouring work.
According to the utility model discloses above-mentioned technical scheme's high-efficient pile device of watering in succession of photovoltaic can also have following additional technical characteristics:
in the above technical solution, the mount includes:
the fixing plate is inserted into the material leaking pipe;
and the bolt assembly is screwed to the fixed plate, and one end of the blocking plate is rotatably connected to the bolt assembly.
In this technical scheme, the installed part includes fixed plate and bolt assembly. Wherein, the fixed plate is used for leaking the material union coupling, on this basis, installs bolt assembly on the fixed plate, can guarantee the rotation of closure plate and connect. This simple structure, and convenient to detach and installation improve the efficiency of construction.
In the above technical solution, the bolt assembly includes:
a bolt bar screwed to the fixing plate;
a first locking bolt provided at one end of the bolt shank;
and the second locking bolt is arranged at the other end of the bolt rod.
In the technical scheme, the bolt assembly comprises a bolt rod, a first locking bolt and a second locking bolt. The first locking bolt and the second locking bolt fasten the bolt rod on the fixing plate, and the bolt rod can be prevented from falling off.
In the above technical solution, the number of the fixing plates is two, and the two fixing plates are parallel to the blocking plate.
In this technical scheme, the fixed plate is provided with two. Of course, multiple sets can be added according to actual working conditions. For example, when the hourglass material pipe specification is great and closure plate weight is heavier, in order to guarantee the installation stability of closure plate, can increase a plurality of fixed plates to this connection steadiness of assurance closure plate.
In the above technical solution, the method further comprises:
and the handle is arranged on one side of the blocking plate.
In the technical scheme, the multifunctional electric kettle further comprises a handle. The handle is used for the grasp of operating personnel to realize the rotation of closure plate through operating handle. In order to ensure the comfort of the operator, a foam soft sleeve can be sleeved on the handle.
In the above technical scheme, the blocking plate is of an oval structure.
In this technical scheme, set the closure plate to oval structure to this guarantees the complete shutoff to the discharge gate of leaking the material pipe.
In the technical scheme, a mounting hole is formed at one end of the blocking plate, and the mounting hole is sleeved with the bolt rod.
In this technical scheme, be formed with the mounting hole at the one end of closure plate. The mounting hole can be sleeved with the bolt rod, so that a simple and convenient rotary connection mode is realized.
In the above technical scheme, the handle is detachably linked with the blocking plate.
In this technical scheme, the handle can be dismantled with the closure plate and be connected, ensures in time to change or the maintenance. Specifically, a hole with internal threads is formed in the side wall surface of the blocking plate, external threads are formed at the end part of the handle, and the two threads are matched to form a detachable connection mode.
The utility model provides a high-efficient stake device of watering in succession of photovoltaic, compared with the prior art, has following beneficial effect:
the utility model discloses can realize that the foundation pile of special topography is pour to save the process of artifical transport, and then improve efficiency of construction and quality;
the device of the utility model is simple in structure, the cost of manufacture is low, easy operation. After the pile casting device is used, on the basis of reducing 50% of casting labor and labor intensity, the pile casting efficiency can be improved by more than 50%, meanwhile, the concrete loss is obviously reduced, and the comprehensive benefits in the aspects of pile casting period control and cost control are obvious.
Additional aspects and advantages of the invention will be set forth in part in the description which follows, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a front view of the photovoltaic high-efficiency continuous pile casting device of the present invention;
fig. 2 is the utility model discloses a high-efficient continuous pile device that waters of photovoltaic top view.
Wherein, the correspondence between the reference numbers and the component names in fig. 1 to 2 is:
1. a material leaking pipe; 2. a blocking plate; 3. a fixing plate; 4. a handle; 5. a bolt assembly.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention more clearly understood, the present invention will be described in further detail with reference to the accompanying drawings and detailed description. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the scope of the present invention is not limited by the specific embodiments disclosed below.
A photovoltaic high-efficiency continuous pile casting device provided according to some embodiments of the present invention is described below with reference to fig. 1 to 2.
Some embodiments of the present application provide a photovoltaic high efficiency continuous piling device.
As shown in fig. 1 to 2, a first embodiment of the present invention provides a photovoltaic high-efficiency continuous pile casting device, which includes:
the device comprises a material leaking pipe 1, wherein a feeding hole is formed in the top of the material leaking pipe 1, and a discharging hole is formed in the bottom of the material leaking pipe 1;
the mounting piece is arranged on one side of the leakage pipe 1;
the plugging plate 2 is arranged at a discharge port at the bottom of the material leakage pipe 1, one end of the plugging plate is connected with the mounting piece, and the plugging plate 2 rotates by taking the joint of the plugging plate and the mounting piece as a circle center to open or close the discharge port.
The utility model provides a high-efficient stake device that waters in succession of photovoltaic, including hourglass material pipe 1, installed part and closure plate 2. The leakage pipe 1 is used for bearing and flowing out concrete. Specifically, weld hourglass material pipe 1 in the scraper bowl bottom of loader to at the scraper bowl bottom opening of loader, make it and hourglass material pipe 1 intercommunication, consequently can guarantee that the concrete in the scraper bowl has flowed into in leaking material pipe 1, and does not influence the use of scraper bowl. The installed part is then used for guaranteeing the rotation of closure plate 2 and connecting, through the rotation of closure plate 2, realizes opening or closing of the 1 discharge gate of hourglass material pipe. Specifically, the loader is driven to the place where the mixer truck can reach, the blocking plate 2 is closed, concrete is poured into a bucket of the loader, then the loader is driven to the side of a foundation pile, the pipe opening of the material leakage pipe 1 is aligned to the foundation pile, the blocking plate 2 is opened, the concrete is poured into the foundation pile, after pouring is completed, the blocking plate 2 is closed, the loader is driven to the side of the next foundation pile for pouring, when the concrete in the bucket is used up, the loader is driven to the side of the mixer truck for loading the concrete, and later pouring is carried out.
The utility model discloses a second embodiment provides a high-efficient stake device that waters in succession of photovoltaic, and on the basis of first embodiment, the installed part includes:
the fixed plate 3 is inserted into the material leaking pipe 1;
and the bolt assembly 5 is screwed to the fixing plate 3, and one end of the blocking plate 2 is rotatably connected to the bolt assembly 5.
In the present embodiment, the mounting member includes a fixing plate 3 and a bolt assembly 5. Wherein, fixed plate 3 is used for being connected with hourglass material pipe 1, on this basis, and the rotation that can guarantee closure plate 2 is connected at the last construction bolt subassembly 5 of fixed plate 3. This simple structure, and convenient to detach and installation improve the efficiency of construction.
The utility model discloses a third embodiment provides a high-efficient continuous pile device that waters of photovoltaic, and on the basis of above-mentioned arbitrary embodiment, bolt assembly 5 includes:
a bolt bar screwed to the fixing plate 3;
a first locking bolt provided at one end of the bolt shank;
and the second locking bolt is arranged at the other end of the bolt rod.
In the present embodiment, the bolt assembly 5 includes a bolt shank, a first locking bolt, and a second locking bolt. Wherein, the bolt bar is fastened on the fixing plate 3 by the first locking bolt and the second locking bolt, and the bolt bar can be prevented from falling off.
The utility model discloses the fourth embodiment provides a high-efficient stake device of watering in succession of photovoltaic, and on the basis of above-mentioned arbitrary embodiment, fixed plate 3 is two, and two fixed plate 3 with 2 parallel arrangement of closure plate.
In the present embodiment, two fixing plates 3 are provided. Of course, multiple sets can be added according to actual working conditions. For example, when the specification of the leaking pipe 1 is large and the weight of the blocking plate 2 is heavy, in order to ensure the stable installation of the blocking plate 2, a plurality of fixing plates 3 can be added, so as to ensure the stable connection of the blocking plate 2.
The utility model discloses the fifth embodiment provides a high-efficient stake device that waters in succession of photovoltaic, and on the basis of above-mentioned arbitrary embodiment, still include:
and the handle 4 is arranged on one side of the blocking plate 2.
In this embodiment, a handle 4 is also included. The handle 4 is used for the operator's grip, so that the rotation of the blocking plate 2 is achieved by operating the handle 4. In order to ensure the comfort of the operator, a foam sleeve can be placed over the handle 4.
The utility model discloses the sixth embodiment provides a high-efficient stake device of watering in succession of photovoltaic, and on the basis of above-mentioned arbitrary embodiment, closure plate 2 is oval structure.
In the present embodiment, the blocking plate 2 is configured in an oval structure, so as to ensure complete blocking of the discharge opening of the leakage pipe 1.
The utility model discloses a seventh embodiment provides a high-efficient stake device of watering in succession of photovoltaic, and on the basis of above-mentioned arbitrary embodiment, the one end of closure plate 2 is formed with the mounting hole, the mounting hole with the shank of bolt cup joints.
In the present embodiment, a mounting hole is formed at one end of the blocking plate 2. The mounting hole can be sleeved with the bolt rod, so that a simple and convenient rotary connection mode is realized.
The utility model discloses the eighth embodiment provides a high-efficient continuous device of watering of photovoltaic, and on the basis of above-mentioned arbitrary embodiment, handle 4 with closure plate 2 can dismantle the link.
In this embodiment, the handle 4 is detachably connected to the closure plate 2, ensuring timely replacement or maintenance. Specifically, a hole with an internal thread is formed in the side wall surface of the blocking plate 2, an external thread is formed at the end of the handle 4, and the two threads are matched to form a detachable connection mode.
In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a high-efficient stake device that waters in succession of photovoltaic which characterized in that includes:
the material leakage device comprises a material leakage pipe (1), wherein a feeding hole is formed in the top of the material leakage pipe (1), and a discharging hole is formed in the bottom of the material leakage pipe (1);
the mounting piece is arranged on one side of the material leakage pipe (1);
the plugging plate (2) is arranged at a discharge port at the bottom of the material leakage pipe (1), one end of the plugging plate is connected with the mounting piece, and the plugging plate (2) rotates by taking the joint of the plugging plate and the mounting piece as the circle center to open or close the discharge port.
2. The photovoltaic high efficiency continuous piling device of claim 1, wherein the mounting member comprises:
a fixing plate (3) inserted into the leakage pipe (1);
and the bolt assembly (5) is screwed to the fixing plate (3), and one end of the blocking plate (2) is rotatably connected to the bolt assembly (5).
3. The photovoltaic high-efficiency continuous piling device according to claim 2, wherein the bolt assembly (5) comprises:
a bolt shank screwed to the fixing plate (3);
a first locking bolt provided at one end of the bolt shank;
and the second locking bolt is arranged at the other end of the bolt rod.
4. The photovoltaic high-efficiency continuous piling device according to claim 3, wherein the number of the fixing plates (3) is two, and the two fixing plates (3) are arranged in parallel with the blocking plate (2).
5. The photovoltaic high-efficiency continuous casting pile device according to claim 4, further comprising:
and the handle (4) is arranged on one side of the blocking plate (2).
6. A photovoltaic high-efficiency continuous piling device according to claim 5, wherein the plugging plate (2) is in an oval structure.
7. The photovoltaic high-efficiency continuous pile casting device according to claim 6, wherein one end of the blocking plate (2) is provided with a mounting hole, and the mounting hole is sleeved with the bolt rod.
8. A photovoltaic efficient continuous piling device according to claim 7, wherein said handle (4) is detachably linked with said plugging plate (2).
CN202221290948.1U 2022-05-27 2022-05-27 Photovoltaic high-efficiency continuous pile casting device Active CN217580178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221290948.1U CN217580178U (en) 2022-05-27 2022-05-27 Photovoltaic high-efficiency continuous pile casting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221290948.1U CN217580178U (en) 2022-05-27 2022-05-27 Photovoltaic high-efficiency continuous pile casting device

Publications (1)

Publication Number Publication Date
CN217580178U true CN217580178U (en) 2022-10-14

Family

ID=83554901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221290948.1U Active CN217580178U (en) 2022-05-27 2022-05-27 Photovoltaic high-efficiency continuous pile casting device

Country Status (1)

Country Link
CN (1) CN217580178U (en)

Similar Documents

Publication Publication Date Title
CN205704673U (en) A kind of agitating device for building
CN207088188U (en) A kind of build concrete heavy duty detergent agitating device
CN217580178U (en) Photovoltaic high-efficiency continuous pile casting device
CN208323801U (en) One kind being convenient for cleaning type concrete mixer
CN210915487U (en) Mixing and stirring sewage treatment device with microbial filler
CN207126658U (en) A kind of seed water choosing device of the agricultural production with decontamination function
CN108582489A (en) A kind of protecting wall construction and maintenance equipment
CN210361908U (en) Building is backfilled with compound dry-mixed lightweight aggregate concrete mixing device
CN208247148U (en) It is a kind of for producing the proportioning machine of water-permeable brick
CN207385270U (en) A kind of easy-to-dismount Efficient Agitator
CN214925717U (en) Stirring roller for preparing grouting material
CN206680297U (en) A kind of rare earth recovery filter
CN214163469U (en) Easy-to-drain concrete mixing drum
CN209665860U (en) A kind of Portable reinforcing steel bar Sleeve jar slurry stirring device
CN213290820U (en) Concrete mixer for industrial building
CN211838249U (en) Civil engineering construction material crushing mixes integrated device
CN211665495U (en) Bituminous mixture discharging device
CN207105273U (en) A kind of high-effective concrete agitating device for building
CN215202684U (en) High-efficient intelligent agitator of cement
CN217989030U (en) Cleaning device of lithium battery slurry stirrer
CN215029276U (en) Afforestation soil environmental protection prosthetic devices
CN220807981U (en) Discharge tank for building mortar
CN214982060U (en) Concrete mixing device that bridge construction used
CN216968210U (en) Storage agitator tank
CN218053250U (en) Stirring kettle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant