CN217580105U - Major diameter drilling bored concrete pile steel reinforcement cage positioner - Google Patents

Major diameter drilling bored concrete pile steel reinforcement cage positioner Download PDF

Info

Publication number
CN217580105U
CN217580105U CN202221771657.4U CN202221771657U CN217580105U CN 217580105 U CN217580105 U CN 217580105U CN 202221771657 U CN202221771657 U CN 202221771657U CN 217580105 U CN217580105 U CN 217580105U
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
outside
collar
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221771657.4U
Other languages
Chinese (zh)
Inventor
张陈培
刘明
李江兵
李超
杨华明
吕建忠
何振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Bureau Of China Construction Corp
Original Assignee
Second Construction Bureau Of China Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Bureau Of China Construction Corp filed Critical Second Construction Bureau Of China Construction Corp
Priority to CN202221771657.4U priority Critical patent/CN217580105U/en
Application granted granted Critical
Publication of CN217580105U publication Critical patent/CN217580105U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of drilling bored concrete pile steel reinforcement cage hoist and mount, especially, be a major diameter drilling bored concrete pile steel reinforcement cage positioner, including protecting a section of thick bamboo, steel reinforcement cage and fixed solid fixed ring that sets up in protecting a section of thick bamboo outside, be provided with a plurality of perpendicular reinforcing bars on the steel reinforcement cage, the outside slip cap of steel reinforcement cage is equipped with the collar, be provided with a plurality of U type screw rods on the collar, a plurality of U type screw rods are established respectively the cover and are established the outside at the perpendicular reinforcing bar that corresponds. The utility model has the advantages of reasonable design, through U type screw rod, nut, collar, bracing piece, down tube, location hoop, protect the cooperation of a section of thick bamboo and guide ring, can fix a position the steel reinforcement cage in the central point of drilling and put the department, simultaneously after hoist and mount are ended, twisting the nut, take off U type screw rod, upwards roll-off collar, bracing piece and location hoop from the outside of steel reinforcement cage, can be quick hoop location and demolish, and then made things convenient for the use.

Description

Major diameter drilling bored concrete pile steel reinforcement cage positioner
Technical Field
The utility model relates to a bored concrete pile steel reinforcement cage hoist and mount technical field especially relates to a major diameter bored concrete pile steel reinforcement cage positioner.
Background
With the large-scale construction of highway and railway express road networks in China, a large number of cross-river, river and sea bridge girders are built in succession, and the huge bridges are usually required to build huge pier foundations in deep water. The construction of large-diameter and ultra-long piles of a bridge in a deep water environment inevitably meets the problem that an overweight reinforcement cage is difficult to accurately position a lifting hole opening after being placed. After the last section of reinforcement cage is put down in place, the traditional orifice positioning method is to find out the center of the reinforcement cage, adjust the lifting hook of the crane to make the center of the reinforcement cage coincide with the center of the protective cylinder, and then fix the lifting rib. And the last section of reinforcement cage needs to be lengthened when being put down, after the reinforcement cage is put down in place, the whole reinforcement cage is completely submerged in the slurry, only a few lengthened hanging ribs are exposed outside the opening of the protective sleeve, therefore, after the reinforcement cage is put down in place, the center of the reinforcement cage needs to be found, the center position of the reinforcement cage can be deduced only through the lengthened hanging ribs (generally 4), the diagonal hanging ribs are connected through stay wires in the conventional method, and the center position of the reinforcement cage is determined through the intersection point of the connecting wires.
After retrieval: a grant publication number is CN 203625890U's a major diameter bored concrete pile steel reinforcement cage positioner, through set up the distance between a plurality of location support control steel reinforcement cages and the pile casing at steel reinforcement cage excircle terminal surface, when the loop wheel machine hoists the steel reinforcement cage to protecting in the section of thick bamboo, regard a pile casing as spacing direction, along with the transfer of steel reinforcement cage, steel reinforcement cage plane position adjusts to the allowed deviation within range by oneself, whole convenient operation is swift, need not to protect a section of thick bamboo mouth and repeatedly act as go-between, centering, the offset of steel reinforcement cage center, the safety risk of site operation process and pile casing mouth back and forth operation has been reduced.
However, when the positioning device for the large-diameter bored pile reinforcement cage is used, the positioning diagonal brace and the positioning diagonal rod are welded on the reinforcement cage, and after the positioning diagonal brace and the positioning diagonal rod are hoisted, the positioning diagonal brace and the positioning diagonal rod are difficult to detach from the reinforcement cage, so that the construction efficiency is reduced, and therefore the positioning device for the large-diameter bored pile reinforcement cage is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects in the prior art, and provides a large-diameter bored concrete pile cage positioning device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a major diameter drilling bored concrete pile steel reinforcement cage positioner, is protecting a solid fixed ring in the section of thick bamboo outside including protecting a section of thick bamboo, steel reinforcement cage and fixed setting, be provided with a plurality of perpendicular reinforcing bars on the steel reinforcement cage, the outside sliding sleeve of steel reinforcement cage is equipped with the collar, be provided with a plurality of U type screw rods on the collar, a plurality of U type screw rods are established respectively the cover and are established in the outside of the perpendicular reinforcing bar that corresponds, the outside thread bush of U type screw rod is equipped with two nuts, the inboard equal activity butt of two nuts in the outside of collar, a plurality of bracing pieces of outside fixedly connected with of collar, the same location hoop of crossing of the outer end fixedly connected with of a plurality of bracing pieces, location hoop sliding sleeve is established in protecting a section of thick bamboo, the activity bush in the collar is equipped with four pegs, the top fixedly connected with spacing disc of peg, it is provided with the worm to rotate on the peg top inner wall, rotate same stud on the both sides inner wall, stud's the outside fixed bush is equipped with the transmission worm wheel, the worm meshes with the transmission worm wheel, stud's outside thread bush is equipped with two movable plates, and two equal fixed inserted bars that are provided with of keeping away from each other.
Preferably, the top of the protective cylinder is fixedly connected with a guide ring, and the guide ring is arranged in a large-size manner.
Preferably, the same limiting rod is fixedly connected to the inner walls of the two sides of the wood pile nail, and the two movable plates are slidably sleeved on the outer side of the limiting rod.
Preferably, the top of spacing dish has been seted up and has been accomodate the groove, the fixed hand wheel that is provided with in top of worm, the hand wheel movable sleeve is established and is accomodate the inslot, spacing dish activity butt is at the top of solid fixed ring.
Preferably, four round holes are formed in the top of the fixing ring, and the four timber pile nails are respectively sleeved in the corresponding round holes in a sliding manner.
Preferably, the bottom of the supporting rod is fixedly connected with an inclined rod, and the inclined rod is fixedly connected to the outer side of the mounting ring.
Preferably, through holes are formed in two sides of the wood pile nail, and the two inserting rods are respectively sleeved in the corresponding through holes in a sliding mode.
In the utility model, the positioning device for the large-diameter bored concrete pile reinforcement cage is convenient for firmly fixing the fixing ring and the protective cylinder by matching the wood pile nail, the worm, the limiting disc, the transmission worm wheel, the double-end screw, the movable plate and the inserted rod, so that the protective cylinder is prevented from deviating when the reinforcement cage is hoisted, and the reinforcement cage cannot be guided and positioned well;
in the utility model, a major diameter drilling bored concrete pile steel reinforcement cage positioner, through the cooperation of U type screw rod, nut, collar, bracing piece, down tube, location hoop, protect a section of thick bamboo and guide ring, can fix a position the steel reinforcement cage in the central point of drilling department, after hoist and mount simultaneously, after twisting off the nut, take off U type screw rod, upwards roll off collar, bracing piece and location hoop from the outside of steel reinforcement cage, can be quick location hoop demolish and recycle, and then made things convenient for the use;
the utility model has the advantages of reasonable design, through U type screw rod, nut, collar, bracing piece, down tube, location hoop, protect the cooperation of a section of thick bamboo and guide ring, can fix a position the steel reinforcement cage in the central point of drilling and put the department, simultaneously after hoist and mount are ended, twisting the nut, take off U type screw rod, upwards roll-off collar, bracing piece and location hoop from the outside of steel reinforcement cage, can be quick hoop location and demolish, and then made things convenient for the use.
Drawings
Fig. 1 is a schematic structural view of a positioning device for a large-diameter bored concrete pile reinforcement cage according to the present invention;
fig. 2 is a cross-sectional view of a large diameter bored concrete pile reinforcement cage positioning device according to the present invention;
fig. 3 is a top cross-sectional view of the positioning hoop, the reinforcement cage and the mounting ring of the large-diameter bored concrete pile reinforcement cage positioning device according to the present invention;
fig. 4 is a schematic structural view of part a of a large-diameter bored concrete pile cage positioning device according to the present invention;
fig. 5 is a schematic structural view of part B of a large-diameter bored concrete pile cage positioning device according to the present invention;
fig. 6 is a schematic structural diagram of part C of a large diameter bored concrete pile cage positioning device according to the present invention.
In the figure: 1. protecting the cylinder; 2. a guide ring; 3. a reinforcement cage; 4. a fixing ring; 5. wooden stake nails; 6. a limiting disc; 7. a hand wheel; 8. a receiving groove; 9. a positioning hoop; 10. a support bar; 11. a diagonal bar; 12. a mounting ring; 13. a nut; 14. erecting steel bars; 15. a U-shaped screw; 16. a circular hole; 17. a worm; 18. a double-ended screw; 19. a drive worm gear; 20. inserting a rod; 21. a limiting rod; 22. a through hole; 23. and (5) moving the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-6, a large-diameter bored pile reinforcement cage positioning device includes a casing 1, a reinforcement cage 3 and a fixing ring 4 fixedly disposed outside the casing 1, a plurality of vertical bars 14 are disposed on the reinforcement cage 3, a mounting ring 12 is slidably sleeved outside the reinforcement cage 3, a plurality of U-shaped screws 15 are disposed on the mounting ring 12, the plurality of U-shaped screws 15 are respectively sleeved outside the corresponding vertical bars 14, two nuts 13 are threadedly sleeved outside the U-shaped screws 15, inner sides of the two nuts 13 are movably abutted against outer sides of the mounting ring 12, a plurality of support rods 10 are fixedly connected to outer sides of the mounting ring 12, the same over-positioning hoop 9 is fixedly connected to outer ends of the plurality of support rods 10, the positioning hoop 9 is slidably sleeved in the casing 1, the reinforcement cage 3 is suspended in the casing 1, when entering the casing 1, the positioning hoop 9 contacts with an inner wall of the casing 1, the reinforcement cage 3 can be positioned at a center position of a drilled hole, the positioning hoop 9 can be stably supported, when the reinforcement cage 3 enters the casing 1, the support rod falls from the bottom of the drilled hole, the support rod 3, the nut 13 falls off the positioning hoop, the positioning hoop and the mounting hoop can be quickly removed from the outside of the reinforcement cage 9, and the positioning hoop 15, the positioning hoop can be removed;
the fixing ring 4 is internally movably sleeved with four wood pile nails 5, the top of each wood pile nail 5 is fixedly connected with a limiting disc 6, a worm 17 is rotatably arranged on the inner wall of the top of each wood pile nail 5, the inner walls of two sides of each wood pile nail 5 are rotatably connected with the same double-headed screw 18, the outer side of each double-headed screw 18 is fixedly sleeved with a transmission worm gear 19, the worm 17 is meshed with the transmission worm gear 19, the outer side of each double-headed screw 18 is sleeved with two movable plates 23, one side, away from each other, of each movable plate 23 is fixedly provided with an inserted rod 20, the protecting cylinder 1 is placed in a drilled hole, the fixing ring 4 is contacted with the ground, the protecting cylinder 1 below the fixing ring 4 is positioned in the drilled hole, the protecting cylinder 1 above the fixing ring 4 is exposed out of the drilled hole, then the four wood pile nails 5 are hammered into the ground, further the fixing ring 4 and the protecting cylinder 1 can be fixed, then the worm 17 is rotated, the worm 17 drives the transmission worm gear 19 and the double-headed screw 18 to rotate, the double-headed screw 18 drives the two movable plates 23 and the inserted rods 20 to be away from each other, so that the inserted rod 20 can be transversely inserted into the ground, further, the fixing ring 4 and the fixing ring can be firmly fixed, and the fixing cage can not firmly fixed, and the steel bar can be prevented from shifting cage 3 from being lifted.
The utility model discloses in, protect a 1 top fixedly connected with guide ring 2, guide ring 2 is big end down and sets up, hangs into a reinforcement cage 3 from guide ring 2 and protects a 1 in, because of guide ring 2 is big end down and sets up for reinforcement cage 3's position is by gradual correction.
The utility model discloses in, the same gag lever post 21 of fixedly connected with on the both sides inner wall of timber pile nail 5, two movable plates 23 all slide the cover and establish in the outside of gag lever post 21, can lead movable plate 23, make it not rotatory together with double-end screw 18.
The utility model discloses in, spacing dish 6's top has been seted up and has been accomodate groove 8, and worm 17's the fixed hand wheel 7 that is provided with in top, and 7 movable sleeves of hand wheel are established and are being accomodate inslot 8, and 6 movable butts of spacing dish are convenient for accomodate hand wheel 7 at solid fixed ring 4's top, and then do not hinder in the ground of impressing stake nail 5, are convenient for rotate worm 17 simultaneously.
The utility model discloses in, four round holes 16 have been seted up at solid fixed ring 4's top, and four stake nails 5 slip cover respectively are established in corresponding round hole 16, are convenient for insert the round hole to stake nail 5, fix solid fixed ring 4.
The utility model discloses in, the bottom fixedly connected with down tube 11 of bracing piece 10, 11 fixed connection of down tube are in the outside of collar 12, are convenient for support the bracing piece 10 and consolidate, and then make location hoop 9 firm more.
The utility model discloses in, through-hole 22 has all been seted up to the both sides of stake nail 5, and two inserted bars 20 slide the cover respectively and establish in corresponding through-hole 22, are convenient for lead inserted bar 20, make more steady of its removal.
In the utility model, when in use, firstly the pile casing 1 is placed in the borehole, the fixing ring 4 is contacted with the ground, the pile casing 1 below the fixing ring 4 is positioned in the borehole, the pile casing 1 above the fixing ring 4 is exposed out of the borehole, then four wood studs 5 are inserted into the round holes 16 arranged on the fixing ring 4, then the wood studs 5 are hammered into the ground, further the fixing ring 4 and the pile casing 1 can be preliminarily fixed, then the worm 17 is rotated through the hand wheel 7, the worm 17 drives the transmission worm wheel 19 and the double-end screw 18 to rotate, under the limit of the limiting rod 21, the double-end screw 18 drives the two moving plates 23 and the inserted rod 20 to be mutually separated and extend out of the through hole 22, thereby the inserted rod 20 is transversely inserted into the ground, further the fixing ring 4 and the pile casing 1 can be fixed again, make fixed more firm, when avoiding hoist and mount steel reinforcement cage 3, protect the condition that a section of thick bamboo 1 takes place the skew, then hang into from guide ring 2 steel reinforcement cage 3 and protect in a section of thick bamboo 1, set up big-end-up because of guide ring 2 is, make steel reinforcement cage 3's position by gradual correction, when getting into protecting in a section of thick bamboo 1, location hoop 9 and the inner wall contact who protects a section of thick bamboo 1, and then can fix a position steel reinforcement cage 3 in the central point department of putting of drilling, through the setting of a plurality of bracing pieces 10 and down tube 11, can carry out stable support to location hoop 9, after steel reinforcement cage 3 reachs the drilling bottom, screw nut 13 is being twisted off, take off U type screw rod 15, to collar 12, bracing piece 10 and location hoop 9 follow the outside of steel reinforcement cage 3, upwards roll-off, can be quick location hoop 9 for demolising and recycle.

Claims (7)

1. The utility model provides a major diameter drilling bored concrete pile steel reinforcement cage positioner, includes protects a section of thick bamboo (1), steel reinforcement cage (3) and fixed solid fixed ring (4) of setting in protecting a section of thick bamboo (1) outside, its characterized in that, be provided with a plurality of perpendicular reinforcing bars (14) on steel reinforcement cage (3), the outside slip cover of steel reinforcement cage (3) is equipped with collar (12), be provided with a plurality of U type screw rods (15) on collar (12), a plurality of U type screw rods (15) are established respectively in the outside of corresponding perpendicular reinforcing bar (14), the outside thread bush of U type screw rod (15) is equipped with two nuts (13), the inboard equal activity butt of two nuts (13) is in the outside of collar (12), a plurality of bracing pieces of worm rods (10) of outside fixedly connected with of collar (12), the same location hoop (9) of crossing of outer end fixedly connected with of a plurality of bracing pieces (10), location hoop (9) slip cover is established in protecting a section of thick bamboo (1), gu fixed ring (4) endotheca set is equipped with four nails (5), the top fixedly connected with the dowel dish (6) of dowel (6), the same double-end stake (18) is provided with the drive screw rod (18) on the rotation of double-ended stake (18), worm (17) and transmission worm wheel (19) mesh mutually, the outside thread bush of double-thread screw (18) is equipped with two movable plates (23), and one side that two movable plates (23) kept away from each other all is fixed and is provided with inserted bar (20).
2. A large diameter bored pile cage positioning device as claimed in claim 1, wherein the top of said casing (1) is fixedly connected with a guide ring (2), and said guide ring (2) is arranged in a large-sized up and small-sized down.
3. The positioning device for the large-diameter bored pile reinforcement cage according to claim 1, wherein the same limiting rod (21) is fixedly connected to the inner walls of the two sides of the timber pile (5), and the two moving plates (23) are slidably fitted over the outer side of the limiting rod (21).
4. The positioning device for the large-diameter bored pile reinforcement cage according to claim 1, wherein a receiving groove (8) is formed at the top of the limiting disc (6), a hand wheel (7) is fixedly arranged at the top end of the worm (17), the hand wheel (7) is movably sleeved in the receiving groove (8), and the limiting disc (6) is movably abutted against the top of the fixing ring (4).
5. The device for positioning the large-diameter bored pile cage according to claim 1, wherein the top of the fixing ring (4) is formed with four circular holes (16), and the four wooden studs (5) are slidably fitted into the corresponding circular holes (16).
6. A large diameter bored pile cage positioning device as claimed in claim 1, wherein the bottom of the support rod (10) is fixedly connected with a diagonal rod (11), and the diagonal rod (11) is fixedly connected to the outside of the mounting ring (12).
7. The device as claimed in claim 1, wherein the dowel pins (5) have through holes (22) at both sides, and the two insertion rods (20) are slidably inserted into the corresponding through holes (22).
CN202221771657.4U 2022-07-11 2022-07-11 Major diameter drilling bored concrete pile steel reinforcement cage positioner Active CN217580105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221771657.4U CN217580105U (en) 2022-07-11 2022-07-11 Major diameter drilling bored concrete pile steel reinforcement cage positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221771657.4U CN217580105U (en) 2022-07-11 2022-07-11 Major diameter drilling bored concrete pile steel reinforcement cage positioner

Publications (1)

Publication Number Publication Date
CN217580105U true CN217580105U (en) 2022-10-14

Family

ID=83533868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221771657.4U Active CN217580105U (en) 2022-07-11 2022-07-11 Major diameter drilling bored concrete pile steel reinforcement cage positioner

Country Status (1)

Country Link
CN (1) CN217580105U (en)

Similar Documents

Publication Publication Date Title
CN201649072U (en) Pile foundation reinforcement cage hoisting device
CN111170171A (en) Core cylinder movable arm type tower crane installation climbing structure and method thereof
CN217580105U (en) Major diameter drilling bored concrete pile steel reinforcement cage positioner
CN209742389U (en) Alignment positioning machine tool for casting ribs of prefabricated column
CN2599134Y (en) Construction device for lifting scaffold turnover plate of towering chimney
CN216739246U (en) Simple device for bridge wet joint construction
CN217680907U (en) Interior pulling type exempts from to tear open composite forms and concrete section of thick bamboo wall
CN112412152B (en) Construction method of underslung derrick-free variable-section rectangular chimney support system
CN212866086U (en) Lattice column direction control device
CN210368947U (en) Prefabricated reinforced concrete foundation
CN209779626U (en) Upright pile positioning and lowering auxiliary device
CN111101519A (en) Pile foundation reinforcement cage lowering positioning support structure and construction method
CN218175815U (en) Steel reinforcement cage structure in pile body
CN220317207U (en) Cantilever crane reinforced structure
CN220318540U (en) High-precision auxiliary lowering device for cast-in-place pile reinforcement cage
CN217027053U (en) Multistage formula steel pipe concrete foundation structure that sinks of heavy grade landing stage
CN219547809U (en) Filling pile positioning grouting frame
CN218056396U (en) Be used for building construction engineering residue conveyor
CN219384478U (en) Precast beam template hoist
CN219157679U (en) Deep water pile foundation reinforcement cage is transferred and back pressure cage
CN211773680U (en) Pile foundation steel reinforcement cage transfers location bearing structure
CN219653901U (en) Five-rod support net rack supporting device
CN214245717U (en) Hydraulic pile gripper
CN214941635U (en) Prefabricated assembled concrete beam component
CN221072599U (en) Prestressed recycled concrete precast pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant