CN217572540U - Steel construction fixing device that construction was used - Google Patents

Steel construction fixing device that construction was used Download PDF

Info

Publication number
CN217572540U
CN217572540U CN202220884779.8U CN202220884779U CN217572540U CN 217572540 U CN217572540 U CN 217572540U CN 202220884779 U CN202220884779 U CN 202220884779U CN 217572540 U CN217572540 U CN 217572540U
Authority
CN
China
Prior art keywords
fixedly connected
plate
fixing device
gear
sector plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220884779.8U
Other languages
Chinese (zh)
Inventor
陶华钧
田利君
言立波
冯春红
施琴芳
葛炜祎
胡涛
孙建福
朱超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220884779.8U priority Critical patent/CN217572540U/en
Application granted granted Critical
Publication of CN217572540U publication Critical patent/CN217572540U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a construction technical field specifically is a steel construction fixing device that construction used, including the elevating gear body, the top of elevating gear body is rotated and is connected with the commentaries on classics piece, encircle around and fixedly connected with gear one of commentaries on classics piece, the motor is installed to the right-hand member of elevating gear body, the top output end fixedly connected with bull stick of motor, the top fixedly connected with gear two of bull stick, gear two meshes with gear one, the top middle part fixedly connected with sector plate one of commentaries on classics piece, it is connected with sector plate two to rotate on the sector plate one, the concave template of top fixedly connected with of sector plate two, fixedly connected with spring one between the top left part of commentaries on classics piece and the bottom left part of concave template, install electric putter on the top right part of commentaries on classics piece, its steel construction fixing device that should construction used contrasts prior art, at the steel construction installation, be convenient for adjust the angle and the direction of steel construction, the practicality is stronger.

Description

Steel construction fixing device that construction used
Technical Field
The utility model relates to a construction technical field specifically is a steel construction fixing device that construction used.
Background
As is well known, a steel structure is a structure made of steel materials, and is one of the main building structure types, the structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and adopts rust removal and prevention processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like, all the members or parts are usually connected by welding lines, bolts or rivets, and because of light dead weight and simple construction, the steel structure is widely applied to the fields of large-scale factory buildings, venues, super high-rise buildings and the like, and a fixing device is usually used in the construction process of the steel structure buildings.
Through the retrieval, chinese patent application No. CN 202122230458.4's utility model discloses a steel construction fixing device for construction, its approximate description does, including fixed frame, the inside of fixed frame is provided with elevating gear, elevating gear is connected with the installing frame, the top of installing frame is provided with clamping device, the inside of installing frame is provided with draw gear, draw gear is connected with clamping device, the bottom of fixed frame is connected with the lug, it is when using, set up clamping device, it is fixed to be convenient for carry out the centre gripping to the steel construction, improve steel construction fixed stability, set up elevating gear, the staff of being convenient for adjusts the height of installing frame.
Although foretell prior art scheme is convenient for carry out the height that the centre gripping was fixed and was adjusted the installing frame to the steel construction, combine actual conditions to see, in steel construction building construction in-process, will often adjust the installation to the height and the angle and the direction of steel construction after fixing the steel construction, the device is only convenient for adjust the height of steel construction, is not convenient for adjust the angle and the direction of steel construction, uses limitedly in the steel construction installation, and the limitation is great.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a steel construction fixing device that construction was used to solve the prior art that provides in the background art and only be convenient for adjust the height of steel construction, the angle and the direction of the steel construction of being not convenient for adjust use limited, the great problem of limitation in the steel construction installation.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel construction fixing device that construction used, includes the elevating gear body, the top of elevating gear body is rotated and is connected with the commentaries on classics piece, encircle around the piece and fixedly connected with gear one, the motor is installed to the right-hand member of elevating gear body, the top output end fixedly connected with bull stick of motor, the top fixedly connected with gear two of bull stick, gear two meshes with gear one, the top middle part fixedly connected with sector plate one of commentaries on classics piece, rotate on the sector plate one and be connected with sector plate two, the concave template of top fixedly connected with of sector plate two, fixedly connected with spring one between the top left part of commentaries on classics piece and the bottom left part of concave template, install electric putter on the top right part of commentaries on classics piece, electric putter's top output end fixedly connected with sector plate three, rotate on the sector plate three and be connected with sector plate four, the top lateral sliding connection of sector plate four is in the bottom right part of concave template, the equal fixedly connected with backup pad in both ends upper portion about concave template is provided with clamping device on the concave template.
Preferably, clamping device includes the grip block, grip block lateral sliding connects in the inside of recess board, the right-hand member lower part fixedly connected with nut of grip block, the inside threaded connection of nut has the screw rod, both ends all run through to the left and right sides and the fixedly connected with carousel of recess board about the screw rod, and the right-hand member fixedly connected with rocking handle of the carousel that is located the right side is located and has been seted up a plurality of spacing grooves and be provided with stop device on the left carousel.
Further, stop device includes the stopper, the right-hand member fixed connection of stopper is at the left end of concave template, the top fixedly connected with spring two of stopper, the top fixedly connected with pull rod of spring two, the inside of spring two is passed and runs through to the inside of spacing groove to the bottom of pull rod.
Still further, the front end of elevating gear body is provided with the warning sign, and the bottom fixedly connected with bottom plate of elevating gear body, a plurality of auto-lock universal wheels are installed to the bottom of bottom plate.
Furthermore, the upper part of the right end of the clamping block and the groove plate are both provided with anti-slip pads.
On the basis of the scheme, the motor is provided with a casing, and the casing is provided with heat dissipation holes.
(III) advantageous effects
Compared with the prior art, the utility model provides a steel construction fixing device that construction used possesses following beneficial effect:
this steel construction fixing device that construction was used, it is good to fix the steel construction through clamping device, the starter motor, through a motor, the bull stick, gear two, gear one must cooperate, make the commentaries on classics piece rotate, be convenient for adjust clamping device's direction, through electric putter, spring one, sector plate two, sector plate three, the cooperation of sector plate four, be convenient for adjust clamping device's angle, consequently this steel construction fixing device that construction was used compares prior art, at the steel construction installation, be convenient for adjust the angle and the direction of steel construction, the practicality is stronger.
Drawings
Fig. 1 is a schematic front view of a partially cut-away plan structure of the present invention;
fig. 2 is a schematic front plan view of the present invention;
FIG. 3 is a schematic view of a portion A of the present invention shown in FIG. 1;
fig. 4 is a schematic view of a part of the enlarged structure at B in fig. 1 according to the present invention.
In the figure: 1. a lifting device body; 2. rotating the block; 3. a first gear; 4. a motor; 5. a rotating rod; 6. a second gear; 7. a first sector plate; 8. a second sector plate; 9. a concave plate; 10. a first spring; 11. an electric push rod; 12. a third sector plate; 13. a sector plate IV; 14. a support plate; 15. a clamping block; 16. a nut; 17. A screw; 18. a turntable; 19. a rocking handle; 20. a limiting block; 21. a second spring; 22. a pull rod; 23. a warning board; 24. a base plate; 25. a self-locking universal wheel; 26. a non-slip mat; 27. a casing.
Detailed Description
Examples
Please refer to fig. 1-4, a steel structure fixing device for building construction, including elevating gear body 1, the top of elevating gear body 1 is rotated and is connected with runner 2, elevating gear body 1 is convenient for adjust the height of the device, runner 2 encircles and fixedly connected with gear one 3 all around, motor 4 is installed to the right-hand member of elevating gear body 1, be provided with casing 27 on the motor 4, the louvre has been seted up on the casing 27, be convenient for protect motor 4, the top output end fixedly connected with bull stick 5 of motor 4, the top fixedly connected with gear two 6 of bull stick 5, gear two 6 meshes with gear one 3, the top middle part fixedly connected with sector plate one 7 of runner 2, the sector plate two 8 rotates on 7 to be connected with, the top fixedly connected with concave plate 9 of sector plate two 8, fixedly connected with concave plate 9 between the top left part of runner 2 and the bottom left part of concave plate 9, be convenient for stabilize the regulation of clamping device's position and angle, install electric putter 11 on the top right part of runner 2, the top output end fixedly connected with concave plate three 12 of electric putter 11, the concave plate three 12 are connected with the concave plate 13 upper portions of concave sector plate 9, the concave plate 9 upper portion of the horizontal sliding plate 9 is connected with the concave type sector plate 9, the concave plate 9 upper portion of the four concave type sector plate 13 upper portions of the sector plate is connected with the sector plate 9, the concave type of the sector plate 9 upper portion of the sector plate is connected with the left and right side of the sector plate 9, the sector plate 13 upper portion of the sector plate is connected with the concave type of the sector plate.
Still further, it should be noted that clamping device includes grip block 15, grip block 15 lateral sliding connects in the inside of recess board, all be provided with slipmat 26 on the right-hand member upper portion of grip block 15 and the recess board, be convenient for more stable fix the steel construction, the right-hand member lower part fixedly connected with nut 16 of grip block 15, the inside threaded connection of nut 16 has screw rod 17, both ends all run through to the left and right sides and the fixedly connected with carousel 18 of recess board about screw rod 17, the right-hand member fixedly connected with rocking handle 19 of carousel 18 that is located the right side, be located and seted up a plurality of spacing grooves and be provided with stop device on the left carousel 18, be convenient for carry out the centre gripping to the steel construction fixedly, be convenient for staff's use, stop device includes stopper 20, stopper 20's right-hand member fixed connection is at the left end of concave template 9, stopper 20's top fixedly connected with spring two 21, the top fixedly connected with pull rod 22 of spring two 21, the bottom of pull rod 22 passes the inside of spring two 21 and runs through to the inside of spacing groove, be convenient for fixing device's position after clamping device fixes, the front end is provided with warning device body 23, the bottom end of warning device is connected with many self-locking device and is convenient for the bottom plate 24 and is irrelevant to the bottom plate.
The motor 4 and the electric push rod 11 in this embodiment are conventional devices that are purchased on the market and known to those skilled in the art, and the models can be selected or customized according to actual needs, and we only use them in this patent, and do not improve their structures and functions, and their setting mode, installation mode and electrical connection mode, for those skilled in the art, as long as debugging operation is performed according to the requirements of their usage specifications, and it is not described here any more, and the motor 4 and the electric push rod 11 are provided with control switches that are matched with them, and the installation positions of the control switches are selected according to actual usage requirements, so that the operators can perform operation control conveniently.
To sum up, the working principle and the working process of the steel structure fixing device for building construction are that, when the device is used, the steel structure fixing device for building construction is firstly placed at a place where the device is needed to be used, the motor 4 is connected with a forward and reverse rotation circuit according to the specification, when a steel structure is stabilized in the construction process, the height of the clamping device is adjusted through the lifting device, the motor 4 is started, the output end of the motor 4 drives the rotating rod 5 to rotate, the rotation of the rotating rod 5 drives the gear II 6 to rotate, the rotating gear I3 of the gear II 6 rotates, the rotating block 2 is driven to rotate by the rotation of the gear I3, the direction of the clamping device is adjusted, the electric push rod 11 is started, the output end of the electric push rod 11 drives the rocking plate III 12 to move, the sector plate III 12 drives the sector plate IV 13 to move, the sector plate IV 13 moves through the sector plate I7 and the sector plate II 8, the angle of the clamping device is adjusted, the pull rod 22 and the spring II 21 is pulled, the bottom end of the pull rod 22 leaves a limiting groove, the rotating rocking handle 19 moves, the rotating handle 19 drives the rotating disk 18 to rotate, the nut 18 drives the rotating block 18 to rotate, the rotating screw rod 18 to move rightwards, the nut 17, the rotating block 16 can stably move, the nut 17 moves, and the nut 17 moves to move, and the nut 15 moves stably and the screw rod 16 moves to move, the bottom end of the clamping device, and the nut 15 moves stably.

Claims (6)

1. The utility model provides a steel construction fixing device that construction used, includes elevating gear body (1), its characterized in that: the top end of the lifting device body (1) is rotationally connected with a rotating block (2), the periphery of the rotating block (2) is encircled and fixedly connected with a first gear (3), the right end of the lifting device body (1) is provided with a motor (4), a rotating rod (5) is fixedly connected with the output end of the top of the motor (4), the top end of the rotating rod (5) is fixedly connected with a second gear (6), the second gear (6) is meshed with the first gear (3), the middle part of the top end of the rotating block (2) is fixedly connected with a first sector plate (7), the fan-shaped plate I (7) is rotatably connected with a fan-shaped plate II (8), the top end of the fan-shaped plate II (8) is fixedly connected with a concave plate (9), a spring I (10) is fixedly connected between the left part of the top end of the rotating block (2) and the left part of the bottom end of the concave plate (9), the right part of the top end of the rotating block (2) is provided with an electric push rod (11), the output end of the top of the electric push rod (11) is fixedly connected with a third sector plate (12), the third sector plate (12) is rotationally connected with a fourth sector plate (13), the top end of the sector plate four (13) is transversely connected to the right part of the bottom end of the concave plate (9) in a sliding manner, the upper parts of the left end and the right end of the concave plate (9) are fixedly connected with supporting plates (14), and the concave plate (9) is provided with a clamping device.
2. The steel structure fixing device for building construction according to claim 1, wherein: clamping device includes grip block (15), grip block (15) lateral sliding connects in the inside of recess board, the right-hand member lower part fixedly connected with nut (16) of grip block (15), the internal thread connection of nut (16) has screw rod (17), both ends all run through to the left and right sides and fixedly connected with carousel (18) of recess board about screw rod (17), and right-hand member fixedly connected with rocking handle (19) of carousel (18) that are located the right side are located and have been seted up a plurality of spacing grooves and be provided with stop device on left carousel (18).
3. The steel structure fixing device for building construction according to claim 2, characterized in that: the limiting device comprises a limiting block (20), the right end of the limiting block (20) is fixedly connected to the left end of the concave plate (9), a second spring (21) is fixedly connected to the top end of the limiting block (20), a pull rod (22) is fixedly connected to the top end of the second spring (21), and the bottom end of the pull rod (22) penetrates through the inner portion of the second spring (21) and the inner portion of the limiting groove.
4. The steel structure fixing device for building construction according to claim 3, wherein: the front end of elevating gear body (1) is provided with warning sign (23), the bottom fixedly connected with bottom plate (24) of elevating gear body (1), a plurality of auto-lock universal wheels (25) are installed to the bottom of bottom plate (24).
5. The steel structure fixing device for building construction according to claim 4, wherein: and the upper part of the right end of the clamping block (15) and the groove plate are both provided with an anti-skid pad (26).
6. The steel structure fixing device for building construction according to claim 5, wherein: a shell (27) is arranged on the motor (4), and heat dissipation holes are formed in the shell (27).
CN202220884779.8U 2022-04-16 2022-04-16 Steel construction fixing device that construction was used Active CN217572540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220884779.8U CN217572540U (en) 2022-04-16 2022-04-16 Steel construction fixing device that construction was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220884779.8U CN217572540U (en) 2022-04-16 2022-04-16 Steel construction fixing device that construction was used

Publications (1)

Publication Number Publication Date
CN217572540U true CN217572540U (en) 2022-10-14

Family

ID=83543074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220884779.8U Active CN217572540U (en) 2022-04-16 2022-04-16 Steel construction fixing device that construction was used

Country Status (1)

Country Link
CN (1) CN217572540U (en)

Similar Documents

Publication Publication Date Title
CN213085420U (en) A turning device for steel member
CN217572540U (en) Steel construction fixing device that construction was used
CN216056006U (en) Auxiliary mounting bracket for electric power engineering
CN212027830U (en) Supporting device for tunnel
CN218438344U (en) Steel beam lifting and mounting device
CN218320396U (en) Hoisting device for steel structure section bar
CN214082519U (en) Part clamping device is used in injection molding machine production
CN210084404U (en) Photovoltaic frame section bar oxidation clamping device
CN112706811A (en) Building steel structure transfer device
CN207483221U (en) A kind of building intellectualization lifting appliance
CN219026522U (en) Large-scale structure upset equipment of shifting
CN221447856U (en) New energy regulator cubicle stabilising arrangement that can assist removal
CN213927642U (en) Support arrangement for steel construction is used
CN216446581U (en) Strutting arrangement for steel construction with regulatory function
CN221424085U (en) Adjustable supporting platform for pipeline installation
CN221523276U (en) Device is drawn to building engineering management engineering
CN218699002U (en) Robot base
CN221447940U (en) Threading structure
CN221053388U (en) Early warning device of face limit protection in construction
CN219371751U (en) Power distribution cabinet structure capable of radiating and carrying out portable maintenance
CN216341181U (en) A consolidate and correct structure for building
CN211621977U (en) Steel structure support with regulatory function
CN221463116U (en) Pipeline support frame for hydraulic pipeline engineering
CN112068529B (en) Temperature cycle test detection device for electrical control box
CN216808048U (en) Turning device used in electromechanical installation process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant