CN217556993U - Foundation pit monitoring base mounting structure - Google Patents

Foundation pit monitoring base mounting structure Download PDF

Info

Publication number
CN217556993U
CN217556993U CN202220670028.6U CN202220670028U CN217556993U CN 217556993 U CN217556993 U CN 217556993U CN 202220670028 U CN202220670028 U CN 202220670028U CN 217556993 U CN217556993 U CN 217556993U
Authority
CN
China
Prior art keywords
mounting
floor
seat
foundation
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220670028.6U
Other languages
Chinese (zh)
Inventor
陈磊山
卞公涵
黄冠冠
李承辉
鲁爽
伏心果
李艳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Chifeng Surveying And Mapping Geographic Information Technology Co ltd
Original Assignee
Henan Chifeng Surveying And Mapping Geographic Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Chifeng Surveying And Mapping Geographic Information Technology Co ltd filed Critical Henan Chifeng Surveying And Mapping Geographic Information Technology Co ltd
Priority to CN202220670028.6U priority Critical patent/CN217556993U/en
Application granted granted Critical
Publication of CN217556993U publication Critical patent/CN217556993U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a foundation ditch monitoring basis pedestal mounting structure, paste including the floor, the lower surface mounting that the floor pasted has main fixed block, and the edge that the floor pasted is connected with inferior fixed stabilizer blade mechanism, the upper end surface mounting that the floor pasted has the triangular platform, and the upper end triangle department of triangular platform is connected with the gag lever post to the top of gag lever post is provided with spacing pearl, the mounting groove has been seted up at the middle part of triangular platform, and is provided with on the mounting groove and places the seat, the side of placing the seat is installed the installation piece, and sets up threaded hole on the installation piece to the lower extreme surface connection who places the seat has the card strip. The utility model discloses a main fixed block of toper structure can relax more and run through between the ground to realize the stable installation of whole device and handle, cooperate the inferior fixed stabilizer blade mechanism of floor hem department installation simultaneously, guarantee the stable installation of whole floor subsides, guarantee the floor subsides and the ground connection stability between the installation department.

Description

Foundation pit monitoring base mounting structure
Technical Field
The utility model relates to a foundation ditch monitoring pedestal mounting technical field specifically is a foundation ditch monitoring foundation pedestal mounting structure spare.
Background
Foundation pit monitoring mainly includes: supporting structure, relevant natural environment, construction working condition, underground water condition, foundation pit bottom and surrounding soil body, surrounding buildings, surrounding underground pipelines and underground facilities, surrounding important roads and other objects to be monitored; in the foundation pit monitoring, vertical columns are embedded in soil bodies mostly, and the vertical displacement monitoring precision of the vertical columns and the earth surface behind the foundation pit enclosure wall (slope) top and the wall is determined according to a vertical displacement alarm value; when burying the stand, need consolidate the connection basis between detection stand and the ground, avoid the stand to produce the slope.
When the existing stand column is installed, the placing stability between the base at the bottom end and the installation ground is limited, the phenomenon that the stand column loosens and inclines automatically is generated after long-time use, the inaccuracy of a detection structure is caused, and the detection precision of the stand column to a building is influenced. Aiming at the problems, the innovative design is carried out on the basis of the installation of the original foundation pit monitoring foundation base.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a foundation ditch monitoring basis pedestal mounting structure to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a foundation ditch monitoring foundation pedestal mounting structure, pastes including the floor, the lower surface mounting that the floor pasted has main fixed block, and the edge that the floor pasted is connected with inferior fixed stabilizer blade mechanism, the upper end surface mounting that the floor pasted has the triangular platform, and the upper end triangle department of triangular platform is connected with the gag lever post to the top of gag lever post is provided with spacing pearl, the mounting groove has been seted up at the middle part of triangular platform, and is provided with on the mounting groove and places the seat, the side of placing the seat is installed the mounting plate, and sets up threaded hole on the mounting plate to the lower extreme surface connection who places the seat has the card strip, the bolt hole has been seted up to the edge of mounting groove, and is provided with first bolt on the bolt hole.
Preferably, main fixed block is established to the toper structure, and main fixed block and floor subsides are welded connection to inferior fixed stabilizer blade mechanism distributes in the edge that the floor was pasted.
Preferably, inferior fixed stabilizer blade mechanism is including installation piece, screw thread mount pad, second bolt, connecting rod, screw thread piece and inserted bar, and the lower extreme of installation piece installs the screw thread mount pad to the side of installation piece is provided with the second bolt, screw thread mount pad in-connection has the connecting rod, and the upper end of connecting rod is provided with the screw thread piece, and the inserted bar is installed to the connecting rod one end of keeping away from the screw thread piece.
Preferably, the connecting rod is in threaded connection with the threaded mounting base through a threaded block, the threaded mounting base is in welded connection with the mounting block, and the mounting block is in through threaded connection with the second bolt.
Preferably, the inserted link is designed to be a cone-shaped structure, and the inserted link and the connecting link are designed integrally.
Preferably, the inclination angle of the limiting rod is the same as the inclination extension angle of the triangular platform, and the triangular platform is connected with the limiting rod in a welding mode.
Preferably, the mounting pieces are distributed on the placing seat in a 120-degree circular array, the mounting pieces are in penetrating connection with the first bolts through threaded holes, and the first bolts are in threaded connection with the threaded holes.
Preferably, the card strip with place the seat and be welded connection, and the inner wall of card strip and mounting groove is the block connection to the side section of card strip is established to the trapezium structure.
Compared with the prior art, the beneficial effects of the utility model are that: the foundation pit monitoring foundation base mounting structural member,
1. the main fixing block with the conical structure can penetrate through the ground more easily, stable installation processing of the whole device is realized, and meanwhile, the secondary fixing support leg mechanism installed at the edge of the floor paste is matched, so that stable and stable installation of the whole floor paste is guaranteed, and the grounding stability between the floor paste and the installation position is guaranteed;
2. through the gag lever post the same with the slope extension angle of triangular platform, can reduce the upper end area of triangular platform in spacing, can be more stable bury whole device to subaerial to can cooperate the stability of triangular structure, the effectual phenomenon of avoiding whole device to produce the slope after long-time the use produces, and the detection data of assurance equipment is more accurate, makes the detection effect of building more stable.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the mounting structure of the placing base of the present invention;
FIG. 3 is a schematic structural view of a triangular platform of the present invention;
fig. 4 is a schematic structural view of the main fixing block of the present invention;
fig. 5 is a schematic structural view of the secondary fixing leg mechanism of the present invention.
In the figure: 1. floor sticking; 2. a main fixed block; 3. a secondary fixed leg mechanism; 31. mounting blocks; 32. a threaded mounting seat; 33. a second bolt; 34. a connecting rod; 35. a thread block; 36. inserting a rod; 4. a triangular table; 5. a limiting rod; 6. a limiting bead; 7. bolt holes; 8. mounting grooves; 9. a placing seat; 10. mounting a sheet; 11. a threaded hole; 12. a first bolt; 13. and (6) clamping the strip.
Detailed Description
To further illustrate the technical means and effects of the present invention adopted to achieve the objects of the present invention, the following detailed description of the embodiments, structures, features and effects according to the present invention will be made with reference to the accompanying drawings and preferred embodiments.
Referring to fig. 1-5, the present invention provides a technical solution: a foundation pit monitoring foundation base mounting structure comprises a floor sticker 1, wherein a main fixing block 2 is mounted on the lower surface of the floor sticker 1, a secondary fixing support leg mechanism 3 is connected to the edge of the floor sticker 1, the main fixing block 2 is of a conical structure, the main fixing block 2 is in welded connection with the floor sticker 1, the secondary fixing support leg mechanism 3 is distributed at the edge of the floor sticker 1, the main fixing block 2 of the conical structure can penetrate through the ground more easily, stable mounting processing of the whole device is achieved, meanwhile, the secondary fixing support leg mechanism 3 mounted at the edge of the floor sticker 1 is matched to enable the floor sticker 1 to be mounted more stably, and grounding stability between the floor sticker 1 and a mounting position is improved;
the secondary fixing leg mechanism 3 includes an installation block 31, a thread installation seat 32, a second bolt 33, a connection rod 34, a thread block 35 and an insertion rod 36, the thread installation seat 32 is installed at the lower end of the installation block 31, and the side of the installation block 31 is provided with the second bolt 33, the connection rod 34 is connected in the thread installation seat 32, and the upper end of the connection rod 34 is provided with the thread block 35, and the insertion rod 36 is installed at one end of the connection rod 34 far away from the thread block 35, the connection rod 34 forms a threaded connection with the thread installation seat 32 through the thread block 35, the quick installation processing of the connection rod 34 can be completed through the thread block 35, the stable preassembly of the floor sticker 1 is ensured, the thread installation seat 32 and the installation block 31 are in welded connection, the installation block 31 and the second bolt 33 are in a penetrating threaded connection, the quick preassembly processing between the installation block 31 and the floor sticker 1 can be realized through the installed second bolt 33, the stable installation effect is realized, the insertion rod 36 is set to be of a conical structure, and the insertion rod 36 and the connection rod 34 are integrally designed, the whole device can be quickly and stably inserted into soil.
The triangular table 4 is installed on the upper end surface of the floor sticker 1, a limiting rod 5 is connected to the three corners of the upper end of the triangular table 4, a limiting bead 6 is arranged at the top end of the limiting rod 5, the limiting bead 6 can limit the placement seat 9 and increase rolling flexibility between the placement seat and the triangular table 4, the inclination angle of the limiting rod 5 is the same as the inclined extension angle of the triangular table 4, the triangular table 4 is in welded connection with the limiting rod 5, the limiting rod 5 is the same as the inclined extension angle of the triangular table 4, the upper end area of the triangular table 4 can be reduced while limiting, the whole device can be buried into the ground more stably, the stability of a triangular structure can be matched, the phenomenon that the whole device is inclined after being used for a long time can be effectively avoided, and the detection data of equipment are more accurate;
mounting groove 8 has been seted up at the middle part of triangular platform 4, and be provided with on mounting groove 8 and place seat 9, bolt hole 7 has been seted up at the edge of mounting groove 8, and be provided with first bolt 12 on bolt hole 7, accomplish the threaded connection of bolt hole 7 with first bolt 12 under the cooperation of first bolt 12, place the side of seat 9 and install installation piece 10, and set up threaded hole 11 on the installation piece 10, installation piece 10 is 120 circular permutation and distribution on placing seat 9, and installation piece 10 constitutes through connection through threaded hole 11 and first bolt 12, and first bolt 12 is threaded connection with threaded hole 11, can install seat 9 on triangular platform 4 through quick the placing of first bolt 12, the stable installation that realizes placing seat 9 handles, and the lower extreme surface that places seat 9 is connected with card strip 13, card strip 13 is welded connection with placing seat 9, and the inner wall of card strip 13 and mounting groove 8 is the block connection, and the side section of card strip 13 is established to trapezium structure, card strip 13 atress is pushed into the inner wall corresponding department of mounting groove 8 when seat 9 is placed in the promotion, and realize at the mounting groove 8 inside, spacing fixed 10 is accomplished later.
The working principle is as follows: firstly, mounting the secondary fixing leg mechanism 3, namely, firstly, attaching the mounting block 31 to the floor sticker 1, then screwing the thread block 35 on the connecting rod 34 into the thread mounting seat 32, then taking out the second bolt 33 to screw the mounting block 31 into the floor sticker 1, completing the overall mounting treatment of the secondary fixing leg mechanism 3, then applying force to the floor sticker 1 and embedding the main fixing block 2 into the land at the lower end, simultaneously enabling the inserted link 36 and the main fixing block 2 to enter the fixed land together, and then tamping the fixed land to complete the mounting of the whole foundation;
secondly, after the stand column and the placing seat 9 are integrally designed, the placing seat 9 is taken out, the mounting piece 10 at the lower end of the placing seat 9 is inserted into the middle of the limiting rod 5, the clamping strip 13 mounted on the surface of the lower end of the placing seat 9 is clamped into the mounting groove 8 when the placing seat 9 faces downwards, the mounting piece 10 is attached to the upper surface of the triangular platform 4 at the moment, then the placing seat 9 is rotated, the threaded hole 11 in the mounting piece 10 arranged at the edge of the placing seat 9 is aligned with the bolt hole 7, then the first bolt 12 is taken out and penetrates through the threaded hole 11 and is in threaded connection with the bolt hole 7, and the mounting processing of the stand column on the placing seat 9 is completed;
finally bury and handle, cooperate the triangle platform 4 simultaneously and pile up soil in its surface department to realize the stability of whole base and place through the triangle form of triangle platform 4 and gag lever post 5, guarantee that equipment places stability at the base when using.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention has been disclosed by the preferred embodiment, it is not limited to the present invention, and any person skilled in the art can make modifications or changes equivalent to the equivalent embodiments by utilizing the above disclosed technical contents without departing from the technical scope of the present invention, but all the modifications, changes and changes of the technical spirit of the present invention made to the above embodiments are also within the scope of the technical solution of the present invention.

Claims (8)

1. The utility model provides a foundation ditch monitoring basis pedestal mounting structure spare, includes floor subsides (1), its characterized in that: the lower surface mounting that the floor pasted (1) has main fixed block (2), and the edge that the floor pasted (1) is connected with inferior fixed stabilizer blade mechanism (3), the upper end surface mounting that the floor pasted (1) has triangular platform (4), and the upper end three corners department of triangular platform (4) is connected with gag lever post (5) to the top of gag lever post (5) is provided with spacing pearl (6), mounting groove (8) have been seted up at the middle part of triangular platform (4), and are provided with on mounting groove (8) and place seat (9), place the side of seat (9) and install mounting plate (10), and seted up threaded hole (11) on mounting plate (10) to the lower extreme surface connection who places seat (9) has draw-in bar (13), bolt hole (7) have been seted up in the edge of mounting groove (8), and be provided with first bolt (12) on bolt hole (7).
2. The foundation pit monitoring foundation bed mounting structure of claim 1, wherein: main fixed block (2) are established to the toper structure, and main fixed block (2) and floor subsides (1) are welded connection to inferior fixed stabilizer blade mechanism (3) distribute in the edge that floor subsides (1).
3. The foundation pit monitoring foundation bed mounting structure of claim 1, wherein: inferior fixed leg mechanism (3) is including installation piece (31), screw thread mount pad (32), second bolt (33), connecting rod (34), screw thread piece (35) and inserted bar (36), and the lower extreme of installation piece (31) installs screw thread mount pad (32) to the side of installation piece (31) is provided with second bolt (33), screw thread mount pad (32) in-connection has connecting rod (34), and the upper end of connecting rod (34) is provided with screw thread piece (35), and inserted bar (36) are installed to the one end that screw thread piece (35) were kept away from in connecting rod (34).
4. The foundation pit monitoring foundation pedestal mounting structure of claim 3, wherein: the connecting rod (34) is in threaded connection with the threaded mounting seat (32) through the threaded block (35), the threaded mounting seat (32) is in welded connection with the mounting block (31), and the mounting block (31) is in through threaded connection with the second bolt (33).
5. A foundation pit monitoring foundation footing mounting structure of claim 3, wherein: the inserted bar (36) is in a conical structure, and the inserted bar (36) and the connecting bar (34) are designed in an integrated mode.
6. The foundation pit monitoring foundation pedestal mounting structure of claim 1, wherein: the inclination angle of gag lever post (5) is the same with the slope extension angle of triangular platform (4), and triangular platform (4) are welded connection with gag lever post (5).
7. The foundation pit monitoring foundation pedestal mounting structure of claim 1, wherein: the mounting pieces (10) are distributed on the placing seat (9) in a 120 DEG circular array, the mounting pieces (10) are in through connection with the first bolts (12) through the threaded holes (11), and the first bolts (12) are in threaded connection with the threaded holes (11).
8. The foundation pit monitoring foundation bed mounting structure of claim 1, wherein: the clamping strips (13) are connected with the placing seat (9) in a welding mode, the clamping strips (13) are connected with the inner wall of the installing groove (8) in a clamping mode, and the side section of each clamping strip (13) is of a trapezoid structure.
CN202220670028.6U 2022-03-21 2022-03-21 Foundation pit monitoring base mounting structure Active CN217556993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220670028.6U CN217556993U (en) 2022-03-21 2022-03-21 Foundation pit monitoring base mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220670028.6U CN217556993U (en) 2022-03-21 2022-03-21 Foundation pit monitoring base mounting structure

Publications (1)

Publication Number Publication Date
CN217556993U true CN217556993U (en) 2022-10-11

Family

ID=83470832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220670028.6U Active CN217556993U (en) 2022-03-21 2022-03-21 Foundation pit monitoring base mounting structure

Country Status (1)

Country Link
CN (1) CN217556993U (en)

Similar Documents

Publication Publication Date Title
CN210459226U (en) Adjustable rectangle supporting device of geotechnical engineering
CN104081136B (en) Solar energy system mounting assembly
CN217556993U (en) Foundation pit monitoring base mounting structure
CN111778986B (en) Foundation pit support structure convenient to measure and method
JP6033806B2 (en) Prop fixing method and fixing device used therefor
JP3179843U (en) Base support for field structure
CN214498492U (en) Interim strutting arrangement of adjustable for engineering is built in room
CN207959254U (en) A kind of general mounting seat
CN210887226U (en) Civil engineering assembled pit foundation supporting device
CN212007889U (en) Geotechnical sampling device in geotechnical engineering
JP5166632B1 (en) Method of constructing foundation foundation using foundation platform and foundation platform used therefor
CN215484868U (en) Gardens ancient building wall body restoration support
CN212534134U (en) Foundation pit supporting and reinforcing device
CN206945000U (en) A kind of civil engineering surveying support platform
CN212477754U (en) A supporting construction for peripheral foundation ditch of existing building
CN212772702U (en) Pipeline fixing device is used in municipal works network management construction
CN214194042U (en) Asphalt concrete construction strutting arrangement
CN211145835U (en) Horizontal fixing device for exploration surveying and mapping
CN209797271U (en) Portal frame capable of being quickly leveled
CN212957006U (en) Concrete embedded part for civil engineering
CN217272900U (en) Plant protection apparatus fixing base
JP5940318B2 (en) Installation method of mounting base
CN213867901U (en) Conveniently-installed underground pile for public facilities
CN219757378U (en) Geological disaster monitoring pile
CN218508960U (en) Floor type scaffold