CN217556725U - Basket construction equipment is hung to continuous roof beam of railway engineering large-span - Google Patents

Basket construction equipment is hung to continuous roof beam of railway engineering large-span Download PDF

Info

Publication number
CN217556725U
CN217556725U CN202221750166.1U CN202221750166U CN217556725U CN 217556725 U CN217556725 U CN 217556725U CN 202221750166 U CN202221750166 U CN 202221750166U CN 217556725 U CN217556725 U CN 217556725U
Authority
CN
China
Prior art keywords
hanging basket
frame
railway engineering
water inlet
continuous beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221750166.1U
Other languages
Chinese (zh)
Inventor
于爽
段广
尹光凯
忽海庄
姚晓刚
张广海
王建亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Roadbridge Group Co Ltd
Original Assignee
PowerChina Roadbridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Roadbridge Group Co Ltd filed Critical PowerChina Roadbridge Group Co Ltd
Priority to CN202221750166.1U priority Critical patent/CN217556725U/en
Application granted granted Critical
Publication of CN217556725U publication Critical patent/CN217556725U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a basket construction equipment is hung to continuous roof beam of railway engineering large-span need not to dismantle, can wash the rotor body, labour saving and time saving, including frame, feed cylinder, rotor block, rotating electrical machines, setting gauge, whitewashing head, play stuff pump, first inlet tube and second inlet tube, the first inlet opening and the second inlet opening of connecting with the bottom are seted up to the feed cylinder lateral part, first inlet opening is through first inlet tube and high pressure water source connection, the second inlet opening is through second inlet tube and high pressure water source connection, the setting gauge sets up in the feed cylinder, keeps being connected with the rotating electrical machines who installs on the frame, the rotor block is inside to be provided with a plurality of sectorial check, the rotor block bottom is provided with the bottom plate of fixed mounting on the frame, set up the discharge opening with rotor block internal connection on the bottom plate, play stuff pump is installed on the frame, and its grout inlet and discharge opening connection, and whitewashing head connection.

Description

Basket construction equipment is hung to continuous roof beam of railway engineering large-span
Technical Field
The utility model relates to a building construction equipment technical field specifically says a basket construction equipment is hung to continuous roof beam of railway engineering large-span.
Background
When present bridge construction, all need carry out the whitewashing operation to some positions in the work progress, whitewashing device is used in current bridge construction, because the space restriction of bridge, large-scale whitewashing setting is difficult to carry out the operation, so adopt artifical whitewashing mode to carry out the whitewashing and pour the work, need artifical hand to embrace shower nozzle and spray hose and spray appointed whitewashing construction operation region, although realized suitable in accordance with the ground, the operation of being convenient for, but because the restriction of patching machine structure, be difficult to wash the patching machine rotor body, need dismantle the rotor body, waste time and energy.
SUMMERY OF THE UTILITY MODEL
Therefore, in order to solve the above-mentioned not enough, the utility model provides a basket construction equipment is hung to continuous roof beam of railway engineering large-span here, need not to dismantle, can wash labour saving and time saving to the rotor body.
The utility model discloses a realize like this, construct a railway engineering large-span continuous beam hanging basket construction equipment, including frame, feed cylinder, rotor block, rotating electrical machines, setting gauge, whitewashing head, play thick liquid pump, first inlet tube and second inlet tube, the feed cylinder sets up on the frame, and curved blown down tank is seted up to its bottom, and its lateral part sets up the first inlet opening and the second inlet opening that connect with the bottom, the first inlet opening connects with the high pressure water source through the first inlet tube, the second inlet opening connects with the high pressure water source through the second inlet tube, the setting gauge sets up in the feed cylinder, keeps connecting with the rotating electrical machines installed on the frame;
the rotor body is rotatably arranged at the bottom of the charging barrel and is connected with the rotating motor, a plurality of fan-shaped lattices are arranged in the rotor body, a bottom plate fixedly installed on the frame is arranged at the bottom of the rotor body, a discharge hole connected with the inside of the rotor body is formed in the bottom plate, the slurry outlet pump is installed on the frame, a slurry inlet of the slurry outlet pump is connected with the discharge hole, and a slurry outlet is connected with the slurry spraying head.
Furthermore, wheels are installed at the bottom of the frame, and a pull rod is hinged to one side of the frame.
The purpose of this setting lies in, pulling the pull rod, portable construction equipment is convenient for remove.
Further, a feed hopper is installed at the top of the charging barrel.
The purpose of this setting lies in, the feeder hopper can temporarily store the raw materials, has enlarged raw materials storage space, improves the continuation of whitewashing procedure.
Furthermore, a vibration motor is arranged on the side surface of the feed hopper.
The purpose of this setting is in, vibrating motor drives the feeder hopper vibration, is convenient for the raw materials to dash and shake off to the rotor block.
Furthermore, the slurry outlet pump is connected with the slurry spraying head through a soft slurry outlet pipe.
The aim of this setting is convenient for extend the whitewashing head, is convenient for adjust the injection direction of whitewashing head simultaneously.
Furthermore, a grout outlet valve is arranged on the grout spraying head.
The purpose of this arrangement is to facilitate control of the shotcrete head to spray cement.
Further, the device also comprises a controller for controlling vibration, rotation, pulp discharge and cleaning.
This arrangement aims to improve the control accuracy.
The utility model has the advantages of as follows: the utility model provides a construction device for a large-span continuous beam hanging basket of railway engineering, which does not need to be disassembled; offer first inlet opening and the second inlet opening with the bottom connection at the feed cylinder lateral part, first inlet opening is through first inlet tube and high pressure water source connection, and the second inlet opening is through second inlet tube and high pressure water source connection, and switch-on high pressure water source rotates through the rotating electrical machines drive rotor block, washes the rotor block labour saving and time saving.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is a front view of the present invention;
fig. 3 is a side view of the present invention;
fig. 4 is a top view of the present invention;
FIG. 5 isbase:Sub>A sectional view A-A of FIG. 2;
FIG. 6 is a cross-sectional view B-B of FIG. 5;
FIG. 7 is a cross-sectional view taken at C-C of FIG. 6;
FIG. 8 is a schematic view of the cartridge;
fig. 9 is a cross-sectional view taken along line D-D of fig. 8.
Wherein: 1. a frame; 2. a controller; 3. a pull rod; 4. a feed hopper; 5. a pulp outlet pipe; 6. a guniting head; 7. a slurry outlet valve; 8. a wheel; 9. a vibration motor; 10. a first water inlet pipe; 11. discharging a slurry pump; 12. a rotating electric machine; 13. a kick-out device; 14. a charging barrel; 14-1, discharging a material tank; 14-2, a first water inlet hole; 14-3, a second water inlet hole; 15. a second water inlet pipe; 16. a rotor body; 17. a base plate.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings 1-9, wherein the technical solutions in the embodiments of the present invention are clearly and completely described, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
The utility model provides a railway engineering large-span continuous beam hangs basket construction equipment through the improvement here, including frame 1, feed cylinder 14, rotor block 16, rotating electrical machines 12, setting gauge 13, whitewashing head 6, play thick liquid pump 11, first inlet tube 10 and second inlet tube 15, feed cylinder 14 sets up on frame 1, and its bottom is seted up curved blown down tank 14-1, and its lateral part is seted up with first inlet opening 14-2 and the second inlet opening 14-3 of bottom intercommunication, first inlet opening 14-2 is through first inlet tube 10 and high pressure water source intercommunication, second inlet opening 14-3 is through second inlet tube 15 and high pressure water source intercommunication, setting gauge 13 sets up in feed cylinder 14, keeps being connected with rotating electrical machines 12 who installs on frame 1;
the rotor block 16 is rotatably arranged at the bottom of the charging barrel 14 and is connected with the rotating motor 12, a plurality of fan-shaped grids are arranged inside the rotor block, a bottom plate 17 fixedly arranged on the frame 1 is arranged at the bottom of the rotor block 16, a discharge hole connected with the inside of the rotor block 16 is formed in the bottom plate 17, the slurry outlet pump 11 is arranged on the frame 1, a slurry inlet of the slurry outlet pump is connected with the discharge hole, and a slurry outlet is connected with the slurry spraying head 6.
Wherein the kick-out device 13 and the rotor body 16 are both mounted on a rotary shaft which is connected to the output shaft of the rotary motor 12.
The use process comprises the following steps: the concrete is put into the charging barrel 14, the rotating motor 12 drives the kick-out device 13 and the rotor body 16 to rotate simultaneously, the slurry outlet pump 11 works simultaneously, the kick-out device 13 shifts the raw materials to the position of a discharge chute 14-1, the raw materials fall into a grid of the rotor body 16 and rotate to a discharge hole of the bottom plate 17 along with the rotor body 16, and under the action of the slurry outlet pump 11, the concrete is pumped out of the discharge hole and is sprayed out of the slurry spraying head 6;
when cleaning, the high-pressure water source is connected, the rotating motor 12 drives the kick-out device 13 and the rotor body 16 to rotate simultaneously, the slurry outlet pump 11 works simultaneously, the high-pressure water washes the rotating rotor body 16, two high-pressure water sources at different positions act on the rotating rotor body 16 simultaneously, the cleaning efficiency is improved, and the cleaned slurry is sprayed out from the slurry spray head 6 under the action of the slurry outlet pump 11, so that the cleaning is convenient and quick.
Preferably, the bottom of the frame 1 is provided with wheels, one side of the frame is hinged with a pull rod 3 to pull the pull rod 3, and the construction device can be moved and is convenient to move.
Preferably, the top of the charging barrel 14 is provided with a feeding hopper 4, and the feeding hopper 4 can temporarily store raw materials, thereby enlarging the storage space of the raw materials and improving the continuity of the guniting process.
Preferably, the vibrating motor 9 is installed on the side surface of the feeding hopper 4, and the vibrating motor 9 drives the feeding hopper 4 to vibrate, so that raw materials can be washed and shaken off to the rotor body 16 conveniently.
Preferably, the slurry outlet pump 11 is connected with the slurry spraying head 6 through the soft slurry outlet pipe 5, so that the slurry spraying head 6 can be conveniently extended, and the spraying direction of the slurry spraying head 6 can be conveniently adjusted.
Preferably, a grout outlet valve 7 is arranged on the grout spraying head 6, so that the grout spraying head 6 can be controlled to spray cement conveniently.
Preferably, the device also comprises a controller 2 for vibration control, rotation control, pulp discharge control and cleaning control, and the control precision is improved.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (7)

1. A railway engineering large-span continuous beam hanging basket construction device is characterized in that a hanging basket is arranged on a beam hanging basket; the mortar spraying machine comprises a frame (1), a charging barrel (14), a rotor body (16), a rotating motor (12), a kick-out device (13), a mortar spraying head (6), a mortar discharging pump (11), a first water inlet pipe (10) and a second water inlet pipe (15), wherein the charging barrel (14) is arranged on the frame (1), the bottom of the charging barrel is provided with an arc-shaped discharging groove (14-1), the side part of the charging barrel is provided with a first water inlet hole (14-2) and a second water inlet hole (14-3) which are communicated with the bottom, the first water inlet hole (14-2) is communicated with a high-pressure water source through the first water inlet pipe (10), the second water inlet hole (14-3) is communicated with a high-pressure water source through the second water inlet pipe (15), and the kick-out device (13) is arranged in the charging barrel (14) and is connected with the rotating motor (12) arranged on the frame (1); rotor block (16) rotation sets up in feed cylinder (14) bottom, keeps being connected with rotating electrical machines (12), and its inside is provided with a plurality of sectorial check, rotor block (16) bottom is provided with bottom plate (17) of fixed mounting on frame (1), set up the discharge opening with rotor block (16) inside intercommunication on bottom plate (17), grout outlet pump (11) are installed on frame (1), and its grout inlet and discharge opening intercommunication, grout outlet and whitewashing head (6) intercommunication.
2. The railway engineering large-span continuous beam hanging basket construction device is characterized in that the hanging basket is a hanging basket body; wheels are installed at the bottom of the frame (1), and a pull rod (3) is hinged to one side of the frame.
3. The railway engineering large-span continuous beam hanging basket construction device as claimed in claim 2, wherein; and the top of the charging barrel (14) is provided with a feed hopper (4).
4. The construction device of the large-span continuous beam hanging basket for the railway engineering according to claim 3, wherein the hanging basket is a hollow structure; a vibration motor (9) is arranged on the side surface of the feed hopper (4).
5. The railway engineering large-span continuous beam hanging basket construction device is characterized in that the hanging basket is a hanging basket body; the slurry outlet pump (11) is connected with the slurry spraying head (6) through a soft slurry outlet pipe (5).
6. The construction device of the large-span continuous beam hanging basket for the railway engineering according to claim 5, wherein the hanging basket is a hollow structure; and a slurry outlet valve (7) is arranged on the slurry spraying head (6).
7. The railway engineering large-span continuous beam hanging basket construction device is characterized in that the hanging basket is a hanging basket body; the device also comprises a controller (2) for controlling vibration, rotation, pulp discharge and cleaning.
CN202221750166.1U 2022-07-06 2022-07-06 Basket construction equipment is hung to continuous roof beam of railway engineering large-span Active CN217556725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221750166.1U CN217556725U (en) 2022-07-06 2022-07-06 Basket construction equipment is hung to continuous roof beam of railway engineering large-span

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221750166.1U CN217556725U (en) 2022-07-06 2022-07-06 Basket construction equipment is hung to continuous roof beam of railway engineering large-span

Publications (1)

Publication Number Publication Date
CN217556725U true CN217556725U (en) 2022-10-11

Family

ID=83504196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221750166.1U Active CN217556725U (en) 2022-07-06 2022-07-06 Basket construction equipment is hung to continuous roof beam of railway engineering large-span

Country Status (1)

Country Link
CN (1) CN217556725U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116426151A (en) * 2023-03-10 2023-07-14 中国电建集团华东勘测设计研究院有限公司 Ultra-light UHDC fireproof protective coating for steel structure building and spraying device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116426151A (en) * 2023-03-10 2023-07-14 中国电建集团华东勘测设计研究院有限公司 Ultra-light UHDC fireproof protective coating for steel structure building and spraying device

Similar Documents

Publication Publication Date Title
CN204673796U (en) A kind of concrete cleans mixer automatically
CN209568713U (en) A kind of concrete slurry casting device
CN217556725U (en) Basket construction equipment is hung to continuous roof beam of railway engineering large-span
CN210876462U (en) Automatic cleaning device for concrete mixing tank
CN211616117U (en) Concrete mixing device is used in traffic engineering construction
CN207647213U (en) A kind of caulking machine with seam cleaning function
CN211891386U (en) Concrete mixing device is used in production of cement pole
CN210333301U (en) Sand screening machine for constructional engineering
CN210011153U (en) Stirring device for assembly type building
CN211221260U (en) Glazing slurry supply device
CN215702808U (en) Concrete raw material mixing stirring device
CN213703994U (en) Concrete processing equipment convenient to maintain
CN212684330U (en) Building construction mixing arrangement
CN2197411Y (en) Wet concrete jetting machine with multi-jets
CN218195836U (en) Evaporate and press mould for preparation of lightweight wallboard of steel bar ceramsite concrete
CN113085009A (en) Concrete mixing device
CN217812177U (en) Outer wall decoration spraying machine with lifting function
CN220219035U (en) Mortar production dust collector
CN213829622U (en) High-efficiency concrete mixer
CN213499957U (en) Concrete grouting pipe easy to clean
CN213793270U (en) Adjustable tubular pile belt cleaning device
CN213648074U (en) Cement concrete horizontal shaft type agitating unit of easily clearing up
CN218985245U (en) Mixer for preparing polymer mortar
CN217432419U (en) Glyphosate crystal cleaning device